roofy

1065 Boston Road

Bronx, NY 10456BBL 2-02607-0072Map

Owner of record: Br Affordable Housing Development Fund C Orporation

1065 Boston Road is an elevator apartment building built in 1906 in Bronx, 10456. It has 84 residential units across 6 floors. The owner of record is Br Affordable Housing Development Fund C Orporation. HPD has recorded 187 housing violations here, most recently on April 27, 2026. 15 of the 50 most recent violations are still open. City tax records listed 82 rent-stabilized apartments here in 2024.

HPD violations
187
DOB violations
38
ECB violations
24
HPD complaints
441

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 27, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
82
About 98% of the building's 84 apartments
Up from 81 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 187

  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 3rd room from east at south, the 1st room from east at north, the 2nd room from east at north, the foyer , the kitchen , the private hallway , the bathroom located at apt 1e, 1st story, 2nd apartment from west at north

    Apr 27, 2026 · Apt 1E

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective lifting wood floor in the 1st room from east at north located at apt 1e, 1st story, 2nd apartment from west at north

    Apr 21, 2026 · Apt 1E

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door, 1st door from north at east wall, 1st door frame from east at south wall, 1st door frame from north at east wall, north wall in the 4th room from east located at apt 1e, 1st story, 2nd apartment from west at north

    Apr 16, 2026 · Apt 1E

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame, 1st door from west at north wall, 1st door frame from west at north wall, north wall, east wall, west wall in the private hallway located at apt 1e, 1st story, 2nd apartment from west at north

    Apr 16, 2026 · Apt 1E

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door, 1st closet from north at east wall door frame, 1st door from east at south wall, 1st door frame from east at south wall, south wall in the 2nd room from east located at apt 1e, 1st story, 2nd apartment from west at north

    Apr 16, 2026 · Apt 1E

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall, west wall in the 1st room from east at north located at apt 1e, 1st story, 2nd apartment from west at north

    Apr 16, 2026 · Apt 1E

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall in the kitchen located at apt 1e, 1st story, 2nd apartment from west at north

    Apr 16, 2026 · Apt 1E

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall, 1st door frame from east at south wall, south wall in the entrance located at apt 1e, 1st story, 2nd apartment from west at north

    Apr 16, 2026 · Apt 1E

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door, 1st closet from east at south wall door frame, north wall, west wall in the foyer located at apt 1e, 1st story, 2nd apartment from west at north

    Apr 16, 2026 · Apt 1E

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door, 1st door from west at north wall, north wall, east wall, west wall in the private hallway located at apt 1e, 1st story, 2nd apartment from west at north

    Apr 16, 2026 · Apt 1E

    Open — Nov sent out
Show 40 more ↓
  • A

    Paint metal in accordance with dept. regulation the 1st closet from north at east wall door frame, 1st door frame from west at north wall in the private hallway located at apt 1e, 1st story, 2nd apartment from west at north

    Apr 16, 2026 · Apt 1E

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the north wall, south wall, east wall in the kitchen located at apt 1e, 1st story, 2nd apartment from west at north

    Apr 16, 2026 · Apt 1E

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from east at south wall door, 1st door from north at east wall, north wall in the 4th room from east located at apt 1e, 1st story, 2nd apartment from west at north

    Apr 16, 2026 · Apt 1E

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st door frame from east at south wall, 1st door frame from north at east wall in the 4th room from east located at apt 1e, 1st story, 2nd apartment from west at north

    Apr 16, 2026 · Apt 1E

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from east at south wall door, 1st closet from east at south wall door frame, north wall, west wall in the foyer located at apt 1e, 1st story, 2nd apartment from west at north

    Apr 16, 2026 · Apt 1E

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the north wall, east wall, west wall in the 1st room from east at north located at apt 1e, 1st story, 2nd apartment from west at north

    Apr 16, 2026 · Apt 1E

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door, 1st door from east at south wall, south wall in the 2nd room from east located at apt 1e, 1st story, 2nd apartment from west at north

    Apr 16, 2026 · Apt 1E

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st closet from north at east wall door frame, 1st door frame from east at south wall in the 2nd room from east located at apt 1e, 1st story, 2nd apartment from west at north

