roofy

3430 3 Avenue

Bronx, NY 10456BBL 2-02608-0037Map

Owner of record: 3430 Third Ave Corp.

3430 3 Avenue is a walk-up apartment building built in 2016 in Bronx, 10456. It has 11 residential units across 4 floors. The owner of record is 3430 Third Ave Corp.. HPD has recorded 122 housing violations here, most recently on October 1, 2026. 35 of the 50 most recent violations are still open. City tax records listed 11 rent-stabilized apartments here in 2024.

HPD violations
122
DOB violations
0
ECB violations
1
HPD complaints
75

What to know

Concern
14 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 1, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
11
About 100% of the building's 11 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 122

  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4a, 4th story, 1st apartment from south at west

    Oct 1, 2026 · Apt 4A

    Open — First no access to re- inspect violation
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west

    Oct 1, 2026 · Apt 4A

    Open — Civ14 mailed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the private hallway located at apt 4a, 4th story, 1st apartment from south at west

    Oct 1, 2026 · Apt 4A

    Open — Civ14 mailed
  • B

    Repair the roof so that it will not leak over the ceiling in the private hallway located at apt 4a, 4th story, 1st apartment from south at west

    Oct 1, 2026 · Apt 4A

    Open — Civ14 mailed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at fire door leading to staircase at public hall, 1st story

    Oct 1, 2026

    Open — Not complied with
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at fire door leading to staircase at public hall, 2nd story

    Oct 1, 2026

    Open — Nov certified on time
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at fire door leading to staircase at public hall, 3rd story

    Oct 1, 2026

    Open — Nov certified on time
  • A

    Trace and repair the source and abate the visible mold condition... observed less than 10 sq.ft. at ceiling in the private hallway located at apt 4a, 4th story, 1st apartment from south at west

    Oct 1, 2026 · Apt 4A

    Open — Notice of issuance sent to tenant
  • A

    Trace and repair the source and abate the visible mold condition... observed less than 10 sq. ft at west wall in the kitchen located at apt 4a, 4th story, 1st apartment from south at west

    Sep 24, 2026 · Apt 4A

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective wood drawer at north wall cabinet in the kitchen located at apt 4a, 4th story, 1st apartment from south at west

    Sep 24, 2026 · Apt 4A

    Open — Civ14 mailed
Show 40 more ↓
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4a, 4th story, 1st apartment from south at west

    Sep 24, 2026 · Apt 4A

    Open — Not complied with
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing information at public hall, 1st story

    Sep 22, 2026

    Open — Nov certified on time
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Sep 22, 2026

    Open — Nov certified on time
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Sep 22, 2026

    Open — Nov certified on time
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; at west wall in the 2nd room from east located at apt 4a, 4th story, 1st apartment from south at west

    Sep 22, 2026 · Apt 4A

    Open — Civ14 mailed
  • B

    Properly repair the source and abate the evidence of a water leak at south wall in the foyer located at apt 4a, 4th story, 1st apartment from south at west

    Sep 22, 2026 · Apt 4A

    Open — Civ14 mailed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the foyer located at apt 4a, 4th story, 1st apartment from south at west

    Sep 22, 2026 · Apt 4A

    Open — Civ14 mailed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west

    Sep 22, 2026 · Apt 4A

    Open — Civ14 mailed
  • A

    Trace and repair the source and abate the visible mold condition... observed less than 10 square feet at ceiling in the foyer located at apt 4a, 4th story, 1st apartment from south at west

    Sep 22, 2026 · Apt 4A

    Open — Notice of issuance sent to tenant
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at staircase door at public hall, 1st story

    Sep 22, 2026

    Open — Not complied with
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at apartment door in the entrance located at apt 4a, 4th story, 1st apartment from south at west

    Sep 22, 2026 · Apt 4A

    Open — Not complied with
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 4a, 4th story, 1st apartment from south at west

    Sep 7, 2026 · Apt 4A

    Open — Civ14 mailed
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 4a, 4th story, 1st apartment from south at west

    Sep 7, 2026 · Apt 4A

    Open — Civ14 mailed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west

    Sep 7, 2026 · Apt 4A

    Open — Not complied with
  • A

    Trace and repair the source and abate the visible mold condition... less then 10 square feet at ceiling and south wall in the private hallway located at apt 4a, 4th story, 1st apartment from south at west

