4575 Park Avenue
Bronx, NY 10458BBL 2-03031-0069Map
Owner of record: Park Ave. Apartments
4575 Park Avenue is a walk-up apartment building built in 1926 in Bronx, 10458. It has 62 residential units across 5 floors. The owner of record is Park Ave. Apartments. HPD has recorded 3,379 housing violations here, most recently on September 30, 2026. 50 of the 50 most recent violations are still open. City tax records listed 59 rent-stabilized apartments here in 2024.
- HPD violations
- 3,379
- DOB violations
- 10
- ECB violations
- 86
- HPD complaints
- 3,329
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 3,379
- BHazardous
Properly repair with similar material the broken or defective erroded brick and mortar at west exterior parapet wall and chimney at roof
Sep 30, 2026
Open — Nov sent out - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts west 2 unit # bb2 illegal apartment created at cellar under vacate order # 261191 ( posted date 9/29/2026 )
Sep 29, 2026
Open — Info nov sent out - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts west 1 unit # bb1 illegal apartment created at cellar under vacate order # 261191 ( posted date 9/29/2026 )
Sep 29, 2026
Open — Info nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at south, the 1st room from east at north, the bathroom located at bsmt-apt gg, 1st bsmt-apt from north at east
Sep 28, 2026 · Apt GG
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from east at south located at bsmt-apt gg, 1st bsmt-apt from north at east
Sep 28, 2026 · Apt GG
Open — Nov sent out - BHazardous
Replace with new the missing electrical outlets switch cover plate at north wall in the private hallway located at apt gg, 1st apartment from north at east
Sep 28, 2026 · Apt GG
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at bsmt-apt gg, 1st bsmt-apt from north at east
Sep 28, 2026 · Apt GG
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt gg, 1st apartment from north at east
Sep 28, 2026 · Apt GG
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt gg, 1st apartment from north at east
Sep 28, 2026 · Apt GG
Open — Notice of issuance sent to tenant - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt gg, 1st apartment from north at east
Sep 28, 2026 · Apt GG
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3h, 4th story, 2nd apartment from north at east
Sep 25, 2026 · Apt 3H
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3h, 4th story, 2nd apartment from north at east
Sep 25, 2026 · Apt 3H
Open — Nov sent out - BHazardous
Replace with new the missing door frame casing, jamb and header in the kitchen located at apt 3h, 4th story, 2nd apartment from north at east
Sep 25, 2026 · Apt 3H
Open — Nov sent out - BHazardous
Replace with new the missing electrical outlet cover plate at east wall in the 1st room from east at center located at apt 3h, 4th story, 2nd apartment from north at east
Sep 25, 2026 · Apt 3H
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wood baseboard at east wall in the 1st room from east at center located at apt 3h, 4th story, 2nd apartment from north at east
Sep 25, 2026 · Apt 3H
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at center located at apt 3h, 4th story, 2nd apartment from north at east
Sep 25, 2026 · Apt 3H
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulkng at sink in the kitchen located at apt 3h, 4th story, 2nd apartment from north at east
Sep 25, 2026 · Apt 3H
Open — Nov sent out - BHazardous
Replace with new the missing electrical outlet cover plate at east wall in the 1st room from east at north located at apt 3h, 4th story, 2nd apartment from north at east
Sep 25, 2026 · Apt 3H
Open — Nov sent out - BHazardous
Replace with new the missing electrical outlet cover plate at east wall in the 1st room from east at south located at apt 3h, 4th story, 2nd apartment from north at east
Sep 25, 2026 · Apt 3H
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east at south located at apt 3h, 4th story, 2nd apartment from north at east
Sep 25, 2026 · Apt 3H
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Sep 25, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective wired glass pane at lower sash window at intermediary landing at public hall, 4th story, section at north
Sep 25, 2026
Open — Nov certified on time - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3h, 4th story, 2nd apartment from north at east
Sep 25, 2026 · Apt 3H
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the kitchen located at apt 3h, 4th story, 2nd apartment from north at east
