roofy

54 Featherbed Lane

Bronx, NY 10452BBL 2-02865-0103Map

Owner of record: 54 Featherco, INC.

54 Featherbed Lane is an elevator apartment building built in 1927 in Bronx, 10452. It has 68 residential units across 6 floors. The owner of record is 54 Featherco, INC.. HPD has recorded 132 housing violations here, most recently on February 26, 2026. 8 of the 50 most recent violations are still open. City tax records listed 62 rent-stabilized apartments here in 2024.

HPD violations
132
DOB violations
22
ECB violations
6
HPD complaints
289

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Feb 26, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
62
About 91% of the building's 68 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 132

  • A

    Paint with light colored paint to the satisfaction of this department at south wall [ by bathroom ] in the private hallway located at apt 3c, 3rd story, 1st apartment from north at east , section ''east''

    Feb 26, 2026 · Apt 3C

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 3c, 3rd story, 1st apartment from north at east , section ''east''

    Feb 26, 2026 · Apt 3C

    Closed — Violation closed
  • A

    Properly repair or replace the broken or defective eroded wood sink cabinet floor in the kitchen located at apt 2g, 2nd story, 2nd apartment from south at west , section ''west''

    Feb 26, 2026 · Apt 2G

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 2nd apartment from north at east , section ''north''

    Dec 16, 2025 · Apt 2A

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2a, 2nd story, 2nd apartment from north at east , section ''north''

    Dec 16, 2025 · Apt 2A

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the foyer located at apt 2a, 2nd story, 2nd apartment from north at east , section at north

    Feb 25, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2a, 2nd story, 2nd apartment from north at east

    Feb 25, 2025 · Apt 2A

    Closed — Violation dismissed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 2a, 2nd story, 2nd apartment from north at east , section at north

    Feb 25, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the bathroom located at apt 2a, 2nd story, 2nd apartment from north at east , section at north

    Feb 25, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 1st room from east located at apt 2a, 2nd story, 2nd apartment from north at east , section at north

    Feb 25, 2025 · Apt 2A

    Closed — Violation closed
Show 40 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the kitchen located at apt 2a, 2nd story, 2nd apartment from north at east , section at north

    Feb 25, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door frame in the private hallway located at apt 2a, 2nd story, 2nd apartment from north at east , section at north

    Feb 25, 2025 · Apt 2A

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the bathroom located at apt 2a, 2nd story, 2nd apartment from north at east , section at north

    Feb 25, 2025 · Apt 2A

    Open — Not complied with
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door frame from west at north wall, south wall, east wall, north wall, ceiling in the bathroom located at apt 2a, 2nd story, 2nd apartment from north at east , section at north

    Feb 25, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall in the foyer located at apt 2a, 2nd story, 2nd apartment from north at east

    Feb 25, 2025 · Apt 2A

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation the 1st door frame from south at west wall in the foyer located at apt 2a, 2nd story, 2nd apartment from north at east

    Feb 25, 2025 · Apt 2A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the north wall, 1st closet from north at east wall door frame, 1st closet from north at east wall door, south wall, east wall, 1st closet from west at north wall door in the private hallway located at apt 2a, 2nd story, 2nd apartment from north at east , section at north

    Feb 25, 2025 · Apt 2A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, north wall, south wall, west wall in the 1st room from east located at apt 2a, 2nd story, 2nd apartment from north at east , section at north

    Feb 25, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hopper door at trash chute at public hall, 2nd story

    Feb 25, 2025

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective spring balance at lower window sash at second window from north at east in the 1st room from east located at apt 2a, 2nd story, 2nd apartment from north at east

    Feb 25, 2025 · Apt 2A

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from east located at apt 2a, 2nd story, 2nd apartment from north at east , section at north

    Feb 25, 2025 · Apt 2A

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2a, 2nd story, 2nd apartment from north at east , section at north

    Feb 25, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Remove all obstructions from water closet bowl in the bathroom located at apt 2a, 2nd story, 2nd apartment from north at east , section at north

    Feb 25, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2a, 2nd story, 2nd apartment from north at east

    Feb 25, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the foyer located at apt 2a, 2nd story, 2nd apartment from north at east , section at north

    Feb 25, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 2nd apartment from north at east

    Feb 25, 2025 · Apt 2A

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway located at apt 2a, 2nd story, 2nd apartment from north at east

    Feb 25, 2025 · Apt 2A

    Closed — Violation closed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 2a, 2nd story, 2nd apartment from north at east

    Feb 5, 2025 · Apt 2A

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2a, 2nd story, 2nd apartment from north at east

    Feb 5, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 2nd apartment from north at east

    Feb 5, 2025 · Apt 2A

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2a, 2nd story, 2nd apartment from north at east

    Feb 5, 2025 · Apt 2A

    Open — Not complied with
  • C

    Replace or repair the self-closing doors that is missing or defective door at north bulkhead, at public hall, 6th story

    Feb 3, 2025

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 2a, 2nd story, 2nd apartment from north at east