    Sep 7, 2026 · Apt 4A

    Open — Notice of issuance sent to tenant
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4a, 4th story, 1st apartment from south at west

    Sep 7, 2026 · Apt 4A

    Open — Not complied with
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at fire door at east leading to yard at public hall, 1st story

    Sep 1, 2026

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the bathroom located at apt 4c, 4th story

    Jul 29, 2026 · Apt 4C

    Open — Notice of issuance sent to tenant
  • B

    Remove the illegal fastening hook and eye installed on roof door that does not allow re-entry from, roof to public hall at 1st public hall from north, 4th story

    Jul 29, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at staircase door at public hall, 1st story

    Jul 29, 2026

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 square feet at ceiling in the 3rd room from east located at apt 3a, 3rd story

    Jul 29, 2026 · Apt 3A

    Open — Notice of issuance sent to tenant
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4c, 4th story

    Jul 29, 2026 · Apt 4C

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4c, 4th story

    Jul 29, 2026 · Apt 4C

    Open — Civ14 mailed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 4c, 4th story

    Jul 29, 2026 · Apt 4C

    Open — Civ14 mailed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    May 8, 2026

    Closed — Violation dismissed
  • C

    Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at ceiling in the bathroom located at apt 4c, 4th story, 1st apartment from north at east original violation 18819996 issued 28-apr-26 has been upgraded to class c per administrative code 27-2017.3a(5)(a) or (b).

    Apr 28, 2026 · Apt 4C

    Open — Nov certified late
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at ceiling in the kitchen located at apt 4c, 4th story, 1st apartment from north at east

    Apr 28, 2026 · Apt 4C

    Open — Defect letter issued
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at ceiling in the bathroom located at apt 4c, 4th story, 1st apartment from north at east

    Apr 28, 2026 · Apt 4C

    Closed — Violation closed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Feb 20, 2026

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system sign posted, information missing at public hall, 1st story

    Feb 20, 2026

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west

    Feb 20, 2026 · Apt 3A

    Closed — Violation dismissed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Feb 20, 2026

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective located at apt 3a, 3rd story, 1st apartment from south at west

    Feb 20, 2026 · Apt 3A

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective located at apt 3a, 3rd story, 1st apartment from south at west

    Feb 20, 2026 · Apt 3A

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west

    Feb 20, 2026 · Apt 3A

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west

    Jan 20, 2026 · Apt 3A

    Open — Defect letter issued
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at west wall in the 1st room from east located at apt 3a, 3rd story, 1st apartment from south at west original violation 18582036 issued 20-jan-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Jan 20, 2026 · Apt 3A

    Open — Defect letter issued
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at west wall in the 1st room from east located at apt 3a, 3rd story, 1st apartment from south at west

    Jan 20, 2026 · Apt 3A

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3a, 3rd story, 1st apartment from south at west

    Jan 20, 2026 · Apt 3A

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 1st room from east located at apt 3a, 3rd story, 1st apartment from south at west

    Jan 20, 2026 · Apt 3A

    Closed — Violation dismissed

DOB building violations · 0

No DOB violations on record

ECB violations · 1

  • Class - 1

    Failure to notify dob w/ 24-48 hours of the start excavation. @ time of insp observed 4 story residential bldg. work w/ exterior brick work done completed. during insp after search on bis noted that the contrac

    Jul 29, 2017 · Penalty $1,200

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Sep 1, 2026 · Apt 4A

    Close
  • Unsanitary condition

    Mold

    Sep 1, 2026 · Apt 4A

    Close
  • Plumbing

    Water supply

    Sep 1, 2026 · Apt 4A

    Close
  • Unsanitary condition

    Pests

    Apr 16, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    Apr 16, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    Apr 16, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Mold

