roofy

1890 Crotona Parkway

Bronx, NY 10460BBL 2-02985-0013Map

Owner of record: 1890 Realty LLC

1890 Crotona Parkway is a walk-up apartment building built in 1913 in Bronx, 10460. It has 39 residential units across 5 floors. The owner of record is 1890 Realty LLC. HPD has recorded 3,143 housing violations here, most recently on September 30, 2026. 50 of the 50 most recent violations are still open. City tax records listed 39 rent-stabilized apartments here in 2024.

HPD violations
3,143
DOB violations
7
ECB violations
31
HPD complaints
2,558

What to know

Concern
10 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 30, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
39
About 100% of the building's 39 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 3,143

  • A

    Paint with light colored paint to the satisfaction of this department at all walls and ceiling in the bathroom located at apt 28, 2nd story, 3rd apartment from south at west

    Sep 30, 2026 · Apt 28

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroom located at apt 47, 4th story, 4th apartment from south at west

    Sep 30, 2026 · Apt 47

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective lifting vinyl floor tile in the kitchen located at apt 47, 4th story, 4th apartment from south at west

    Sep 30, 2026 · Apt 47

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 28, 2nd story, 3rd apartment from south at west

    Sep 30, 2026 · Apt 28

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 28, 2nd story, 3rd apartment from south at west

    Sep 30, 2026 · Apt 28

    Open — Nov sent out
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl water closet in the bathroom located at apt 28, 2nd story, 3rd apartment from south at west

    Sep 30, 2026 · Apt 28

    Open — Nov sent out
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at door in the entrance located at apt 28, 2nd story, 3rd apartment from south at west

    Sep 30, 2026 · Apt 28

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 28, 2nd story, 3rd apartment from south at west

    Sep 30, 2026 · Apt 28

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 28, 2nd story, 3rd apartment from south at west

    Sep 30, 2026 · Apt 28

    Open — Notice of issuance sent to tenant
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 28, 2nd story, 3rd apartment from south at west

    Sep 30, 2026 · Apt 28

    Open — Nov sent out
Show 40 more ↓
  • C

    Properly repair with similar material the broken or defective lifting vinyl floor tile creating a trip hazard in the kitchen located at apt 28, 2nd story, 3rd apartment from south at west

    Sep 30, 2026 · Apt 28

    Open — Civ14 mailed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 21, 2nd story, 2nd apartment from south at west

    Sep 28, 2026 · Apt 21

    Open — Notice of issuance sent to tenant
  • B

    Properly repair with similar material the broken or defective re-caulk around bathtub in the bathroom located at apt 26, 2nd story, 5th apartment from south at west

    Sep 28, 2026 · Apt 26

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4, 1st story, 1st apartment from north at east

    Sep 28, 2026 · Apt 4

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 4, 1st story, 1st apartment from north at east

    Sep 28, 2026 · Apt 4

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 4, 1st story, 1st apartment from north at east

    Sep 28, 2026 · Apt 4

    Open — Notice of issuance sent to tenant
  • B

    Properly repair with similar material the broken or defective re-grout ceramic wall tiles at south and west walls in the bathroom located at apt 26, 2nd story, 5th apartment from south at west

    Sep 28, 2026 · Apt 26

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective porcelain enamel by method of re-glazing at bathtub in the bathroom located at apt 4, 1st story, 1st apartment from north at east

    Sep 28, 2026 · Apt 4

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood sub floor in the bathroom located at apt 4, 1st story, 1st apartment from north at east

    Sep 28, 2026 · Apt 4

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 4, 1st story, 1st apartment from north at east

    Sep 28, 2026 · Apt 4

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 41, 4th story, 2nd apartment from south at west

    Sep 28, 2026 · Apt 41

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 41, 4th story, 2nd apartment from south at west

    Sep 28, 2026 · Apt 41

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective spring balance at lower window sash at fire escape in the 5th room from east located at apt 26, 2nd story, 5th apartment from south at west

    Sep 28, 2026 · Apt 26

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 26, 2nd story, 5th apartment from south at west

    Sep 28, 2026 · Apt 26

    Open — Notice of issuance sent to tenant
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceilings in the entire apartment located at apt 21, 2nd story, 2nd apartment from south at west

    Sep 28, 2026 · Apt 21

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 26, 2nd story, 5th apartment from south at west

    Sep 28, 2026 · Apt 26

    Open — Notice of issuance sent to tenant
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at 1st public hall bulkhead from east

    Sep 28, 2026

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 21, 2nd story, 2nd apartment from south at west

    Sep 28, 2026 · Apt 21

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective mortise lock ( cylinder loose ) in the entrance located at apt 36, 3rd story, 5th apartment from south at west

    Sep 28, 2026 · Apt 36

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at 1st public hall bulkhead from east

