1475 Walton Avenue
Bronx, NY 10452BBL 2-02844-0058Map
Owner of record: Walton Ave Associates
1475 Walton Avenue is an elevator apartment building built in 1935 in Bronx, 10452. It has 68 residential units across 6 floors. The owner of record is Walton Ave Associates. HPD has recorded 183 housing violations here, most recently on October 12, 2026. 15 of the 50 most recent violations are still open. City tax records listed 69 rent-stabilized apartments here in 2024.
- HPD violations
- 183
- DOB violations
- 19
- ECB violations
- 9
- HPD complaints
- 384
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 183
- CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). north wall in the 5th room from east located at apt 4c, 4th story, 1st apartment from north at east , section ''north''
Oct 12, 2026 · Apt 4C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 5th room from east located at apt 4c, 4th story, 1st apartment from north at east , section ''north''
Oct 12, 2026 · Apt 4C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). south wall in the kitchen located at apt 4c, 4th story, 1st apartment from north at east , section ''north''
Oct 12, 2026 · Apt 4C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). east wall in the 1st room from east at north located at apt 4c, 4th story, 1st apartment from north at east , section ''north''
Oct 12, 2026 · Apt 4C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at south located at apt 4c, 4th story, 1st apartment from north at east , section ''north''
Oct 12, 2026 · Apt 4C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, ceiling in the kitchen located at apt 4c, 4th story, 1st apartment from north at east , section ''north''
Oct 12, 2026 · Apt 4C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, west wall, ceiling in the 5th room from east located at apt 4c, 4th story, 1st apartment from north at east , section ''north''
Oct 12, 2026 · Apt 4C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, south wall, west wall, ceiling in the 1st room from east at north located at apt 4c, 4th story, 1st apartment from north at east , section ''north''
Oct 12, 2026 · Apt 4C
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective bell return buzzer from building entrance to the panel at the south wall in the foyer located at apt 4c, 4th story, 1st apartment from north at east , section ''north''
Oct 12, 2026 · Apt 4C
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective door lock in the 1st room from east at north located at apt 4c, 4th story, 1st apartment from north at east , section ''north''
Oct 12, 2026 · Apt 4C
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Replace with new the missing upper escutcheon plate at east heat riser in the 1st room from east at north located at apt 4c, 4th story, 1st apartment from north at east , section ''north''
Oct 12, 2026 · Apt 4C
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from east at north located at apt 4c, 4th story, 1st apartment from north at east , section ''north''
Oct 12, 2026 · Apt 4C
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from east at south located at apt 4c, 4th story, 1st apartment from north at east , section ''north''
Oct 12, 2026 · Apt 4C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the kitchen located at apt 4c, 4th story, 1st apartment from north at east , section ''north''
Oct 12, 2026 · Apt 4C
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Jul 19, 2026
Open — Nov certified on time - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 10, 2026
Closed — Violation closed - BHazardous
Provide approved glass inplace of plexiglass at vestibule door at 1st story public hall
Jun 10, 2026
Closed — Violation closed - BHazardous
Provide approved glass inplace of plexiglass at building entrance door at 1st story
Jun 10, 2026
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of plexiglass installed at building entrance door at 1st story
Jun 10, 2026
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of plexiglass installed at vestibule door at 1st story public hall
Jun 10, 2026
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 6g, 6th story, 1st apartment from north at east
Mar 4, 2026 · Apt 6G
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq feet at south wall 1st closet from east at south wall ceiling in the foyer located at apt 6g, 6th story, 1st apartment from north at east
Mar 4, 2026 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, east wall in the bathroom located at apt 6g, 6th story, 1st apartment from north at east
Mar 4, 2026 · Apt 6G
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak the 1st closet from east at south wall ceiling in the foyer located at apt 6g, 6th story, 1st apartment from north at east
Mar 4, 2026 · Apt 6G
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective upper escutcheon plate at heat riser in the bathroom located at apt 6g, 6th story, 1st apartment from north at east
Mar 4, 2026 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east at north, the 4th room from east, the 1st room from east at south, the private hallway , the foyer , the kitchen located at apt 6g, 6th story, 1st apartment from north at east
Mar 4, 2026 · Apt 6G
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame readily accessible for signature, bottom edge of frame between 48-62 inches above floor at frame too high at public hall, 1st story
Feb 14, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door (from roof to public hall stair case) at 1st public hall bulkhead from north, 6th story
Feb 1, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective the hinges at fire door at south at public hall, 6th story
