4683 Park Avenue
Bronx, NY 10458BBL 2-03032-0054Map
Owner of record: Forrest Equities LLC
4683 Park Avenue is an elevator apartment building built in 1910 in Bronx, 10458. It has 23 residential units across 8 floors. The owner of record is Forrest Equities LLC. HPD has recorded 530 housing violations here, most recently on September 9, 2026. 36 of the 50 most recent violations are still open. City tax records listed 23 rent-stabilized apartments here in 2023.
- HPD violations
- 530
- DOB violations
- 23
- ECB violations
- 37
- HPD complaints
- 677
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 530
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east located at apt 4c, 4th story, 2nd apartment from south at west
Sep 9, 2026 · Apt 4C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroom located at apt 4c, 4th story, 2nd apartment from south at west
Sep 9, 2026 · Apt 4C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 4th room from east located at apt 4c, 4th story, 2nd apartment from south at west
Sep 9, 2026 · Apt 4C
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 4c, 4th story, 2nd apartment from south at west
Sep 9, 2026 · Apt 4C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4c, 4th story, 2nd apartment from south at west
Sep 9, 2026 · Apt 4C
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall
Jun 22, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall
Jun 22, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 2, 2026
Open — Nov sent out - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder shoe tack welded secure with proper nuts and bolts at fire escape
Jun 2, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 2nd apartment from north at east
Apr 6, 2026 · Apt 3B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at evidence of rodents in the entire apartment located at apt 3b, 3rd story, 2nd apartment from north at east
Apr 6, 2026 · Apt 3B
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective latch set and assembly at building entrance door at public hall, 1st story
Apr 6, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set and assembly at building entrance door at public hall, 1st story
Apr 6, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower window sash glass pane at 2nd window from east at south in the private hallway located at apt 6a, 6th story, 1st apartment from east at south
Mar 6, 2026 · Apt 6A
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings sign posted however information is missing at cellar
Feb 15, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [latch set] door from street to cellar at public hall
Feb 15, 2026
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the building front yard at public hall
Feb 15, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox sign posted however information is missing at cellar at public hall
Feb 15, 2026
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall
Feb 15, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign posted however information is missing at cellar at public hall
Feb 15, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set and its assemblys at door from street to cellar at public hall
Feb 15, 2026
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall in the 2nd room from east located at apt 8a, 7th story, 1st apartment from west at north
Jan 16, 2026 · Apt 8A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall in the private hallway located at apt 8a, 7th story, 1st apartment from west at north
Jan 16, 2026 · Apt 8A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, north wall in the 2nd room from east located at apt 8a, 7th story, 1st apartment from west at north
Jan 16, 2026 · Apt 8A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, north wall in the private hallway located at apt 8a, 7th story, 1st apartment from west at north
Jan 16, 2026 · Apt 8A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the kitchenette located at apt 8a, 7th story, 1st apartment from west at north
Jan 16, 2026 · Apt 8A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the kitchenette located at apt 8a, 7th story, 1st apartment from west at north
Jan 16, 2026 · Apt 8A
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 8a, 7th story, 1st apartment from west at north
Jan 14, 2026 · Apt 8A
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 8a, 7th story, 1st apartment from west at north
