109 East 153 Street
Bronx, NY 10451BBL 2-02482-0001Map
Owner of record: 153 Realty Asscoaties
109 East 153 Street is an elevator apartment building built in 1931 in Bronx, 10451. It has 60 residential units across 6 floors. The owner of record is 153 Realty Asscoaties. HPD has recorded 780 housing violations here, most recently on October 2, 2026. 37 of the 50 most recent violations are still open. City tax records listed 58 rent-stabilized apartments here in 2024.
- HPD violations
- 780
- DOB violations
- 37
- ECB violations
- 23
- HPD complaints
- 2,121
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 780
- BHazardous
Properly repair with similar material the broken or defective ceramic floor tile in the bathroom located at apt 25c, 3rd story, 1st apartment from south at west , section ''north''
Oct 2, 2026 · Apt 25C
Open — Nov sent out - CImmediately hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ..... in the bathroom located at apt 25c, 3rd story, 1st apartment from south at west , section ''north''
Oct 2, 2026 · Apt 25C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at east located at apt 25c, 3rd story, 1st apartment from south at west , section ''north''
Oct 2, 2026 · Apt 25C
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower sash at 1st window from east at south wall in the 2nd room from north at east located at apt 25c, 3rd story, 1st apartment from south at west , section ''north''
Oct 2, 2026 · Apt 25C
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in at waste at bathtub in the bathroom located at apt 25c, 3rd story, 1st apartment from south at west , section ''north''
Oct 2, 2026 · Apt 25C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the private hallway located at apt 25c, 3rd story, 1st apartment from south at west , section ''north''
Oct 2, 2026 · Apt 25C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak over the ceiling and west wall in the bathroom located at apt 25c, 3rd story, 1st apartment from south at west , section ''north''
Oct 2, 2026 · Apt 25C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 25c, 3rd story, 1st apartment from south at west , section ''north''
Oct 2, 2026 · Apt 25C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 25c, 3rd story, 1st apartment from south at west , section ''north''
Oct 2, 2026 · Apt 25C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at door in the entrance located at apt 25c, 3rd story, 1st apartment from south at west , section ''north''
Oct 2, 2026 · Apt 25C
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 25c, 3rd story, 1st apartment from south at west , section ''north''
Oct 2, 2026 · Apt 25C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at west located at apt 25c, 3rd story, 1st apartment from south at west , section ''north''
Oct 2, 2026 · Apt 25C
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower sash at 1st window from south at west wall in the 2nd room from north at west located at apt 25c, 3rd story, 1st apartment from south at west , section ''north''
Oct 2, 2026 · Apt 25C
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower sash at 1st window from south at west wall in the 1st room from north located at apt 25c, 3rd story, 1st apartment from south at west , section ''north''
Oct 2, 2026 · Apt 25C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak over the ceiling and east wall in the kitchen located at apt 25c, 3rd story, 1st apartment from south at west , section ''north''
Oct 2, 2026 · Apt 25C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 25c, 3rd story, 1st apartment from south at west , section ''north''
Oct 2, 2026 · Apt 25C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the kitchen located at apt 25c, 3rd story, 1st apartment from south at west , section ''north''
Oct 2, 2026 · Apt 25C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak over the ceiling in the 1st room from north located at apt 25c, 3rd story, 1st apartment from south at west , section ''north''
Oct 2, 2026 · Apt 25C
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective connection under base cabinet sink in the kitchen located at apt 25c, 3rd story, 1st apartment from south at west , section ''north''
Oct 2, 2026 · Apt 25C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule to 1st story public hall , 1st story
Sep 28, 2026
Open — Nov sent out - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder missing shoe, properly secure with appropriate nuts and bolts at 1st fire escape from north at west, 1st story
Sep 28, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Sep 28, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Sep 28, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at vestibule door ( from vestibule door to public hall) at public hall, 1st story
Sep 27, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material approx 5sq.ft at ceiling at vestibule at public hall, 1st story
Sep 27, 2026
Open — Nov certified on time - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at vestibule at public hall, 1st story
Sep 27, 2026
Open — Nov sent out - BHazardous
Properly secure the loose handrail at north wall at public hall stairs, 1st story
