280 East Burnside Avenue
Bronx, NY 10457BBL 2-02814-0073Map
Owner of record: 280 Burnside Housing Development Fund Co Rporation
280 East Burnside Avenue is an elevator apartment building built in 2014 in Bronx, 10457. It has 40 residential units across 13 floors. The owner of record is 280 Burnside Housing Development Fund Co Rporation. HPD has recorded 184 housing violations here, most recently on September 16, 2026. 31 of the 50 most recent violations are still open. City tax records listed 40 rent-stabilized apartments here in 2024.
- HPD violations
- 184
- DOB violations
- 26
- ECB violations
- 33
- HPD complaints
- 172
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 184
- BHazardous
Provide lock allowing access from roof to building , 13th story
Sep 16, 2026
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in at sink in the kitchen located at apt 901, 9th story, 1st apartment from east at south
Sep 9, 2026 · Apt 901
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 901, 9th story, 1st apartment from east at south
Sep 9, 2026 · Apt 901
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... observed more than 10 sq.ft at ceiling in the 2nd room from north at east located at apt 901, 9th story, 1st apartment from east at south
Sep 9, 2026 · Apt 901
Open — Civ14 mailed - BHazardous
Remove all obstructions and repair all defects in at bathtub in the bathroom located at apt 901, 9th story, 1st apartment from north at east
Sep 2, 2026 · Apt 901
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 901, 9th story, 1st apartment from north at east
Sep 2, 2026 · Apt 901
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 901, 9th story, 1st apartment from north at east
Sep 2, 2026 · Apt 901
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... observed less than 10 sq.ft at ceiling in the 1st room from east located at apt 901, 9th story, 1st apartment from north at east
Sep 2, 2026 · Apt 901
Open — Civ14 mailed - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 901, 9th story, 1st apartment from north at east
Sep 2, 2026 · Apt 901
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at roof door at 1st public hall bulkhead from north, 13th story
Aug 10, 2026
Open — False certification
Show 40 more ↓
- ANon-hazardous
Provide a mirror in self-service elevator arranged so as to enable a person entering, to view inside of elevator number 2p11795
Aug 10, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 1302, 13th story, 2nd apartment from east at south
Aug 10, 2026 · Apt 1302
Open — Civ14 mailed - BHazardous
Properly secure the loose wash basin at east wall in the bathroom located at apt 1302, 13th story, 2nd apartment from east at south
Aug 10, 2026 · Apt 1302
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective in the entire apartment located at apt 1202, 12th story, 2nd apartment from east at south
Aug 10, 2026 · Apt 1202
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is defective in the entire apartment located at apt 1202, 12th story, 2nd apartment from east at south
Aug 10, 2026 · Apt 1202
Open — Civ14 mailed - CImmediately hazardous
Replace the broken or defective bathtub rusted beyond repair in the bathroom located at apt 1202, 12th story, 2nd apartment from east at south
Aug 10, 2026 · Apt 1202
Open — Violation will be reinspected - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all ceilings, walls, baseboards and trim inside closets and throughout in the entire apartment located at apt 901, 9th story, 1st apartment from east at south
Aug 10, 2026 · Apt 901
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 901, 9th story, 1st apartment from east at south
Aug 10, 2026 · Apt 901
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of re-glaing at bathtub in the bathroom located at apt 901, 9th story, 1st apartment from east at south
Aug 10, 2026 · Apt 901
Open — Civ14 mailed - BHazardous
Provide electrical outlet cover at west wall at public hall, 1st story
Aug 7, 2026
Open — Nov certified on time - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 1202, 12th story, 1st apartment from west at north
Aug 7, 2026 · Apt 1202
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective mechanical stopper at bathtub in the bathroom located at apt 901, 9th story, 1st apartment from south at west
Jun 26, 2026 · Apt 901
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls and ceiling in the entire apartment located at apt 901, 9th story, 1st apartment from south at west
Jun 26, 2026 · Apt 901
Open — Not complied with - BHazardous
Remove all obstructions and repair all defects in wasteline at wash basin in the bathroom located at apt 901, 9th story, 1st apartment from south at west
Jun 26, 2026 · Apt 901
Open — Not complied with - BHazardous
Repair the broken or defective connection mechanical stopper at bathtub in the bathroom located at apt 901, 9th story, 1st apartment from south at west
Jun 26, 2026 · Apt 901
