roofy

1058 University Avenue

Bronx, NY 10452BBL 2-02526-0040Map

Owner of record: 1058 Goldstar LLC

1058 University Avenue is an elevator apartment building built in 2022 in Bronx, 10452. It has 26 residential units across 7 floors. The owner of record is 1058 Goldstar LLC. HPD has recorded 64 housing violations here, most recently on July 23, 2026. 3 of the 50 most recent violations are still open. City tax records listed 27 rent-stabilized apartments here in 2024.

HPD violations
64
DOB violations
7
ECB violations
43
HPD complaints
105

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Jul 23, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
27
About 100% of the building's 26 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 64

  • B

    Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 7a, 7th story, 1st apartment from east at south

    Jul 23, 2026 · Apt 7A

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective latch set and it's assemblies to bulkhead door at 1st public hall bulkhead from north, 7th story

    Jun 11, 2026

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 7a, 7th story, 1st apartment from south at west

    Jun 11, 2026 · Apt 7A

    Open — Not complied with
  • C

    Replace or repair the self-closing doors that is missing or defective latch to hopper door at compactor closet at compactor closet, 1st story

    Jun 11, 2026

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective latch set and assemblies to hopper door at compactor closet, 1st story

    Jun 11, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges to hopper door at compactor closet at public hall, 7th story

    Jun 11, 2026

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of household items at public hall, 7th story

    Jun 11, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch to door at 1st public hall bulkhead from north, 7th story

    Jun 11, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at building entrance , 1st story

    Jan 28, 2026

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective light fixture at ceiling at public hall, 1st story

    Oct 15, 2025

    Closed — Violation closed
Show 40 more ↓
  • C

    Properly repair or replace the broken or defective concrete step at building entrance door , 1st story

    Oct 15, 2025

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective sink base cabinet door in the kitchen located at apt 7a, 7th story, 1st apartment from south at west

    Oct 8, 2025 · Apt 7A

    Open — False certification
  • C

    Properly repair or replace the broken or defective sprinkler head at ceiling in the kitchen located at apt 4c, 4th story, 1st apartment from north at east

    Jul 9, 2025 · Apt 4C

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 4c, 4th story, 1st apartment from north at east

    Jun 23, 2025 · Apt 4C

    Open — Not complied with
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 5c, 5th story, 1st apartment from north at east

    Mar 1, 2025 · Apt 5C

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchen located at apt 5c, 5th story, 1st apartment from north at east

    Mar 1, 2025 · Apt 5C

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 18, 2024

    Closed — Violation dismissed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Feb 18, 2022

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Feb 18, 2022

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 5, 2021

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Apr 5, 2021

    Closed — Violation closed
  • C

    Provide seal up all openings

    Nov 12, 2020

    Closed — Violation closed
  • A

    Post and maintain a notice, written in english and in spanish, on the building entrance door or other conspicuous location in the building common area, stating that: (1) the building is in the alternative enforcement program, (2) that occupants may call 311 or the aep at 212-863-8262 to report housing maintenance complaints, (3) the name, telephone, and address of the owner, and, (4) the identity of any financial institution that holds a mortgage on the property. post at public hall, 1st story

    Feb 3, 2020

    Closed — Violation closed
  • I

    The premises has been selected to participate in the alternative enforcement program which may result in building-wide inspections, fees, and extensive repair work to correct violations and underlying conditions. charges for repair work done pursuant to this order, if not paid, will become liens on the property

    Jan 31, 2020

    Closed — Violation dismissed
  • C

    Provide a safe and adequate supply of electric service to the fixtures , in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Nov 30, 2019 · Apt 2

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Nov 30, 2019 · Apt 2

    Closed — Violation closed
  • B

    Provide adequate supply of cold water for the fixtures at bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from north at east

    Nov 30, 2019 · Apt 2

    Closed — Violation closed
  • B

    Provide adequate supply of hot water for the fixtures at bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from north at east

    Nov 30, 2019 · Apt 2

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system , door to cellar locked at public hall, 1st story

    Nov 30, 2019

    Closed — Violation closed
  • C

    Properly repair the broken or defective mortise lock at building door at public hall, 1st story

    Nov 30, 2019

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of hot water not to exceed 130 degrees in the entire apartment located at apt 2, 2nd story, 1st apartment from north at east

