745 Hunts Point Avenue
Bronx, NY 10474BBL 2-02763-0149Map
Owner of record: Coster 1 LLC
745 Hunts Point Avenue is a walk-up apartment building built in 1927 in Bronx, 10474. It has 28 residential units across 5 floors. The owner of record is Coster 1 LLC. HPD has recorded 595 housing violations here, most recently on September 26, 2026. 15 of the 50 most recent violations are still open. City tax records listed 27 rent-stabilized apartments here in 2024.
- HPD violations
- 595
- DOB violations
- 4
- ECB violations
- 3
- HPD complaints
- 741
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 595
- BHazardous
Repair the leaky and/or defective faucets leaky faucet at wash basin in the bathroom located at apt 5a, 5th story, 3rd apartment from south at west
Sep 26, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective cracked glass pane at lower sash window in the 2nd room from north located at apt 5a, 5th story, 3rd apartment from south at west
Sep 26, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the 2nd room from north located at apt 5a, 5th story, 3rd apartment from south at west
Sep 26, 2026 · Apt 5A
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water temperature exceeding 130 degrees at faucets in the bathroom located at apt 5a, 5th story, 3rd apartment from south at west
Sep 26, 2026 · Apt 5A
Open — Civ14 mailed - BHazardous
Repair the leaky and/or defective faucets faucet at bathtub in the bathroom located at apt 5a, 5th story, 3rd apartment from south at west
Sep 26, 2026 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5a, 5th story, 3rd apartment from south at west
Sep 26, 2026 · Apt 5A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 5a, 5th story, 3rd apartment from south at west
Sep 26, 2026 · Apt 5A
Open — Nov certified on time - ANon-hazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 5a, 5th story, 3rd apartment from south at west
Sep 26, 2026 · Apt 5A
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 1o square feet at ceiling, north and east walls in the bathroom located at apt 5a, 5th story, 3rd apartment from south at west
Sep 26, 2026 · Apt 5A
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 5a, 5th story, 3rd apartment from south at west
Sep 26, 2026 · Apt 5A
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5a, 5th story, 3rd apartment from south at west
Sep 26, 2026 · Apt 5A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at bulkhead door at 1st public hall bulkhead from north, 5th story
Jul 3, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5b, 5th story, 2nd apartment from south at west
Jul 3, 2026 · Apt 5B
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft around both window casings in the 1st room from north located at apt 5b, 5th story, 2nd apartment from south at west
Jul 3, 2026 · Apt 5B
Open — Notice of issuance sent to tenant - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft around window casing in the 4th room from north located at apt 5b, 5th story, 2nd apartment from south at west
Jul 3, 2026 · Apt 5B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 5b, 5th story, 2nd apartment from south at west
Jul 3, 2026 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective cracked glass pane at lower window sash creating a cut hazard in the 4th room from north located at apt 5b, 5th story, 2nd apartment from south at west
Jul 3, 2026 · Apt 5B
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft around window casing in the bathroom located at apt 5b, 5th story, 2nd apartment from south at west
Jul 3, 2026 · Apt 5B
Open — Notice of issuance sent to tenant - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft around window casing in the kitchen located at apt 5b, 5th story, 2nd apartment from south at west
Jul 3, 2026 · Apt 5B
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 5b, 5th story, 2nd apartment from south at west
Jul 3, 2026 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak above ceiling in the private hallway located at apt 5b, 5th story, 2nd apartment from south at west
Jul 3, 2026 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west and north walls and ceiling in the kitchen located at apt 5b, 5th story, 2nd apartment from south at west