    Apr 16, 2026 · Apt 1E

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the south wall in the entrance located at apt 1e, 1st story, 2nd apartment from west at north

    Apr 16, 2026 · Apt 1E

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st door from east at south wall, 1st door frame from east at south wall in the entrance located at apt 1e, 1st story, 2nd apartment from west at north

    Apr 16, 2026 · Apt 1E

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1e, 1st story, 1st apartment from west at north

    Apr 13, 2026 · Apt 1E

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective hardwood floor in the 1st room from east at north located at apt 1e, 1st story, 1st apartment from west at north

    Apr 13, 2026 · Apt 1E

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1e, 1st story, 1st apartment from west at north

    Apr 13, 2026 · Apt 1E

    Open — Notice of issuance sent to tenant
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 1e, 1st story, 2nd apartment from west at north

    Dec 5, 2025 · Apt 1E

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 1e, 1st story, 2nd apartment from west at north

    Dec 5, 2025 · Apt 1E

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling and all walls in the entire apartment located at apt 4b, 4th story, 2nd apartment from north at east

    Oct 30, 2025 · Apt 4B

    Closed — Violation dismissed
  • C

    Remove the illegal double cylinder key operated locking device at door .. in the entrance located at apt 4b, 4th story, 2nd apartment from north at east

    Oct 30, 2025 · Apt 4B

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective fire metal door in the entrance located at apt 5c, 5th story, 1st apartment from south at west

    Oct 30, 2025 · Apt 5C

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5c, 5th story, 1st apartment from south at west

    Oct 30, 2025 · Apt 5C

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective buzzer intercom from the building entrance to return buzzer at east wall in the 2nd room from east located at apt 2c, 2nd story, 1st apartment from west at north

    Aug 10, 2025 · Apt 2C

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroom located at apt 1e, 1st story, 2nd apartment from west at north

    Jul 9, 2025 · Apt 1E

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic tiled south wall in the bathroom located at apt 1e, 1st story, 2nd apartment from west at north

    Jul 9, 2025 · Apt 1E

    Closed — Violation closed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet , in the bathroom located at apt 1e, 1st story, 2nd apartment from west at north

    Jul 9, 2025 · Apt 1E

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 1e, 1st story, 2nd apartment from west at north

    Jul 9, 2025 · Apt 1E

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1e, 1st story, 2nd apartment from west at north

    Jul 9, 2025 · Apt 1E

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective (intercom) not functioning communicating properly with intercom at building front (n) at south wall in the private hallway located at apt 1e, 1st story, 2nd apartment from west at north

    Feb 21, 2025 · Apt 1E

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color peeling and cracked at ceiling in the kitchen located at apt 1e, 1st story, 2nd apartment from west at north

    Feb 21, 2025 · Apt 1E

    Open — Not complied with
  • A

    Properly repair with similar material the broken or defective hole (wood) at entrance door in the bathroom located at apt 1e, 1st story, 2nd apartment from west at north

    Feb 21, 2025 · Apt 1E

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ( ceramic wall tile) missing at south wall (window stool) pest entryway in the bathroom located at apt 1e, 1st story, 2nd apartment from west at north

    Feb 21, 2025 · Apt 1E

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective cement board at south wall (window stool) in the bathroom located at apt 1e, 1st story, 2nd apartment from west at north

    Feb 21, 2025 · Apt 1E

    Closed — Violation closed
  • B

    Replace the broken or defective cracked/broken(wash basin) at south wall in the bathroom located at apt 1e, 1st story, 2nd apartment from west at north

    Feb 21, 2025 · Apt 1E

    Closed — Violation closed
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 1e, 1st story, 2nd apartment from west at north

    Feb 21, 2025 · Apt 1E

    Closed — Violation dismissed
  • A

    Properly repair or replace the broken or defective vinyl floor tile (1) at floor in the 5th room from east located at apt 1e, 1st story, 2nd apartment from west at north

    Feb 21, 2025 · Apt 1E

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1e, 1st story, 2nd apartment from west at north