Sep 25, 2026 · Apt 3H
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3h, 4th story, 2nd apartment from north at east
Sep 25, 2026 · Apt 3H
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from east located at apt 3h, 4th story, 2nd apartment from north at east
Sep 25, 2026 · Apt 3H
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak the ceiling in the bathroom located at apt 3h, 4th story, 2nd apartment from north at east
Sep 25, 2026 · Apt 3H
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sq ft at ceiling and west wall in the bathroom located at apt 3h, 4th story, 2nd apartment from north at east
Sep 25, 2026 · Apt 3H
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3h, 4th story, 2nd apartment from north at east
Sep 25, 2026 · Apt 3H
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at upper sash window at south wall in the kitchen located at apt 3h, 4th story, 2nd apartment from north at east
Sep 25, 2026 · Apt 3H
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Sep 24, 2026
Open — Nov certified on time - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at ceiling at public hall, 1st story
Sep 24, 2026
Open — Nov certified on time - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, south and west walls in the 3rd room from east located at apt bb, 1st apartment from north at east , section ''south''
Sep 16, 2026 · Apt BB
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at cieling, south and west walls in the 3rd room from east located at apt bb, 1st apartment from north at east , section ''south''
Sep 16, 2026 · Apt BB
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt bb, 1st apartment from north at east , section ''south''
Sep 16, 2026 · Apt BB
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt bb, 1st apartment from north at east , section ''south''
Sep 16, 2026 · Apt BB
Open — Nov sent out - BHazardous
Replace with new the missing escutcheon plate at south riser pipe at top in the kitchen located at apt bb, 1st apartment from north at east , section ''south''
Sep 16, 2026 · Apt BB
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, east, west and south walls in the kitchen located at apt bb, 1st apartment from north at east , section ''south''
Sep 16, 2026 · Apt BB
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower counter balance at the south 1 window in the 3rd room from east located at apt bb, 1st apartment from north at east , section ''south''
Sep 16, 2026 · Apt BB
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ceiling light fixture in the 3rd room from east located at apt bb, 1st apartment from north at east , section ''south''
Sep 16, 2026 · Apt BB
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color inside the north 2 closet at all walls and ceiling in the 1st room from east located at apt bb, 1st apartment from north at east , section ''south''
Sep 16, 2026 · Apt BB
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower counter balance at the south 1 window in the 1st room from east located at apt bb, 1st apartment from north at east , section ''south''
Sep 16, 2026 · Apt BB
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective north 1 wood closet door in the 1st room from east located at apt bb, 1st apartment from north at east , section ''south''
Sep 16, 2026 · Apt BB
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east. west, south and north walls in the 1st room from east located at apt bb, 1st apartment from north at east , section ''south''
Sep 16, 2026 · Apt BB
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ceiling light fixture in the 1st room from east located at apt bb, 1st apartment from north at east , section ''south''
Sep 16, 2026 · Apt BB
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt bb, 1st apartment from north at east , section ''south''
Sep 16, 2026 · Apt BB
Open — Nov sent out - BHazardous
Properly secure the loose washbasin in the bathroom located at apt bb, 1st apartment from north at east , section ''south''
Sep 16, 2026 · Apt BB
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective grout and mortar joints at west and south in the bathroom located at apt bb, 1st apartment from north at east , section ''south''
Sep 16, 2026 · Apt BB
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt bb, 1st apartment from north at east , section ''south''
Sep 16, 2026 · Apt BB
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt bb, 1st apartment from north at east , section ''south''
Sep 16, 2026 · Apt BB
