roofy

536 East 168 Street

Bronx, NY 10456BBL 2-02609-0028Map

Owner of record: Cht 168 Trust

536 East 168 Street is a walk-up apartment building built in 1917 in Bronx, 10456. It has 34 residential units across 6 floors. The owner of record is Cht 168 Trust. HPD has recorded 535 housing violations here, most recently on December 28, 2025. 7 of the 50 most recent violations are still open. City tax records listed 33 rent-stabilized apartments here in 2024.

HPD violations
535
DOB violations
8
ECB violations
4
HPD complaints
1,063

What to know

Concern
3 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Dec 28, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
33
About 97% of the building's 34 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 535

  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt b6, 2nd story, 2nd apartment from west at north

    Dec 28, 2025 · Apt B6

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective rereglaze porcelain enamel at bathtub in the bathroom located at apt d5, 5th story, 1st apartment from west at north

    Dec 28, 2025 · Apt D5

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt d5, 5th story, 1st apartment from west at north

    Dec 28, 2025 · Apt D5

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt b6, 2nd story, 2nd apartment from west at north

    Dec 28, 2025 · Apt B6

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Dec 28, 2025

    Closed — Violation dismissed
  • C

    Provide a safe and adequate supply of electric service to the fixtures all outlet, switches and light fixtures in the entire apartment located at apt c2, 4th story, 2nd apartment from east at south

    Nov 26, 2025 · Apt C2

    Closed — Violation dismissed
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt c2, 4th story, 2nd apartment from east at south

    Nov 26, 2025 · Apt C2

    Closed — Violation dismissed
  • C

    Provide a safe and adequate supply of electric service to the fixtures at all wall electrical receptacles and all light fixtures at ceilings in the entire apartment located at apt c2, 4th story, 2nd apartment from east at south

    Nov 25, 2025 · Apt C2

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the entire apartment located at apt 2, 1st story, 1st apartment from east at south

    Jun 9, 2025 · Apt 2

    Open — Civ14 mailed
  • A

    Properly repair or replace the broken or defective closet door in the private hallway located at apt a3, 2nd story, 1st apartment from south at west

    May 13, 2025 · Apt A3

    Open — Civ14 mailed
Show 40 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt a3, 2nd story, 1st apartment from south at west

    May 13, 2025 · Apt A3

    Open — Civ14 mailed
  • B

    Properly repair with similar material the broken or defective wooden sub floor (rotten) in the 4th room from north located at apt a3, 2nd story, 1st apartment from south at west

    Apr 6, 2025 · Apt A3

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of air conditioner unit obstructing fire escape window at north wall in the 4th room from north located at apt a3, 2nd story, 1st apartment from south at west

    Apr 6, 2025 · Apt A3

    Open — Civ14 mailed
  • B

    Properly repair with similar material the broken or defective vynil floor tiles (lifting) in the 4th room from north located at apt a3, 2nd story, 1st apartment from south at west

    Apr 6, 2025 · Apt A3

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt a3, 2nd story, 1st apartment from south at west

    Apr 6, 2025 · Apt A3

    Closed — Violation dismissed
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at rats in the entire apartment located at apt a3, 2nd story, 1st apartment from south at west

    Apr 6, 2025 · Apt A3

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective (defective spring loaded hinges/door does not align with frame) in the entrance located at apt a3, 2nd story, 1st apartment from south at west

    Mar 24, 2025 · Apt A3

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt a3, 2nd story, 1st apartment from south at west

    Mar 24, 2025 · Apt A3

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system (door locked) at boiler room

    Mar 24, 2025

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt a3, 2nd story, 1st apartment from south at west

    Mar 24, 2025 · Apt A3

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector (defective) in the entire apartment located at apt a3, 2nd story, 1st apartment from south at west

    Mar 24, 2025 · Apt A3

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). (defective) in the entire apartment located at apt a3, 2nd story, 1st apartment from south at west

    Mar 24, 2025 · Apt A3

    Closed — Violation dismissed
  • C

    Properly repair with similar material the broken or defective wood floor in the 5th room from east located at apt a3, 2nd story, 1st apartment from south at west

    Mar 24, 2025 · Apt A3

    Closed — Violation dismissed
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at (rats) thru out in the entire apartment located at apt a3, 2nd story, 1st apartment from south at west

    Mar 24, 2025 · Apt A3

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective (bell/buzzer system) in the foyer located at apt a3, 2nd story, 1st apartment from south at west

    Mar 20, 2025 · Apt A3

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system (door locked) at boiler room

