1941 Southern Boulevard
Bronx, NY 10460BBL 2-02960-0073Map
Owner of record: Ahc Housing Development Fund Corporation
1941 Southern Boulevard is a walk-up apartment building built in 1912 in Bronx, 10460. It has 19 residential units across 5 floors. The owner of record is Ahc Housing Development Fund Corporation. HPD has recorded 390 housing violations here, most recently on October 13, 2026. 3 of the 50 most recent violations are still open. City tax records listed 19 rent-stabilized apartments here in 2024.
- HPD violations
- 390
- DOB violations
- 7
- ECB violations
- 3
- HPD complaints
- 304
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 390
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building vestibule , 1st story
Oct 13, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch and assembly at building vestibule door , 1st story
Oct 13, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 4d, 4th story, 1st apartment from south at west
Apr 18, 2025 · Apt 4D
Open — Violation will be reinspected - BHazardous
Remove all obstructions and repair all defects in drain pipe at wash basin in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south
Apr 18, 2025 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Replace the broken or defective wash basin in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south
Apr 18, 2025 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 4d, 4th story, 1st apartment from south at west
Apr 18, 2025 · Apt 4D
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 5b, 5th story, 1st apartment from east at south
Mar 18, 2025 · Apt 5B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective intercom connection from entrance door to building to intercom panel at south wall in the private hallway located at apt 5b, 5th story, 1st apartment from east at south
Mar 18, 2025 · Apt 5B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the kitchen located at apt 5b, 5th story, 1st apartment from east at south
Mar 18, 2025 · Apt 5B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen located at apt 5b, 5th story, 1st apartment from east at south
Mar 11, 2025 · Apt 5B
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 5b, 5th story, 1st apartment from east at south
Mar 11, 2025 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective due to defective mortise lock at door in the entrance located at apt 5b, 5th story, 1st apartment from east at south
Mar 11, 2025 · Apt 5B
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor ( around the west radiator ) in the 2nd room from east located at apt 5b, 5th story, 1st apartment from east at south
Mar 11, 2025 · Apt 5B
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor ( around the east radiator ) in the 1st room from east at north located at apt 5b, 5th story, 1st apartment from east at south
Mar 11, 2025 · Apt 5B
Closed — Violation dismissed - BHazardous
Refit lower window sash at west wall in the 2nd room from east located at apt 5b, 5th story, 1st apartment from east at south
Mar 11, 2025 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 5b, 5th story, 1st apartment from east at south
Mar 11, 2025 · Apt 5B
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of garbage bags at door leading to west yard.
Aug 3, 2024
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Aug 3, 2024
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor
Aug 3, 2024
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1c, 6th story, 1st apartment from east at south
Aug 3, 2024 · Apt 1C
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of wood floor panel in the 1st room from east located at apt 1c, 1st story, apartment at south
Aug 3, 2024 · Apt 1C
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Aug 3, 2024
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Aug 3, 2024
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box
Aug 3, 2024
Closed — Violation closed - ANon-hazardous
File with this department a registration statement for building.
Aug 3, 2024
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east at south located at apt 1c, 1st story, apartment at south
Aug 3, 2024 · Apt 1C
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... (less than 10 sq-ft) at south wall in the 1st room from east located at apt 1c, 1st story, apartment at south
Aug 3, 2024 · Apt 1C
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... (less than 10 sq-ft) at south wall in the 1st room from east located at apt 1c, 1st story, apartment at south original violation 17173305 issued 03-aug-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Aug 3, 2024 · Apt 1C
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 3rd story fire escape balcony at east exterior wall building front.
Aug 3, 2024
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system
Aug 3, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective door frame north wall in the 2nd room from east at south located at apt 1c, 1st story, apartment at south
Aug 3, 2024 · Apt 1C
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1c, 6th story, 1st apartment from east at south
Aug 3, 2024 · Apt 1C
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1c, 6th story, 1st apartment from east at south
Aug 3, 2024 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1c, 6th story, 1st apartment from east at south
Aug 3, 2024 · Apt 1C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective door at east wall in the 1st room from east located at apt 1c, 1st story, apartment at south
Aug 3, 2024 · Apt 1C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from east located at apt 1c, 1st story, apartment at south
Aug 3, 2024 · Apt 1C
Closed — Violation closed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story
Jun 27, 2024
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south
Jun 27, 2024 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ... , 1st story
Jun 27, 2024
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story
Jun 27, 2024
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Jun 27, 2024
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor, 1st story
Jun 27, 2024
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Jun 27, 2024
Closed — Violation closed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box ... , 1st story
Jun 27, 2024
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper., 1st story
Jun 27, 2024
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of electric motorcycle at public hall, 1st story
Jun 27, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1c, 1st story, 1st apartment from east at south
Jun 27, 2024 · Apt 1C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1c, 1st story, 1st apartment from east at south
Jun 27, 2024 · Apt 1C
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 5th room from east, the 3rd room from east located at apt 2c, 2nd story, 2nd apartment from east at south
Jun 25, 2024 · Apt 2C
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood flooring, in the 5th room from east located at apt 2c, 2nd story, 2nd apartment from east at south
Jun 18, 2024 · Apt 2C
Closed — Violation closed
DOB building violations · 7
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 3
- Class - 2
At time of inspection observed sidewalk shed with trash, debris and a pallet of cement on sidewalk shed no drawings to verify storage.remove trash, debris and materials from sidewalk shed.
