671 Manida Street
Bronx, NY 10474BBL 2-02765-0205Map
Owner of record: Phoenix Estates HDFC
671 Manida Street is an elevator apartment building built in 1923 in Bronx, 10474. It has 39 residential units across 5 floors. The owner of record is Phoenix Estates HDFC. HPD has recorded 126 housing violations here, most recently on August 18, 2026. 26 of the 50 most recent violations are still open. City tax records listed 39 rent-stabilized apartments here in 2024.
- HPD violations
- 126
- DOB violations
- 20
- ECB violations
- 18
- HPD complaints
- 415
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 126
- BHazardous
Remove all obstructions and repair all defects in waste drain pipe at wash basin in the bathroom located at apt 3f, 3rd story, 1st apartment from west at north
Aug 18, 2026 · Apt 3F
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective rubber gasket at lower refrigerator door in the kitchen located at apt 6a, 6th story, 1st apartment from north at east
Aug 18, 2026 · Apt 6A
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of lifting vinyl floor tiles [ walk area ] in the kitchen located at apt 6a, 6th story, 1st apartment from north at east
Aug 18, 2026 · Apt 6A
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective eroded sink wood counter-top in the kitchen located at apt 6b, 6th story, 2nd apartment from north at east
Aug 18, 2026 · Apt 6B
Open — Nov sent out - BHazardous
Replace with new the missing latching plate at door frame in the entrance located at apt 6d, 6th story, 1st apartment from south at west
Aug 18, 2026 · Apt 6D
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective sagging wood floor in the 2nd room from east located at apt 4f, 4th story, 1st apartment from west at north
Aug 18, 2026 · Apt 4F
Open — Nov sent out - ANon-hazardous
Refit entrance door in the 1st room from east located at apt 4f, 4th story, 1st apartment from west at north
Aug 18, 2026 · Apt 4F
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective wood floor saddle in the 1st room from east located at apt 3f, 3rd story, 1st apartment from west at north
Aug 18, 2026 · Apt 3F
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2g, 2nd story, 1st apartment from north at east
Aug 18, 2026 · Apt 2G
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective dead-bolt at mortise lock door in the entrance located at apt 2a, 2nd story, 1st apartment from north at east
Aug 18, 2026 · Apt 2A
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration compactor closet sealed shut at public hall, 2nd story
Jun 20, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south and west wall at public hall, 2nd story
Jun 20, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardent materials at south and west wall at public hall, 2nd story
Jun 20, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Apr 22, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Apr 22, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox missing at public hall, 1st story
Apr 22, 2026
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system boiler room locked at boiler room
Oct 2, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2d, 2nd story, 1st apartment from east at south , section ''west''
Oct 2, 2025 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods out of guide at second stack from north at west exterior wall rear of building at fire escape
Oct 1, 2025
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at apartment entrance in the entrance located at apt 6g, 6th story, 1st apartment from north at east , section at north
Oct 1, 2025 · Apt 6G
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6g, 6th story, 1st apartment from north at east , section at north
Oct 1, 2025 · Apt 6G
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Oct 1, 2025
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 6a, 6th story, 1st apartment from north at east , section at south
Oct 1, 2025 · Apt 6A
Open — Nov certified late - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6a, 6th story, 1st apartment from north at east , section at south
Oct 1, 2025 · Apt 6A
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east , section ''south''
Oct 1, 2025 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from north at east , section ''south''
Oct 1, 2025 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Sep 30, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6a, 6th story, 2nd apartment from north at east
Sep 30, 2025 · Apt 6A
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system boiler room locked at basement
Sep 29, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1g, 1st story, 1st apartment from west at north
Sep 29, 2025 · Apt 1G
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at east wall in the bathroom located at apt 6a, 6th story, 2nd apartment from north at east
Jul 21, 2025 · Apt 6A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 6a, 6th story, 2nd apartment from north at east
Jul 21, 2025 · Apt 6A
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2024
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2023
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approcimately 8 sq ft at ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from south at west
Oct 10, 2023 · Apt 2C
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... approcimately 8 sq ft at ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from south at west original violation 16299511 issued 10-oct-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Oct 10, 2023 · Apt 2C