Jul 3, 2026 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak above the ceiling in the 4th room from north located at apt 5b, 5th story, 2nd apartment from south at west
Jul 3, 2026 · Apt 5B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north and east walls at public hall stairs, 4th story
Jul 3, 2026
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 5b, 5th story, 2nd apartment from south at west
Jul 3, 2026 · Apt 5B
Closed — Violation dismissed - BHazardous
Replace with new the missing latch and assembly's at bulkhead door at 1st public hall bulkhead from north, 5th story
Jul 3, 2026
Closed — Violation dismissed - BHazardous
Provide re entry handle / knob at bulkhead door at 1st public hall bulkhead from north, 5th story
Jul 3, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective ceiling light fixtures in the kitchen located at apt 5a, 5th story, 3rd apartment from south at west
Jun 18, 2026 · Apt 5A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 5a, 5th story, 3rd apartment from south at west
Jun 18, 2026 · Apt 5A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, east wall in the 1st room from east located at apt 4d, 4th story, 1st apartment from east at south
Feb 14, 2026 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the private hallway located at apt 4d, 4th story, 1st apartment from east at south
Feb 14, 2026 · Apt 4D
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). west wall in the 1st room from east located at apt 4d, 4th story, 1st apartment from east at south
Feb 14, 2026 · Apt 4D
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall in the kitchen located at apt 4d, 4th story, 1st apartment from east at south
Feb 14, 2026 · Apt 4D
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 4d, 4th story, 1st apartment from east at south
Feb 14, 2026 · Apt 4D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical light fixture at ceiling in the bathroom located at apt 4d, 4th story, 1st apartment from east at south
Feb 14, 2026 · Apt 4D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 4d, 4th story, 1st apartment from east at south
Feb 14, 2026 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). south wall in the foyer located at apt 4d, 4th story, 1st apartment from east at south
Feb 14, 2026 · Apt 4D
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak over the ceiling in the 1st room from east located at apt 4d, 4th story, 1st apartment from east at south
Feb 14, 2026 · Apt 4D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 4d, 4th story, 1st apartment from east at south
Feb 14, 2026 · Apt 4D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak over the ceiling in the kitchen located at apt 4d, 4th story, 1st apartment from east at south
Feb 14, 2026 · Apt 4D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak over the ceiling in the bathroom located at apt 4d, 4th story, 1st apartment from east at south
Feb 14, 2026 · Apt 4D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective base cabinet at east wall in the kitchen located at apt 4d, 4th story, 1st apartment from east at south
Feb 14, 2026 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Feb 9, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the 2nd room from east located at apt 4a, 4th story, 3rd apartment from south at west
Feb 9, 2026 · Apt 4A
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures at bathtub in the bathroom located at apt 3b, 3rd story, 2nd apartment from south at west
Dec 13, 2025 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3b, 3rd story, 2nd apartment from east at south
Dec 9, 2025 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 2nd apartment from east at south
Dec 9, 2025 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 3b, 3rd story, 2nd apartment from east at south
Dec 9, 2025 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3b, 3rd story, 2nd apartment from east at south
Dec 9, 2025 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3b, 3rd story, 2nd apartment from east at south
Dec 9, 2025 · Apt 3B
Closed — Violation dismissed
DOB building violations · 4
- Construction other optional
C-construction other optional
Dec 24, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
ECB violations · 3
- Class - 2