Jan 14, 2026 · Apt 8A
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... [less than ten] sq.feet at ceiling in the private hallway located at apt 8a, 7th story, 1st apartment from west at north original violation 18569105 issued 14-jan-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jan 14, 2026 · Apt 8A
Open — First no access to re- inspect violation - ANon-hazardous
Trace and repair the source and abate the visible mold condition... [less than ten] sq.feet at ceiling in the private hallway located at apt 8a, 7th story, 1st apartment from west at north
Jan 14, 2026 · Apt 8A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 4th story, 2nd apartment from north at east
Dec 4, 2025 · Apt 4B
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4b, 4th story, 2nd apartment from north at east
Dec 4, 2025 · Apt 4B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4b, 4th story, 2nd apartment from north at east
Dec 4, 2025 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at fire door (leading to west section) at public hall, 1st story
Nov 28, 2025
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north
Nov 28, 2025 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Nov 28, 2025
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign present, information missing at public hall, 1st story
Nov 28, 2025
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Nov 28, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building's entrance door (from street to public hall) , 1st story
Nov 28, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at public hall door (from vestibule to public hall north section) , 1st story
Nov 22, 2025
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of lock at hopper door, at compactor closet at public hall, 4th story
Nov 22, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building's entrance door (from street to public hall) , 1st story
Nov 22, 2025
Closed — Violation closed - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder tack welded, properly secure by using the appropriate nuts and bolts to secure at fire escape at building front. at fire escape
Nov 22, 2025
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective cabinet door, at 3rd door from west at north wall in the kitchen located at apt 4c, 4th story, 2nd apartment from west at north
Nov 22, 2025 · Apt 4C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at compactor closet ''trash room'' door at public hall, 4th story
Nov 22, 2025
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 4c, 4th story, 2nd apartment from west at north
Nov 22, 2025 · Apt 4C
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the foyer located at apt 8b, 8th story, 1st apartment from east at south
Nov 15, 2025 · Apt 8B
Open — Nov sent out
DOB building violations · 23
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 2, 2022
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Construction other optional
Ftm 4 stry+cellar resid bldg.due to gas explosion on 3/2/18 bldg suffered strl damage.front stoop dislodged&miss.1stfl finish displaced &part coll at lobby.main interior stair deteriorating&rotting.deterior bricks&mortar joints found at chimney&ext walls.remedy:own engage lic pe&cont'r eval bldg&perf rprs.file perm for rpr wrk no later 3/23/18
Mar 5, 2018
Dob violation - active - Construction other optional
Structure rendered non-compliatn at time of inspection damage observed to have been sustained to front stoop gas explosion has blown stoop out, buckled lobby floor,damaged wall in celllar this has occured due to gas explosion in cellar at 4683 park avenue, bronx
Mar 2, 2018
Dob violation - dismissed
Show 13 more ↓
- Construction other optional
Emerg wrk.4 stry+cellar mas walls+wood frame flrs.bldg sustain damage due to explosion on bsmt.part wall at cellar coll.severe damage to the flr finishes at hallway at 1stfl.bldg is open&unguided.corn at front wall in disrepair.remedy:own immed seal all doors&windows at 1stfl install fence at front.install sidewalk shed.file perm no later 3/6/18
Mar 2, 2018
Dob violation - active - Immediate emergency anythingoptional
Erect fence along exposure #1 and seal all accessible openings to prevent unauthorized access
Mar 2, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 2, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Construction other optional
C-construction other optional