Open — Nov sent out
DOB building violations · 10
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 24, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 24, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 10, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 16, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 16, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 16, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 8, 1998
Dob violation - dismissed
ECB violations · 86
- Class - 2
Contrary to dob/official records (mdr # 201824): which indicates 61 class 'a' apts - at time of inspection: new unlabeled bsmt apt west at north created 62 units with addl't 3 pc bthrm; kitchen with gas stove,
Sep 18, 2026 · Penalty $1,250
Active - Class - 1
W/o a permit. noted: at bsmt apt west at north - water & waste lines installed for 3 pc bthrm (toilet, sink, tub); residential sink at kitchen area. gas line installed for stove., obtain permit
Sep 18, 2026 · Penalty $2,500
Active - Class - 1
W/o a permit. noted: at bsmt apt west at north - electrical wiring installed for addl't lights, outlets, switches, branch circuits., obtain permit
Sep 18, 2026 · Penalty $2,500
Active - Class - 2
W/o a permit. noted: at bsmt apt west at north - full height partition walls erected to create a bthrm & 2 bdrms., obtain all permits
Sep 18, 2026 · Penalty $1,250
Active - Class - 1
Failure to ground electrical systems. observed in the basement the main water ground clamp is deteriorated and broken, also no ground installed the water meter is not jumped. clamp must maintain contiuntiy at t
Sep 16, 2026 · Penalty $4,800
Active - Class - 1
Unapproved/unsafe/unsuitable electrical equipment, apparatus, materials, devices, appliances or wiring in use observed in apt gg no face plates on receptacle and switch also flex cord passing thru kitchen wall,
Sep 16, 2026 · Penalty $1,600
Active - Class - 1
Electrical work without a permit. observed in the basement one new 8/16 panel installed for the plp meter. apts in basement new electrical installed lights , receptacles ,panels thru out all rooms. permit # #x0
Sep 16, 2026 · Penalty $2,500
Active - Class - 2
Failure to maintain. i observed in the basement of the property excessive storage of combustible materials in the gas meter room, which is prohibited by fgc appendix e.3.3. also observed in basement apartment g
Sep 16, 2026 · Penalty $1,250
Active - Class - 2
Work without a permit. i observed in the basement of the property recently installed gas fittings and associated piping to provide gas service to three basement apartments. there are no permits on file with the
Sep 16, 2026 · Penalty $1,250
Active - Class - 1
Failure to maintain building in code-compliant manner. atoi observed hairline cracks at exposure 4 below / above windows and chimney, loose asphalt at roof level parapet exposure 4 and ceiling above boiler is d
Sep 16, 2026 · Penalty $2,500
Active
Show 40 more ↓
- Class - 1
Work without a permit. atoi observed aluminum tracks and sheet rock have been erected throughout basement walls ,a partition with door at center of hallway and 2 apartments at west end and north end of basement
Sep 16, 2026 · Penalty $2,500
Active - Class - 1
W/o a permit. noted: at bsmt east at north - full height partition walls erected to create 4 bdrms, bthrm & kitchen. water & waste lines installed for 3 pc bthrm; residential sink at kitchen area. gas line inst
Apr 29, 2022
Resolve - Class - 2
W/o a permit. noted: at bsmt, east at south - new ongoing construction observed, consisting of full height partition walls erected for (2) rms. plumbing rough installed for bthrm. electrical wiring installed fo
Apr 29, 2022 · Penalty $625
Resolve - Class - 1
Dwelling converted to 3 or more addl't families. noted: at bsmt east at north - 2nd rm from front created & occupied as a sro with key locks at door, beds, tv, refrigerator, food, toiletries, personal belonging
Apr 29, 2022 · Penalty $16,000
Resolve - Class - 1
Dwelling converted to 3 or more addl't families. noted: at bsmt east at north - rear rm at left created & occupied as a sro with hasp & eye padlock assembly, bed, tv's, refrigerators, toiletries, personal belon
Apr 29, 2022 · Penalty $16,000
Resolve - Class - 1
Dwelling converted to 3 or more addl't families. noted: at bsmt west at south - created & occupied as a sro with key lock at door, bed, tv, microwave, refrigerator, hot-plate, food, space heater, toiletries, pe
Apr 29, 2022 · Penalty $16,000
Resolve - Class - 1