Open — Not complied with - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2g, 2nd story, 1st apartment from north at east , section ''north''
Sep 7, 2023 · Apt 2G
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 2nd story
Sep 7, 2023
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system no access to boiler room and no sign to call superintendent at time of inspection. at boiler room
Sep 7, 2023
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5a, 5th story, 1st apartment from west at north , section ''east''
Sep 6, 2023 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Sep 6, 2023
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4g, 4th story, 1st apartment from north at east
Sep 5, 2023 · Apt 4G
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Sep 5, 2023
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical light switch at the south wall in the 4th room from east located at apt 2b, 2nd story, 4th apartment from south at west
Aug 28, 2023 · Apt 2B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 1st room from east at north located at apt 3a, 3rd story, 2nd apartment from north at east
Aug 28, 2023 · Apt 3A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3a, 3rd story, 2nd apartment from north at east
Aug 28, 2023 · Apt 3A
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 3a, 3rd story, 2nd apartment from north at east
Aug 28, 2023 · Apt 3A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east at north located at apt 3a, 3rd story, 2nd apartment from north at east
Aug 28, 2023 · Apt 3A
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 5d, 5th story, 1st apartment from south at west
Aug 28, 2023 · Apt 5D
Closed — Violation closed
DOB building violations · 20
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 24, 2021
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 15, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 7, 2018
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 5, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 5, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 10, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 1, 2011
Dob violation - resolved
Show 10 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jun 4, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 1, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 9, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 13, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 19, 2005
Dob violation - resolved - Elevator elevatorrequired
2p5227
Feb 20, 2002
Dob violation - resolved - Elevator elevatorrequired
2p5227
Aug 11, 1999
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - active - Elevator elevatorrequired
Device #2p5227
Apr 30, 1991
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 7, 1988
Dob violation - resolved
ECB violations · 18
- Class - 1
Found laars,boiler on gas btus rate=999000 ceased use due to hazardous condition: high levels of c/o2 due to rotted flue. as per nyfd do not operate boiler until all hazardous conditions are immediately correct
Sep 29, 2025 · Penalty $2,500
Active - Class - 1
Found a laars boiler for hot water rated at 399000 btus ceased use due to hazardous condition: as per nyfd,due to high levels of c/o2 due to rotted flue do not operate boiler until all hazardous conditions are
Sep 29, 2025 · Penalty $2,500
Active - Class - 1
Found a laars h/w boiler ceased use due to hazardous conditions)high levels of c/o2 due to rotted flue. as per nyfd do not operate boiler until all hazardous conditions are immediately corrected and dob is noti
Sep 29, 2025 · Penalty $2,500
Active - Class - 1
Found a laars on gas rated at 999000 btus ceased use due to hazardous condition: high levels of c/o2 due to rotted flue as per nyfd . do not operate boiler until all hazardous conditions are immediately correct
Sep 29, 2025 · Penalty $2,500
Active - Class - 1
At time of inspection observed at basement 6 gas burning boilers exhaust pipe have multiple uncovered spots where co leaking., repair and/replace
Sep 26, 2025 · Penalty $2,500
Active - Class - 2
Ftm boiler b254 boiler inoperable laars#pnch400 rated at 399000 btu /not working circulation pump removed for repair correct violation and submit cert.of correction
Jan 26, 2021 · Penalty $312
Active - Class - 1
.icensed rigger failed to ensure scaffold worker met min requirement.no cert of fitness for workers on site.remedy:comply w/code.
Apr 28, 2009 · Penalty $1,600
Resolve - Class - 1
Supervision or use of rigging equipment w/o (4) riggers license. c-hokks installed used as support for a suspended scaffold observed installed @ exposures #1. remedy: comply with code.
Jan 31, 2009 · Penalty $4,800
Resolve - Hazardous
Sidewalk shed does not meet bldg code specifications.defect noted:sidewalk shed erected under permit #200996253 does not have vandal proof fixtures along underside of shed.remedy:conform shed to bldg code speci
Mar 3, 2008 · Penalty $2,000
Resolve - Non-hazardous
11q6/ 21x12/ 57o2/ 35p17/ (11) unguard car hight inside of car (21) arrow indicate ot wor king (57) pit dirty (35) no access to motor room
May 15, 2002 · Penalty $2,500
Resolve
Show 8 more ↓
- Non-hazardous
15l11/30o2/57o2/35p17/22l11/22d6/ (15) lobby hoistway not self closing(22) replace emg exit cover up to city code
Jun 20, 2000 · Penalty $440
Resolve - Non-hazardous
57o2,35p17,36p17,15l11,30o2,22l11. 15-lobby hoistway not self closing 23-repair ems exit cover uo to city code
May 2, 2000 · Penalty $180
Resolve - Non-hazardous
36t 18q 7x 15l 55l 74d 18 cover interlockbox
Aug 11, 1999 · Penalty $180
Resolve - Non-hazardous
2l11,8v1,57o2,14m7,22d6,15j1,50y11,22o2,18q3,21l11. 15-too much gap to buck 6th fl. 22-car top.