    Nov 30, 2019 · Apt 2

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood flooring in the private hallway located at apt 2, 2nd story, 1st apartment from north at east

    Nov 30, 2019 · Apt 2

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from north at east

    Nov 30, 2019 · Apt 2

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2, 2nd story, 1st apartment from north at east

    Nov 30, 2019 · Apt 2

    Closed — Violation closed
  • C

    Replace with new the broken or defective metal window frame in the kitchen located at apt 2, 2nd story, 1st apartment from north at east

    Nov 30, 2019 · Apt 2

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of key operated lock at door of room leading to fire escape in the 1st room from east at south located at apt 2, 2nd story, 1st apartment from north at east

    Nov 30, 2019 · Apt 2

    Closed — Violation closed
  • C

    Replace with new the missing door in the entrance located at apt 2, 2nd story, 1st apartment from north at east

    Nov 30, 2019 · Apt 2

    Closed — Violation closed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Oct 28, 2019

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures at gas range. in the kitchen located at apt 3rd, 3rd story, 1st apartment from east at south

    Jan 30, 2019 · Apt 3RD

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south

    Jan 30, 2019 · Apt 3

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3, 3rd story, 1st apartment from east at south

    Jan 30, 2019 · Apt 3

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Jan 30, 2019 · Apt 2

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Jan 30, 2019 · Apt 2

    Closed — Violation closed
  • C

    Provide an adequate supply of gas to the fixtures at gas range. in the entire apartment located at apt 2, 2nd story, 1st apartment from east at south

    Jan 30, 2019 · Apt 2

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system no access to boiler room. at basement

    Jan 30, 2019

    Closed — Violation dismissed
  • B

    Discontinue unlawful use for single room occupancy purposes .. in the 1st room from east at south located at apt 3rd, 3rd story, 1st apartment from north at east

    Jan 30, 2019 · Apt 3RD

    Closed — Violation closed
  • B

    Discontinue unlawful use for single room occupancy purposes .. in the 2nd room from east located at apt 3rd, 3rd story, 1st apartment from north at east

    Jan 30, 2019 · Apt 3RD

    Closed — Violation closed
  • B

    Discontinue unlawful use for single room occupancy purposes ... in the 3rd room from east at north located at apt 3rd, 3rd story, 1st apartment from north at east

    Jan 30, 2019 · Apt 3RD

    Closed — Violation closed
  • B

    Discontinue unlawful use for single room occupancy purposes .. in the 1st room from east at south located at apt 2nd, 2nd story, 1st apartment from north at east

    Jan 30, 2019 · Apt 2ND

    Closed — Violation closed
  • B

    Discontinue unlawful use for single room occupancy purposes ... in the 3rd room from east located at apt 2nd, 2nd story, 1st apartment from north at east

    Jan 30, 2019 · Apt 2ND

    Closed — Violation closed

DOB building violations · 7

  • Construction other optional

    Stop all work. make site safe. contact dob.

    Oct 26, 2022

    Dob violation - dismissed
  • Construction other optional

    The department of buildings orders that you stop all work under the permit# 220638237 due to general contractor withdrawal.

    Oct 26, 2022

    Dob violation - dismissed
  • Construction other optional

    Stop all work. make site safe. contact dob.

    Oct 26, 2022

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 4, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 4, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Aug 4, 2021

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 3, 2019

    Dob violation - dismissed

ECB violations · 43

  • Class - 2

    Missing in case of fire signs. missing sign, as per fdny, indicationg location of controller room, provide explicitly detailed info on how/where to obtain keys to controller room. misalinged cab mirror.

    Jan 20, 2026 · Penalty $3,125

    Active
  • Class - 1

    Bc 3307.1 miscellaneous violations. observed a diesel fueled generator at exposure 1 in the street unprotected from pedestrians. upon review of nycstreets it was observed that the general contractor has no dot

    Jul 28, 2023

    Resolve
  • Class - 1

    Observed a diesel fueled generator at exposure 1 in the street unprotected from pedestrians. upon review of nycstreets it was observed that the general contractor has no dot permits for the generator required b

    Jul 28, 2023 · Penalty $1,250

    Resolve
  • Class - 2

    No en drawing and com/check approved from dob provided on the job site at the time of inspection., provide approved /accepted construction documents; please go to https://www1.nyc.gov/site/buildings/codes/energ

    Apr 17, 2023 · Penalty $312

    Resolve
  • Class - 2

    Missing chapter 33 documents: installation letter, 6 months inspection letter/ no daily inspection logs for sws. provide/maintained required documents by chapter 33 onsite.