Jan 10, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed
ECB violations · 37
- Class - 2
Class 2: hoist ropes at the shackle/hitch area are not properly secured and require correction. fasten and secure the suspension ropes at the shackles and maintain proper alignment of the load-carrying ropes wi
Aug 10, 2026 · Penalty $625
Active - Class - 2
Responding to a 311 elevator, upon inspection, class 2 violation issued for, cat 1, category 1 annual inspection tag has expired, and annualyear to year brake tag expired, both issued in 2023, remedy; complete
Mar 24, 2025 · Penalty $1,562
Resolve - Class - 2
Occupancy in contrary to that allowed by c/o and/or department of building record(occupancy).illegally created a full class a apartment withfull bathroom and kitchen the illegal conversion increased the occupan
Jun 21, 2023 · Penalty $1,250
Resolve - Class - 2
Occupancy in contrary to that allowed by c/o and/or department of building record.illegal conversion,creating a full class a apartment with full bathroom and kitchen increasing occupancy from 8 class apts to 23
Jun 21, 2023 · Penalty $1,250
Resolve - Class - 2
Occupancy in contrary to that allowed by c/o and/or department of building record.illegal conversion,creating a full class a apartment with full bathroom and kitchen increasing occupancy from 8 class a apts to
Jun 21, 2023 · Penalty $1,250
Resolve - Class - 2
Occupancy in contrary to that allowed by c/o and/or department of building record.illegal conversion,creating a full class a apt with full bathroom and kitchen increasing occupancy from 8 class a apts to 23 cla
Jun 21, 2023 · Penalty $1,250
Resolve - Class - 2
Occupancy in contrary to that allowed by c/o and/or department of building record.illegal conversion,creating a full class a apartment with full bathroom and kitchen increasing occupancy from 8 apts to 23 class
Jun 21, 2023 · Penalty $1,250
Resolve - Class - 2
Occupancy in contrary to that allowed by c/o and/or department of building record.illegally conversion,creating a full class a apartment with full bathroom and kitchen increasing occupancy from 8 class a apartm
Jun 21, 2023 · Penalty $1,250
Resolve - Class - 2
Occupancy in contrary to that allowed by c/o and/or department of building record.illegal conversion,creating a full class a apt with full bathroom and kitchen increasing occupancy from 8 class a apts to 23 cla
Jun 21, 2023 · Penalty $1,250
Resolve - Class - 2
Occupancy in contrary to that allowed by c/o and/or department of building record.illegal conversion creating full class a apt with full bathroom and kitchen increasing occupancy from 8 class a apt to 23 class
Jun 21, 2023 · Penalty $1,250
Resolve
Show 27 more ↓
- Class - 2
Occupancy in contrary to that allowed by c/o and/or department of building record.illegal conversion,creating a full class a apt with full bathroom and kitchen increasing occupancy from 8 class a apt to 23 clas
Jun 21, 2023 · Penalty $1,250
Resolve - Class - 2
At time of my inspection i observed a 8 story building at 78 feet in height.i noticed that elevator was not in working order and not in state of readiness as per code.this creates a unsafe situation for first r
Apr 10, 2023 · Penalty $1,250
Resolve - Class - 2
At time of my inspection i observed a 8 story building at 78 feet in height. i noticed that standpipe system wasn't in state of readiness as per code and no test has been conducted or provided upon my request.
Apr 10, 2023 · Penalty $1,250
Resolve - Class - 2
At time of my inspection i observed a 8 story building undergoing construction. i noticed a 40yard container dumpster onsite. upon requesting for dot permits none was made available upon my request. code requir
Apr 10, 2023
Resolve - Class - 1
6 story alt1 active site. i observed 1 competent person onsite signing logs without valid nycdob connect supervisor sst card. gopaul singh sst#4m67b50b7f. also 2 workers seepaul ram sst#4q01103905 and randolph
Mar 22, 2023 · Penalty $625
Resolve - Class - 2
Inspection of an alt1 6 story active site. i observed 5 workers performing work in multiple areas on bulkhead. upon request for dob approved plans structural architectural plumbing electrical. to verify scope o
Mar 22, 2023
Resolve - Class - 1
An alt1 enlargement 6 story building active site working installing roofing/sheetrock. upon review on jobsite logs. i observed superintendent on pw2 was not present onsite more than 2 weeks. i observed on logbo
