roofy

2074 Arthur Avenue

Bronx, NY 10457BBL 2-03069-0065Map

Owner of record: 2074 Arthur Ave LLC

2074 Arthur Avenue is a walk-up apartment building built in 1915 in Bronx, 10457. It has 27 residential units across 5 floors. The owner of record is 2074 Arthur Ave LLC. HPD has recorded 1,065 housing violations here, most recently on October 6, 2026. 21 of the 50 most recent violations are still open. City tax records listed 23 rent-stabilized apartments here in 2024.

HPD violations
1,065
DOB violations
8
ECB violations
4
HPD complaints
1,152

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 6, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
23
About 85% of the building's 27 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 1,065

  • B

    Properly repair with similar material the broken or defective cracked north concrete pillar at building front entrance

    Oct 6, 2026

    Open — Nov sent out
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame to high at public hall, 1st story

    Oct 6, 2026

    Open — Nov sent out
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at street door at basement at public hall, 1st story

    Oct 6, 2026

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective lock and assembly at building entrance door , 1st story

    Sep 28, 2026

    Open — Nov certified on time
  • C

    Replace or repair the self-closing doors that is missing or defective latch at building entrance , 1st story

    Sep 28, 2026

    Open — Violation will be reinspected
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east at north located at apt 4a, 4th story, 2nd apartment from south at west

    Sep 28, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east at north located at apt 4a, 4th story, 2nd apartment from south at west

    Sep 28, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 4th room from east at south located at apt 4a, 4th story, 2nd apartment from south at west

    Sep 28, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east at south located at apt 4a, 4th story, 2nd apartment from south at west

    Sep 28, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 4a, 4th story, 2nd apartment from south at west

    Sep 28, 2026 · Apt 4A

    Open — Nov sent out
Show 40 more ↓
  • B

    Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south

    Aug 29, 2026 · Apt 1C

    Open — Invalid certification
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1c, 1st story, 1st apartment from east at south

    Aug 29, 2026 · Apt 1C

    Open — Civ14 mailed
  • B

    M/d law abate the nuisance consisting of missing vinyl tile at floor approximately 1sqft in the kitchen located at apt 1c, 1st story, 1st apartment from east at south

    Aug 29, 2026 · Apt 1C

    Open — Civ14 mailed
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 1c, 1st story, 1st apartment from east at south

    Aug 29, 2026 · Apt 1C

    Open — Civ14 mailed
  • A

    § 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder and properly secure by using appropiate nuts and bolts (the shoe) at 1st fire escape from north at west exterior wall at fire escape

    Aug 29, 2026

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective 1st lower wood cabinet door at west wall in the kitchen located at apt 1c, 1st story, 1st apartment from east at south

    Aug 29, 2026 · Apt 1C

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective porcelain enamel finished method by reglazing at bath tub in the bathroom located at apt 4e, 4th story, 1st apartment from north at east

    Jun 1, 2026 · Apt 4E

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the bathroom located at apt 4e, 4th story, 1st apartment from north at east

    Jun 1, 2026 · Apt 4E

    Open — Civ14 mailed
  • A

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 4e, 4th story, 1st apartment from north at east

    Jun 1, 2026 · Apt 4E

    Open — Civ14 mailed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 4e, 4th story, 1st apartment from north at east

    Jun 1, 2026 · Apt 4E

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective radiator air valve in the 2nd room from north at east located at apt 2d, 2nd story, 2nd apartment from north at east

    Mar 8, 2026 · Apt 2D

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east located at apt 4c, 4th story, 1st apartment from east at south

    Feb 5, 2026 · Apt 4C

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at building vestibule door (from vestibule to public hall) , 1st story

    Feb 5, 2026

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 2nd room from east located at apt 4c, 4th story, 1st apartment from east at south

    Feb 5, 2026 · Apt 4C

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4c, 4th story, 1st apartment from east at south

    Feb 5, 2026 · Apt 4C

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective latch and assembly at building vestibule door (from vestibule to public hall) , 1st story

    Feb 5, 2026

    Closed — Violation closed
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Feb 5, 2026

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east located at apt 4c, 4th story, 1st apartment from north at east

    Jan 13, 2026 · Apt 4C

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 4c, 4th story, 1st apartment from north at east

    Jan 13, 2026 · Apt 4C

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 4d, 4th story, 2nd apartment from north at east

    Jan 6, 2026 · Apt 4D

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4d, 4th story, 2nd apartment from north at east