Jan 28, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet at public hall, 6th story
Jan 28, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper at compactor closet, 6th story
Jan 28, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper at compactor closet, 5th story
Jan 28, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at compactor closet at public hall, 5th story
Jan 28, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch at compactor closet door at public hall, 6th story
Jan 28, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from east at south located at apt 5d, 5th story, 2nd apartment from north at east , section ''north''
Nov 22, 2024 · Apt 5D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 4b, 4th story, 2nd apartment from south at west , section ''north''
Nov 22, 2024 · Apt 4B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 6th story
Nov 22, 2024
Closed — Violation dismissed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sq ft at ceiling and all walls in the 2nd bathroom from east located at apt 1c, 1st story, 1st apartment from north at east
Nov 22, 2024 · Apt 1C
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at south and west walls in the bathroom located at apt 2l, 2nd story, 1st apartment from south at west , section ''center''
Nov 22, 2024 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at secondary egress door in the 1st room from north located at apt 2f, 2nd story, 2nd apartment from north at east , section ''center''
Nov 22, 2024 · Apt 2F
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at south wall in the bathroom located at apt 3g, 3rd story, 1st apartment from north at east , section ''south''
Nov 22, 2024 · Apt 3G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6b, 6th story, 2nd apartment from south at west , section ''north''
Nov 22, 2024 · Apt 6B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6b, 6th story, 2nd apartment from south at west , section ''north''
Nov 22, 2024 · Apt 6B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall in the bathroom located at apt 3b, 3rd story, 2nd apartment from south at west , section ''north ''
Nov 22, 2024 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at tub in the bathroom located at apt 4b, 4th story, 2nd apartment from south at west , section ''north''
Nov 22, 2024 · Apt 4B
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at ceiling in the bathroom located at apt 5h, 5th story, 3rd apartment from north at east , section ''south''
Nov 22, 2024 · Apt 5H
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 4th story, 2nd apartment from south at west , section ''north ''
Nov 22, 2024 · Apt 4B
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of lockable slidebolt at secondary egress door in the 1st room from north located at apt 2e, 2nd story, 1st apartment from north at east
Nov 22, 2024 · Apt 2E
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at secondary egress door in the 1st room from north located at apt 1c, 1st story, 1st apartment from north at east , section ''north''
Nov 22, 2024 · Apt 1C
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 6th story
Nov 22, 2024
Closed — Violation dismissed
DOB building violations · 19
- Facade safety program facade required
Fisp-facade safety program facade required
Oct 10, 2018
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 8a technical report by 02/21/2017
May 31, 2018
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 9, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 12, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 1, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 30, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 2, 2010
Dob violation - resolved
Show 9 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 9, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 24, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 29, 2005
Dob violation - resolved - Elevator elevatorrequired
2p1654
Apr 22, 2002
Dob violation - active - Elevator elevatorrequired
2p1654
Feb 12, 2001
Dob violation - resolved - Elevator elevatorrequired
2p1654
Dec 3, 1999
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Elevator elevatorrequired
74-provide toe guard-74(a)repair or replace cw shoes
Sep 14, 1988
Dob violation - resolved
ECB violations · 9
- Class - 2
Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control#812422. remedy: submit required technical report
May 18, 2018 · Penalty $1,250
Resolve - Class - 2
08v01 39q03 21q03 45q03 46q03 56y13 67m07 76m07 39q-install guard for light top of car 21q-install for electrical hoistway door interlock 45q-install covers for electrical box by the governor 67m-provide commun
Feb 28, 2012
Resolve - Class - 2
98bb05.10h11.56y1358f10.39y02.53h10.73o02.74o02.10h11 car door gibs are worn provide 56y13 seal oil leak main machine 58f10 hoist machine is bunching and making noise 39o02 clean oil leak on top of car
Feb 17, 2009
Resolve - Non-hazardous
23x10/41g10/66o02/57f10/55y13/11x10. 23-elevator not responding to lobby hall call you have to walk to 2nd floor to get on elev. 41g10-fuse wire jumped and some oversized . 57f10-exessive backlash and rocking
Apr 19, 2005 · Penalty $180
Resolve - Non-hazardous
Failure to provide elevator landing sign that shall read:in case of fire use stairs unless otherwise instructed:at the the elevator's bank on fl 2 to 6.br2-failure to provide 3-inch high alphabetic letter of id
Nov 1, 2004
Resolve - Non-hazardous
59x10/ 55y10/ 39o02/ 34r09/ 39w06/ 84b07/ 83m07/ #34=remove none elev.wiring from m.r. #84=provide second hand rail to steps leading to m.r.#83=provide vision glass b fl.