Failure to maintain building in code compliant manner. noted: at time of inspection - observed at bsmt west at north - a gas operated motorcycle stored; creating a fire hazard., repair and/replace
Apr 29, 2022 · Penalty $1,250
Resolve - Class - 1
W/o a permit. noted: at bsmt west at south - electrical lines installed for lights & outlets. toilet installed in an unsafe manner propped onto wood boards over a trap opening; supply of water from a water hose
Apr 29, 2022 · Penalty $2,500
Resolve - Class - 1
Dwelling converted to 3 or more addl't families. noted: at bsmt east at north - rear rm at right created & occupied as a sro with slide-bolt lock assembly, bed, tv, refrigerators, toiletries, dishes, personal b
Apr 29, 2022 · Penalty $16,000
Resolve - Class - 1
Dwelling converted to 3 or more addl't families. noted: at bsmt east at north - front rm created & occupied as a sro with bed, tv, refrigerator, toiletries, personal belongings, no windows, shared kitchen & bth
Apr 29, 2022 · Penalty $16,000
Resolve - Class - 1
Failure to maintain building in code compliant manner. noted: at time of inspection - observed at right yard: excessive accumulation of garbage, debris & construction material. also, beneath rear fire escape dr
Apr 29, 2022 · Penalty $312
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons.violation #35316399j issued on 08-07-18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.dwelling converted comp
Aug 6, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35316399j issued on 08/07/18 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. dwelling converted maintained or occupied w/3 or mo
Jun 10, 2021 · Penalty $3,125
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35316399j issued on 08/07/18 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. dwelling converted,maintained or occupied w/3 or mo
Apr 26, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35316399j issued on 8/7/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.
Mar 18, 2020 · Penalty $3,125
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35316399j issued on 08-07-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Dec 12, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35316399j issued on 8/7/18 and a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.remedy:comply with the commissione
Oct 16, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35316399j issued on 08-07-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. dwelling convered maintain or occupied w/3 or more dwellings
Aug 24, 2019 · Penalty $3,125
Resolve - Class - 2
Failure to compyl with the commissioners order contained in summons/violation #35316399j issued on 08/07/18 and to file a certificate of correction pursuant to 28-208.1 and 1rcny 102-01.rem:comply with commissi
Jun 5, 2019
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35316388j issued on 08/07/18 and to file a certificate of correction pursuant to 28-208.1 and 1rcny 102-01.rem:comply with commissi
Jun 5, 2019 · Penalty $1,250
Resolve - Class - 2
28-210.1;residence altered as a dwelling for more than teh number of families authorized by the c of o or official records at time of inspection noted apart#b illegally converted into a 3 bedroom with full flig
May 15, 2019
Resolve - Class - 2
Violation of parking regulation in a residential district. at time of inspection, noted a white 2 door mazda car that is parked in the lot and abandoned with no roof, no doors, no trunk, no registration and no
May 15, 2019
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35316399j issued on 08-07-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Apr 5, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/violation#35316399j issued on 8/7/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. remedy:comply w/ commission
Feb 1, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35316399j issued on 08/07/2018 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commis
Dec 11, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35316399j issued on 08-07-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Nov 1, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35316399j issued on 08-07-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. dwelling converted maintained or occupied w/3 or more dwelling
Sep 17, 2018 · Penalty $1,250
Resolve - Class - 3
Work w/out a permit. noted: @ 2nd flr unit 1-h, erected full height partition walls, in living room & middle bedroom to create 4 rooms used for bedrooms. rem: obtain all required permits.
