1017 Home Street
Bronx, NY 10459BBL 2-02993-0031Map
Owner of record: Dreamyard 1017 Home Street Housing Dev. Fund Corp.
1017 Home Street is an elevator apartment building built in 2018 in Bronx, 10459. It has 64 residential units across 8 floors. The owner of record is Dreamyard 1017 Home Street Housing Dev. Fund Corp.. HPD has recorded 12 housing violations here, most recently on November 17, 2025. City tax records listed 63 rent-stabilized apartments here in 2024.
- HPD violations
- 12
- DOB violations
- 20
- ECB violations
- 12
- HPD complaints
- 51
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 12
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing/defective devices in the entire apartment located at apt 2g, 2nd story, 2nd apartment from south at west
Nov 17, 2025 · Apt 2G
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing/defective devices in the entire apartment located at apt 2g, 2nd story, 2nd apartment from south at west
Nov 17, 2025 · Apt 2G
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the kitchen located at apt 5a, 5th story, 4th apartment from east at south
Nov 17, 2025 · Apt 5A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the 2nd room from north located at apt 5a, 5th story, 4th apartment from east at south
Nov 17, 2025 · Apt 5A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the bathroom located at apt 5a, 5th story, 4th apartment from east at south
Nov 17, 2025 · Apt 5A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the foyer located at apt 5a, 5th story, 4th apartment from east at south
Nov 17, 2025 · Apt 5A
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from east located at apt 8j, 8th story, 2nd apartment from west at north
Dec 10, 2024 · Apt 8J
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east located at apt 8j, 8th story, 2nd apartment from west at north
Dec 10, 2024 · Apt 8J
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at entrance to apartment in the entire apartment located at apt 8g, 8th story, 4th apartment from west at north
Feb 2, 2022 · Apt 8G
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at entrance to apartment in the foyer located at apt 8c, 8th story, 3rd apartment from east at south
Feb 2, 2022 · Apt 8C
Closed — Violation dismissed
Show 2 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at entrance to apartment in the foyer located at apt 6e, 6th story, 2nd apartment from east at south
Feb 2, 2022 · Apt 6E
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed
DOB building violations · 20
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed
Show 10 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Apr 23, 1993
Dob violation - dismissed
ECB violations · 12
- Class - 2
Notification. failure to notify the department prior to installation or removal of equipment. note: at time of inspection, i observed c-hook rope suspended scaffold installed at exp #4 without notifying the dep
Dec 15, 2018 · Penalty $1,250
Resolve - Class - 2
Maintenance sidewalk shed shall be maintained and used by the general contractor. pedestrian protection does not meet code specifications. note: at time of inspection, i observed sws in place at exp #1 and #4 w
Dec 15, 2018 · Penalty $2,400
Resolve - Class - 2
Bc3301.1 failure to comply with osha standard. note: at time of inspection, i observed electrical power line going through supported scaffold which is metal, and electrical power line is not protected/insulated
Dec 15, 2018 · Penalty $625
Resolve - Class - 2
Bc3314.8.2 debris netting. where required by section 3314.8 the scaffold shall be enclosed with a debris netting. such netting shall be securely attached to the scaffold for the full height of all platform and
Dec 15, 2018 · Penalty $625
Resolve - Class - 1
Bc3314.8 guardrails and toeboards. all working platforms need to have top, mid, endrails and toeboard. note at time of inspection, i observed supported scaffold installed at exp #1 with several work platform mi
Dec 15, 2018 · Penalty $2,500
Resolve - Class - 2
Bc3307.7.2/gates.at the time of my inspection of an 8 story nb,topped off,i observed at expo 1,the main gate entering the site swings out into the public and was chocked open blocking the sidewalk reducing the
Dec 6, 2018
Resolve - Class - 2
Bc3316.9.2/no 16/32 hour rigging certs.for personnel working with rigging equipment.hoisting outside of a building.while performing audit inspection on mobile crane cn#1085/17 cd#4737 operatd by h.m.o peter fro
May 16, 2018 · Penalty $1,250
Resolve - Class - 2
No 16/32 hour rigging cert for personal working with rigging equipmentouside of building.while peforming audit inspection on mobile crane cn#1083/17 cd#4737 operated by hmo peter fran2050 lic#9264 exp 7/31/18
May 16, 2018 · Penalty $625
Resolve - Class - 1
