2074 Arthur Avenue
Bronx, NY 10457BBL 2-03069-0065Map
Owner of record: 2074 Arthur Ave LLC
2074 Arthur Avenue is a walk-up apartment building built in 1915 in Bronx, 10457. It has 27 residential units across 5 floors. The owner of record is 2074 Arthur Ave LLC. HPD has recorded 1,065 housing violations here, most recently on October 6, 2026. 21 of the 50 most recent violations are still open. City tax records listed 23 rent-stabilized apartments here in 2024.
- HPD violations
- 1,065
- DOB violations
- 8
- ECB violations
- 4
- HPD complaints
- 1,152
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,065
- BHazardous
Properly repair with similar material the broken or defective cracked north concrete pillar at building front entrance
Oct 6, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame to high at public hall, 1st story
Oct 6, 2026
Open — Nov sent out - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at street door at basement at public hall, 1st story
Oct 6, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly at building entrance door , 1st story
Sep 28, 2026
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance , 1st story
Sep 28, 2026
Open — Violation will be reinspected - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east at north located at apt 4a, 4th story, 2nd apartment from south at west
Sep 28, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east at north located at apt 4a, 4th story, 2nd apartment from south at west
Sep 28, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 4th room from east at south located at apt 4a, 4th story, 2nd apartment from south at west
Sep 28, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east at south located at apt 4a, 4th story, 2nd apartment from south at west
Sep 28, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 4a, 4th story, 2nd apartment from south at west
Sep 28, 2026 · Apt 4A
Open — Nov sent out
Show 40 more ↓
- BHazardous
Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south
Aug 29, 2026 · Apt 1C
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1c, 1st story, 1st apartment from east at south
Aug 29, 2026 · Apt 1C
Open — Civ14 mailed - BHazardous
M/d law abate the nuisance consisting of missing vinyl tile at floor approximately 1sqft in the kitchen located at apt 1c, 1st story, 1st apartment from east at south
Aug 29, 2026 · Apt 1C
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 1c, 1st story, 1st apartment from east at south
Aug 29, 2026 · Apt 1C
Open — Civ14 mailed - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder and properly secure by using appropiate nuts and bolts (the shoe) at 1st fire escape from north at west exterior wall at fire escape
Aug 29, 2026
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective 1st lower wood cabinet door at west wall in the kitchen located at apt 1c, 1st story, 1st apartment from east at south
Aug 29, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finished method by reglazing at bath tub in the bathroom located at apt 4e, 4th story, 1st apartment from north at east
Jun 1, 2026 · Apt 4E
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the bathroom located at apt 4e, 4th story, 1st apartment from north at east
Jun 1, 2026 · Apt 4E
Open — Civ14 mailed - ANon-hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 4e, 4th story, 1st apartment from north at east
Jun 1, 2026 · Apt 4E
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4e, 4th story, 1st apartment from north at east
Jun 1, 2026 · Apt 4E
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective radiator air valve in the 2nd room from north at east located at apt 2d, 2nd story, 2nd apartment from north at east
Mar 8, 2026 · Apt 2D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east located at apt 4c, 4th story, 1st apartment from east at south
Feb 5, 2026 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building vestibule door (from vestibule to public hall) , 1st story
Feb 5, 2026
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 2nd room from east located at apt 4c, 4th story, 1st apartment from east at south
Feb 5, 2026 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4c, 4th story, 1st apartment from east at south
Feb 5, 2026 · Apt 4C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch and assembly at building vestibule door (from vestibule to public hall) , 1st story
Feb 5, 2026
Closed — Violation closed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Feb 5, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east located at apt 4c, 4th story, 1st apartment from north at east
Jan 13, 2026 · Apt 4C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 4c, 4th story, 1st apartment from north at east
Jan 13, 2026 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 4d, 4th story, 2nd apartment from north at east
Jan 6, 2026 · Apt 4D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4d, 4th story, 2nd apartment from north at east
Jan 6, 2026 · Apt 4D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east located at apt 4a, 4th story, 2nd apartment from south at west
Jan 6, 2026 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 4a, 4th story, 2nd apartment from south at west
Jan 6, 2026 · Apt 4A
Closed — Violation dismissed - BHazardous
Provide adequate lighting no light at fire passage way, 1st story
Dec 12, 2025
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor to high at public hall, 1st story
Dec 12, 2025
Open — False certification - CImmediately hazardous
Abate the infestation consisting of roaches located at apt 4e, 4th story, apartment at east
Dec 9, 2025 · Apt 4E
Closed — Violation dismissed - ANon-hazardous
Post and maintain a street number on the front of the dwelling plainly visible from the sidewalk.