    Mar 25, 2026 · Apt 4C

    Close
  • Paint/plaster

    Wall

    Mar 25, 2026 · Apt 4C

    Close
  • Door/window

    Door frame

    Mar 25, 2026 · Apt 4C

    Close
  • Heat/hot water

    Apartment only

    Mar 25, 2026 · Apt 4C

    Close
Show 40 more ↓
  • Plumbing

    Basin/sink

    Mar 25, 2026 · Apt 4C

    Close
  • Plumbing

    Toilet

    Mar 25, 2026 · Apt 4C

    Close
  • Door/window

    Door

    Mar 25, 2026 · Apt 4C

    Close
  • Plumbing

    Toilet

    Mar 25, 2026 · Apt 4C

    Close
  • Plumbing

    Water supply

    Jan 12, 2026 · Apt 3A

    Close
  • Safety

    Window guard broken/missing

    Jan 12, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    Jan 12, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Mold

    Jan 12, 2026 · Apt 3A

    Close
  • Paint/plaster

    Wall

    Jan 12, 2026 · Apt 3A

    Close
  • Heat/hot water

    Apartment only

    Jan 12, 2026 · Apt 3A

    Close
  • Heat/hot water

    Apartment only

    Jan 10, 2026 · Apt 4B

    Close
  • Plumbing

    Water supply

    Jan 9, 2026 · Apt 4B

    Close
  • Paint/plaster

    Wall

    Jan 8, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    Jan 8, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    Jan 8, 2026 · Apt 3A

    Close
  • Safety

    Window guard broken/missing

    Jan 8, 2026 · Apt 3A

    Close
  • Unsanitary condition

    Mold

    Jan 8, 2026 · Apt 3A

    Close
  • Plumbing

    Water supply

    Jan 8, 2026 · Apt 3A

    Close
  • Heat/hot water

    Apartment only

    Jan 4, 2026 · Apt 4B

    Close
  • Door/window

    Door

    Dec 31, 2025 · Apt 3D

    Close
  • Paint/plaster

    Ceiling

    Dec 31, 2025 · Apt 3D

    Close
  • General

    Bell/buzzer/intercom

    Dec 31, 2025 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Dec 31, 2025 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Dec 28, 2025 · Apt 4B

    Close
  • Electric

    Power outage

    Dec 16, 2025 · Apt 3B

    Close
  • General

    Ventilation system

    Nov 26, 2025 · Apt 3B

    Close
  • Appliance

    Electric/gas range

    Nov 26, 2025 · Apt 3B

    Close
  • Paint/plaster

    Ceiling

    Nov 26, 2025 · Apt 3B

    Close
  • General

    Bell/buzzer/intercom

    Nov 26, 2025 · Apt 3B

    Close
  • Electric

    Power outage

    Nov 26, 2025 · Apt 3B

    Close
  • Unsanitary condition

    Pests

    Nov 21, 2025 · Apt 4B

    Close
  • Unsanitary condition

    Pests

    Nov 21, 2025 · Apt 4B

    Close
  • Unsanitary condition

    Pests

    Nov 21, 2025 · Apt 4B

    Close
  • Unsanitary condition

    Pests

    Nov 21, 2025 · Apt 4B

    Close
  • Unsanitary condition

    Pests

    Nov 21, 2025 · Apt 4B

    Close
  • Unsanitary condition

    Pests

    Jun 16, 2025 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Mar 26, 2025 · Apt 1B

    Close
  • Water leak

    Heavy flow

    Oct 23, 2024 · Apt 3C

    Close
  • Unsanitary condition

    Mold

    Oct 23, 2024 · Apt 3C

    Close
  • Unsanitary condition

    Pests

    Jun 25, 2024 · Apt 4B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
2016
Floors
4
Residential units
11
Building area
6,518 ft²
Lot area
2,568 ft²
Zoning
M1-1/R7-2
Community board
203
Council district
17
Block / lot
2608 / 37
Assessed value
$395,550
Landmark / historic district
No

HPD registration #227764, last renewed Sep 8, 2025.

Questions about 3430 3 Avenue

Who owns 3430 3 Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 3430 Third Ave Corp..

Does 3430 3 Avenue have violations?

Yes. NYC HPD has recorded 122 housing violations at this property.

Is 3430 3 Avenue rent stabilized?

NYC Department of Finance tax bills listed 11 rent-stabilized units here in 2024 (about 100% of its 11 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 3430 3 Avenue built?

City records list 2016 as the year it was built.

How many apartments are in 3430 3 Avenue?

It has 11 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.