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls and ceiling in the entire apartment located at apt 901, 9th story, 1st apartment from south at west
Jun 26, 2026 · Apt 901
Open — Not complied with - BHazardous
Remove all obstructions and repair all defects in the waste pipe of the sink in the bathroom located at apt 901, 9th story, 1st apartment from north at east
Jun 15, 2026 · Apt 901
Open — Not complied with - BHazardous
Repair the broken or defective connection waste pipe of the sink in the kitchen located at apt 901, 9th story, 1st apartment from north at east
Jun 15, 2026 · Apt 901
Closed — Violation closed - BHazardous
Repair the broken or defective connection bathtub shower hose in the bathroom located at apt 901, 9th story, 1st apartment from north at east
Jun 15, 2026 · Apt 901
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective gasket on lower door of refrigerator in the kitchen located at apt 504, 5th story, 1st apartment from north at east
Jun 6, 2026 · Apt 504
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of east wall in closet in the private hallway located at apt 504, 5th story, 1st apartment from north at east
Jun 6, 2026 · Apt 504
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of at east wall in the closet in the foyer located at apt 504, 4th story, 1st apartment from east at south
Jun 6, 2026 · Apt 504
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective closet doors at east wall in the private hallway located at apt 504, 5th story, 1st apartment from north at east
Jun 6, 2026 · Apt 504
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective ventilation system at ceiling in the bathroom located at apt 504, 5th story, 1st apartment from north at east
Jun 6, 2026 · Apt 504
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective outlet cover at west wall in the kitchen located at apt 904, 9th story, 1st apartment from north at east
Apr 27, 2026 · Apt 904
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling in the entire apartment located at apt 904, 9th story, 1st apartment from north at east
Apr 27, 2026 · Apt 904
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules dwfective in the entire apartment located at apt 904, 9th story, 1st apartment from north at east
Apr 27, 2026 · Apt 904
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 904, 9th story, 1st apartment from north at east
Apr 27, 2026 · Apt 904
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 504, 5th story, 1st apartment from north at east
Apr 27, 2026 · Apt 504
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 504, 5th story, 1st apartment from north at east
Apr 27, 2026 · Apt 504
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 504, 5th story, 1st apartment from north at east
Apr 27, 2026 · Apt 504
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 504, 5th story, 1st apartment from north at east
Apr 27, 2026 · Apt 504
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is defective located at apt 902, 9th story, 1st apartment from east at south
Apr 1, 2026 · Apt 902
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective located at apt 902, 9th story, 1st apartment from east at south
Apr 1, 2026 · Apt 902
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective refrigerator upper and lower gasket seal in the kitchen located at apt 504, 5th story, 1st apartment from east at south
Mar 27, 2026 · Apt 504
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the foyer located at apt 1302, 13th story, 2nd apartment from south at west
Mar 27, 2026 · Apt 1302
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1302, 13th story, 2nd apartment from south at west
Mar 27, 2026 · Apt 1302
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak above ceiling in the kitchen located at apt 1302, 13th story, 2nd apartment from south at west
Mar 27, 2026 · Apt 1302
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the 2nd room from east located at apt 1302, 13th story, 2nd apartment from south at west
Mar 27, 2026 · Apt 1302
Open — Not complied with - BHazardous
Repair the roof so that it will not leak at ceiling in the 2nd room from east located at apt 1302, 13th story, 2nd apartment from south at west
Mar 27, 2026 · Apt 1302
Open — Not complied with
DOB building violations · 26
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9a technical report by 02/21/2022
Feb 22, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Construction other optional
Failure to maintain building or appurtenance. at time of inspection observed at rear of property a collaspe retaining wall approx 20'feet high and 30' wide also observe wall of a garage undermine remedy: vacate rear yard
Dec 3, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 4, 2018
Dob violation - dismissed
Show 16 more ↓
- Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 8, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
ECB violations · 33
- Class - 2
Failure to maintain building in code compliant manner. upon inspection, the device is found to be out of service. remedy: restore to service.