Apr 27, 2023 · Penalty $5,000
Resolve - Class - 2
At time of inspection observed supported scaffold in place not in use with permit x00663720 expired 1-25-2023.
Apr 27, 2023
Resolve - Class - 2
At time of inspection observed sidewalk shed in place asked for sidewalk shed drawing none provided.have documents on site
Apr 27, 2023
Resolve
Complaints
- Heat/hot water
Entire building
Oct 12, 2026 · Apt 5B
Close - Unsanitary condition
Pests
Aug 19, 2026 · Apt 5B
Close - Flooring/stairs
Floor
Aug 19, 2026 · Apt 5B
Close - Door/window
Door
Mar 17, 2025 · Apt 5B
Close - Flooring/stairs
Floor
Mar 17, 2025 · Apt 5B
Close - Door/window
Window frame
Mar 17, 2025 · Apt 5B
Close - Paint/plaster
Ceiling
Mar 17, 2025 · Apt 5B
Close - Unsanitary condition
Pests
Mar 17, 2025 · Apt 5B
Close - General
Bell/buzzer/intercom
Mar 17, 2025 · Apt 5B
Close - Door/window
Window frame
Mar 10, 2025 · Apt 5B
Close
Show 40 more ↓
- Unsanitary condition
Pests
Mar 10, 2025 · Apt 5B
Close - Flooring/stairs
Floor
Mar 10, 2025 · Apt 5B
Close - Flooring/stairs
Floor
Mar 10, 2025 · Apt 5B
Close - Plumbing
Radiator
Mar 10, 2025 · Apt 5B
Close - Paint/plaster
Ceiling
Mar 10, 2025 · Apt 5B
Close - Door/window
Door
Feb 24, 2025 · Apt 5B
Close - Plumbing
Radiator
Feb 24, 2025 · Apt 5B
Close - Paint/plaster
Ceiling
Feb 24, 2025 · Apt 5B
Close - Unsanitary condition
Pests
Feb 24, 2025 · Apt 5B
Close - Flooring/stairs
Floor
Jul 27, 2024 · Apt 1C
Close - Unsanitary condition
Mold
Jul 27, 2024 · Apt 1C
Close - Unsanitary condition
Mold
Apr 20, 2024 · Apt 1C
Close - Flooring/stairs
Floor
Apr 20, 2024 · Apt 1C
Close - Heat/hot water
Apartment only
Apr 20, 2024 · Apt 1C
Close - Unsanitary condition
Pests
Mar 6, 2024 · Apt 5C
Close - Unsanitary condition
Mold
Mar 6, 2024 · Apt 5C
Close - Water leak
Heavy flow
Jan 20, 2024 · Apt 2B
Close - Heat/hot water
Entire building
Nov 9, 2023 · Apt 5B
Close - Heat/hot water
Entire building
Nov 9, 2023 · Apt BLDG
Close - Unsanitary condition
Pests
Oct 25, 2023 · Apt 5B
Close - Plumbing
Water supply
Oct 25, 2023 · Apt 5B
Close - Heat/hot water
Entire building
Oct 25, 2023 · Apt BLDG
Close - Plumbing
Water supply
Oct 11, 2023 · Apt BLDG
Close - Unsanitary condition
Pests
Oct 11, 2023 · Apt 1D
Close - Appliance
Electric/gas range
Oct 11, 2023 · Apt 1D
Close - Heat/hot water
Apartment only
Oct 11, 2023 · Apt 1D
Close - Paint/plaster
Wall
Jun 21, 2023 · Apt 2B
Close - Door/window
Door
Jun 21, 2023 · Apt 2B
Close - Heat/hot water
Entire building
Feb 9, 2023 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 21, 2022 · Apt 4D
Close - Electric
Power outage
Oct 2, 2022 · Apt 5B
Close - Water leak
Heavy flow
Sep 25, 2022 · Apt 5A
Close - Paint/plaster
Wall
Aug 10, 2022 · Apt 5B
Close - Paint/plaster
Wall
Aug 10, 2022 · Apt 5B
Close - Water leak
Slow leak
Aug 10, 2022 · Apt 5B
Close - Water leak
Heavy flow
Jul 21, 2022 · Apt 5B
Close - Heat/hot water
Entire building
Jul 21, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 19, 2022 · Apt 5B
Close - Paint/plaster
Ceiling
Jul 19, 2022 · Apt 5B
Close - Heat/hot water
Entire building
Jul 19, 2022 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1912
- Floors
- 5
- Residential units
- 19
- Building area
- 16,888 ft²
- Lot area
- 4,470 ft²
- Zoning
- R7-1
- Community board
- 206
- Council district
- 15
- Block / lot
- 2960 / 73
- Assessed value
- $352,800
- Landmark / historic district
- No
HPD registration #208099, last renewed Sep 18, 2025.
Questions about 1941 Southern Boulevard
Who owns 1941 Southern Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is Ahc Housing Development Fund Corporation.
Does 1941 Southern Boulevard have violations?
Yes. NYC HPD has recorded 390 housing violations at this property.
Is 1941 Southern Boulevard rent stabilized?
NYC Department of Finance tax bills listed 19 rent-stabilized units here in 2024 (about 100% of its 19 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1941 Southern Boulevard built?
City records list 1912 as the year it was built.
How many apartments are in 1941 Southern Boulevard?
It has 19 residential units and 21 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.