Sec: bc 3301.2. safety measures: @ time of insp of an incident of a bearing wall falling & injuring a worker's leg @ a proposed 8 story new bldg installing bearing walls in 6 story. a pre-fabrication bearing wa
May 15, 2018 · Penalty $625
Resolve - Class - 1
Respondent failed to have a qualified/competent lift director on site as required. at the time of inspection designated lift director daniflhollond was on site. i requested his lift director logs but he had no
Apr 13, 2018
Resolve
Show 2 more ↓
- Class - 1
Respondent failed to have a qualified/competent lift director as required. mobile () cn#1085/17 co#4737 was on site operated by h mo robert m. von see making picks but lift director daniel holland was unable to
Apr 13, 2018 · Penalty $1,250
Resolve - Class - 2
Work does not conform to approved construction documents or approved amendments. as noted: @ time of insp @ an active construction site observed @ 1st flr level layout for column. base plate missing bolts on th
Feb 27, 2018
Resolve
Complaints
- Plumbing
Water supply
Jun 21, 2026 · Apt 3E
Close - Heat/hot water
Apartment only
Jan 27, 2026 · Apt 4H
Close - General
Bell/buzzer/intercom
Jan 8, 2026 · Apt 4F
Close - Heat/hot water
Entire building
Nov 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 21, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 8, 2025 · Apt 8J
Close - Heat/hot water
Entire building
Feb 6, 2025 · Apt 8J
Close - Heat/hot water
Apartment only
Jan 9, 2025 · Apt 4H
Close - Heat/hot water
Apartment only
Jan 3, 2025 · Apt 4H
Close - Heat/hot water
Entire building
Dec 14, 2024 · Apt 4H
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Nov 26, 2024 · Apt 4H
Close - Water leak
Slow leak
Nov 4, 2024 · Apt 8J
Close - General
Cooking gas
Sep 30, 2024 · Apt 4F
Close - Heat/hot water
Apartment only
Dec 7, 2023 · Apt 5D
Close - General
Janitor/super
Mar 16, 2023 · Apt 7H
Close - Heat/hot water
Apartment only
Mar 1, 2023 · Apt 5H
Close - Heat/hot water
Entire building
Jan 31, 2023 · Apt 2K
Close - Plumbing
Radiator
Jan 31, 2023 · Apt 7H
Close - Heat/hot water
Apartment only
Jan 25, 2023 · Apt 7H
Close - Heat/hot water
Entire building
Jan 14, 2023 · Apt 2K
Close - Heat/hot water
Apartment only
Dec 15, 2022 · Apt 2K
Close - Heat/hot water
Entire building
Nov 29, 2022 · Apt 7H
Close - Heat/hot water
Entire building
Nov 22, 2022 · Apt 7H
Close - Heat/hot water
Apartment only
Feb 19, 2022 · Apt 4G
Close - Heat/hot water
Apartment only
Feb 14, 2022 · Apt APT4G
Close - Heat/hot water
Apartment only
Jan 24, 2022 · Apt 2J
Close - Heat/hot water
Entire building
Jan 20, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 16, 2022 · Apt 3J
Close - Heat/hot water
Apartment only
Jan 12, 2022 · Apt 3G
Close - Heat/hot water
Apartment only
Jan 3, 2022 · Apt 2J
Close - Heat/hot water
Entire building
Jan 3, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 30, 2021 · Apt 2J
Close - Heat/hot water
Apartment only
Mar 2, 2021 · Apt 3G
Close - Heat/hot water
Apartment only
Feb 17, 2021 · Apt 3G
Close - Heat/hot water
Entire building
Feb 13, 2021 · Apt 4F
Close - Heat/hot water
Apartment only
Feb 12, 2021 · Apt 7E
Close - Heat/hot water
Apartment only
Feb 8, 2021 · Apt 4H
Close - Heat/hot water
Apartment only
Jan 31, 2021 · Apt 4A
Close - Heat/hot water
Entire building
Jan 12, 2021 · Apt 8G
Close - Heat/hot water
Apartment only
Jan 7, 2021 · Apt 2J
Close - Heat/hot water
Apartment only
Dec 20, 2020 · Apt 3B
Close - Heat/hot water
Apartment only
Dec 15, 2020 · Apt 2K
Close - Heat/hot water
Apartment only
Dec 15, 2020 · Apt 6B
Close - Heat/hot water
Apartment only
Jan 17, 2020 · Apt 3G
Close - Heat/hot water
Apartment only
Jan 17, 2020 · Apt 3G
Close - General
Bell/buzzer/intercom
Jan 16, 2020 · Apt 7C
Close - Plumbing
Radiator
Jan 16, 2020 · Apt 7C
Close - Door/window
Door
Jan 16, 2020 · Apt 7C
Close - Electric
Lighting
Jan 16, 2020 · Apt 7C
Close - Heat/hot water
Apartment only
Dec 5, 2019 · Apt 3G
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 2018
- Floors
- 8
- Residential units
- 64
- Building area
- 46,750 ft²
- Lot area
- 9,835 ft²
- Zoning
- R7-1
- Community board
- 203
- Council district
- 17
- Block / lot
- 2993 / 31
- Assessed value
- $2,206,350
- Landmark / historic district
- No
HPD registration #228115, last renewed Aug 13, 2025.
Questions about 1017 Home Street
Who owns 1017 Home Street?
The owner of record in NYC Department of City Planning PLUTO data is Dreamyard 1017 Home Street Housing Dev. Fund Corp..
Does 1017 Home Street have violations?
Yes. NYC HPD has recorded 12 housing violations at this property.
Is 1017 Home Street rent stabilized?
NYC Department of Finance tax bills listed 63 rent-stabilized units here in 2024 (about 98% of its 64 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1017 Home Street built?
City records list 2018 as the year it was built.
How many apartments are in 1017 Home Street?
It has 64 residential units and 65 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.