    Jan 6, 2026 · Apt 4D

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east located at apt 4a, 4th story, 2nd apartment from south at west

    Jan 6, 2026 · Apt 4A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 4a, 4th story, 2nd apartment from south at west

    Jan 6, 2026 · Apt 4A

    Closed — Violation dismissed
  • B

    Provide adequate lighting no light at fire passage way, 1st story

    Dec 12, 2025

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor to high at public hall, 1st story

    Dec 12, 2025

    Open — False certification
  • C

    Abate the infestation consisting of roaches located at apt 4e, 4th story, apartment at east

    Dec 9, 2025 · Apt 4E

    Closed — Violation dismissed
  • A

    Post and maintain a street number on the front of the dwelling plainly visible from the sidewalk.

    Dec 9, 2025

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system locked door at boiler room

    Dec 3, 2025

    Closed — Violation closed
  • B

    Provide adequate supply of hot water for the fixtures ... in the bathroom located at apt 1c, 1st story, 1st apartment from east at south

    Dec 3, 2025 · Apt 1C

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south

    Dec 3, 2025 · Apt 1C

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 1st apartment from south at west

    Nov 25, 2025 · Apt 4B

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system locked door at boiler room

    Nov 25, 2025

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective buzzer and return voice system from building entrance up to panel at south wall in the private hallway located at apt 4b, 4th story, 1st apartment from south at west

    Nov 25, 2025 · Apt 4B

    Open — Invalid certification
  • C

    M/d law abate the nuisance consisting of free standing radiator creating a trip and fall hazard at public hall, 3rd story

    Nov 21, 2025

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of free standing radiator creating a trip and fall hazard at public hall, 3rd story

    Nov 21, 2025

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department north and south wall in the private hallway located at apt 5e, 5th story, 2nd apartment from north at east

    Nov 8, 2025 · Apt 5E

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system boiler room door locked at boiler room

    Nov 8, 2025

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 5e, 5th story, 2nd apartment from north at east

    Nov 8, 2025 · Apt 5E

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the bathroom located at apt 5e, 5th story, 2nd apartment from north at east

    Nov 8, 2025 · Apt 5E

    Closed — Violation closed
  • B

    Provide adequate lighting at front south at fire passage way

    Oct 10, 2025

    Open — Not complied with

DOB building violations · 8

  • Low pressure boiler boiler required

    Violation issued-failure to file 2020 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Construction other optional

    Notice of order to stop work immediately due to applicant withdrawal

    May 10, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2016 inspection report

    Apr 6, 2018

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed

ECB violations · 4

  • Class - 1

    Work w/o a permit on 4/24/2014 @ 12:50 pm i obsserved the installation of new gas piping installed in apt #'s 1c&1d a permit was issued under laa#240055774 which is for testing only. remedy:obtain required perm

    Apr 24, 2014 · Penalty $800

    Resolve
  • Class - 2

    Failure to maintain bldg in a code compliant manner:installation of plumbing materials/equipment per pc 102.3;27-902 on 4/24/14 @ 12:52 i observed the installation of dresser couplings &"uniors" installed on th

    Apr 24, 2014

    Resolve
  • Class - 2

    28-408.1,performing unlicensed plumbing work w/o a mater plumber license.on 04/24/14 @ 12:50pm i was informed by mr.juau f.silva-samboy thathe was the person who installed the pipes in apt #'s 1c&1d & he starte

    Apr 24, 2014

    Resolve
  • Non-hazardous

    Failure to maintain. defect is: broken and defective steps by entrance lobby leading into hallway. remedy- repair or replace said broken & defective steps

    Feb 15, 1994 · Penalty $1,000

    Resolve

Complaints

  • Water leak

    Slow leak

    Sep 28, 2026 · Apt 4A

    Close
  • Paint/plaster

    Ceiling

    Sep 28, 2026 · Apt 4A

    Close
  • Electric

    Outlet/switch

    Sep 28, 2026 · Apt 4A

    Close
  • Paint/plaster

    Ceiling

    Sep 28, 2026 · Apt 4A

    Close
  • Plumbing

    Bathtub/shower

    Sep 28, 2026 · Apt 4A

    Close
  • Water leak

    Heavy flow

    Sep 27, 2026 · Apt 1C

    Close
  • Electric

    Power outage

    Sep 22, 2026 · Apt 2D

    Close
  • Electric

    Power outage

    Sep 21, 2026 · Apt 4D

    Close
  • Unsanitary condition

    Mold

    Aug 26, 2026 · Apt 1C

    Close
  • Unsanitary condition

    Pests

    Aug 26, 2026 · Apt 1C

    Close
Show 40 more ↓
  • General

    Cabinet

    Aug 26, 2026 · Apt 1C

    Close
  • Paint/plaster

    Ceiling

    Aug 26, 2026 · Apt 1C

    Close
  • Appliance

    Refrigerator

    Aug 26, 2026 · Apt 1C

    Close
  • Water leak

    Slow leak

    Aug 26, 2026 · Apt 1C

    Close
  • Safety

    Fire escape

    Jul 30, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Jul 30, 2026 · Apt 4D