Aug 7, 2018 · Penalty $500
Resolve - Class - 1
Dwelling converted,maintained or occupied w/ 3 or more dwellings units than legally authorized by the c of o, or official records. noted: sro's# 2,3,4,5 each w/ locking devices. #2 equipt w/ mini fridge & micro
Aug 7, 2018 · Penalty $15,000
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/violation#35194911r issued on 05/20/16 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102.01.illegal work.rem:comply w
May 23, 2017 · Penalty $2,400
Resolve - Class - 2
Failure to maintain building in a code compliant manner.noted:at cellar,in boiler room water penetration at ceiling.rem:repair and or replace.
May 2, 2017 · Penalty $250
Resolve - Class - 1
Misc vios:gas piping not labeled.observed in cellar hallway gas pipingnot labeled.observed in cellar hallway gas piping not labeled to indicate that it is gas piping.photo taken:comply w/code.
May 2, 2017 · Penalty $400
Resolve - Class - 2
Failure to maintain bldg in code-compliant manner:failure to comply w/law for water supply system per pc 602.3;27-908 observed in cellar water suplly line leaking from ceiling over oil tank.rem:modify system to
May 2, 2017 · Penalty $250
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/vio # 35194911r issued on 05/20/16 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. note: no documents filed for work w/o a permit. re
Mar 10, 2017 · Penalty $2,400
Resolve - Class - 1
Work w/o a permit at cellar. failure to comply w/the comm's order contained in summons/vio#35194911r issued on 5-20-16 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. installed new water & waste lines
Jan 6, 2017 · Penalty $6,000
Resolve - Class - 2
Failure to comply w/the comm's order contained in nov #35194912z issued on 05/20/16 & to file a c of c pursuant to 28-201.1;28-204.4 & 1rcny102-01. for occupancy contrary,additional class'a'apt created at cella
Dec 28, 2016 · Penalty $800
Resolve - Class - 2
Failure to comply w/the comm's order contained in nov #35170968l issued on 03/30/16 & to file a c of c pursuant to 28-201.1;28-204.4 & 1rcny102-01. note: no document filed for multiple dwelling convertion.
Dec 17, 2016 · Penalty $800
Resolve - Class - 2
Failure to comply with the commissioners order contained in nov#3519491z issued on 05/20/16 and to file a certificate of correction pursuantto 28-201.1,28-204.4 and 1rcny 102-01.for occupancy contrary to that a
Nov 13, 2016 · Penalty $800
Resolve - Class - 1
Failure to comply with the commissioners order contained in nov#35194911r issued on 05/20/16 and to file a certificate of correction pursuant to 28-20101,28-204.4 and 1rcny 102-01.for wrk without permit.wrk not
Nov 13, 2016 · Penalty $2,400
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in nov# 35170968l issued on 3/30/16 & to file a c of c pursuant to 28-201.1, 28-204.4 & 1rcny 102-01. rem: comply w/ commissioner's order &/or file a c of
Aug 4, 2016 · Penalty $800
Resolve
Complaints
- General
Cabinet
Sep 18, 2026 · Apt 3H
Close - Paint/plaster
Wall
Sep 18, 2026 · Apt 3H
Close - Paint/plaster
Ceiling
Sep 18, 2026 · Apt 3H
Close - Door/window
Door
Sep 18, 2026 · Apt 3H
Close - Electric
Wiring
Sep 18, 2026 · Apt 3H
Close - Electric
Outlet/switch
Sep 18, 2026 · Apt 3H
Close - Door/window
Window frame