    Mar 20, 2025

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective wood floor in the 5th room from north located at apt a3, 2nd story, 1st apartment from south at west

    Mar 20, 2025 · Apt A3

    Open — Civ14 mailed
  • B

    Repair or replace the smoke detector (device present but needs relocation to within 15ft of sleeping areas) in the entire apartment located at apt a3, 2nd story, 1st apartment from south at west

    Mar 20, 2025 · Apt A3

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). (device present but needs relocation to within 15ft of sleeping areas) in the entire apartment located at apt a3, 2nd story, 1st apartment from south at west

    Mar 20, 2025 · Apt A3

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt a3, 2nd story, 1st apartment from south at west

    Mar 20, 2025 · Apt A3

    Closed — Violation dismissed
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at (rats) in the entire apartment located at apt a3, 2nd story, 1st apartment from south at west

    Mar 20, 2025 · Apt A3

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the 1st room from north at east located at apt a3, 2nd story, 1st apartment from south at west

    Mar 20, 2025 · Apt A3

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective defective spring loaded hinges) in the entrance located at apt a3, 2nd story, 1st apartment from south at west

    Mar 20, 2025 · Apt A3

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of key operated lock at door leading to fire escape in the 1st room from north located at apt b6, 3rd story, 2nd apartment from west at north

    Oct 11, 2024 · Apt B6

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the kitchen located at apt b6, 3rd story, 2nd apartment from west at north

    Sep 6, 2024 · Apt B6

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt b6, 3rd story, 2nd apartment from west at north

    Sep 6, 2024 · Apt B6

    Closed — Violation closed
  • A

    Post a sign indicating hours of collection and method of collection of waste material where dumbwaiter service is not provided.

    Aug 22, 2024

    Closed — Violation dismissed
  • A

    Post, in the form approved by the commissioner, and maintain the notice about prevention, detection and removal of bedbug infestation required by §27-2018.1 in common area of the building or provide to each tenant, according to the certification made on such annual bedbug report.

    Aug 22, 2024

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinge & closure arm at door (street to public hall)

    Aug 22, 2024

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt a1, 2nd story, 1st apartment from east at south

    Jul 29, 2024 · Apt A1

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt a1, 2nd story, 1st apartment from east at south

    Jul 29, 2024 · Apt A1

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt a1, 2nd story, 1st apartment from east at south

    Jul 29, 2024 · Apt A1

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt a1, 2nd story, 1st apartment from east at south

    Jul 29, 2024 · Apt A1

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt a1, 2nd story, 1st apartment from east at south

    Jul 29, 2024 · Apt A1

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 2nd room from east, the kitchen located at apt c2, 4th story, 2nd apartment from east at south

    Jun 5, 2024 · Apt C2

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt c2, 4th story, 2nd apartment from east at south

    Jun 5, 2024 · Apt C2

    Open — First no access to re- inspect violation
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt c2, 4th story, 2nd apartment from east at south

    Jun 5, 2024 · Apt C2

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the bathroom located at apt 1, 1st story, 1st apartment from east at south

    May 27, 2024 · Apt 1

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective [hinge] door in the entrance located at apt 1, 1st story, 1st apartment from east at south

    May 27, 2024 · Apt 1

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... 5 sqft at window casing at east wall in the bathroom located at apt 1, 1st story, 1st apartment from east at south

    May 27, 2024 · Apt 1

    Closed — Violation dismissed

DOB building violations · 8

  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    Oct 1, 2019

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2015 inspection report

    Feb 24, 2017

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed

ECB violations · 4

  • Class - 2

    1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not received a retaining wall condition assess

    Feb 25, 2025

    Resolve
  • Class - 2

    B254,11a,50a,50b,50c,50d,50e.as per class 2(b254) 28-301.1 failure to maintain.11a-surface blowdown valve misisng; 50a-guard missing from sight glass; 50b-domestic hot water temperature gauge broken; 50c-body

    Oct 1, 2018

    Resolve
  • Class - 3

    Failure to maintain bldg in code compliant manner. in apt #1d-5th fl mold observed at bathroom ceiling broken tiles at bathroom bath: loose/detached bottom cabinet at kitchen,holes & deteriorating floor observe

    Jun 15, 2015

    Resolve
  • Non-hazardous

    Failure to maintain.defect is:plaster missing and spalling at rear of store(botanica)left of main entrance.approx 2square feet.remedy:make all necessay repairs.

