roofy

1860 Billingsley Terrace

Bronx, NY 10453BBL 2-02879-0253Map

Owner of record: Billingsley LLC

1860 Billingsley Terrace is an elevator apartment building built in 1927 in Bronx, 10453. It has 59 residential units across 6 floors. The owner of record is Billingsley LLC. HPD has recorded 833 housing violations here, most recently on July 29, 2026. 27 of the 50 most recent violations are still open. City tax records listed 58 rent-stabilized apartments here in 2024.

HPD violations
833
DOB violations
23
ECB violations
15
HPD complaints
1,251

What to know

Concern
10 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Jul 29, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
58
About 98% of the building's 59 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 833

  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2l, 3rd story, 1st apartment from north at east

    Jul 29, 2026 · Apt 2L

    Open — Nov sent out
  • A

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories, all balconies and all componets at fire escape, section ''north''

    Jul 16, 2026

    Open — Nov sent out
  • C

    Fire escape defective. properly secure detuched hand rail from supporting bracket at 5th story balcony at south wall at fire escape, section ''north''

    Jul 16, 2026

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5g, 5th story, 2nd apartment from south at west

    Jul 16, 2026 · Apt 5G

    Open — First no access to re- inspect violation
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5g, 5th story, 2nd apartment from south at west

    Jul 16, 2026 · Apt 5G

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway from east at south located at apt 5g, 5th story, 2nd apartment from south at west

    Jul 16, 2026 · Apt 5G

    Open — First no access to re- inspect violation
  • C

    Properly repair with similar material the broken or defective wood sub floor in the 3rd room from east at south located at apt 5g, 5th story, 2nd apartment from south at west

    Jul 16, 2026 · Apt 5G

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east at center located at apt 5g, 5th story, 2nd apartment from south at west

    Jul 16, 2026 · Apt 5G

    Open — First no access to re- inspect violation
  • B

    Properly repair with similar material the broken or defective wood sub floor in the private hallway from north located at apt 5g, 5th story, 2nd apartment from south at west

    Jul 16, 2026 · Apt 5G

    Open — First no access to re- inspect violation
  • C

    M/d law abate the nuisance consisting of discarded refrigerator with doors intact creating potential hazard at public hall, 5th story

    Jun 30, 2026

    Closed — Violation closed
Show 40 more ↓
  • B

    Properly repair with similar material the broken or defective porcelain enamel at the bathtub in the bathroom located at apt 2h, 3rd story, 3rd apartment from south at west

    Jun 6, 2026 · Apt 2H

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5g, 6th story, 1st apartment from south at west

    May 26, 2026 · Apt 5G

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall and wall in the 1st room from east at south located at apt 5g, 6th story, 1st apartment from south at west

    May 26, 2026 · Apt 5G

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5g, 6th story, 1st apartment from south at west

    May 26, 2026 · Apt 5G

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq. ft. at south wall and east wall in the bathroom located at apt 2l, 3rd story, 1st apartment from north at east original violation 18851759 issued 05-may-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    May 5, 2026 · Apt 2L

    Open — Notice of issuance sent to tenant
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Open — Certification postponment granted
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from north at east wall in the 2nd room from north located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Open — Certification postponment granted
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 2nd window frame from north at east wall in the 2nd room from north located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, south wall, east wall in the bathroom located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st dumb waiter from south at west wall in the kitchen located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Open — Certification postponment granted
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the kitchen located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Open — Defect letter issued
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from east at south wall door frame in the foyer located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Open — Certification postponment granted
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall, west wall, north wall in the bathroom located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Open — Civ14 mailed
  • A

    Paint metal in accordance with dept. regulation the 1st door from south at west wall in the foyer located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Open — Civ14 mailed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from south at west wall door, 2nd closet from south at west wall door in the 1st private hallway from north located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Open — Civ14 mailed
  • C