Sep 30, 2003
Resolve - Non-hazardous
74y02/ 25o12/ 11b#/ 57o02/ 08v01/ 74y02 clean oil off top of car 25o12 replace cover 11b# properly wire in car lights 57o02 clean pit 08v01 adjusts at 1st floor up & dn
Nov 13, 2002
Resolve - Non-hazardous
73x.73-restore elevator service so proper inspection can be by this dept
Jul 30, 1996
Resolve - Non-hazardous
74x,30i,11r,35i,75u50y,74o,74x. 74 work light 30 holes 11 across top emergency exit 31 in motor room going down hole and out hoistway wall 35 wall and window can be open 74 top car 74 fire service.
Jun 22, 1996
Resolve
Complaints
- Paint/plaster
Ceiling
Oct 6, 2026 · Apt 4C
Close - Unsanitary condition
Garbage/recycling storage
Jul 8, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jul 2, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jul 2, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jul 2, 2026 · Apt BLDG
Close - Paint/plaster
Wall
May 5, 2026 · Apt 2M
Close - Paint/plaster
Ceiling
May 5, 2026 · Apt 2M
Close - Door/window
Door
May 5, 2026 · Apt 2M
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt 1G
Close - Heat/hot water
Entire building
Mar 14, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Mar 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 28, 2026 · Apt BLDG
Close - Paint/plaster
Wall
Feb 23, 2026 · Apt 6G
Close - Paint/plaster
Ceiling
Feb 23, 2026 · Apt 6G
Close - Heat/hot water
Entire building
Feb 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 28, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 26, 2025 · Apt 3B
Close - Unsanitary condition
Pests
Aug 13, 2025 · Apt BUILDI
Close - Unsanitary condition
Pests
Aug 13, 2025 · Apt BUILDI
Close - Plumbing
Water supply
Jun 24, 2025 · Apt BLDG
Close - Plumbing
Water supply
Jun 24, 2025 · Apt 3E
Close - Plumbing
Water supply
Jun 24, 2025 · Apt BLDG
Close - Plumbing
Water supply
Jun 23, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 19, 2025 · Apt 1H
Close - Unsanitary condition
Garbage/recycling storage
Jan 3, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Nov 17, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Oct 19, 2024 · Apt BLDG
Close - Unsanitary condition
Mold
Sep 3, 2024 · Apt 6C
Close - Paint/plaster
Window/frame
Sep 3, 2024 · Apt 6C
Close - Unsanitary condition
Pests
Sep 3, 2024 · Apt 6C
Close - Paint/plaster
Ceiling
Sep 3, 2024 · Apt 6C
Close - Water leak
Heavy flow
Sep 3, 2024 · Apt 6C
Close - Appliance
Refrigerator
Jul 16, 2024 · Apt 1C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1935
- Floors
- 6
- Residential units
- 68
- Building area
- 76,776 ft²
- Lot area
- 17,945 ft²
- Zoning
- R8
- Community board
- 204
- Council district
- 16
- Block / lot
- 2844 / 58
- Assessed value
- $2,402,100
- Landmark / historic district
- No
HPD registration #202433, last renewed Jul 22, 2026.
Questions about 1475 Walton Avenue
Who owns 1475 Walton Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Walton Ave Associates.
Does 1475 Walton Avenue have violations?
Yes. NYC HPD has recorded 183 housing violations at this property.
Is 1475 Walton Avenue rent stabilized?
NYC Department of Finance tax bills listed 69 rent-stabilized units here in 2024 (about 100% of its 68 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1475 Walton Avenue built?
City records list 1935 as the year it was built.
How many apartments are in 1475 Walton Avenue?
It has 68 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.