1350 Grand Concourse
Bronx, NY 10456BBL 2-02831-0036Map
Owner of record: 1350 Grand Concourse Realty LLC
1350 Grand Concourse is a walk-up apartment building built in 1924 in Bronx, 10456. It has 50 residential units across 5 floors. The owner of record is 1350 Grand Concourse Realty LLC. HPD has recorded 303 housing violations here, most recently on September 15, 2026. 34 of the 50 most recent violations are still open. City tax records listed 50 rent-stabilized apartments here in 2024.
- HPD violations
- 303
- DOB violations
- 5
- ECB violations
- 3
- HPD complaints
- 510
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 303
- CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from east at south wall, 2nd window frame from east at south wall in the 4th room from north at center located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 4th room from north at center located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from east at south wall in the 1st room from north located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from south at west wall door frame in the private hallway located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from south at west wall in the 3rd room from north located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 4th room from north at east located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from south at west wall door in the private hallway located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0, wg to replace = 0, wg to repair = 2 in the entire apartment located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Nov sent out - ANon-hazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at west wall in the bathroom located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at lower sash, 1st window from east at south wall in the 4th room from north at east located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at north wall and south wall in the bathroom located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 4th room from north at center located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Nov sent out - ANon-hazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at south wall in the private hallway located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall in the 1st room from north located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st window frame from north at east wall in the 3rd room from north located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st radiator from east at south wall in the 4th room from north at east located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from north at east wall in the 4th room from north at center located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sq. ft. at all walls and ceiling in the bathroom located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Notice of issuance sent to tenant - ANon-hazardous
Properly repair with similar material the broken or defective wood bottom shelf at sink base cabinet in the kitchen located at apt 27, 3rd story, 2nd apartment from north at east , section at south
Sep 15, 2026 · Apt 27
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jul 12, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the private hallway located at apt 49, 5th story, 2nd apartment from south at west , section at south
Jul 12, 2026 · Apt 49
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 49, 5th story, 2nd apartment from south at west , section at south
Jul 12, 2026 · Apt 49
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 49, 5th story, 2nd apartment from south at west , section at south
Jul 12, 2026 · Apt 49
Open — Civ14 mailed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 49, 5th story, 2nd apartment from south at west , section at south
Jul 12, 2026 · Apt 49
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the mold on tiled surfaces at east wall in the bathroom located at apt 49, 5th story, 2nd apartment from south at west , section at south
Jul 12, 2026 · Apt 49
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 49, 5th story, 2nd apartment from south at west , section at south
Jul 12, 2026 · Apt 49
Open — Notice of issuance sent to tenant - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at north wall in the bathroom located at apt 49, 5th story, 2nd apartment from south at west , section at south
Jul 12, 2026 · Apt 49
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 49, 5th story, 2nd apartment from south at west , section at south
Jul 12, 2026 · Apt 49
Open — Civ14 mailed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 4, 1st story, 1st apartment from north at east
May 4, 2026 · Apt 4
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 4, 1st story, 1st apartment from north at east
May 4, 2026 · Apt 4
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the 4th room from east at center located at apt 28, 2nd story, 1st apartment from west at north
May 4, 2026 · Apt 28
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north and west walls in the 4th room from east at south located at apt 28, 2nd story, 1st apartment from west at north
May 4, 2026 · Apt 28
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroom located at apt 4, 1st story, 1st apartment from north at east
May 4, 2026 · Apt 4
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 4, 1st story, 1st apartment from north at east
May 4, 2026 · Apt 4
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 4th room from east at center located at apt 28, 2nd story, 1st apartment from west at north
May 4, 2026 · Apt 28