    Feb 21, 2025 · Apt 1E

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1e, 1st story, 2nd apartment from west at north

    Feb 21, 2025 · Apt 1E

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1e, 1st story, 2nd apartment from west at north

    Feb 21, 2025 · Apt 1E

    Closed — Violation dismissed
  • A

    § 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder (shoe) tack welded using appropriate nurs and bolts at 1st fire ecape from south at west east exterior wall

    Feb 21, 2025

    Closed — Violation dismissed
  • A

    § 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder (shoe) tack welded using appropriate nurs and bolts at 2nd fire ecape from south at west east exterior wall

    Feb 21, 2025

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1e, 1st story, 2nd apartment from west at north

    Feb 21, 2025 · Apt 1E

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic floor tile (2) broken/cracked at floor in the bathroom located at apt 1e, 1st story, 2nd apartment from west at north

    Feb 21, 2025 · Apt 1E

    Closed — Violation closed

DOB building violations · 38

  • Construction other optional

    Failure to maintain. observed on exp 1 e.elev: - missing mortar joints beneath several fire escape landings. exp 2 s.elev: - spalling stucco at 5th & 6th floor behind waterdown spout pipe. exp 4 n.elev: - spalled, spalling brick 4th floor lintel and spandrels. remedy:repair and/or replace all damaged facade

    Jun 11, 2026

    Dob violation - active
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jul 1, 2015

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 21, 2015

    Dob violation - resolved
  • Facade safety program facade required

    Fisp-facade safety program facade required

    Feb 17, 2015

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 10, 2014

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 22, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 16, 2012

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2012

    Dob violation - dismissed
Show 28 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 16, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 7, 2010

    Dob violation - resolved
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 9, 2009

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 18, 2008

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 24, 2007

    Dob violation - resolved
  • Facade facade required

    L1198-local law 11/98 - facade facade required

    Jun 25, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 22, 2005

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 24, 2004

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 13, 2002

    Dob violation - resolved
  • Elevator elevatorrequired

    2p5745

    May 10, 2000

    Dob violation - resolved
  • Elevator elevatorrequired

    2p5745

    Apr 22, 1999

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Apr 17, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 9, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - dismissed

ECB violations · 24

  • Class - 2

    Failure to submit an acceptable required cycle 8b and 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #907676. agg2 history of noncomp

    Apr 11, 2024 · Penalty $6,250

    Resolve
  • Class - 2

    Failure to file acceptable amended cycle 7b report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 control #707676. agg2: history of noncompliance on 37022078

    Jan 16, 2024 · Penalty $6,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#807676.agg1 prior nov#37021623j under 2

    Oct 19, 2022 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to file acceptable amended cycle 7b report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#707676.rem:file acceptable report.

    Oct 8, 2021 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passageway.as noted:at time of inspection 9 observed garbage stored on exit stairs on exp #1.remedy:remove obstruction from exit stairs.

    Jul 2, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to maintain exterior building walls and appurtenances.as noted:at time of inspection observed on exp #2, 4 & roof cracks spalling and bulging stucco at serveral locations and floors, roof:cracks in bulk

    Jul 2, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 8b report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control#807676. remedy: submit acceptable require

    Jun 1, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    Cleanout for chimney was brick up. remedy; install cleanout for chimmey

    Apr 10, 2019

    Resolve
  • Class - 2

    Cleanout for chimney was brick up. remedy; install cleanout for chimmey.

    Apr 10, 2019 · Penalty $310

    Resolve
  • Class - 2

    Temporary construction equipment on site. expired permit. noted: at time of inspection i observed shed installed at exp1 with permit of shed expired. shed permit expired 02/07/2017. rmdy:comply with code. ren

    Feb 27, 2019 · Penalty $3,125

    Resolve
Show 14 more ↓
  • Class - 2

    Failure to maintain bldg walls & appurtenances. noted: at time of inspection at exp#1(east elev)a)cracked terra cotta at (3f) at 3rd window line from north. b)spalled corner at terra cotta plaque at various flo

    Apr 26, 2017 · Penalty $500

    Resolve
  • Class - 2

    Failure to file acceptable amended report indicating corretion of un safe conditions described in initial local law 11/98 report. rmdy: file acceptable amended report.

