1915 Southern Boulevard
Bronx, NY 10460BBL 2-02960-0040Map
Owner of record: 1911-1915 Southern Blvd, LLC
1915 Southern Boulevard is a walk-up apartment building built in 1916 in Bronx, 10460. It has 18 residential units across 5 floors. The owner of record is 1911-1915 Southern Blvd, LLC. HPD has recorded 196 housing violations here, most recently on October 16, 2026. 7 of the 50 most recent violations are still open. City tax records listed 16 rent-stabilized apartments here in 2024.
- HPD violations
- 196
- DOB violations
- 11
- ECB violations
- 6
- HPD complaints
- 827
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 196
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt 2b, 3rd story, 1st apartment from south at west
Oct 16, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt a, 1st story, 2nd apartment from south at west
Jul 15, 2026 · Apt A
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt a, 1st story, 2nd apartment from south at west
Jul 15, 2026 · Apt A
Closed — Violation closed - BHazardous
Replace with new the missing eschutchen plate at heat riser at ceiling in the bathroom located at apt a, 1st story, 2nd apartment from south at west
Jul 15, 2026 · Apt A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt a, 1st story, 2nd apartment from south at west
Jul 15, 2026 · Apt A
Closed — Violation closed - BHazardous
Fire egress defective. remove the obstruction in fireproof passageway consisting of household item and construction material
Jul 15, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at closer arm, at fire door leading to north yard at public hall, 1st story
May 18, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt c, 1st story, 1st apartment from east at south
May 18, 2026 · Apt C
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt c, 1st story, 1st apartment from east at south
May 18, 2026 · Apt C
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt c, 1st story, 1st apartment from east at south
May 18, 2026 · Apt C
Closed — Violation closed
Show 40 more ↓
- BHazardous
Provide a safe and adequate supply of electric service to the fixtures (light and outlets) in the 2nd room from east located at apt c, 1st story, 1st apartment from east at south
May 18, 2026 · Apt C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color blistering, holes at ceiling, west and north walls in the 2nd room from east located at apt c, 1st story, 1st apartment from east at south
May 18, 2026 · Apt C
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt c, 1st story, 1st apartment from east at south
May 18, 2026 · Apt C
Closed — Violation closed - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder tack welded, secure using appropriate nuts and bolts at east exterior wall fire escape at fire escape
May 18, 2026
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt a, 1st story, 1st apartment from east at south
May 1, 2026 · Apt A
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt a, 1st story, 1st apartment from east at south
May 1, 2026 · Apt A
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at north and west walls in the bathroom located at apt a, 1st story, 1st apartment from east at south
May 1, 2026 · Apt A
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective cracked glass pane at building entrance
May 1, 2026
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at north yard
May 1, 2026
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchen located at apt a, 1st story, 2nd apartment from south at west
Feb 18, 2026 · Apt A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt a, 1st story, 2nd apartment from south at west
Feb 18, 2026 · Apt A
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the mold at ceramlc tile at east wall in the bathroom located at apt a, 1st story, 2nd apartment from south at west
Feb 18, 2026 · Apt A
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10.sq.ft at west wall in the bathroom located at apt a, 1st story, 2nd apartment from south at west original violation 18653773 issued 18-feb-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Feb 18, 2026 · Apt A
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10.sq.ft at west wall in the bathroom located at apt a, 1st story, 2nd apartment from south at west
Feb 18, 2026 · Apt A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 1st room from east located at apt 2b, 3rd story, 1st apartment from south at west
Dec 23, 2025 · Apt 2B
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the private hallway located at apt 2b, 3rd story, 1st apartment from south at west
Dec 23, 2025 · Apt 2B
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the kitchen located at apt 2b, 3rd story, 1st apartment from south at west