    Feb 6, 2023

    Resolve
  • Class - 1

    Missing window protection for adjacent building at exposure # 2 during slabs concrete pouring operations.provide windows protection for adjacent building.

    Feb 3, 2023 · Penalty $625

    Resolve
  • Class - 2

    Note: at the time of inspection observed excavation work in progress & site closed. also observed from outside exp2 have 5sty residential building, foundation exposed 3 area about 3ftx5ft for underpinning. leav

    Oct 28, 2022

    Resolve
  • Class - 2

    Wood support of excavation @ exposure 2 contrary to pe drawings - pswo. stop all work within 15 feet of exposures 2, 3, and 4. comply with pe drawings.

    Aug 12, 2022 · Penalty $1,250

    Resolve
  • Class - 1

    No earthwork notification

    Aug 12, 2022 · Penalty $6,250

    Resolve
  • Class - 2

    Missing viewing panel at construction fence.at time of inspection on dm job site observed construction fence did not have any viewing panel as indicated at bc chapter 33.code stipulates that permit holder shall

    Aug 9, 2021

    Resolve
Show 33 more ↓
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements. at time of inspection, observed, demolition of a 3 story building has completed as per job# 220721645 but the debris from demo work has not be

    Jun 3, 2021

    Resolve
  • Class - 1

    3307.7.7 failure to maintain jobsite fence.at time of my inspection i observed 3 story building demolished and brought down to 1st story level with no work going on.i observed jobsite fence provided was inadequ

    May 12, 2021 · Penalty $500

    Resolve
  • Class - 1

    Notification-fail to porvide required notification to the department prior to commencement of demolition.note at time of my inspection i observed 3 story building demolished and brought down to 1st story level.

    May 12, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Housekeeping.note at time of my inspection i observed a 3 story building demolished and brought down to 1st story level with combustible material piled above 4 feet high throughout lot consisting of wood and ot

    May 12, 2021

    Resolve
  • Class - 1

    3309.9 weatherproof integrity of adjoining buildings.note at time of my inspection i observed 3 story building demolished and brought down to 1st story level.i noticed the wall of adjacent property was exposed

    May 12, 2021 · Penalty $2,500

    Resolve
  • Class - 2

    Construction super faield to perform duties as per rule.the following conditions were observed and a stop work order was issued on this siteon this date 5/12/2021.1)failed to notify dept prior to commencement o

    May 12, 2021 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in summons/vio#35381380k issued on 01/08/19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. work w/o permit. remedy: comply w/comm's order &/or file a c of

    Nov 15, 2019 · Penalty $6,250

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in summons/vio#35381380k issued on 01/08/19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.

    Oct 1, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to comply w/the comm's order contained in summons/vio#35381380k issued on 01/08/19 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. for work w/o a permit. remedy: comply w/comm's order &/or file

    Aug 12, 2019 · Penalty $6,250

    Resolve
  • Class - 1

    Failure to comply w/ the commissioner's order contained in summons/violation#35381380k issued on 1/8/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for work w/o a permit. reme

    May 22, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation #35381385j issued on 01/08/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.comply with commissioner

    Mar 14, 2019 · Penalty $625

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation #35381386l issued on 01/08/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for work without a permi

    Mar 14, 2019 · Penalty $625

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation #35381387n issued on 01/18/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.dwelling converted maint

    Mar 13, 2019 · Penalty $625

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation #35381382y issued on 01/08/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.dwelling converted maint

    Mar 13, 2019 · Penalty $625

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation #35381381m issued on 01/08/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.dwelling converted maint

    Mar 13, 2019

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation #35381388p issued on 01/08/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.dwelling converted maint

    Mar 13, 2019

    Resolve
  • Class - 1

    Failure to comply with the commissioners order contained in summons/violation #35381380k issued on 01/08/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.wrok without permit:note

    Mar 13, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation #35381383x issued on 01/08/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.dwelling converted maint

    Mar 13, 2019 · Penalty $625

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation #35381389r issued on 01/00/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.dwelling maintained conv