    Nov 7, 2016 · Penalty $400

    Resolve
  • Class - 2

    Failure to file an acceptable amended cycle 7 report to this dept indicating correction of unsafe conditions described in initial local law fisp report. remedy: file an amended report following remedial repair

    May 29, 2015 · Penalty $800

    Resolve
  • Class - 1

    Failure to provide safety measures such as sidewalk shed.fence etc to protect public from unsafe conditions as per 1rcny 103-4 and as per notification of unsafe conditions complaint #2208739 by ra/pe dated

    Apr 1, 2015 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat

    Oct 3, 2014 · Penalty $800

    Resolve
  • Class - 2

    Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report rem: file an amended report following remedial repair

    Dec 17, 2010

    Resolve
  • Class - 2

    Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report rem: file an amended report following remedial repair

    Sep 17, 2010 · Penalty $1,000

    Resolve
  • Class - 2

    Failure to provide safety measures of sidewalk shed where required according to the cycle tr-6 filed as unsafe of the local law 11/98. remedy: provide safety measures or sidewalk shed where required according

    Feb 18, 2010 · Penalty $2,400

    Resolve
  • Class - 2

    07j10.41d6.07j10 repair safrty constant reopening 41d6 properly secure machine rm

    Sep 21, 2009

    Resolve
  • Class - 2

    Failure to file an amended sixth round report acceptable to this departmetn indicating correction of unsafe conditions described in initial local law 11/98 report. rem: file an amended report following remedial

    May 22, 2009 · Penalty $800

    Resolve
  • Class - 2

    39q03, 52m07, 57l10, 60q03, 61t07, 71x10, 71q03. 39q03- install guard for right on top of car. 52m07- provide spin out for hoist cables. 57l10- repair motor repairing to eliminate loud noise. 61t07- provide

    Jan 13, 2009 · Penalty $500

    Resolve
  • Class - 2

    Failure to file an amended sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report remedy:file an amended report following remedial of

    Nov 28, 2008 · Penalty $4,000

    Resolve
  • Non-hazardous

    Failure to file an amendment sixth round report acceptable to this dept indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedial