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective lower window sash in the kitchen located at apt 4, 1st story, 1st apartment from north at east
May 4, 2026 · Apt 4
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4, 1st story, 1st apartment from north at east
May 4, 2026 · Apt 4
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south and west walls in the 3rd room from east located at apt 28, 2nd story, 1st apartment from west at north
May 4, 2026 · Apt 28
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective wood door in the bathroom located at apt 4, 1st story, 1st apartment from north at east
May 4, 2026 · Apt 4
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 4th room from north located at apt 4, 1st story, 1st apartment from north at east
May 4, 2026 · Apt 4
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes house hold items at 5th story balcony at west exterior wall
Apr 11, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 39, 3rd story, 2nd apartment from south at west
Apr 3, 2026 · Apt 39
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 39, 3rd story, 2nd apartment from south at west
Apr 3, 2026 · Apt 39
Closed — Violation dismissed
DOB building violations · 5
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)
Jun 23, 2024
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2021
Aug 21, 2022
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed
ECB violations · 3
- Non-hazardous
Failure to maintain defect is in apt #35 the plaster ceiling in bdrm front of bldg has a 3'x3' section missing.remedy:make repairs to ceiling
Jun 4, 2003
Resolve - Non-hazardous
Failure to maintain.defect is in apt 35 there is a section of plaster approx:4' x 4' missing from ceiling in bedroom.remedy:make safe immediatly make all necessary repairs forthwith
May 25, 2003 · Penalty $180
Resolve - Hazardous
Failure to maintain:defect is at lobby level. a 3'x6' section of plaster missing from ceiling loose plaster rewrinig and in danger of falling to floor at public access(lobby) causing a dangerous condition
May 24, 2003 · Penalty $800
Resolve
Complaints
- Unsanitary condition
Mold
Sep 11, 2026 · Apt 27
Close - Door/window
Window frame
Sep 11, 2026 · Apt 27
Close - Electric
Outlet/switch
Sep 11, 2026 · Apt 27
Close - Plumbing
Basin/sink
Sep 11, 2026 · Apt 27
Close - Paint/plaster
Wall
Sep 11, 2026 · Apt 27
Close - General
Bell/buzzer/intercom
Sep 11, 2026 · Apt 27
Close - Door/window
Door
Sep 11, 2026 · Apt 27
Close - Plumbing
Radiator
Sep 11, 2026 · Apt 27
Close - Flooring/stairs
Floor
Sep 11, 2026 · Apt 27
Close - Unsanitary condition
Mold
Jul 7, 2026 · Apt 49
Close
Show 40 more ↓
- Unsanitary condition
Pests
Jul 7, 2026 · Apt 49
Close - Water leak
Heavy flow
Jun 24, 2026 · Apt F
Close - Heat/hot water
Entire building
Apr 9, 2026 · Apt BLDG
Close - Water leak
Slow leak
Apr 8, 2026 · Apt 39
Close - Paint/plaster
Ceiling
Apr 8, 2026 · Apt 39
Close - General
Cabinet
Apr 8, 2026 · Apt 39
Close - Plumbing
Radiator
Apr 8, 2026 · Apt 39
Close - Electric
No lighting
Apr 8, 2026 · Apt 39
Close - Heat/hot water
Apartment only
Mar 19, 2026 · Apt 39
Close - Water leak
Heavy flow
Mar 19, 2026 · Apt 39
Close - General
Cabinet
Mar 10, 2026 · Apt 39
Close - Heat/hot water
Apartment only
Feb 22, 2026 · Apt 28
Close - Heat/hot water
Apartment only
Feb 18, 2026 · Apt 28
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt 36
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt 23
Close - Heat/hot water
Entire building
Jan 16, 2026 · Apt 36
Close - Electric
Outlet/switch
Dec 20, 2025 · Apt 23
Close - Electric
Lighting
Dec 20, 2025 · Apt 23
Close - Heat/hot water
Entire building
Dec 6, 2025 · Apt 36
Close - Heat/hot water
Entire building
Nov 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt 36
Close - Heat/hot water
Entire building
Oct 27, 2025 · Apt 36
Close - Electric
Power outage
Aug 1, 2025 · Apt 23
Close - Door/window
Door
Aug 1, 2025 · Apt 23
Close - Plumbing
Basin/sink
Aug 1, 2025 · Apt 23
Close - Flooring/stairs
Floor
Aug 1, 2025 · Apt 23
Close - Door/window
Window frame
Aug 1, 2025 · Apt 23
Close - Plumbing
Bathtub/shower
Aug 1, 2025 · Apt 23
Close - Door/window
Door
Aug 1, 2025 · Apt 23
Close - Unsanitary condition
Mold
Aug 1, 2025 · Apt 23
Close - General
Cabinet
Aug 1, 2025 · Apt 23
Close - Paint/plaster
Wall
Aug 1, 2025 · Apt 23
Close - Heat/hot water
Apartment only
Feb 13, 2025 · Apt 23
Close - Plumbing
Radiator
Feb 13, 2025 · Apt 23
Close - Electric
Lighting
Feb 13, 2025 · Apt 23
Close - Plumbing
Basin/sink
Feb 13, 2025 · Apt 23
Close - Water leak
Slow leak
Feb 13, 2025 · Apt 23
Close - Door/window
Window frame
Feb 13, 2025 · Apt 23
Close - Plumbing
Bathtub/shower
Feb 13, 2025 · Apt 23
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1924
- Floors
- 5
- Residential units
- 50
- Building area
- 50,800 ft²
- Lot area
- 11,035 ft²
- Zoning
- R8
- Community board
- 204
- Council district
- 16
- Block / lot
- 2831 / 36
- Assessed value
- $990,900
- Landmark / historic district
- No
HPD registration #211137, last renewed Aug 8, 2025.
Questions about 1350 Grand Concourse
Who owns 1350 Grand Concourse?
The owner of record in NYC Department of City Planning PLUTO data is 1350 Grand Concourse Realty LLC.
Does 1350 Grand Concourse have violations?
Yes. NYC HPD has recorded 303 housing violations at this property.
Is 1350 Grand Concourse rent stabilized?
NYC Department of Finance tax bills listed 50 rent-stabilized units here in 2024 (about 100% of its 50 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1350 Grand Concourse built?
City records list 1924 as the year it was built.
How many apartments are in 1350 Grand Concourse?
It has 50 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.