    Properly repair or replace the broken or defective uncapped radiator steam valve at south in the 2nd room from north located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0, wg to replace = 0, wg to repair = 3 in the entire apartment located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective spring balance at lower window sash at south wall in the kitchen located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective spring balance at lower window sash, 1st from north at east wall in the 1st room from north located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic tiled floor in the bathroom located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Closed — Violation dismissed
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Closed — Violation dismissed
  • B

    Provide adequate supply of hot water for the fixtures at bathtub in the bathroom located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st window frame from east at south wall, ceiling, ceiling, 1st window frame from east at south wall in the 3rd room from north at east located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Open — Civ14 mailed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall, ceiling in the 2nd room from north located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Open — Civ14 mailed
  • A

    Paint with light colored paint to the satisfaction of this department at west wall, north wall in the bathroom located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Open — Civ14 mailed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq. ft. at south wall and east wall in the bathroom located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door from west at north wall in the bathroom located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Open — Civ14 mailed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door frame from south at west wall, north wall, 1st door frame from south at west wall, north wall in the 1st room from north located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Open — Civ14 mailed
  • A

    Paint with light colored paint to the satisfaction of this department .... north wall, 1st closet from east at south wall door, north wall in the foyer located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Open — Civ14 mailed
  • A

    Paint metal in accordance with dept. regulation at 1st door from south at west wall in the foyer located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Open — Civ14 mailed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from south at west wall, 1st window frame from north at east wall in the 3rd room from north at east located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Open — Certification postponment granted
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from south at west wall door frame in the 2nd private hallway from north located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Open — Certification postponment granted
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from south at west wall door frame, 2nd closet from south at west wall door frame in the 1st private hallway from north located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Open — Certification postponment granted
  • C

    M/d law abate the nuisance consisting of key operated lock at door leading to room with fire escape window in the 1st room from north located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from north at east wall in the 1st room from north located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Open — Certification postponment granted
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from north at east wall in the 1st room from north located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the foyer located at apt 2l, 3rd story, 1st apartment from north at east

    May 5, 2026 · Apt 2L

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 29, 2026

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective vinyl floor tile in the private hallway located at apt 5g, 6th story, 1st apartment from south at west , section ''north''

    Mar 6, 2026 · Apt 5G

    Closed — Violation closed
  • C

    Repair the broken or defective connection waste drain pipe at wash basin in the bathroom located at apt 5g, 6th story, 1st apartment from south at west , section ''north''

    Mar 6, 2026 · Apt 5G

    Closed — Violation dismissed

DOB building violations · 23

  • Construction other optional

    Ftc w/commissioner's order control#347482 vio#082425pi20501sb dated 8/24/25 requiring owner to provide a corrective action plan by 9/21/25 &start bldg reprs under permit by 10/21/25&completed/signed off by 11/21/25 as of 10/24/25 a cap&evidence of repr work has not been rec'd immed comply w/commissioner's order #347812 vio#082425pi20501sb

    Oct 24, 2025

    Dob violation - active
  • Construction other optional

    Corrective action plan req'd-obsvd @ exp1 cracked window sills @ interior courtyard @ window frames in disrepair on 5&6 floors. @ exp2 obsvd loose/missing brick 2 the parapet. owner to immed retain reg design prof in good standing w/dob&nys to eval entire bldg & to submit a corrective action plan by 9/2125.bldg t/be repaired under permit

    Aug 21, 2025

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2024

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Feb 22, 2024

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Nov 2, 2023

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2023

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 14, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 28, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 26, 2016

    Dob violation - resolved
Show 13 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 29, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 24, 2014

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 25, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 19, 2012

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2012

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 7, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 4, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 1, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 13, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 4, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 23, 2003

    Dob violation - resolved
  • Elevator elevatorrequired

    2p426

    Jul 5, 2001

    Dob violation - resolved

ECB violations · 15

  • Class - 2

    Class 2 items: access to elevator machine room was not provided at time of inspection, preventing inspection and access to elevator equipment, in violation of asme a17.1-2013 2.7.3 and 8.6.1.2.1, and nyc admini