Sep 2, 2026 · Penalty $625
Active - Class - 2
Ressponding to a 311 complaint, upon inspection. device was found to be out of service 97 x 10 remedy repair device as email for a re-inpection [email protected]
May 4, 2026 · Penalty $625
Active - Class - 1
Bldg occupied w/o valid ceo.note:at time of inspection observed a tenant occupied nb wih job#220081186 have a temp ceo which is exired at 9/13/20.mean bldg occured w/o valid ceo(certificate of occupancy).rem:ob
Oct 19, 2020
Resolve - Class - 2
Ac281181-no building shall be used or occupied without a certificate of occupancy issued by the commissioner.at the time of my inspection ofa 13-story building i observed no major construction operation or punc
Dec 19, 2019 · Penalty $500
Resolve - Class - 2
67.x.10,40.p.07,52.u.07,52.u.07,52.b.14=(67)repair two way communication(40) provide keys to complete an incomplete an inspection for this department to complete an inspection (52) provide hoist rope data tag
Mar 21, 2019 · Penalty $625
Resolve - Class - 1
Work w/o a permit. noted: observed electrical being done at commercialgrocery store at 1st sty. there are exposed & unsecured electrical wires & bx cables at new installed circuit breaker box. there are electri
Apr 27, 2018
Resolve - Class - 1
Sec. 3303.4.2.3 containers: at time of inspection of a 13 sty new bldgthat is topped out. i observed a debris container on street is full beyond rim & not covered. this creates a potential hazard to cons & pede
Jan 3, 2018 · Penalty $4,000
Resolve - Class - 2
Work does not conform to approved construction documents (design drawings)for horizontal netting. horizontal netting has not been provided @rear of bldg went of hoist exp#3 & at rear of exp#4 as shown on debris
Mar 14, 2016 · Penalty $100
Resolve - Class - 2
Work does not conform to approved construction documents &/or approvedamendments. sidewalk shed at exp#1 does not conform w/dd's(#220332398)in that the dd's show 6 vertical 3.5" steel pipe columns 8' on center.
Mar 14, 2016
Resolve - Class - 1
Failure to safeguard all persons and property affected by construction operations note:observed active jobsite, crane in street standing by to grout 10th fl of block & plank jobsite observed pedestrians being d
Feb 2, 2016 · Penalty $2,400
Resolve
Show 23 more ↓
- Class - 1
Sec. 3310.8 site safety coordinators duties. note: observed active jobsite erected to the 10 floor,crane operations in progress,grounting planks at 10 floor level. ssc akif chughtai #2294 is suppose to be cover
Feb 2, 2016
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments.note:observed active jobsite crane operations at burnside lifting ops to 10fl observed that there was no solid line at barraca
Feb 2, 2016 · Penalty $1,000
Resolve - Class - 1
3307.2.2 temporary public walkways in street note:at time of inspection observed active jobsite crane operations in progress observed people trying to access sidewalk which was closed. people being flagged into
Feb 2, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction.no handrails:upon inspection as noted at active construction site there is no handrails on upper floors 4th-6th and no mid-rails
Sep 22, 2015 · Penalty $1,000
Resolve - Class - 1
Required (lighted) stairway & temporary lighting.upon inspection as n0ted at active construction site up to 6th floor slab temp lights are missing in stairwells 3rd-6th and on working floors 4th-6th endangering
Sep 22, 2015 · Penalty $1,600
Resolve - Class - 1
Materials stored/stacked within 10ft from building perimeter."partial stop work order" on all work within 10ft of building perimeter issued pursuant to 28-207.2 and posted at premises.upon inspection as noted a
Sep 22, 2015 · Penalty $2,400
Resolve - Class - 1
Vertical safety netting not provided upon inspection as noted at active construction site up to 6th floor slab there is no vertical netting on 5th fl. at all and none on exp. #3 4th fl. and not properly attache
Sep 22, 2015 · Penalty $1,600