    Mar 13, 2019 · Penalty $625

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation #35381384h issued on 01/08/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.comply with commissioner

    Feb 14, 2019

    Resolve
  • Class - 2

    Occupancy in contrary to that allowed by c/o or dob's records. legal class'a'apt at 2nd sty illegally converted into 5 single room occupances(sro's)partitions made up of wood & sheetrock creating rooms for livi

    Jan 30, 2019

    Resolve
  • Class - 2

    Occupancy in contrary to that allowed by c/o or dept of bldg records. legal class'a'apt at 3rd sty illegally converted into 4 single room occupances(sro's). wood & shettrock partitons creating rooms for living

    Jan 30, 2019

    Resolve
  • Class - 1

    Dwelling converted,maintained or occupied with 3 or more additional units other than authorized by the c of o or official records.noted:3 family house converted to 9 sro's observed mid room 13rd door from front

    Jan 8, 2019 · Penalty $60,000

    Resolve
  • Class - 1

    Dwelling converted,maintained or occupied with 3 or more additional units other than authorized by the c of o or official records.noted:3 family house converted to 9 sro's observed 2 adults (male and female)occ

    Jan 8, 2019

    Resolve
  • Class - 1

    Dwelling converted,maintained or occupied with 3 or more additional units other than authorized by the c of o or official records.noted:3 family house converted into 9 sro's observed a male occupying front room

    Jan 8, 2019 · Penalty $60,000

    Resolve
  • Class - 1

    Dwelling converted,maintained or occupied with 3 or more additional units other than authorized by the c of o or official records.noted:3 family house converted to 9 sro's observed front room at 3rd floor arran

    Jan 8, 2019 · Penalty $60,000

    Resolve
  • Class - 1

    Dwelling converted,maintained or occupied with 3 or more additional units other than authorized by the c of o or official records.noted:3 family house converted to 9 sro's observed rear room on 3rd floor occupi

    Jan 8, 2019

    Resolve
  • Class - 1

    Work without a permit.noted:erected full height partions subdividing abasement and attic creating rooms also observed electrical work throughout entire bldg newer recepticals bx wires penetrating walls,splicas

    Jan 8, 2019 · Penalty $1,600

    Resolve
  • Class - 1

    Dwelling converted,maintained or occupied with 3 or more additional units other than authorized by the c of o or official records.noted:3 family house converted to 9 sro's observed a bedroom at the attic rear s

    Jan 8, 2019 · Penalty $60,000

    Resolve
  • Class - 1

    Dwelling converted,maintained or occupied with 3 or more additional dwelling units other than authorized c of o or official records.noted:3 family house converted to 9 sro's observed a male on door,fridge and c

    Jan 8, 2019 · Penalty $60,000

    Resolve
  • Class - 1

    Dwelling converted,maintained or occupied with 3 or more additional units other than authorized by the c of o or official records.noted:3 family house converted to 9 sro's observed a female occuping rear room o

    Jan 8, 2019

    Resolve
  • Class - 1

    Dwelling converted,maintained or occupied with 3 or more additional units other than authroized by the c of o or official records.noted:3 family house converted to 9 sro's obsevred front room right side on 3rd

    Jan 8, 2019 · Penalty $60,000

    Resolve
  • Non-hazardous

    Occupancy contrary to that allowed by building department records. from 3 apartments--to 3 apartments plus living quarters at basement. remedy: discontinue unlawful use.