Dec 23, 2025 · Apt 2B
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, south wall, east wall in the 4th room from east located at apt 2b, 3rd story, 1st apartment from south at west
Dec 23, 2025 · Apt 2B
Open — Defect letter issued - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish, by method of reglazing at bathtub in the bathroom located at apt 2b, 3rd story, 1st apartment from south at west
Dec 12, 2025 · Apt 2B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective escutcheon plate at riser at east wall in the 1st room from east located at apt 2b, 3rd story, 1st apartment from south at west
Dec 12, 2025 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 3rd story, 1st apartment from south at west
Dec 12, 2025 · Apt 2B
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at window frame from east at south wall in the bathroom located at apt 2b, 3rd story, 1st apartment from south at west original violation 18371311 issued 15-nov-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Nov 15, 2025 · Apt 2B
Open — Violation will be reinspected - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the bathroom located at apt 2b, 3rd story, 1st apartment from south at west
Nov 15, 2025 · Apt 2B
Open — Defect letter issued - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at 1st window frame from east at south wall in the bathroom located at apt 2b, 3rd story, 1st apartment from south at west
Nov 15, 2025 · Apt 2B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective handle at radiator shut off valve at west wall in the 5th room from east located at apt a, 1st story, 2nd apartment from south at west
Nov 11, 2025 · Apt A
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective leaky air valave at east wall radiator in the 4th room from east located at apt a, 1st story, 2nd apartment from south at west
Nov 11, 2025 · Apt A
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation riser at north wall in the bathroom located at apt a, 1st story, 2nd apartment from south at west
Nov 11, 2025 · Apt A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt a, 1st story, 2nd apartment from south at west
Nov 11, 2025 · Apt A
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at west wall and south wall door in the bathroom located at apt a, 1st story, 2nd apartment from south at west
Nov 11, 2025 · Apt A
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Nov 11, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at upper sash at south wall window in the bathroom located at apt 2b, 3rd story, 1st apartment from south at west
Nov 11, 2025 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt a, 1st story, 2nd apartment from south at west
Nov 11, 2025 · Apt A
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of a lockable slidebolt installed at apartment door in the entrance located at apt a, 1st story, 2nd apartment from south at west
Nov 11, 2025 · Apt A
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt a, 1st story, 2nd apartment from south at west
Nov 11, 2025 · Apt A
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective leaky air valve at east wall radiator in the 1st room from east located at apt a, 1st story, 2nd apartment from south at west
Nov 11, 2025 · Apt A
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items at at public hall, 3rd story
Oct 15, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at 1st fire door from west at north at public hall, 1st story
Oct 15, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4d, 4th story, 1st apartment from north at east
Oct 5, 2025 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4d, 4th story, 1st apartment from north at east
Oct 5, 2025 · Apt 4D
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 1st apartment from south at west
Oct 5, 2025 · Apt 4B
Closed — Violation dismissed
DOB building violations · 11
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed
Show 1 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 6
- Class - 2
Defective electrical at solenoid valve on boiler feed pipe-no cover for pit at rear of boiler-safety valve discharge no piped down-no supports for safety valve discharge pipe-insulation falling from boiler-no b
Mar 18, 2022
Resolve - Class - 1
Failure to provide unobstructed exit passageway noted at time of insp construction debris garbage bags being stored and piled up 5th floor stair landing obstructing exit passage from apt 5b rem: remove obstruct
Feb 3, 2011
Resolve - Class - 2
Failure to comply with an order from the commissioner to file a certificate of correction with the dept of buildings for nov #34759678z,issued 3/12/09 for "occupancy to d.o.b. records" cellar level.