    Dec 5, 2024 · Apt 2A

    Closed — Violation closed
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 2a, 2nd story, 2nd apartment from north at east

    Dec 5, 2024 · Apt 2A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door frame from west at north wall in the bathroom located at apt 2a, 2nd story, 2nd apartment from north at east

    Dec 5, 2024 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the bathroom located at apt 2a, 2nd story, 2nd apartment from north at east

    Dec 5, 2024 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the kitchen located at apt 2a, 2nd story, 2nd apartment from north at east

    Dec 5, 2024 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 1st room from east located at apt 2a, 2nd story, 2nd apartment from north at east

    Dec 5, 2024 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, south wall in the private hallway located at apt 2a, 2nd story, 2nd apartment from north at east

    Dec 5, 2024 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame in the private hallway located at apt 2a, 2nd story, 2nd apartment from north at east

    Dec 5, 2024 · Apt 2A

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2a, 2nd story, 2nd apartment from north at east

    Dec 5, 2024 · Apt 2A

    Open — Not complied with
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door from south at west wall in the 1st room from east located at apt 2a, 2nd story, 2nd apartment from north at east

    Dec 5, 2024 · Apt 2A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at baseboard at north wall, 1st closet from west at north wall door frame in the private hallway located at apt 2a, 2nd story, 2nd apartment from north at east

    Dec 5, 2024 · Apt 2A

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2a, 2nd story, 2nd apartment from north at east

    Dec 5, 2024 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 4th room from north located at apt 3f, 2nd story, 2nd apartment from west at north

    Oct 28, 2024 · Apt 3F

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall in the foyer located at apt 3f, 2nd story, 2nd apartment from west at north

    Oct 28, 2024 · Apt 3F

    Open — Nov sent out
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of excessive storage in the 1st room from north located at apt 3f, 2nd story, 2nd apartment from west at north

    Oct 28, 2024 · Apt 3F

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the 4th room from north located at apt 3f, 2nd story, 2nd apartment from west at north

    Oct 28, 2024 · Apt 3F

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling, west wall in the foyer located at apt 3f, 2nd story, 2nd apartment from west at north

    Oct 28, 2024 · Apt 3F

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling, west wall, 1st closet from east at south wall ceiling in the private hallway located at apt 3f, 2nd story, 2nd apartment from west at north

    Oct 28, 2024 · Apt 3F

    Open — Nov sent out

DOB building violations · 22

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2022

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst

    Jan 26, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 11, 2017

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst

    Nov 14, 2016

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 26, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 22, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 17, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 18, 2012

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2012

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
Show 12 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 7, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 21, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 30, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 13, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 23, 2002

    Dob violation - resolved
  • Elevator elevatorrequired

    2p575

    Feb 12, 2002

    Dob violation - resolved
  • Elevator elevatorrequired

    2p575

    Nov 26, 1999

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 26, 1996

    Vp*-violation unserved ecb- dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 26, 1990

    Vp*-violation unserved ecb- dismissed
  • Elevator elevatorrequired

    (51) provide capacity plate in car

    Dec 6, 1988

    Dob violation - resolved

ECB violations · 6

  • Class - 2

    37x10,37q3,39o2,39x10,46q3,56y13,67m7,77x10. 37x- repair light in overhead sheave room. 37q- install guard for light in overhead sheave room. 39x- repair light top of car. 46q- install cover for electrical box

    Apr 10, 2013

    Resolve
  • Non-hazardous

    36i10.38o02.33b10.66o02.36d06.55y02. cui 36i10 repair overhead deflector sheave shaft walking out from bearing causing rumbling shaft out about 3 inches non c.u 38o02 clean top 33b10 repair shaft wall from fall

    Apr 4, 2008 · Penalty $800

    Resolve
  • Non-hazardous

    08v01/84##/43#10/66z09/29o02/30o02.(08-v-01)adjust flr stops for proper level.(84-#-#)repair rusted plate 3rd flr.(43-#-10)repair noise oversheaves(66-z-09)remove water from p.t.(29-o-02)clean dirt from bottom

    Sep 21, 2006

    Resolve
  • Non-hazardous

    55y10/15l10/55o02/58y02/39o02. 15-cover missing.

    Aug 4, 2005

    Resolve
  • Non-hazardous

    15l11-15l11-23u16-50y2-73u16-75u5 slams 2nd fl. not self closing 4&6 fls. incorrect city id tags 2p1390 the correct is 20575.