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements.upon inspection as noted at ative construction site up to 6th floor slab there is an exessive amount of debris,approx. 20yds throughout all lev
Sep 22, 2015
Resolve - Class - 2
Failure to provide fence as required. "partial stop work order" on allwork rear yard exp. #2 issued pursuant to 28-207.2 and posted at premises.upon inspection as noted a section of fence approx. 20ft missing a
Sep 22, 2015 · Penalty $400
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction.no guardrails:upon inspection as noted at active construction site guardrail system is missing at upper fls. 5th & 6th slab inad
Sep 22, 2015 · Penalty $1,200
Resolve - Class - 1
Failure to protect adjoining property "partial stop work order" on allwork within 20ft of adjacent property exp's #2 & #4 issued pursuant t028-207.2 and posted at premises.upon inspection as noted at active con
Sep 22, 2015 · Penalty $2,400
Resolve - Class - 2
Sidewalk shed does not meet code specifications."partial stop work order" on all work above & adjacent to sidewalk shed:issued pursuant to 28-207.2 and posted at premises.upon inspection as noted at active cons
Sep 22, 2015 · Penalty $2,400
Resolve - Class - 2
Failure to provide design drawing "partial stop work order" on all temporary platforms issued pursuant to 28-207.2 and posted at premises.upon inspection as noted at active construction site up to 6th fl. slab
Sep 22, 2015 · Penalty $250
Resolve - Class - 1
Holes/openings not covered upon inspection as noted at active construction site up to 6th floor slab there are holes approx. 8"x8"-8"x4" formechanical rough-in.all levels has penetrations in front of all stair
Sep 22, 2015 · Penalty $2,400
Resolve - Class - 2
Adequate means of egress.upon inspection as noted @ active construction site up to 6th fl slab.the egress in & out of the stairwell @ 4th fllevel is blocked w/ planks & egress to & from rms @ 1st fl level is bl
Sep 22, 2015 · Penalty $1,200
Resolve - Class - 2
Work contrary to plans and applications full stop work order entire site.upon inspection as noted atfer hours variance work in progress pouring concete 1st floor partial slab.no site safety manager or coordinat
Sep 19, 2015
Resolve - Class - 2
Failure to provide site safety plan & program."full stop work order"issued pursuant tp 28-207.2 & posted @ premises upon insp as noted work in progress concrete & re-bar placement excavating elevator pit no sit
Dec 2, 2014 · Penalty $400
Resolve - Class - 1
Failure to notify the dob's before commencement of demolition - upon inspection,the demolition work has commenced,the bldg is down,site graded. as per dob record the dept was not provided w/the required notific
Jul 9, 2014 · Penalty $1,200
Resolve - Class - 2
Sec. 3307.1 job site fence not painted as per code - upon inspection observed the construction fence erected at this demolition site has been painted "blue" instead of painting "hunter green" as required by the
Jul 9, 2014 · Penalty $400
Resolve - Hazardous
Residence altered for occupancy as a dwelling for more than the legally approved # of familes bldg dept records indicates residence is legally approved for 2 families residence is now altered for occupancy by 6
Mar 25, 2004 · Penalty $19,500
Resolve - Hazardous
Work without a permit work noted second and thrid floors erected full height partitons walls doors to create rooms for srols also noted floor kitcehn has been removed.remedy:obtian pemrits
Mar 25, 2004 · Penalty $2,500
Resolve - Hazardous
Residence altered for occupancy as a dwelling for more than the legally approval number of families. cofo states legal cofo#67067 cellar.boielr-base retail store one dwell 2nd dwell.now illegally meal for sro's
Sep 9, 2003 · Penalty $2,500
Resolve - Hazardous
Work w/o permits:constructed partition thruout 2nd and 3rd flr.to create rms fro sro's. 2nd flr kit has been removed.location thruout build remedy:obtain all permits.
