1346 Sheridan Avenue
Bronx, NY 10456BBL 2-02830-0021Map
Owner of record: 1348 LLC
1346 Sheridan Avenue is a walk-up apartment building built in 1915 in Bronx, 10456. It has 35 residential units across 6 floors. The owner of record is 1348 LLC. HPD has recorded 927 housing violations here, most recently on October 6, 2026. 24 of the 50 most recent violations are still open. City tax records listed 36 rent-stabilized apartments here in 2024.
- HPD violations
- 927
- DOB violations
- 6
- ECB violations
- 3
- HPD complaints
- 869
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 927
- BHazardous
Replace with new the missing escucheon plate at bathtub faucet in the bathroom located at apt 5b, 5th story, 2nd apartment from south at west
Oct 6, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective sink base cabinet in the kitchen located at apt 5b, 5th story, 2nd apartment from south at west
Oct 6, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective drawer at base caibinet at south wall in the kitchen located at apt 5b, 5th story, 2nd apartment from south at west
Oct 6, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Repair the broken or defective connection at sink base cabinet in the kitchen located at apt 5b, 5th story, 2nd apartment from south at west
Oct 6, 2026 · Apt 5B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5b, 5th story, 2nd apartment from south at west
Oct 6, 2026 · Apt 5B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5b, 5th story, 2nd apartment from south at west
Oct 6, 2026 · Apt 5B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tiles at floor (causing cut hazard) in the bathroom located at apt 5b, 5th story, 2nd apartment from south at west
Oct 6, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective radiator cover at baseboard at east wall in the bathroom located at apt 5b, 5th story, 2nd apartment from south at west
Oct 6, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5b, 5th story, 2nd apartment from south at west
Oct 6, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5b, 5th story, 2nd apartment from south at west
Oct 6, 2026 · Apt 5B
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 5b, 5th story, 2nd apartment from south at west
Oct 6, 2026 · Apt 5B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at entrance door leading to apt and make door self closing at apt 5b, 5th story in the entrance located at apt 5b, 5th story, 2nd apartment from south at west
Oct 6, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Sep 21, 2026 · Apt 2F
Open — Civ14 mailed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east
Sep 21, 2026 · Apt 2F
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Sep 21, 2026 · Apt 2F
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Sep 21, 2026 · Apt 2F
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Sep 21, 2026 · Apt 2F
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Sep 21, 2026 · Apt 2F
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Sep 21, 2026 · Apt 2F
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective heavy duty lock assembly at front entrance door to building
Jul 29, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1c, 1st story, 1st apartment from south at west
Jul 29, 2026 · Apt 1C
Open — First no access to re- inspect violation - BHazardous
Replace with new the missing cover plate for baseboard radiator at south wall and west wall in the 4th room from north at west located at apt 1c, 1st story, 1st apartment from south at west
Jul 29, 2026 · Apt 1C
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Feb 10, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3d, 3rd story, 1st apartment from south at west , section at south
Feb 10, 2026 · Apt 3D
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum of 130 degrees at hot water fixtures in the entire apartment located at apt 3d, 3rd story, 1st apartment from south at west
Feb 4, 2026 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door lock at boiler room
Feb 4, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 3rd room from north located at apt 3d, 3rd story, 1st apartment from south at west
Feb 4, 2026 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Feb 1, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1c, 1st story, 1st apartment from south at west
Feb 1, 2026 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective heavy duty lock assembly at front entrance door to building
Jan 20, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical outlet at north wall, south wall, and west wall in the 3rd room from north located at apt 1c, 1st story, 1st apartment from south at west
Jan 20, 2026 · Apt 1C
Closed — Violation dismissed - BHazardous
Make safe by properly repairing the structural defect horizontal crack at north exterior wall at east yard (building rear) above 5th story window lintol
Jan 4, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5a, 5th story, 1st apartment from north at east
Jan 4, 2026 · Apt 5A
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing door sweep at door in the entrance located at apt 1e, 1st story, 2nd apartment from north at east
Dec 28, 2025 · Apt 1E
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling, north and east walls in the bathroom located at apt 1e, 1st story, 2nd apartment from north at east
Dec 28, 2025 · Apt 1E
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper at south wall at public hall, 1st story
Dec 28, 2025
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding maximum temperature of 130 degrees in the entire apartment located at apt 1e, 1st story, 2nd apartment from north at east
Dec 28, 2025 · Apt 1E
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Dec 28, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1e, 1st story, 2nd apartment from north at east