Sep 18, 2026 · Apt 3H
Close - Electric
Wiring
Sep 18, 2026 · Apt 3H
Close - Door/window
Door
Sep 18, 2026 · Apt 3H
Close - General
Cooking gas
Sep 17, 2026 · Apt GGINTH
Close
Show 40 more ↓
- Flooring/stairs
Floor
Sep 17, 2026 · Apt GGINTH
Close - Unsanitary condition
Pests
Sep 17, 2026 · Apt GGINTH
Close - Unsanitary condition
Mold
Sep 17, 2026 · Apt GGINTH
Close - Unsanitary condition
Pests
Sep 17, 2026 · Apt GGINTH
Close - Water leak
Heavy flow
Sep 17, 2026 · Apt GGINTH
Close - Plumbing
Basin/sink
Sep 17, 2026 · Apt GGINTH
Close - Unsanitary condition
Pests
Aug 28, 2026 · Apt GG
Close - Plumbing
Basin/sink
Aug 28, 2026 · Apt GG
Close - Flooring/stairs
Floor
Aug 28, 2026 · Apt GG
Close - Unsanitary condition
Pests
Aug 28, 2026 · Apt GG
Close - Plumbing
Basin/sink
Aug 28, 2026 · Apt GG
Close - Paint/plaster
Wall
Aug 28, 2026 · Apt GG
Close - Electric
Power outage
Aug 11, 2026 · Apt 1B
Close - Unsanitary condition
Pests
Jul 30, 2026 · Apt 4H
Close - Unsanitary condition
Pests
Jul 30, 2026 · Apt 4H
Close - Unsanitary condition
Pests
Jul 7, 2026 · Apt 4H
Close - Flooring/stairs
Floor
Jul 6, 2026 · Apt C
Close - Paint/plaster
Ceiling
Jul 6, 2026 · Apt C
Close - Paint/plaster
Ceiling
Jul 6, 2026 · Apt C
Close - Electric
Lighting
Jul 6, 2026 · Apt C
Close - Plumbing
Steam pipe/riser
Apr 26, 2026 · Apt J
Close - General
Cabinet
Apr 8, 2026 · Apt 1B
Close - Electric
Wiring
Apr 8, 2026 · Apt 3D
Close - Door/window
Window frame
Apr 8, 2026 · Apt 3D
Close - Unsanitary condition
Mold
Apr 8, 2026 · Apt 3D
Close - Electric
Outlet/switch
Apr 8, 2026 · Apt 3D
Close - Unsanitary condition
Mold
Mar 2, 2026 · Apt 4K
Close - Unsanitary condition
Mold
Feb 11, 2026 · Apt 4K
Close - Unsanitary condition
Mold
Feb 4, 2026 · Apt 4K
Close - Plumbing
Toilet
Feb 2, 2026 · Apt 3A
Close - Water leak
Slow leak
Feb 2, 2026 · Apt 3A
Close - Heat/hot water
Apartment only
Jan 19, 2026 · Apt 3K
Close - Paint/plaster
Ceiling
Jan 12, 2026 · Apt 1G
Close - Door/window
Door
Jan 12, 2026 · Apt 1G
Close - Electric
No lighting
Jan 12, 2026 · Apt 1G
Close - Electric
Outlet/switch
Jan 12, 2026 · Apt 1G
Close - Water leak
Heavy flow
Jan 12, 2026 · Apt 1G
Close - Electric
Power outage
Jan 7, 2026 · Apt 4H
Close - Paint/plaster
Ceiling
Jan 7, 2026 · Apt 1G
Close - Electric
Outlet/switch
Jan 7, 2026 · Apt 1G
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1926
- Floors
- 5
- Residential units
- 62
- Building area
- 52,547 ft²
- Lot area
- 14,040 ft²
- Zoning
- R7-1
- Community board
- 206
- Council district
- 15
- Block / lot
- 3031 / 69
- Assessed value
- $1,017,900
- Landmark / historic district
- No
HPD registration #201824, last renewed Jul 1, 2025.
Questions about 4575 Park Avenue
Who owns 4575 Park Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Park Ave. Apartments.
Does 4575 Park Avenue have violations?
Yes. NYC HPD has recorded 3,379 housing violations at this property.
Is 4575 Park Avenue rent stabilized?
NYC Department of Finance tax bills listed 59 rent-stabilized units here in 2024 (about 95% of its 62 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 4575 Park Avenue built?
City records list 1926 as the year it was built.
How many apartments are in 4575 Park Avenue?
It has 62 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.