    Sep 23, 1996 · Penalty $1,000

    Active

Complaints

  • Water leak

    Slow leak

    Oct 10, 2026 · Apt B2

    Open
  • Unsanitary condition

    Mold

    Aug 14, 2026 · Apt A6

    Close
  • Water leak

    Slow leak

    Aug 14, 2026 · Apt A6

    Close
  • Appliance

    Refrigerator

    Feb 21, 2026 · Apt E1

    Close
  • Plumbing

    Bathtub/shower

    Dec 26, 2025 · Apt D5

    Close
  • Unsanitary condition

    Pests

    Dec 26, 2025 · Apt D5

    Close
  • Heat/hot water

    Apartment only

    Dec 26, 2025 · Apt D5

    Close
  • Water leak

    Slow leak

    Dec 26, 2025 · Apt D5

    Close
  • Appliance

    Refrigerator

    Dec 26, 2025 · Apt D5

    Close
  • Unsanitary condition

    Mold

    Dec 26, 2025 · Apt D5

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Dec 21, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 21, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 21, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Dec 17, 2025 · Apt C6

    Close
  • Paint/plaster

    Ceiling

    Dec 17, 2025 · Apt C6

    Close
  • Paint/plaster

    Wall

    Dec 17, 2025 · Apt C6

    Close
  • Water leak

    Damp spot

    Dec 17, 2025 · Apt C6

    Close
  • Appliance

    Refrigerator

    Dec 17, 2025 · Apt C6

    Close
  • Appliance

    Electric/gas range

    Dec 17, 2025 · Apt C6

    Close
  • Electric

    Power outage

    Nov 23, 2025 · Apt C2

    Close
  • Electric

    Power outage

    Nov 22, 2025 · Apt C2

    Close
  • Paint/plaster

    Ceiling

    Oct 11, 2025 · Apt A3

    Close
  • Plumbing

    Basin/sink

    Oct 11, 2025 · Apt A3

    Close
  • Paint/plaster

    Wall

    Oct 11, 2025 · Apt A3

    Close
  • Water leak

    Damp spot

    May 30, 2025 · Apt 2

    Close
  • Flooring/stairs

    Floor

    May 30, 2025 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    May 30, 2025 · Apt 2

    Close
  • Electric

    Lighting

    May 30, 2025 · Apt 2

    Close
  • Paint/plaster

    Ceiling

    May 30, 2025 · Apt 2

    Close
  • Electric

    Outlet/switch

    May 30, 2025 · Apt 2

    Close
  • Paint/plaster

    Wall

    May 30, 2025 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    May 25, 2025 · Apt A6

    Close
  • Heat/hot water

    Entire building

    May 24, 2025 · Apt A1

    Close
  • Heat/hot water

    Entire building

    Apr 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 22, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Mar 19, 2025 · Apt A3

    Close
  • Flooring/stairs

    Floor

    Mar 19, 2025 · Apt A3

    Close
  • Plumbing

    Radiator

    Mar 19, 2025 · Apt A3

    Close
  • Paint/plaster

    Wall

    Mar 19, 2025 · Apt A3

    Close
  • Heat/hot water

    Entire building

    Mar 19, 2025 · Apt A3

    Close
  • Unsanitary condition

    Pests

    Mar 19, 2025 · Apt A3

    Close
  • Heat/hot water

    Entire building

    Feb 11, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 9, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 5, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 24, 2025 · Apt A6

    Close
  • Heat/hot water

    Entire building

    Nov 15, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 28, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Aug 15, 2024 · Apt B6

    Close
  • Water leak

    Heavy flow

    Jul 25, 2024 · Apt A1

    Close
  • Flooring/stairs

    Floor

    May 23, 2024 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1917
Floors
6
Residential units
34
Building area
24,174 ft²
Lot area
5,871 ft²
Zoning
R6
Community board
203
Council district
16
Block / lot
2609 / 28
Assessed value
$1,008,000
Landmark / historic district
No

HPD registration #206285, last renewed Aug 19, 2025.

Questions about 536 East 168 Street

Who owns 536 East 168 Street?

The owner of record in NYC Department of City Planning PLUTO data is Cht 168 Trust.

Does 536 East 168 Street have violations?

Yes. NYC HPD has recorded 535 housing violations at this property.

Is 536 East 168 Street rent stabilized?

NYC Department of Finance tax bills listed 33 rent-stabilized units here in 2024 (about 97% of its 34 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 536 East 168 Street built?

City records list 1917 as the year it was built.

How many apartments are in 536 East 168 Street?

It has 34 residential units and 38 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.