Dec 9, 2025
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Dec 3, 2025
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures ... in the bathroom located at apt 1c, 1st story, 1st apartment from east at south
Dec 3, 2025 · Apt 1C
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south
Dec 3, 2025 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 1st apartment from south at west
Nov 25, 2025 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Nov 25, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective buzzer and return voice system from building entrance up to panel at south wall in the private hallway located at apt 4b, 4th story, 1st apartment from south at west
Nov 25, 2025 · Apt 4B
Open — Invalid certification - CImmediately hazardous
M/d law abate the nuisance consisting of free standing radiator creating a trip and fall hazard at public hall, 3rd story
Nov 21, 2025
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of free standing radiator creating a trip and fall hazard at public hall, 3rd story
Nov 21, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department north and south wall in the private hallway located at apt 5e, 5th story, 2nd apartment from north at east
Nov 8, 2025 · Apt 5E
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at boiler room
Nov 8, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5e, 5th story, 2nd apartment from north at east
Nov 8, 2025 · Apt 5E
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the bathroom located at apt 5e, 5th story, 2nd apartment from north at east
Nov 8, 2025 · Apt 5E
Closed — Violation closed - BHazardous
Provide adequate lighting at front south at fire passage way
Oct 10, 2025
Open — Not complied with
DOB building violations · 8
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Construction other optional
Notice of order to stop work immediately due to applicant withdrawal
May 10, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
ECB violations · 4
- Class - 1
Work w/o a permit on 4/24/2014 @ 12:50 pm i obsserved the installation of new gas piping installed in apt #'s 1c&1d a permit was issued under laa#240055774 which is for testing only. remedy:obtain required perm
Apr 24, 2014 · Penalty $800
Resolve - Class - 2
Failure to maintain bldg in a code compliant manner:installation of plumbing materials/equipment per pc 102.3;27-902 on 4/24/14 @ 12:52 i observed the installation of dresser couplings &"uniors" installed on th
Apr 24, 2014
Resolve - Class - 2
28-408.1,performing unlicensed plumbing work w/o a mater plumber license.on 04/24/14 @ 12:50pm i was informed by mr.juau f.silva-samboy thathe was the person who installed the pipes in apt #'s 1c&1d & he starte
Apr 24, 2014
Resolve - Non-hazardous
Failure to maintain. defect is: broken and defective steps by entrance lobby leading into hallway. remedy- repair or replace said broken & defective steps
Feb 15, 1994 · Penalty $1,000
Resolve
Complaints
- Water leak
Slow leak
Sep 28, 2026 · Apt 4A
Close - Paint/plaster
Ceiling
Sep 28, 2026 · Apt 4A
Close - Electric
Outlet/switch
Sep 28, 2026 · Apt 4A
Close - Paint/plaster
Ceiling
Sep 28, 2026 · Apt 4A
Close - Plumbing
Bathtub/shower
Sep 28, 2026 · Apt 4A
Close - Water leak
Heavy flow
Sep 27, 2026 · Apt 1C
Close - Electric