    Sep 28, 2026

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of household items and garbage at public hall, 5th story

    Sep 28, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective porcelain enamel by method of re-glazing at bathtub in the bathroom located at apt 26, 2nd story, 5th apartment from south at west

    Sep 28, 2026 · Apt 26

    Open — Nov sent out
  • A

    Cleanse to the satisfaction of this department the floor at public hall stairs

    Sep 28, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 4th story

    Sep 28, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 3rd story

    Sep 28, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling at public hall, 2nd story

    Sep 28, 2026

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical outlet at south wall in the 5th room from east at north located at apt 26, 2nd story, 5th apartment from south at west

    Sep 28, 2026 · Apt 26

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak at ceiling at 1st public hall bulkhead from east

    Sep 28, 2026

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4, 1st story, 1st apartment from north at east

    Sep 28, 2026 · Apt 4

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of household items at public hall, 3rd story

    Sep 25, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at bulkhead

    Sep 25, 2026

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at bulkhead

    Sep 25, 2026

    Open — Nov sent out
  • A

    Cleanse to the satisfaction of this department the floors at public hall, 5th story

    Sep 25, 2026

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 5th story

    Sep 25, 2026

    Open — Nov sent out
  • A

    Cleanse to the satisfaction of this department the floors at public hall, 4th story

    Sep 25, 2026

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2, 1st story, 1st apartment from south at west

    Sep 25, 2026 · Apt 2

    Open — Notice of issuance sent to tenant
  • A

    Cleanse to the satisfaction of this department the floors at public hall, 2nd story

    Sep 25, 2026

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of household items at public hall, 2nd story

    Sep 25, 2026

    Open — Nov sent out
  • A

    Cleanse to the satisfaction of this department the floors at public hall, 3rd story

    Sep 25, 2026

    Open — Nov sent out
  • A

    Cleanse to the satisfaction of this department the floors at public hall, 1st story

    Sep 25, 2026

    Open — Nov sent out

DOB building violations · 7

  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    Oct 1, 2019

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 21, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 27, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 28, 2011

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 9, 1994

    Dob violation - dismissed

ECB violations · 31

  • Class - 3

    At front of building, left side, vertical cracks appear above 1st floor windows., maintain exterior building wall

    May 8, 2025

    Resolve
  • Class - 1

    At 3rd flr apt 32 - 1 family class 'a' apt observed converted into 5 families. noted: at 2nd rm from front - created & occupied as a sro with key lock at door, 2 beds, tv, refrigerator, pan, toiletries, persona

    Dec 28, 2022 · Penalty $16,000

    Resolve
  • Class - 1

    At 3rd flr apt 32 - 1 family class 'a' apt observed converted into 5 families. noted: at 2nd rm from rear at kitchen - created & occupied as a sro with key lock at door, bed, tv, food, air fryer, refrigerator,

    Dec 28, 2022 · Penalty $16,000

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner. noted: at time of inspection: (1) observed various items stored in common hallway's obstructing clear exit passageway consisting of garbage, furniture & de

    Dec 28, 2022 · Penalty $312

    Resolve
  • Class - 1

    At 3rd flr apt 32 - 1 family class 'a' apt observed converted into 5 families. noted: at rear rm - created & occupied as a sro with key lock at door, bed, tv, microwave, food, pots, refrigerator, pans, toiletri

    Dec 28, 2022 · Penalty $16,000

    Resolve
  • Class - 2

    W/o a permit. noted: at 3rd flr apt 32 - full height partition walls & swing door erected to change apt flr layout, obtain all permits

    Dec 28, 2022

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner: use of prohibited door and/or hardware per bc 1008.1.8; 27-371(j). noted: at time of inspection - observed a key locking device at rm door leading to fire

    Dec 28, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Occupancy contrary to cert of occupancy or dob records c of o#61569 states 1st fl(tube)5 rooms per unit at time of inspection. noted apt#7 had 5 bedrooms 1 full kitchen & 1 3pc bath. increasing room cant by two

    Aug 29, 2019

    Resolve
  • Class - 2

    Work w/o permit at time of inspection. noted erected full height partitions creating additional 2 dwelling units w/doors & lighting w/electrical outlets-(increasing)room (cant)& changing layout of unit.