    Close
  • Paint/plaster

    Wall

    Jul 30, 2026 · Apt 4D

    Close
  • Unsanitary condition

    Mold

    Jul 30, 2026 · Apt 4D

    Close
  • Unsanitary condition

    Pests

    Jul 30, 2026 · Apt 4D

    Close
  • Unsanitary condition

    Sewage

    Jul 30, 2026 · Apt 4D

    Close
  • Water leak

    Slow leak

    Jul 30, 2026 · Apt 4D

    Close
  • Paint/plaster

    Ceiling

    Jul 30, 2026 · Apt 4D

    Close
  • Heat/hot water

    Apartment only

    Apr 25, 2026 · Apt 4E

    Close
  • Heat/hot water

    Entire building

    Mar 6, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Feb 17, 2026 · Apt 2D

    Close
  • Heat/hot water

    Apartment only

    Feb 9, 2026 · Apt 1C

    Close
  • Paint/plaster

    Ceiling

    Feb 4, 2026 · Apt 4C

    Close
  • Flooring/stairs

    Floor

    Feb 4, 2026 · Apt 4C

    Close
  • Flooring/stairs

    Floor

    Feb 1, 2026 · Apt 4C

    Close
  • Paint/plaster

    Ceiling

    Feb 1, 2026 · Apt 4C

    Close
  • Paint/plaster

    Ceiling

    Feb 1, 2026 · Apt 4C

    Close
  • Door/window

    Door

    Jan 20, 2026 · Apt 3E

    Close
  • Door/window

    Door frame

    Jan 20, 2026 · Apt 3E

    Close
  • Unsanitary condition

    Pests

    Jan 20, 2026 · Apt 3E

    Close
  • General

    Cabinet

    Jan 20, 2026 · Apt 3E

    Close
  • Flooring/stairs

    Floor

    Jan 20, 2026 · Apt 3E

    Close
  • Appliance

    Electric/gas range

    Jan 20, 2026 · Apt 3E

    Close
  • Flooring/stairs

    Floor

    Jan 20, 2026 · Apt 3E

    Close
  • Paint/plaster

    Wall

    Jan 20, 2026 · Apt 3E

    Close
  • Electric

    Lighting

    Jan 20, 2026 · Apt 3E

    Close
  • Plumbing

    Basin/sink

    Jan 20, 2026 · Apt 3E

    Close
  • Unsanitary condition

    Pests

    Jan 20, 2026 · Apt 3E

    Close
  • Electric

    Outlet/switch

    Jan 20, 2026 · Apt 3E

    Close
  • Door/window

    Door

    Dec 18, 2025 · Apt 1A

    Close
  • Paint/plaster

    Wall

    Dec 18, 2025 · Apt 1A

    Close
  • Appliance

    Electric/gas range

    Dec 18, 2025 · Apt 1A

    Close
  • General

    Cabinet

    Dec 18, 2025 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    Dec 18, 2025 · Apt 1A

    Close
  • Water leak

    Heavy flow

    Dec 18, 2025 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    Dec 13, 2025 · Apt 4C

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1915
Floors
5
Residential units
27
Building area
22,500 ft²
Lot area
5,680 ft²
Zoning
R7-1
Community board
206
Council district
15
Block / lot
3069 / 65
Assessed value
$909,450
Landmark / historic district
No

HPD registration #202581, last renewed Jun 11, 2025.

Questions about 2074 Arthur Avenue

Who owns 2074 Arthur Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 2074 Arthur Ave LLC.

Does 2074 Arthur Avenue have violations?

Yes. NYC HPD has recorded 1,065 housing violations at this property.

Is 2074 Arthur Avenue rent stabilized?

NYC Department of Finance tax bills listed 23 rent-stabilized units here in 2024 (about 85% of its 27 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 2074 Arthur Avenue built?

City records list 1915 as the year it was built.

How many apartments are in 2074 Arthur Avenue?

It has 27 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.