Power outage
Sep 22, 2026 · Apt 2D
Close - Electric
Power outage
Sep 21, 2026 · Apt 4D
Close - Unsanitary condition
Mold
Aug 26, 2026 · Apt 1C
Close - Unsanitary condition
Pests
Aug 26, 2026 · Apt 1C
Close
Show 40 more ↓
- General
Cabinet
Aug 26, 2026 · Apt 1C
Close - Paint/plaster
Ceiling
Aug 26, 2026 · Apt 1C
Close - Appliance
Refrigerator
Aug 26, 2026 · Apt 1C
Close - Water leak
Slow leak
Aug 26, 2026 · Apt 1C
Close - Safety
Fire escape
Jul 30, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jul 30, 2026 · Apt 4D
Close - Paint/plaster
Wall
Jul 30, 2026 · Apt 4D
Close - Unsanitary condition
Mold
Jul 30, 2026 · Apt 4D
Close - Unsanitary condition
Pests
Jul 30, 2026 · Apt 4D
Close - Unsanitary condition
Sewage
Jul 30, 2026 · Apt 4D
Close - Water leak
Slow leak
Jul 30, 2026 · Apt 4D
Close - Paint/plaster
Ceiling
Jul 30, 2026 · Apt 4D
Close - Heat/hot water
Apartment only
Apr 25, 2026 · Apt 4E
Close - Heat/hot water
Entire building
Mar 6, 2026 · Apt BLDG
Close - Plumbing
Water supply
Feb 17, 2026 · Apt 2D
Close - Heat/hot water
Apartment only
Feb 9, 2026 · Apt 1C
Close - Paint/plaster
Ceiling
Feb 4, 2026 · Apt 4C
Close - Flooring/stairs
Floor
Feb 4, 2026 · Apt 4C
Close - Flooring/stairs
Floor
Feb 1, 2026 · Apt 4C
Close - Paint/plaster
Ceiling
Feb 1, 2026 · Apt 4C
Close - Paint/plaster
Ceiling
Feb 1, 2026 · Apt 4C
Close - Door/window
Door
Jan 20, 2026 · Apt 3E
Close - Door/window
Door frame
Jan 20, 2026 · Apt 3E
Close - Unsanitary condition
Pests
Jan 20, 2026 · Apt 3E
Close - General
Cabinet
Jan 20, 2026 · Apt 3E
Close - Flooring/stairs
Floor
Jan 20, 2026 · Apt 3E
Close - Appliance
Electric/gas range
Jan 20, 2026 · Apt 3E
Close - Flooring/stairs
Floor
Jan 20, 2026 · Apt 3E
Close - Paint/plaster
Wall
Jan 20, 2026 · Apt 3E
Close - Electric
Lighting
Jan 20, 2026 · Apt 3E
Close - Plumbing
Basin/sink
Jan 20, 2026 · Apt 3E
Close - Unsanitary condition
Pests
Jan 20, 2026 · Apt 3E
Close - Electric
Outlet/switch
Jan 20, 2026 · Apt 3E
Close - Door/window
Door
Dec 18, 2025 · Apt 1A
Close - Paint/plaster
Wall
Dec 18, 2025 · Apt 1A
Close - Appliance
Electric/gas range
Dec 18, 2025 · Apt 1A
Close - General
Cabinet
Dec 18, 2025 · Apt 1A
Close - Flooring/stairs
Floor
Dec 18, 2025 · Apt 1A
Close - Water leak
Heavy flow
Dec 18, 2025 · Apt 1A
Close - Flooring/stairs
Floor
Dec 13, 2025 · Apt 4C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1915
- Floors
- 5
- Residential units
- 27
- Building area
- 22,500 ft²
- Lot area
- 5,680 ft²
- Zoning
- R7-1
- Community board
- 206
- Council district
- 15
- Block / lot
- 3069 / 65
- Assessed value
- $909,450
- Landmark / historic district
- No
HPD registration #202581, last renewed Jun 11, 2025.
Questions about 2074 Arthur Avenue
Who owns 2074 Arthur Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2074 Arthur Ave LLC.
Does 2074 Arthur Avenue have violations?
Yes. NYC HPD has recorded 1,065 housing violations at this property.
Is 2074 Arthur Avenue rent stabilized?
NYC Department of Finance tax bills listed 23 rent-stabilized units here in 2024 (about 85% of its 27 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2074 Arthur Avenue built?
City records list 1915 as the year it was built.
How many apartments are in 2074 Arthur Avenue?
It has 27 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.