    Aug 29, 2019

    Resolve
  • Class - 1

    Observed garbage pails stored on front sidewalk which are partially obstructed fire escape drop ladder and 1st floor apt window at expo # 01. , remove obstruction

    Jul 13, 2019 · Penalty $312

    Resolve
Show 21 more ↓
  • Class - 1

    Failure to obey a vacate order from the commissioner per 28-207.4 noted: vacate #x185/17. partial issued 12/28/17 at time of inspection i observed 1 sro at bsement with bed, personal fx, toiletries, tv and key

    Aug 30, 2018

    Resolve
  • Class - 2

    Unlawful acts failure to comply w/ an order of the commissioner. failure to comply w/ the commissioner's order contained in summons/vio# 35338576z issued on 5/15/18 & to file a c of c pursuant to 28-201.1 & 1rc

    Jul 13, 2018 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply w/ the commissioner's order contained in summons/vio# 35297548n issued on 12/12/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. multiple dwelling converted maintained or occupied w/

    Jul 13, 2018 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in summons/vio#35297547l issued on 12/27/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o permit. note at cellar level 8 sro's created some with

    May 15, 2018 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35297548n issued on 12-27-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. multiple dwelling converted maintained or occupied w/3 or more

    May 15, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/violation #35294548n issued 12/29/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. rem: comply with commissi

    Apr 6, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/violation #35297547l issued 12/27/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. rem: comply with commissi

    Apr 6, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply w/commissioner's order contained in summons/violation #35297598n issued on 12/27/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. rmdy: comply with commissione

    Feb 12, 2018 · Penalty $800

    Resolve
  • Class - 1

    Work without a permit. noted: at cellar 8 sro's some with windows two 3pcs bathroom, and two half bathrooms. shared kitchen for 4 bedrooms. one sro with electrical plate. some doors with locks, full height part

    Dec 27, 2017 · Penalty $1,600

    Resolve
  • Class - 1

    Multiple dwelling converted maintained or occupied with 3 or more additional dwelling units than legally authorized by the c of o or official records. observed 5 story multiple dwelling building approved for 39

    Dec 27, 2017 · Penalty $2,400

    Resolve
  • Class - 2

    36;42;48a:as per class 254-36 burner not register as per dob records.correct all violating conditions and submit a cofc.

    Sep 1, 2017 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in nov#35146986p issued on 10/27/15 and to file a certificate of correction pursu ant to 28-201.1, 28-204 and 1rcny 102-01. noted: comply with commissio

    Dec 13, 2015 · Penalty $800

    Resolve
  • Class - 1

    Failure to comply w/commissioner's order contained in nov#35146987r issued on 10/27/15 and to file a certificate of correction pursuant to 28-201.1,28-204.4 and 1 rcny 102-01. noted: at time of inspection no do

    Dec 13, 2015

    Resolve
  • Class - 1

    Work w/o a permit. work noted in apt #7 erected partition to create 6 sros throughout apartment making passageway narrow and changing layoutof apartment as per othe rapartment on other floors. all rooms install

    Oct 27, 2015

    Resolve
  • Class - 1

    Multiple dwelling converted. maintained an occupied with 3 or more additional dwelling units than legally authorized by the cofo on officialrecords. noted: cofo legal occupancy is 39 now with the illegal conver

    Oct 27, 2015 · Penalty $2,400

    Resolve
  • Class - 2

    Occupancy in contrary to that allowed by c/o or dept.of bldg records.illegal conversion at first stry.a class 'a' apt.converted to s.r.o a total of 5 rooms increasing.bldg occupancy partitions made up of wood/m

    Oct 1, 2015

    Resolve
  • Class - 2

    Work w/o a permit. work noted: at the kitchen of apt #32 installed water & waste lines for washing machine. remedy: obtain permit or restore to prior legal condition.

    Jan 24, 2014

    Resolve
  • Class - 1

    3 full grown pit bull observed at rear exit passageway the dogs were kept free and unleashed under fire escape rem: remove obstruction

    Oct 7, 2011 · Penalty $1,200

    Resolve
  • Non-hazardous

    Altered buildilng occupied without a valid certificate of occupancy alt#114-89 remedy:obtain a valid certificate of occupancy showing offices at cellar.

    Jul 5, 1991 · Penalty $285

    Resolve
  • Non-hazardous

    Work without a permit. remedy: obtain a permit.

    Nov 6, 1989 · Penalty $125

    Resolve
  • Non-hazardous

    Failure to provide approved plans at premises at time of inspection. remedy: provide approved plans.