    Aug 18, 2026

    Resolve
  • Class - 1

    Failure to maintain building facade wall"s" and appurtenances. note: at the time of inspection, i observed at ex #1, west elevation cracked/broken glass window at multiple locations. cracked stone window sill a

    Aug 8, 2026 · Penalty $5,000

    Active
  • Class - 1

    Cease use item: door zone restrictor inoperative, creating a hazardous condition per 1rcny11-02. remedy: restore to service immediatley and e-mail the elevator division at [email protected] for a re-inspect

    Apr 1, 2026 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to comply with the commissioner's order control #347954 vio #102425pi20504tc dated 10/24/25. no compliance on file for the corrective action plan. remedy: comply with the commissioner's order.

    Dec 8, 2025 · Penalty $6,250

    Active
  • Class - 1

    Elevator currently out of service and not working; repair and return to service

    Dec 9, 2022 · Penalty $1,250

    Resolve
  • Class - 1

    Class 1 no dlm installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. remedy; file application, install dlm and perform and file test with nycdob. class 2 items 1/ reverse phase r

    Jan 11, 2021 · Penalty $1,250

    Active
  • Class - 2

    08v1,56y13,68m07,68b07,59b07,59v07,57bb11,26d07,21d07,37d10,52e10-08)elevator not level. 56)seal machine leaks. 68)missing mcp. 68)maint log insuff. 59)brake maint tag insufficient, provide dd/mar 1yr and input

    Nov 7, 2018

    Resolve
  • Class - 2

    02x10,05m07,29q03,39x10,37t07,37p16,60x10,60q03. (02x10)repair outsidecommunication in car (telephone). (05m07)provide car door restrictor(zone lock). (39x10)repair light top of car. (42d06)secure rectifier on

    Sep 28, 2016

    Resolve
  • Class - 1

    02l10,05m07,08j10,40p16,70p16. 05m07-cab door reistrictor missing (provide)

    Apr 18, 2016

    Resolve
  • Class - 1

    08v01,02x10,16l10,16m07.c/u 08-fl stops excessively out of level must adjust immediately.02- communication in car inoperative must repair.16-3rd fl door check defective slamming to hard repair.16- (falias) unde

    Jul 15, 2015

    Resolve
Show 5 more ↓
  • Class - 2

    16r11,8v1,100b10,98bb3,52h14,53h14,40#7. 16-remove lock from basementdoor & replace saddle for hall door; 100-fan not working.

    Aug 9, 2013 · Penalty $250

    Resolve
  • Class - 2

    16l10,20i11,98bb05: 16l10;repair defective basement hoistway door check. 20i11;replace damaged car door vision glass.

    Mar 19, 2012

    Resolve
  • Class - 2

    40p7,100l10,8v1,27t15,34i10,21l1,9h10,98bb5: 100 elev phone not working.

    Dec 5, 2011 · Penalty $2,500

    Resolve
  • Non-hazardous

    Failure to provide elevator landing sign that shall read: "in case of fire use stairs unless otherwise instructed" at the elevator bank on floor 1 to 5. remedy: install sign as per local law 16 1984.

    Sep 29, 2005

    Resolve
  • Non-hazardous

    Failure to maintain exterior building wall.defects are:front parapet wall is separating and loose bricks.court yard parapet:missing mortar.remedy:make all necessary repairs.