Mar 22, 2023 · Penalty $2,500
Resolve - Class - 2
At time of inspection of an 6 story alt1 active site. i observed construction fence in place at exp#1 missing jobsite information panel as required. i also observed that there was no 40 sst signage onsite on fe
Mar 22, 2023
Resolve - Class - 2
6 story alt1 active site. superintendent logbooks onsite were inadequately completed onsite. last entry was signed on 1/27/2023. super failed to frequently visit site to perform inspection/report unsafe conditi
Mar 22, 2023 · Penalty $5,000
Resolve - Class - 2
Occupancy in contrary to that allowed by c/o and/or department of building record.illegal conversion a full class a apt with full bathroom and kitchen increasing occupancy from 8 class a apt to 23 class a apt a
Jun 21, 2022 · Penalty $1,250
Resolve - Class - 1
Bc3301.2 failure to provide overhead protection.at time of inspection observed at active job site with vertical enlargment work in progress on exterior work at exp #2 and #4 without overhead protection to adjoi
Nov 1, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to designate and/or have constructin superintendent present at site as required.at time of inspection of active job site with vertical enlargement work in progress noted that contractor did 3 story vert
Nov 1, 2021 · Penalty $10,000
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirement.at time of inspection observed active job site with vertical enlargement work in progress noted piles of debris on floor and electrical extensio
Nov 1, 2021 · Penalty $625
Resolve - Class - 2
Bc3301.7.failure to provide design drawings for needle beams.at time of inspection observed at active job site with enlargement work in progress noted needle beam system supporting scaffold without design drawi
Nov 1, 2021
Resolve - Class - 1
Work w/o permit.at time of inspection observed active job site with interior work in progress.during inspection noted contractor built vertical enlargement of 3 story without proper work permit.bis review revea
Nov 1, 2021
Resolve - Class - 1
Failure to provide handrail.at time of inspection observed active job sit with vertical enlargement work in progress noted no hand rails at some locations and inadequate hand rails on stairwell all over bldg.re
Nov 1, 2021 · Penalty $625
Resolve - Class - 1
Inadequate handrail system.at time of inspection observed active job site with vertical enlargement work in progress noted inadeqaute guard rail system all over job site grs missing mid-rail and toe board as re
Nov 1, 2021 · Penalty $2,500
Resolve - Class - 1
Bc3314.4.8 failure to maintain supported scaffold.at time of inspection observed active job site with vertical enlargement work in progress observed supported scaffold around bldg scaffold missing railing syste
Nov 1, 2021 · Penalty $625
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements @time of inspection of a 4 sty bldg under const i observed several floorswith const debris throughout sloor areas, piller of bricks, piles at
Apr 10, 2020 · Penalty $1,250
Resolve - Class - 2
Jobsite fence not constructed or maintained pursuant to subsection-@the time of inspection of a 4 sty building under const i observed a jobsite fence @exp.1 with the followind conditions: entry gate opening
Apr 10, 2020 · Penalty $1,000
Resolve - Class - 2
Failure to provide approved/accepted construction documents @jobsite @time of inspection-@time of inspection f a 4 sty building under const observed shoring approx 12 ft part with no support @floor joist laps
Apr 10, 2020 · Penalty $312
Resolve - Class - 2
Job site fence not constructed or maintain pursuant to subsection at time of inspection the violating condiions are as follow at exposure #1 loose and leaning plywood panels of construction fence.immeditely.sec
Oct 1, 2018 · Penalty $2,000
Resolve - Class - 2
Residence altered for occupancy as a dwelling for more than the legally approved # of families. bldg altered from 8 families to 9 families. bldg records indicate 2 families on each floor for floors 1-4 & baseme
Aug 12, 2014 · Penalty $8,000
Resolve - Class - 1
Failure to maintain bldg in code-compliant manner.use of prohibited door and/or hardware per bc1008-1.8;27-371(j).noted:at right side fire passageway gate is chained & padlocked.rem:provide legal hardware.
Sep 24, 2012 · Penalty $1,000
Resolve - Hazardous