    Nov 1, 1989 · Penalty $25

    Resolve

Complaints

  • Door/window

    Window frame

    Aug 11, 2026 · Apt 55

    Close
  • Paint/plaster

    Ceiling

    Aug 9, 2026 · Apt 21

    Close
  • Paint/plaster

    Ceiling

    Aug 9, 2026 · Apt 21

    Close
  • Water leak

    Slow leak

    Jul 22, 2026 · Apt 21

    Close
  • Paint/plaster

    Ceiling

    Jul 22, 2026 · Apt 21

    Close
  • Water leak

    Heavy flow

    Jul 13, 2026 · Apt 21

    Close
  • Heat/hot water

    Entire building

    Mar 10, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Mar 7, 2026 · Apt 43

    Close
  • Water leak

    Damp spot

    Mar 7, 2026 · Apt 43

    Close
  • Unsanitary condition

    Pests

    Mar 7, 2026 · Apt 43

    Close
Show 40 more ↓
  • Unsanitary condition

    Pests

    Mar 7, 2026 · Apt 43

    Close
  • Door/window

    Window frame

    Feb 18, 2026 · Apt 38

    Close
  • Paint/plaster

    Ceiling

    Feb 18, 2026 · Apt 38

    Close
  • Water leak

    Heavy flow

    Feb 18, 2026 · Apt 38

    Close
  • Paint/plaster

    Ceiling

    Feb 18, 2026 · Apt 38

    Close
  • Heat/hot water

    Apartment only

    Feb 8, 2026 · Apt 37

    Close
  • Heat/hot water

    Entire building

    Feb 1, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 31, 2026 · Apt 21

    Close
  • Heat/hot water

    Apartment only

    Jan 29, 2026 · Apt 21

    Close
  • Unsanitary condition

    Mold

    Jan 13, 2026 · Apt 56

    Close
  • Paint/plaster

    Window/frame

    Jan 13, 2026 · Apt 21

    Close
  • Paint/plaster

    Wall

    Jan 13, 2026 · Apt 21

    Close
  • Paint/plaster

    Window/frame

    Jan 13, 2026 · Apt 21

    Close
  • Paint/plaster

    Wall

    Jan 13, 2026 · Apt 21

    Close
  • Water leak

    Heavy flow

    Jan 8, 2026 · Apt 23

    Close
  • Unsanitary condition

    Mold

    Jan 8, 2026 · Apt 23

    Close
  • Door/window

    Door

    Jan 6, 2026 · Apt 4

    Close
  • Door/window

    Door

    Jan 6, 2026 · Apt NA

    Close
  • Door/window

    Door

    Jan 6, 2026 · Apt 55

    Close
  • Plumbing

    Water supply

    Jan 6, 2026 · Apt 55

    Close
  • Unsanitary condition

    Pests

    Jan 6, 2026 · Apt 44

    Close
  • Plumbing

    Water supply

    Jan 6, 2026 · Apt 36

    Close
  • Plumbing

    Water supply

    Jan 6, 2026 · Apt 31

    Close
  • Plumbing

    Water supply

    Jan 6, 2026 · Apt 31

    Close
  • Unsanitary condition

    Pests

    Jan 6, 2026 · Apt 28

    Close
  • Unsanitary condition

    Pests

    Jan 6, 2026 · Apt 28

    Close
  • Plumbing

    Water supply

    Jan 6, 2026 · Apt 28

    Close
  • Plumbing

    Water supply

    Jan 6, 2026 · Apt 28

    Close
  • Safety

    Fire escape

    Jan 6, 2026 · Apt 26

    Close
  • Unsanitary condition

    Pests

    Jan 6, 2026 · Apt 21

    Close
  • Plumbing

    Water supply

    Jan 6, 2026 · Apt 21

    Close
  • Plumbing

    Water supply

    Jan 6, 2026 · Apt 21

    Close
  • Unsanitary condition

    Pests

    Jan 6, 2026 · Apt 4

    Close
  • Unsanitary condition

    Pests

    Jan 6, 2026 · Apt 4

    Close
  • Unsanitary condition

    Pests

    Jan 6, 2026 · Apt 56

    Close
  • Plumbing

    Water supply

    Jan 6, 2026 · Apt 4

    Close
  • Plumbing

    Water supply

    Jan 6, 2026 · Apt 4

    Close
  • Unsanitary condition

    Pests

    Jan 6, 2026 · Apt 3

    Close
  • Plumbing

    Water supply

    Jan 6, 2026 · Apt 3

    Close
  • Plumbing

    Water supply

    Jan 6, 2026 · Apt 3

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1913
Floors
5
Residential units
39
Building area
43,244 ft²
Lot area
12,343 ft²
Zoning
R7-1
Community board
206
Council district
15
Block / lot
2985 / 13
Assessed value
$1,096,200
Landmark / historic district
No

HPD registration #208916, last renewed Sep 8, 2025.

Questions about 1890 Crotona Parkway

Who owns 1890 Crotona Parkway?

The owner of record in NYC Department of City Planning PLUTO data is 1890 Realty LLC.

Does 1890 Crotona Parkway have violations?

Yes. NYC HPD has recorded 3,143 housing violations at this property.

Is 1890 Crotona Parkway rent stabilized?

NYC Department of Finance tax bills listed 39 rent-stabilized units here in 2024 (about 100% of its 39 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 1890 Crotona Parkway built?

City records list 1913 as the year it was built.

How many apartments are in 1890 Crotona Parkway?

It has 39 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.