    Jan 12, 1995

    Resolve

Complaints

  • Appliance

    Electric/gas range

    Jul 14, 2026 · Apt APT4D

    Close
  • Unsanitary condition

    Pests

    Jul 14, 2026 · Apt APT4D

    Close
  • Plumbing

    Bathtub/shower

    Jul 14, 2026 · Apt APT4D

    Close
  • Door/window

    Door

    Jul 14, 2026 · Apt APT4D

    Close
  • Water leak

    Heavy flow

    Jul 6, 2026 · Apt 2A

    Close
  • Water leak

    Heavy flow

    Jul 6, 2026 · Apt 2A

    Close
  • Plumbing

    Toilet

    Jun 14, 2026 · Apt 7A

    Close
  • Appliance

    Electric/gas range

    May 28, 2026 · Apt 7A

    Close
  • Appliance

    Refrigerator

    May 28, 2026 · Apt 7A

    Close
  • Appliance

    Electric/gas range

    May 6, 2026 · Apt 7A

    Close
Show 40 more ↓
  • Appliance

    Refrigerator

    May 6, 2026 · Apt 7A

    Close
  • Appliance

    Refrigerator

    May 4, 2026 · Apt 7A

    Close
  • Appliance

    Electric/gas range

    May 4, 2026 · Apt 7A

    Close
  • Heat/hot water

    Apartment only

    Jan 25, 2026 · Apt 4AENTR

    Close
  • Door/window

    Door frame

    Jan 25, 2026 · Apt 4AENTR

    Close
  • Heat/hot water

    Apartment only

    Jan 23, 2026 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Jan 20, 2026 · Apt 4A

    Close
  • Unsanitary condition

    Pests

    Dec 26, 2025 · Apt 6D

    Close
  • Unsanitary condition

    Pests

    Dec 2, 2025 · Apt 6D

    Close
  • Unsanitary condition

    Sewage

    Dec 2, 2025 · Apt 6D

    Close
  • Unsanitary condition

    Mold

    Nov 30, 2025 · Apt 3C

    Close
  • Unsanitary condition

    Pests

    Nov 30, 2025 · Apt 3C

    Close
  • Paint/plaster

    Ceiling

    Nov 16, 2025 · Apt 3C

    Close
  • Appliance

    Refrigerator

    Nov 3, 2025 · Apt 7A

    Close
  • Appliance

    Refrigerator

    Oct 3, 2025 · Apt 7A

    Close
  • Appliance

    Refrigerator

    Sep 25, 2025 · Apt 7A

    Close
  • Electric

    Power outage

    Aug 25, 2025 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Aug 25, 2025 · Apt 2A

    Close
  • Electric

    Power outage

    Aug 21, 2025 · Apt 4C

    Close
  • Safety

    Sprinkler

    Aug 21, 2025 · Apt 4C

    Close
  • Safety

    Sprinkler

    Jun 20, 2025 · Apt 4C

    Close
  • General

    Ventilation system

    Jun 20, 2025 · Apt 4C

    Close
  • Electric

    Power outage

    Apr 24, 2025 · Apt BLDG

    Close
  • General

    Cooking gas

    Apr 24, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Apr 24, 2025 · Apt BLDG

    Close
  • Electric

    Power outage

    Apr 24, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Feb 19, 2025 · Apt 5C

    Close
  • Paint/plaster

    Wall

    Feb 19, 2025 · Apt 5C

    Close
  • Heat/hot water

    Entire building

    Jan 15, 2025 · Apt 5D

    Close
  • Heat/hot water

    Apartment only

    Jan 15, 2025 · Apt 5D

    Close
  • Heat/hot water

    Apartment only

    Jan 11, 2025 · Apt 5D

    Close
  • Heat/hot water

    Entire building

    Jan 10, 2025 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Nov 21, 2024 · Apt 3C

    Close
  • Paint/plaster

    Wall

    Apr 22, 2024 · Apt 5C

    Close
  • Paint/plaster

    Wall

    Apr 15, 2024 · Apt 6C

    Close
  • General

    Cooking gas

    Mar 29, 2022 · Apt 3B

    Close
  • Electric

    Wiring

    Feb 8, 2020 · Apt 2FLOOR

    Close
  • Electric

    Power outage

    Nov 26, 2019 · Apt 2

    Close
  • Plumbing

    Steam pipe/riser

    Nov 26, 2019 · Apt 2

    Close
  • Heat/hot water

    Apartment only

    Nov 26, 2019 · Apt 2

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
2022
Floors
7
Residential units
26
Building area
22,755 ft²
Lot area
5,380 ft²
Zoning
R7-1
Community board
204
Council district
16
Block / lot
2526 / 40
Assessed value
$1,869,300
Landmark / historic district
No

HPD registration #228861, last renewed Aug 26, 2025.

Questions about 1058 University Avenue

Who owns 1058 University Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 1058 Goldstar LLC.

Does 1058 University Avenue have violations?

Yes. NYC HPD has recorded 64 housing violations at this property.

Is 1058 University Avenue rent stabilized?

NYC Department of Finance tax bills listed 27 rent-stabilized units here in 2024 (about 100% of its 26 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 1058 University Avenue built?

City records list 2022 as the year it was built.

How many apartments are in 1058 University Avenue?

It has 26 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.