Failure to maintain hazardous defects are:in apt 3b floor at kitchen & bathroom entry saggs crack over bathroom entry door is evident from outside bathroom wall to inside bathroom.various heavy cracks on
Aug 10, 2007 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain exterior building wall: defect is: front facade bricks are sagging. approximately 2" location : south side. remedy: obtain all necessary permit. submit engineers report. structural stability
Nov 8, 1999 · Penalty $350
Resolve - Non-hazardous
Failure to maintain exterior building wall defect is broken+ defectivewith crack on brick wall frm 1st to 3rd sty and defective line stone at 2nd sty front. remedy: make all necessary repairs work on brick w
Mar 28, 1994 · Penalty $175
Resolve
Complaints
- Paint/plaster
Wall
Oct 7, 2026 · Apt 6A6THF
Open - Unsanitary condition
Pests
Oct 7, 2026 · Apt 6A6THF
Open - Door/window
Window pane
Oct 7, 2026 · Apt 6A6THF
Open - Water leak
Heavy flow
Sep 29, 2026 · Apt 7C
Open - Paint/plaster
Wall
Sep 29, 2026 · Apt 7C
Open - Elevator
Maintenance
Sep 28, 2026 · Apt BLDG
Open - Plumbing
Basin/sink
Sep 8, 2026 · Apt 3D
Open - Appliance
Electric/gas range
Sep 8, 2026 · Apt 3D
Open - Plumbing
Basin/sink
Sep 7, 2026 · Apt 4C
Close - Water leak
Heavy flow
Sep 7, 2026 · Apt 4C
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Sep 7, 2026 · Apt 4C
Close - Appliance
Electric/gas range
Aug 11, 2026 · Apt 3D
Open - Water leak
Slow leak
Jun 12, 2026 · Apt 5A
Close - Plumbing
Toilet
May 1, 2026 · Apt 2B
Close - Unsanitary condition
Pests
Mar 23, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Mar 23, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Mar 23, 2026 · Apt 3B
Close - Heat/hot water
Apartment only
Mar 10, 2026 · Apt 6A
Close - Door/window
Window frame
Mar 10, 2026 · Apt 6A
Close - Door/window
Window pane
Mar 10, 2026 · Apt 6A
Close - Heat/hot water
Apartment only
Mar 7, 2026 · Apt 6A
Close - Heat/hot water
Apartment only
Mar 6, 2026 · Apt 6A
Close - Door/window
Window pane
Mar 6, 2026 · Apt 6A
Close - Unsanitary condition
Pests
Feb 7, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Feb 7, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Jan 29, 2026 · Apt 3B
Close - Heat/hot water
Apartment only
Jan 25, 2026 · Apt 5B
Close - Door/window
Door
Jan 25, 2026 · Apt 5B
Close - Unsanitary condition
Pests
Jan 19, 2026 · Apt 3B
Close - Electric
Power outage
Jan 13, 2026 · Apt 8A
Close - Heat/hot water
Apartment only
Jan 13, 2026 · Apt 8A
Close - Heat/hot water
Apartment only
Jan 13, 2026 · Apt 8A
Close - Heat/hot water
Entire building
Dec 3, 2025 · Apt 68
Close - Heat/hot water
Apartment only
Dec 2, 2025 · Apt 4B
Close - Heat/hot water
Apartment only
Dec 2, 2025 · Apt 4C
Close - Heat/hot water
Apartment only
Nov 29, 2025 · Apt 6A
Close - Heat/hot water
Apartment only
Nov 28, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Nov 21, 2025 · Apt 7B
Close - Heat/hot water
Apartment only
Nov 20, 2025 · Apt 4C
Close - Heat/hot water
Entire building
Nov 13, 2025 · Apt 8B
Close - Heat/hot water
Apartment only
Nov 11, 2025 · Apt 5B
Close - Heat/hot water
Apartment only
Nov 11, 2025 · Apt 3D
Close - Water leak
Heavy flow
Sep 16, 2025 · Apt 4C
Close - General
Cabinet
Sep 16, 2025 · Apt 4C
Close - Paint/plaster
Wall
Sep 16, 2025 · Apt 4C
Close - Paint/plaster
Ceiling
Sep 16, 2025 · Apt 4C
Close - Plumbing
Radiator
Sep 16, 2025 · Apt 4C
Close - Electric
Outlet/switch
Sep 16, 2025 · Apt 4C
Close - Plumbing
Basin/sink
Sep 16, 2025 · Apt 4C
Close - Door/window
Door
Jul 15, 2025 · Apt 4B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1910
- Floors
- 8
- Residential units
- 23
- Building area
- 15,993 ft²
- Lot area
- 4,025 ft²
- Zoning
- R7-1
- Community board
- 206
- Council district
- 15
- Block / lot
- 3032 / 54
- Assessed value
- $1,178,550
- Landmark / historic district
- No
HPD registration #213121, last renewed Jun 11, 2026.
Questions about 4683 Park Avenue
Who owns 4683 Park Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Forrest Equities LLC.
Does 4683 Park Avenue have violations?
Yes. NYC HPD has recorded 530 housing violations at this property.
Is 4683 Park Avenue rent stabilized?
NYC Department of Finance tax bills listed 23 rent-stabilized units here in 2023 (about 100% of its 23 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 4683 Park Avenue built?
City records list 1910 as the year it was built.
How many apartments are in 4683 Park Avenue?
It has 23 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.