907 Faile Street
Bronx, NY 10474BBL 2-02761-0032Map
Owner of record: Guillen, Ramon Sanchez
907 Faile Street is a two-family home built in 1900 in Bronx, 10474. It has 2 residential units across 2 floors. The owner of record is Guillen, Ramon Sanchez. HPD has recorded 31 housing violations here, most recently on November 24, 2025. 19 of the 31 most recent violations are still open.
- HPD violations
- 31
- DOB violations
- 0
- ECB violations
- 1
- HPD complaints
- 19
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 31
- IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 24, 2025
Open — Info nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from south at west
Aug 27, 2024 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from south at west
Aug 27, 2024 · Apt 2NDFLO
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft. at ceiling at closet in the private hallway located at apt 2floor, 2nd story, 1st apartment from south at west original violation 17212988 issued 21-aug-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Aug 21, 2024 · Apt 2FLOOR
Open — First no access to re- inspect violation - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Aug 21, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Aug 21, 2024
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Aug 21, 2024
Open — Nov sent out - BHazardous
Abate the nuisance consisting of abate the nuisance of loose scuttle ladder at public hall, 2nd story
Aug 21, 2024
Open — Nov sent out - BHazardous
Provide wired mesh under skylight at public hall, 2nd story
Aug 21, 2024
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft. at ceiling at closet in the private hallway located at apt 2floor, 2nd story, 1st apartment from south at west
Aug 21, 2024 · Apt 2FLOOR
Closed — Violation closed
Show 21 more ↓
- BHazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2floor, 2nd story, 1st apartment from south at west
Aug 21, 2024 · Apt 2FLOOR
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less then 10 sq.ft. at ceiling and south wall in the bathroom located at apt 2floor, 2nd story, 1st apartment from south at west
Aug 21, 2024 · Apt 2FLOOR
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2floor, 2nd story, 1st apartment from south at west
Aug 21, 2024 · Apt 2FLOOR
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less then 10 sq.ft. at ceiling and south wall in the bathroom located at apt 2floor, 2nd story, 1st apartment from south at west original violation 17212986 issued 21-aug-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Aug 21, 2024 · Apt 2FLOOR
Open — First no access to re- inspect violation - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from south at west
Dec 3, 2023 · Apt 2NDFLO
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2ndflo, 2nd story, 1st apartment from south at west
Dec 3, 2023 · Apt 2NDFLO
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt second, 2nd story, 1st apartment from south at west
Jul 1, 2023 · Apt SECOND
Open — Invalid certification - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt second, 2nd story, 1st apartment from south at west
Jul 1, 2023 · Apt SECOND
Open — Invalid certification - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 2nd room from east located at apt second, 2nd story, 1st apartment from south at west
Jul 1, 2023 · Apt SECOND
Open — Invalid certification - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd room from east located at apt second, 2nd story, 1st apartment from south at west
Jul 1, 2023 · Apt SECOND
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom located at apt second, 2nd story, 1st apartment from south at west
Jul 1, 2023 · Apt SECOND
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the kitchen located at apt second, 2nd story, 1st apartment from south at west
Jul 1, 2023 · Apt SECOND
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt second, 2nd story, 1st apartment from south at west
Jun 21, 2023 · Apt SECOND
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Aug 23, 2022
Closed — Violation dismissed - BHazardous
Fire egress defective. make stationary the iron ladder leading to scuttle opening in roof at north wall at public hall, 2nd story
Aug 22, 2022
Open — Nov sent out - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Aug 22, 2022 · Apt 2
Open — Nov certified late - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Aug 22, 2022 · Apt 2
Open — Nov certified late - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2017
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at stove (range) in the kitchen located at apt 2, 2nd story
Nov 14, 2017 · Apt 2
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective window lower sash, upper sash spring balance for the windows in the entire apartment located at apt 2, 2nd story
Nov 14, 2017 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story
Nov 14, 2017 · Apt 2
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 1
- Class - 2
Failure to provide approved/accepted plan at job site at time of inspection premises under alt-1 job#220601061 at time of inspection no plan provided at site to perform inspection job has not been signed off ye
May 18, 2020 · Penalty $312
Active
Complaints
- Heat/hot water
Apartment only
Aug 18, 2024 · Apt 2NDFLO
Close - Unsanitary condition
Pests
Aug 18, 2024 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Aug 17, 2024 · Apt 2FLOOR
Close - Heat/hot water
Apartment only
Aug 13, 2024 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Aug 9, 2024 · Apt 2
Close - Heat/hot water
Apartment only
Jul 8, 2024 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Nov 29, 2023 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Jul 7, 2023 · Apt 2FL
Close - Heat/hot water
Apartment only
Jul 4, 2023 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Jun 29, 2023 · Apt 2NDFLO
Close
Show 9 more ↓
- Heat/hot water
Apartment only
Jun 19, 2023 · Apt SECOND
Close - Heat/hot water
Apartment only
Aug 21, 2022 · Apt 2SECON
Close - Heat/hot water
Apartment only
Aug 10, 2022 · Apt 2
Close - Heat/hot water
Apartment only
Aug 9, 2022 · Apt 2
Close - Heat/hot water
Apartment only
Aug 8, 2022 · Apt 2FL
Close - Plumbing
Water supply
Jul 25, 2022 · Apt 2NDFLO
Close - Heat/hot water
Apartment only
Nov 8, 2017 · Apt 2
Close - General
Cooking gas
Nov 8, 2017 · Apt 2
Close - Heating
Heat related
Jan 27, 2011 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Two-family home (B2)
- Year built
- 1900
- Floors
- 2
- Residential units
- 2
- Building area
- 2,394 ft²
- Lot area
- 2,500 ft²
- Zoning
- R6
- Community board
- 202
- Council district
- 17
- Block / lot
- 2761 / 32
- Assessed value
- $58,740
- Landmark / historic district
- No
HPD registration #715207, last renewed Nov 5, 2024.
Questions about 907 Faile Street
Who owns 907 Faile Street?
The owner of record in NYC Department of City Planning PLUTO data is Guillen, Ramon Sanchez.
Does 907 Faile Street have violations?
Yes. NYC HPD has recorded 31 housing violations at this property.
Is 907 Faile Street rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 907 Faile Street built?
City records list 1900 as the year it was built.
How many apartments are in 907 Faile Street?
It has 2 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.