    May 9, 2008 · Penalty $700

    Resolve
  • Non-hazardous

    35#,37u,50u,11x,

    May 27, 1997 · Penalty $200

    Resolve

Complaints

  • Appliance

    Refrigerator

    Apr 8, 2026 · Apt 1E

    Close
  • Appliance

    Electric/gas range

    Apr 8, 2026 · Apt 1E

    Close
  • Flooring/stairs

    Floor

    Apr 8, 2026 · Apt 1E

    Close
  • Safety

    Window guard broken/missing

    Apr 8, 2026 · Apt 1E

    Close
  • Appliance

    Electric/gas range

    Feb 15, 2026 · Apt 1E

    Close
  • Appliance

    Refrigerator

    Feb 15, 2026 · Apt 1E

    Close
  • Heat/hot water

    Apartment only

    Jan 25, 2026 · Apt 1C

    Close
  • Heat/hot water

    Entire building

    Dec 31, 2025 · Apt 2D

    Close
  • General

    Bell/buzzer/intercom

    Jul 9, 2025 · Apt 2C

    Close
  • Paint/plaster

    Wall

    Jul 8, 2025 · Apt 1E

    Close
Show 40 more ↓
  • Plumbing

    Toilet

    Jul 8, 2025 · Apt 1E

    Close
  • Paint/plaster

    Ceiling

    Jul 1, 2025 · Apt 1A

    Close
  • Plumbing

    Bathtub/shower

    May 13, 2025 · Apt APT3B

    Close
  • Unsanitary condition

    Sewage

    May 13, 2025 · Apt APT3B

    Close
  • Unsanitary condition

    Mold

    Apr 24, 2025 · Apt 1E

    Close
  • Plumbing

    Toilet

    Apr 24, 2025 · Apt 1E

    Close
  • Paint/plaster

    Wall

    Apr 24, 2025 · Apt 1E

    Close
  • Flooring/stairs

    Floor

    Apr 24, 2025 · Apt 1E

    Close
  • Water leak

    Heavy flow

    Apr 11, 2025 · Apt 5B

    Close
  • Heat/hot water

    Entire building

    Feb 22, 2025 · Apt 2A

    Close
  • General

    Bell/buzzer/intercom

    Feb 19, 2025 · Apt 1E

    Close
  • Flooring/stairs

    Floor

    Feb 19, 2025 · Apt 1E

    Close
  • Paint/plaster

    Door/frame

    Feb 19, 2025 · Apt 1E

    Close
  • Flooring/stairs

    Floor

    Feb 19, 2025 · Apt 1E

    Close
  • Plumbing

    Bathtub/shower

    Feb 19, 2025 · Apt 1E

    Close
  • Plumbing

    Basin/sink

    Feb 19, 2025 · Apt 1E

    Close
  • Paint/plaster

    Wall

    Feb 19, 2025 · Apt 1E

    Close
  • Heat/hot water

    Entire building

    Dec 23, 2024 · Apt 5B

    Close
  • Heat/hot water

    Entire building

    Dec 21, 2024 · Apt BLDG

    Close
  • Safety

    Window guard broken/missing

    May 30, 2024 · Apt 3C

    Close
  • Appliance

    Electric/gas range

    Mar 29, 2024 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Dec 8, 2023 · Apt 3F

    Close
  • Heat/hot water

    Apartment only

    Nov 9, 2023 · Apt 2CFLR2

    Close
  • Unsanitary condition

    Mold

    Aug 23, 2023 · Apt 1E

    Close
  • Safety

    Window guard broken/missing

    Aug 7, 2023 · Apt 3C

    Close
  • Electric

    No lighting

    Jul 11, 2023 · Apt 5C

    Close
  • Safety

    Window guard broken/missing

    May 9, 2023 · Apt 3C

    Close
  • Water leak

    Heavy flow

    Apr 30, 2023 · Apt 5B

    Close
  • Unsanitary condition

    Pests

    Oct 25, 2022 · Apt 1B

    Close
  • Heat/hot water

    Entire building

    Oct 6, 2022 · Apt 3C

    Close
  • Unsanitary condition

    Pests

    Oct 6, 2022 · Apt 3C

    Close
  • Unsanitary condition

    Mold

    Oct 6, 2022 · Apt 3C

    Close
  • Plumbing

    Toilet

    Aug 9, 2022 · Apt 3F

    Close
  • Heat/hot water

    Apartment only

    Jan 22, 2022 · Apt 3F

    Close
  • Heat/hot water

    Apartment only

    Jan 21, 2022 · Apt 3F

    Close
  • Heat/hot water

    Apartment only

    Jan 19, 2022 · Apt 3F

    Close
  • Heat/hot water

    Apartment only

    Jan 16, 2022 · Apt 3F

    Close
  • Heat/hot water

    Apartment only

    Jan 16, 2022 · Apt 3F

    Close
  • Heat/hot water

    Entire building

    Jan 14, 2022 · Apt 1

    Close
  • Door/window

    Window frame

    Aug 4, 2021 · Apt 4C

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1906
Floors
6
Residential units
84
Building area
76,400 ft²
Lot area
27,024 ft²
Zoning
R6
Community board
203
Council district
17
Block / lot
2607 / 72
Assessed value
$1,179,900
Landmark / historic district
No

HPD registration #204486, last renewed Sep 3, 2025.

Questions about 1065 Boston Road

Who owns 1065 Boston Road?

The owner of record in NYC Department of City Planning PLUTO data is Br Affordable Housing Development Fund C Orporation.

Does 1065 Boston Road have violations?

Yes. NYC HPD has recorded 187 housing violations at this property.

Is 1065 Boston Road rent stabilized?

NYC Department of Finance tax bills listed 82 rent-stabilized units here in 2024 (about 98% of its 84 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 1065 Boston Road built?

City records list 1906 as the year it was built.

How many apartments are in 1065 Boston Road?

It has 84 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.