Aug 21, 2009 · Penalty $4,000
Resolve - Class - 1
Occupancy contrary to that allowed by the building department records: noted: from legal occupancty at cellar level as accessory use (boiler room, storage) to: illegal class "a" apartment, with bedroom (bed, pe
Mar 12, 2009 · Penalty $12,000
Resolve - Non-hazardous
Failure to maintain the floor beams within apartments 1b,2b, & 3b as follows: bathrooms & kitchen floors sag, about 4 inches. remedy: replace all defective beams and survey the remaining apartments for any oth
Nov 7, 1997 · Penalty $2,500
Resolve - Non-hazardous
Occupancy contrary to building department records: first floor storefront is occupied as an american legion social club. bsed on building notice application / plan # 57 of 1971, the legal occupancy should be a
Oct 26, 1995 · Penalty $1,000
Resolve
Complaints
- Electric
No lighting
Sep 13, 2026 · Apt 3C
Open - Unsanitary condition
Garbage/recycling storage
Jul 7, 2026 · Apt BLDG
Close - Plumbing
Toilet
Jul 7, 2026 · Apt A
Close - Unsanitary condition
Mold
Jul 7, 2026 · Apt A
Close - Electric
Power outage
May 18, 2026 · Apt C
Close - Water leak
Heavy flow
May 18, 2026 · Apt C
Close - Heat/hot water
Entire building
Apr 25, 2026 · Apt 2B
Close - Unsanitary condition
Garbage/recycling storage
Mar 11, 2026 · Apt A
Close - Plumbing
Toilet
Mar 11, 2026 · Apt A
Close - Unsanitary condition
Garbage/recycling storage
Mar 11, 2026 · Apt A
Close
Show 40 more ↓
- Flooring/stairs
Floor
Mar 11, 2026 · Apt A
Close - Water leak
Damp spot
Mar 11, 2026 · Apt A
Close - Plumbing
Bathtub/shower
Mar 11, 2026 · Apt A
Close - Heat/hot water
Entire building
Feb 28, 2026 · Apt BLDG
Close - Paint/plaster
Wall
Feb 4, 2026 · Apt A
Close - Water leak
Damp spot
Feb 4, 2026 · Apt A
Close - Unsanitary condition
Mold
Feb 4, 2026 · Apt A
Close - Flooring/stairs
Floor
Feb 4, 2026 · Apt A
Close - Unsanitary condition
Garbage/recycling storage
Feb 4, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 11, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Nov 11, 2025 · Apt 2B
Close - Unsanitary condition
Mold
Nov 10, 2025 · Apt A
Close - Plumbing
Radiator
Nov 10, 2025 · Apt A
Close - Plumbing
Steam pipe/riser
Nov 10, 2025 · Apt A
Close - Heat/hot water
Apartment only
Oct 15, 2025 · Apt 2B
Close - Plumbing
Water supply
Oct 3, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Oct 3, 2025 · Apt 4D
Close - Heat/hot water
Entire building
Oct 2, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Oct 1, 2025 · Apt 2A
Close - Unsanitary condition
Garbage/recycling storage
Jun 23, 2025 · Apt 2A
Close - Safety
Sprinkler
Jun 23, 2025 · Apt 2A
Close - General
Janitor/super
Jun 23, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Jun 16, 2025 · Apt 2A
Close - Heat/hot water
Entire building
May 20, 2025 · Apt 2A
Close - Heat/hot water
Entire building
May 12, 2025 · Apt 2A
Close - Unsanitary condition
Mold
Apr 25, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Apr 24, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Apr 24, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Apr 24, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Apr 23, 2025 · Apt BLDG
Close - Plumbing
Water supply
Apr 23, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Apr 23, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Apr 22, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Apr 22, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 21, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Apr 21, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Apr 15, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Apr 14, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Apr 7, 2025 · Apt 2A
Close - Heat/hot water
Apartment only
Apr 6, 2025 · Apt 2A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1916
- Floors
- 5
- Residential units
- 18
- Building area
- 24,142 ft²
- Lot area
- 7,613 ft²
- Zoning
- R7-1
- Community board
- 206
- Council district
- 15
- Block / lot
- 2960 / 40
- Assessed value
- $800,550
- Landmark / historic district
- No
HPD registration #211796, last renewed Jul 16, 2026.
Questions about 1915 Southern Boulevard
Who owns 1915 Southern Boulevard?
The owner of record in NYC Department of City Planning PLUTO data is 1911-1915 Southern Blvd, LLC.
Does 1915 Southern Boulevard have violations?
Yes. NYC HPD has recorded 196 housing violations at this property.
Is 1915 Southern Boulevard rent stabilized?
NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 89% of its 18 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1915 Southern Boulevard built?
City records list 1916 as the year it was built.
How many apartments are in 1915 Southern Boulevard?
It has 18 residential units and 20 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.