Work without permit. noted: illuminated sign reads: "laundromat", sign is approx: 20'x 4'. sign is blue with white illuminated lettering, sign was installed without a permit., obtain all permits
Aug 25, 2026 · Penalty $1,250
Active - Class - 2
B254,15,34a,48a,50a,b,c,d,e,f. 50a- d.a.r. kit missing on burner. 50b-soot all over boiler & burner. 50c- cover missing for supply pump for belt. 50d- pigtail must be brass for pressure gauge. 50e-need shut-off
Mar 9, 2011 · Penalty $500
Resolve - Non-hazardous
Occupancy contrary to that allowed by the building dept. records. 1)application #200130651 for installation on cusal for exinguishing system and 2)application #200271008 to repipe of existing for suppression sy
Dec 22, 2000
Resolve
Complaints
- Appliance
Electric/gas range
Oct 6, 2026 · Apt 5C
Open - Plumbing
Bathtub/shower
Oct 6, 2026 · Apt 5C
Open - Unsanitary condition
Pests
Oct 6, 2026 · Apt 5C
Open - Door/window
Window pane
Sep 25, 2026 · Apt 5A
Open - Plumbing
Bathtub/shower
Sep 25, 2026 · Apt 5A
Open - Plumbing
Bathtub/shower
Sep 24, 2026 · Apt 5A
Close - Plumbing
Water supply
Sep 24, 2026 · Apt 5A
Close - Door/window
Window pane
Sep 24, 2026 · Apt 5A
Close - Plumbing
Bathtub/shower
Sep 24, 2026 · Apt 5A
Close - Door/window
Window pane
Sep 23, 2026 · Apt 5A
Close
Show 40 more ↓
- Plumbing
Bathtub/shower
Sep 23, 2026 · Apt 5A
Close - Paint/plaster
Ceiling
Sep 15, 2026 · Apt 5A
Close - Door/window
Window frame
Sep 15, 2026 · Apt 5A
Close - Plumbing
Bathtub/shower
Sep 15, 2026 · Apt 5A
Close - Paint/plaster
Ceiling
Sep 14, 2026 · Apt 5A
Close - Plumbing
Bathtub/shower
Sep 14, 2026 · Apt 5A
Close - Door/window
Window frame
Sep 14, 2026 · Apt 5A
Close - Plumbing
Water supply
Sep 14, 2026 · Apt 5A
Close - Paint/plaster
Ceiling
Sep 11, 2026 · Apt 5A
Close - Safety
Fire escape
Sep 11, 2026 · Apt 5A
Close - Plumbing
Water supply
Sep 11, 2026 · Apt 5A
Close - Plumbing
Bathtub/shower
Sep 11, 2026 · Apt 5A
Close - Plumbing
Bathtub/shower
Sep 9, 2026 · Apt 5A
Close - Electric
Lighting
Jul 7, 2026 · Apt 5A
Close - Electric
Outlet/switch
Jul 2, 2026 · Apt 5A
Close - Electric
Power outage
Jul 2, 2026 · Apt 5A
Close - Electric
Power outage
Jun 18, 2026 · Apt 1B
Close - Unsanitary condition
Garbage/recycling storage
Jun 1, 2026 · Apt BLDG
Close - Plumbing
Basin/sink
Apr 27, 2026 · Apt 5A
Close - Plumbing
Basin/sink
Apr 27, 2026 · Apt 5A
Close - Paint/plaster
Ceiling
Apr 27, 2026 · Apt 5A
Close - Door/window
Door
Apr 8, 2026 · Apt 5D
Open - Heat/hot water
Apartment only
Mar 1, 2026 · Apt 4A
Close - Heat/hot water
Apartment only
Feb 7, 2026 · Apt 4A
Close - Unsanitary condition
Mold
Jan 26, 2026 · Apt 4D
Close - Paint/plaster
Wall
Jan 26, 2026 · Apt 4D
Close - Paint/plaster
Wall
Jan 26, 2026 · Apt 4D
Close - Water leak
Slow leak
Jan 26, 2026 · Apt 4D
Close - Heat/hot water
Entire building
Dec 31, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt 1A
Close - Heat/hot water
Entire building
Dec 12, 2025 · Apt 3B
Close - Heat/hot water
Entire building
Dec 9, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 9, 2025 · Apt 2E
Close - Heat/hot water
Entire building
Dec 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 8, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 7, 2025 · Apt 5A
Close - Electric
Power outage
Dec 6, 2025 · Apt 3B
Close - Heat/hot water
Apartment only
Dec 6, 2025 · Apt 3B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1927
- Floors
- 5
- Residential units
- 28
- Building area
- 25,000 ft²
- Lot area
- 5,869 ft²
- Zoning
- R6
- Community board
- 202
- Council district
- 17
- Block / lot
- 2763 / 149
- Assessed value
- $623,250
- Landmark / historic district
- No
HPD registration #203510, last renewed Aug 12, 2025.
Questions about 745 Hunts Point Avenue
Who owns 745 Hunts Point Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Coster 1 LLC.
Does 745 Hunts Point Avenue have violations?
Yes. NYC HPD has recorded 595 housing violations at this property.
Is 745 Hunts Point Avenue rent stabilized?
NYC Department of Finance tax bills listed 27 rent-stabilized units here in 2024 (about 96% of its 28 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 745 Hunts Point Avenue built?
City records list 1927 as the year it was built.
How many apartments are in 745 Hunts Point Avenue?
It has 28 residential units and 29 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.