    Aug 9, 2000 · Penalty $350

    Resolve

Complaints

  • Paint/plaster

    Ceiling

    Jul 16, 2026 · Apt 5G

    Close
  • Paint/plaster

    Ceiling

    Jul 16, 2026 · Apt 5G

    Close
  • Unsanitary condition

    Mold

    Jul 16, 2026 · Apt 5G

    Close
  • Paint/plaster

    Wall

    Jul 16, 2026 · Apt 5G

    Close
  • General

    Ventilation system

    Jul 2, 2026 · Apt 5G

    Close
  • Safety

    Fire escape

    Jul 2, 2026 · Apt 5G

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 2, 2026 · Apt 5G

    Close
  • Outside building

    Pavement

    Jul 2, 2026 · Apt 5G

    Close
  • Flooring/stairs

    Floor

    Jul 2, 2026 · Apt 5G

    Close
  • Paint/plaster

    Wall

    Jul 2, 2026 · Apt 5G

    Close
Show 40 more ↓
  • Outside building

    Porch/balcony

    Jul 2, 2026 · Apt 5G

    Close
  • Electric

    Power outage

    Jul 2, 2026 · Apt A

    Close
  • Flooring/stairs

    Floor

    Jun 19, 2026 · Apt 5G

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 12, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jun 12, 2026 · Apt BLDG

    Close
  • Door/window

    Window frame

    May 18, 2026 · Apt 2H

    Close
  • Plumbing

    Bathtub/shower

    May 18, 2026 · Apt 2H

    Close
  • Flooring/stairs

    Floor

    May 18, 2026 · Apt 2H

    Close
  • Flooring/stairs

    Floor

    Apr 28, 2026 · Apt 2L

    Close
  • Unsanitary condition

    Mold

    Apr 28, 2026 · Apt 2L

    Close
  • Paint/plaster

    Wall

    Apr 28, 2026 · Apt 2L

    Close
  • Flooring/stairs

    Floor

    Apr 28, 2026 · Apt 2L

    Close
  • Door/window

    Window frame

    Apr 28, 2026 · Apt 2L

    Close
  • Paint/plaster

    Wall

    Apr 28, 2026 · Apt 2L

    Close
  • Plumbing

    Water supply

    Apr 28, 2026 · Apt 2L

    Close
  • Heat/hot water

    Entire building

    Mar 13, 2026 · Apt BLDG

    Close
  • Plumbing

    Basin/sink

    Feb 24, 2026 · Apt 5G

    Close
  • Heat/hot water

    Apartment only

    Feb 12, 2026 · Apt 5G

    Close
  • Heat/hot water

    Entire building

    Feb 9, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 7, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 21, 2026 · Apt APT1L

    Close
  • Heat/hot water

    Entire building

    Jan 20, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 20, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 20, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 19, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 15, 2026 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    Jan 13, 2026 · Apt 5G

    Close
  • Flooring/stairs

    Floor

    Jan 13, 2026 · Apt 5G

    Close
  • Flooring/stairs

    Floor

    Jan 13, 2026 · Apt 5G

    Close
  • Flooring/stairs

    Floor

    Jan 13, 2026 · Apt 5G

    Close
  • Paint/plaster

    Ceiling

    Jan 13, 2026 · Apt 5G

    Close
  • Paint/plaster

    Ceiling

    Jan 13, 2026 · Apt 5G

    Close
  • Unsanitary condition

    Mold

    Jan 13, 2026 · Apt 5G

    Close
  • Plumbing

    Basin/sink

    Jan 13, 2026 · Apt 5G

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1927
Floors
6
Residential units
59
Building area
64,614 ft²
Lot area
12,700 ft²
Zoning
R5
Community board
205
Council district
14
Block / lot
2879 / 253
Assessed value
$1,148,400
Landmark / historic district
No

HPD registration #206355, last renewed Jan 13, 2026.

Questions about 1860 Billingsley Terrace

Who owns 1860 Billingsley Terrace?

The owner of record in NYC Department of City Planning PLUTO data is Billingsley LLC.

Does 1860 Billingsley Terrace have violations?

Yes. NYC HPD has recorded 833 housing violations at this property.

Is 1860 Billingsley Terrace rent stabilized?

NYC Department of Finance tax bills listed 58 rent-stabilized units here in 2024 (about 98% of its 59 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 1860 Billingsley Terrace built?

City records list 1927 as the year it was built.

How many apartments are in 1860 Billingsley Terrace?

It has 59 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.