Dec 28, 2025 · Apt 1E
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Dec 17, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3a, 3rd story, 1st apartment from west at north
Dec 17, 2025 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3a, 3rd story, 1st apartment from west at north
Dec 17, 2025 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3a, 3rd story, 1st apartment from west at north
Dec 17, 2025 · Apt 3A
Open — Invalid certification - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east
Dec 17, 2025 · Apt 2F
Open — Invalid certification - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at east wall in the bathroom located at apt 4e, 4th story, 1st apartment from east at south
Sep 23, 2025 · Apt 4E
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4e, 4th story, 1st apartment from east at south
Sep 23, 2025 · Apt 4E
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4e, 4th story, 1st apartment from east at south
Sep 23, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective interior base of sink base cabinet in the kitchen located at apt 5f, 5th story, 1st apartment from north at east , section ''south''
Sep 18, 2025 · Apt 5F
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5f, 5th story, 1st apartment from north at east , section ''south''
Sep 18, 2025 · Apt 5F
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5f, 5th story, 1st apartment from north at east , section ''south''
Sep 18, 2025 · Apt 5F
Closed — Violation dismissed
DOB building violations · 6
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 3
- Class - 1
Failure to maintain building in code-compliant manner. noted: at the time of inspection, observed at exp #4 step cracks and cracks above window on 6th floor, and cracks above windows and on facade on 4th floor
Aug 13, 2026 · Penalty $6,250
Active - Class - 1
Summons issued for failure to maintain due to multiple cracks in the concrete stucco exterior exposure #4., repair and/replace
Jan 5, 2026 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain defect is west wall of building the masonry is defective and loose and pieces of stones ar falling to adjacent property remedy make all repairs forthwith
Mar 5, 1993 · Penalty $1,000
Resolve
Complaints
- Water leak
Heavy flow
Sep 30, 2026 · Apt 3B
Open - Plumbing
Basin/sink
Sep 30, 2026 · Apt 3B
Open - Plumbing
Bathtub/shower
Sep 30, 2026 · Apt 3B
Open - General
Cabinet
Sep 27, 2026 · Apt 5B
Close - Plumbing
Basin/sink
Sep 27, 2026 · Apt 5B
Close - Door/window
Door
Sep 27, 2026 · Apt 5B
Close - Door/window
Door
Sep 27, 2026 · Apt 5B
Close - Door/window
Window frame
Sep 27, 2026 · Apt 5B
Close - Plumbing
Bathtub/shower
Sep 27, 2026 · Apt 5B
Close - Unsanitary condition
Pests
Sep 17, 2026 · Apt 2F
Close
Show 40 more ↓
- Paint/plaster
Wall
Sep 17, 2026 · Apt 2F
Close - Flooring/stairs
Floor
Sep 17, 2026 · Apt 2F
Close - Electric
Power outage
Jul 29, 2026 · Apt 4C
Close - Plumbing
Water supply
Jul 22, 2026 · Apt 5A
Close - Unsanitary condition
Pests
Jul 21, 2026 · Apt 1C
Close - Safety
Smoke detector
Jul 21, 2026 · Apt 1C
Close - Unsanitary condition
Mold
Jul 21, 2026 · Apt 1C
Close - Plumbing
Bathtub/shower
Jul 21, 2026 · Apt 1C
Close - Plumbing
Bathtub/shower
Jul 21, 2026 · Apt 1C
Close - Unsanitary condition
Pests
Jul 21, 2026 · Apt 1C
Close - Safety
Carbon monoxide detector
Jul 21, 2026 · Apt 1C
Close - Heat/hot water
Entire building
Feb 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt 3D
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 1, 2026 · Apt 3D
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt 1E
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt 1C
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt 3D
Close - Heat/hot water
Apartment only
Jan 26, 2026 · Apt 3A
Close - Electric
Power outage
Jan 26, 2026 · Apt 3A
Close - Heat/hot water
Apartment only
Jan 21, 2026 · Apt 1B
Close - Appliance
Refrigerator
Jan 21, 2026 · Apt 1B
Close - Plumbing
Toilet
Jan 21, 2026 · Apt 1B
Close - Heat/hot water
Apartment only
Jan 20, 2026 · Apt 1C
Close - Electric
Outlet/switch
Jan 20, 2026 · Apt 1C
Close - Heat/hot water
Entire building
Jan 1, 2026 · Apt 5A
Close - Water leak
Damp spot
Jan 1, 2026 · Apt 5A
Close - Heat/hot water
Apartment only
Dec 26, 2025 · Apt 1E
Close - Heat/hot water
Apartment only
Dec 15, 2025 · Apt 2F
Close - Electric
No lighting
Jul 21, 2025 · Apt 3A
Close - Water leak
Slow leak
Jul 1, 2025 · Apt 2F
Close - Plumbing
Water supply
Jun 23, 2025 · Apt 6B
Close - Safety
Window guard broken/missing
Apr 30, 2025 · Apt 5D
Close - Water leak
Damp spot
Apr 30, 2025 · Apt 5D
Close - Heat/hot water
Apartment only
Apr 30, 2025 · Apt 5D
Close - Paint/plaster
Wall
Apr 30, 2025 · Apt 5D
Close - Flooring/stairs
Floor
Apr 30, 2025 · Apt 5D
Close - Unsanitary condition
Mold
Apr 30, 2025 · Apt 5D
Close - Electric
Lighting
Apr 30, 2025 · Apt 5D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1915
- Floors
- 6
- Residential units
- 35
- Building area
- 33,201 ft²
- Lot area
- 7,658 ft²
- Zoning
- R7-1
- Community board
- 204
- Council district
- 16
- Block / lot
- 2830 / 21
- Assessed value
- $1,083,150
- Landmark / historic district
- No
HPD registration #206014, last renewed May 11, 2026.
Questions about 1346 Sheridan Avenue
Who owns 1346 Sheridan Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1348 LLC.
Does 1346 Sheridan Avenue have violations?
Yes. NYC HPD has recorded 927 housing violations at this property.
Is 1346 Sheridan Avenue rent stabilized?
NYC Department of Finance tax bills listed 36 rent-stabilized units here in 2024 (about 100% of its 35 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1346 Sheridan Avenue built?
City records list 1915 as the year it was built.
How many apartments are in 1346 Sheridan Avenue?
It has 35 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.