    Dec 14, 2000

    Resolve
  • Non-hazardous

    Failure to maintain the interior floor beams within apartments 1a and 2a: kitchen bathroom and hallway floor sags approx. 3-4 inches. remedy: inspect the remaining "a" line apartments determine the cause of the

    Oct 31, 1996

    Resolve

Complaints

  • Door/window

    Door frame

    Sep 21, 2026 · Apt 4HELEV

    Close
  • Appliance

    Refrigerator

    Sep 21, 2026 · Apt 4H

    Close
  • Plumbing

    Water supply

    Jul 2, 2026 · Apt 4G

    Close
  • Plumbing

    Water supply

    Jul 2, 2026 · Apt 6A

    Close
  • Water leak

    Heavy flow

    May 23, 2026 · Apt 2H

    Close
  • Unsanitary condition

    Pests

    Apr 29, 2026 · Apt 2A

    Open
  • Plumbing

    Toilet

    Apr 27, 2026 · Apt 2A

    Open
  • Flooring/stairs

    Floor

    Apr 27, 2026 · Apt 2A

    Open
  • Unsanitary condition

    Garbage/recycling storage

    Mar 13, 2026 · Apt 1J

    Close
  • Plumbing

    Bathtub/shower

    Feb 26, 2026 · Apt 1J

    Close
Show 40 more ↓
  • Unsanitary condition

    Sewage

    Feb 26, 2026 · Apt 1J

    Close
  • Unsanitary condition

    Sewage

    Feb 26, 2026 · Apt 1J

    Close
  • Plumbing

    Toilet

    Feb 26, 2026 · Apt 1J

    Close
  • Heat/hot water

    Apartment only

    Jan 19, 2026 · Apt APT2H

    Close
  • Flooring/stairs

    Floor

    Dec 10, 2025 · Apt 2A

    Close
  • Plumbing

    Toilet

    Dec 10, 2025 · Apt 2A

    Close
  • Plumbing

    Basin/sink

    Dec 10, 2025 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Dec 10, 2025 · Apt 2A

    Close
  • Flooring/stairs

    Floor

    Dec 10, 2025 · Apt 2A

    Close
  • Flooring/stairs

    Floor

    Dec 10, 2025 · Apt 2A

    Close
  • Paint/plaster

    Ceiling

    Dec 10, 2025 · Apt 2A

    Close
  • Appliance

    Electric/gas range

    Dec 10, 2025 · Apt 2A

    Close
  • Plumbing

    Radiator

    Dec 10, 2025 · Apt 2A

    Close
  • Door/window

    Window frame

    Dec 10, 2025 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Nov 2, 2025 · Apt 1G

    Close
  • Flooring/stairs

    Floor

    Nov 2, 2025 · Apt 1G

    Close
  • Electric

    No lighting

    Jul 7, 2025 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Feb 18, 2025 · Apt 2H

    Close
  • Paint/plaster

    Ceiling

    Feb 17, 2025 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Feb 17, 2025 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Feb 12, 2025 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Jan 29, 2025 · Apt 2A

    Close
  • Plumbing

    Toilet

    Jan 29, 2025 · Apt 2A

    Close
  • Flooring/stairs

    Floor

    Jan 29, 2025 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Jan 29, 2025 · Apt 2A

    Close
  • Plumbing

    Radiator

    Jan 29, 2025 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Jan 20, 2025 · Apt 2H

    Close
  • Heat/hot water

    Apartment only

    Jan 16, 2025 · Apt 2H

    Close
  • Heat/hot water

    Entire building

    Jan 2, 2025 · Apt 2F

    Close
  • Heat/hot water

    Apartment only

    Dec 27, 2024 · Apt 2H

    Close
  • Heat/hot water

    Apartment only

    Dec 14, 2024 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Dec 2, 2024 · Apt 2A

    Close
  • Unsanitary condition

    Pests

    Dec 2, 2024 · Apt 2A

    Close
  • Paint/plaster

    Radiator

    Dec 2, 2024 · Apt 2A

    Close
  • Paint/plaster

    Ceiling

    Oct 23, 2024 · Apt 3F

    Close
  • Paint/plaster

    Wall

    Jul 25, 2024 · Apt 2A

    Close
  • Unsanitary condition

    Mold

    Jul 25, 2024 · Apt 2A

    Close
  • Plumbing

    Bathtub/shower

    Mar 28, 2024 · Apt 2A

    Close
  • Flooring/stairs

    Floor

    Mar 28, 2024 · Apt 2A

    Close
  • Plumbing

    Toilet

    Mar 28, 2024 · Apt 2A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1927
Floors
6
Residential units
68
Building area
55,026 ft²
Lot area
12,916 ft²
Zoning
R7-1
Community board
205
Council district
14
Block / lot
2865 / 103
Assessed value
$1,655,550
Landmark / historic district
No

HPD registration #203421, last renewed Jul 22, 2026.

Questions about 54 Featherbed Lane

Who owns 54 Featherbed Lane?

The owner of record in NYC Department of City Planning PLUTO data is 54 Featherco, INC..

Does 54 Featherbed Lane have violations?

Yes. NYC HPD has recorded 132 housing violations at this property.

Is 54 Featherbed Lane rent stabilized?

NYC Department of Finance tax bills listed 62 rent-stabilized units here in 2024 (about 91% of its 68 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 54 Featherbed Lane built?

City records list 1927 as the year it was built.

How many apartments are in 54 Featherbed Lane?

It has 68 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.