Mar 10, 1998
Resolve - Unknown
02l,07i,13m,14m,37#- 37-provide city numbers on all devices in motoroom.
Feb 20, 1996
Resolve - Non-hazardous
14i,22d.
Mar 1, 1995 · Penalty $1,000
Resolve - Non-hazardous
46h,570,73#, 73.perform 5 year test properly tag device and file elev. 3 form
Jun 9, 1992 · Penalty $200
Resolve - Non-hazardous
07l;22r;52e;57o;40# 40.perform 5 year test.
Apr 30, 1991 · Penalty $150
Resolve
Complaints
- Heat/hot water
Entire building
Oct 22, 2026 · Apt 6B
Open - Heat/hot water
Entire building
Oct 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 20, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Oct 20, 2026 · Apt 4D
Close - Heat/hot water
Entire building
Oct 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 19, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Oct 19, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Oct 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 18, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Oct 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 18, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Oct 18, 2026 · Apt 5D
Close - Heat/hot water
Entire building
Oct 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 18, 2026 · Apt BLDG
Close - Flooring/stairs
Floor
Oct 13, 2026 · Apt 4F
Open - Door/window
Door
Oct 13, 2026 · Apt 4F
Open - Paint/plaster
Wall
Oct 13, 2026 · Apt 4F
Open - Unsanitary condition
Mold
Aug 4, 2026 · Apt 2C
Close - Unsanitary condition
Pests
Aug 4, 2026 · Apt 2C
Close - Unsanitary condition
Pests
Aug 4, 2026 · Apt 2C
Close - General
Bell/buzzer/intercom
Jun 4, 2026 · Apt 6B
Close - Door/window
Door
Jun 4, 2026 · Apt BLDG
Close - Door/window
Door
Jun 4, 2026 · Apt BLDG
Close - Door/window
Door
Jun 3, 2026 · Apt BLDG
Close - Door/window
Door
Jun 3, 2026 · Apt BLDG
Close - Door/window
Door
Jun 3, 2026 · Apt BLDG
Close - Plumbing
Bathtub/shower
May 16, 2026 · Apt 2C
Close - Plumbing
Bathtub/shower
May 15, 2026 · Apt 2C
Close - Door/window
Door
Apr 14, 2026 · Apt BLDG
Close - Door/window
Door
Apr 14, 2026 · Apt BLDG
Close - Door/window
Door
Apr 14, 2026 · Apt BLDG
Close - Door/window
Door
Apr 14, 2026 · Apt BLDG
Close - Door/window
Door
Apr 14, 2026 · Apt BLDG
Close - Door/window
Door
Apr 14, 2026 · Apt BLDG
Close - Door/window
Door
Apr 13, 2026 · Apt BLDG
Close - Door/window
Door
Apr 13, 2026 · Apt BLDG
Close - Door/window
Door
Apr 13, 2026 · Apt BLDG
Close - Door/window
Door
Apr 10, 2026 · Apt BLDG
Close - Door/window
Door
Apr 10, 2026 · Apt BLDG
Close - Door/window
Door
Apr 10, 2026 · Apt BLDG
Close - Door/window
Door
Apr 10, 2026 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1923
- Floors
- 5
- Residential units
- 39
- Building area
- 38,750 ft²
- Lot area
- 10,000 ft²
- Zoning
- R6
- Community board
- 202
- Council district
- 17
- Block / lot
- 2765 / 205
- Assessed value
- $2,067,750
- Landmark / historic district
- No
HPD registration #210076, last renewed Oct 30, 2025.
Questions about 671 Manida Street
Who owns 671 Manida Street?
The owner of record in NYC Department of City Planning PLUTO data is Phoenix Estates HDFC.
Does 671 Manida Street have violations?
Yes. NYC HPD has recorded 126 housing violations at this property.
Is 671 Manida Street rent stabilized?
NYC Department of Finance tax bills listed 39 rent-stabilized units here in 2024 (about 100% of its 39 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 671 Manida Street built?
City records list 1923 as the year it was built.
How many apartments are in 671 Manida Street?
It has 39 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.