Sep 9, 2003 · Penalty $2,500
Resolve
Complaints
- Plumbing
Toilet
Sep 30, 2026 · Apt 504
Open - Electric
No lighting
Sep 30, 2026 · Apt 504
Open - Electric
No lighting
Sep 29, 2026 · Apt 504
Open - General
Bell/buzzer/intercom
Sep 15, 2026 · Apt 1301
Close - Unsanitary condition
Pests
Sep 15, 2026 · Apt 1301
Close - Paint/plaster
Wall
Sep 4, 2026 · Apt 901
Close - Unsanitary condition
Mold
Sep 4, 2026 · Apt 901
Close - Plumbing
Basin/sink
Sep 4, 2026 · Apt 901
Close - Plumbing
Toilet
Aug 24, 2026 · Apt 504
Close - General
Ventilation system
Aug 24, 2026 · Apt 504
Close
Show 40 more ↓
- Plumbing
Basin/sink
Aug 19, 2026 · Apt 901
Close - Unsanitary condition
Mold
Aug 19, 2026 · Apt 901
Close - Plumbing
Basin/sink
Aug 19, 2026 · Apt 901
Close - Plumbing
Bathtub/shower
Aug 19, 2026 · Apt 901
Close - Plumbing
Bathtub/shower
Aug 19, 2026 · Apt 901
Close - Unsanitary condition
Mold
Aug 19, 2026 · Apt 901
Close - Plumbing
Basin/sink
Jul 28, 2026 · Apt 1202
Close - Unsanitary condition
Mold
Jul 28, 2026 · Apt 1202
Close - Appliance
Electric/gas range
Jul 16, 2026 · Apt 803
Close - Paint/plaster
Wall
Jun 16, 2026 · Apt 901
Close - Paint/plaster
Ceiling
Jun 16, 2026 · Apt 901
Close - Plumbing
Bathtub/shower
Jun 16, 2026 · Apt 901
Close - Plumbing
Toilet
Jun 16, 2026 · Apt 901
Close - Plumbing
Basin/sink
Jun 16, 2026 · Apt 901
Close - Plumbing
Toilet
Jun 15, 2026 · Apt 504
Close - Appliance
Refrigerator
Jun 15, 2026 · Apt 504
Close - General
Ventilation system
Jun 15, 2026 · Apt 504
Close - Appliance
Electric/gas range
Jun 15, 2026 · Apt 504
Close - Plumbing
Bathtub/shower
Jun 12, 2026 · Apt 901
Close - Paint/plaster
Wall
Jun 12, 2026 · Apt 901
Close - Plumbing
Basin/sink
Jun 12, 2026 · Apt 901
Close - Paint/plaster
Wall
Jun 10, 2026 · Apt 901
Close - Plumbing
Bathtub/shower
Jun 10, 2026 · Apt 901
Close - Plumbing
Basin/sink
Jun 10, 2026 · Apt 901
Close - Appliance
Electric/gas range
May 29, 2026 · Apt 504
Close - Appliance
Refrigerator
May 29, 2026 · Apt 504
Close - Elevator
Maintenance
May 18, 2026 · Apt BLDG
Close - Plumbing
Basin/sink
May 13, 2026 · Apt 504
Close - Plumbing
Basin/sink
May 13, 2026 · Apt 504
Close - Appliance
Electric/gas range
May 13, 2026 · Apt 504
Close - General
Ventilation system
May 13, 2026 · Apt 504
Close - Unsanitary condition
Garbage/recycling storage
Apr 24, 2026 · Apt 904
Close - Unsanitary condition
Mold
Apr 24, 2026 · Apt 904
Close - Appliance
Electric/gas range
Apr 22, 2026 · Apt 504
Close - Plumbing
Basin/sink
Apr 22, 2026 · Apt 504
Close - Plumbing
Bathtub/shower
Apr 22, 2026 · Apt 504
Close - Plumbing
Water supply
Apr 22, 2026 · Apt 504
Close - Appliance
Electric/gas range
Mar 29, 2026 · Apt 504
Close - Plumbing
Bathtub/shower
Mar 29, 2026 · Apt 504
Close - Paint/plaster
Ceiling
Mar 29, 2026 · Apt 504
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D6)
- Year built
- 2014
- Floors
- 13
- Residential units
- 40
- Building area
- 42,917 ft²
- Lot area
- 3,422 ft²
- Zoning
- R8
- Community board
- 205
- Council district
- 15
- Block / lot
- 2814 / 73
- Assessed value
- $846,000
- Landmark / historic district
- No
HPD registration #227744, last renewed Aug 5, 2025.
Questions about 280 East Burnside Avenue
Who owns 280 East Burnside Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 280 Burnside Housing Development Fund Co Rporation.
Does 280 East Burnside Avenue have violations?
Yes. NYC HPD has recorded 184 housing violations at this property.
Is 280 East Burnside Avenue rent stabilized?
NYC Department of Finance tax bills listed 40 rent-stabilized units here in 2024 (about 100% of its 40 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 280 East Burnside Avenue built?
City records list 2014 as the year it was built.
How many apartments are in 280 East Burnside Avenue?
It has 40 residential units and 41 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.