Sep 27, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective marble tread 4th up from bottom at 2nd staircase at north section at public hall stairs, 1st story
Sep 27, 2026
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling, north wall and south wall. in the bathroom located at apt 24d, 3rd story, 2nd apartment from south at west
Sep 13, 2026 · Apt 24D
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroom located at apt 24d, 4th story, 1st apartment from south at west
May 23, 2026 · Apt 24D
Closed — Violation closed - BHazardous
Properly secure the loose metal sink to east wall in the kitchen located at apt 24d, 4th story, 1st apartment from south at west
May 23, 2026 · Apt 24D
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective deteriorated metal sink at east wall in the kitchen located at apt 24d, 4th story, 1st apartment from south at west
May 23, 2026 · Apt 24D
Open — Not complied with - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10sq.ft at east wall in the bathroom located at apt 24d, 4th story, 1st apartment from south at west
May 23, 2026 · Apt 24D
Open — First no access to re- inspect violation - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the bathroom located at apt 24d, 4th story, 1st apartment from south at west
May 23, 2026 · Apt 24D
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures low volume in the bathroom located at apt 24d, 4th story, 1st apartment from south at west
May 23, 2026 · Apt 24D
Closed — Violation closed - BHazardous
Provide adequate supply of hot water for the fixtures low volume in the bathroom located at apt 24d, 4th story, 1st apartment from south at west
May 23, 2026 · Apt 24D
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 24g, 6th story, 1st apartment from south at west , section ''south''
Apr 22, 2026 · Apt 24G
Open — False certification - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 24g, 6th story, 1st apartment from south at west , section ''south''
Apr 22, 2026 · Apt 24G
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in wasteline at bathtub in the bathroom located at apt 24g, 6th story, 1st apartment from south at west , section ''south''
Apr 22, 2026 · Apt 24G
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower window sash at north wall in the bathroom located at apt 24g, 6th story, 1st apartment from south at west , section ''south''
Apr 22, 2026 · Apt 24G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 26d, 4th story, 2nd apartment from south at west
Mar 17, 2026 · Apt 26D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the foyer located at apt 26d, 4th story, 2nd apartment from south at west
Mar 17, 2026 · Apt 26D
Open — Invalid certification - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 26d, 4th story, 2nd apartment from south at west
Mar 17, 2026 · Apt 26D
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at east located at apt 26d, 4th story, 2nd apartment from south at west
Mar 17, 2026 · Apt 26D
Open — Invalid certification - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at east located at apt 26d, 4th story, 2nd apartment from south at west
Mar 17, 2026 · Apt 26D
Open — Invalid certification - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at lower window sash at 1st window from north at west wall at public hall, 1st story
Mar 13, 2026
Closed — Violation dismissed - CImmediately hazardous
Properly repair and abate unsafe electric wiring condition consisting of wires hanging at ceiling in the foyer located at apt 27d, 3rd story, 1st apartment from north at east
Jan 5, 2026 · Apt 27D
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 27d, 3rd story, 1st apartment from north at east
Jan 5, 2026 · Apt 27D
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak behind north wall (near boiler room) at basement
Dec 29, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Dec 13, 2025
Closed — Violation dismissed
DOB building violations · 37
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 26, 2024
Dob violation - active - Construction other optional
Noted cracking on exp 2 from roof down. cracks 1 inch wide and run hieght of wall in various locations. also noted loose concrete in fire exit exp1/2, loose missing stone @exp 2 wall.
Feb 25, 2024
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 4, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 9, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 23, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 30, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 20, 2015
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 22, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 18, 2013
Dob violation - resolved
Show 27 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jul 9, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - active - Emergency none
Egncy-emergency none
Mar 29, 2012
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 4, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 13, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 14, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 19, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 28, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 22, 2003
Dob violation - resolved - Elevator elevatorrequired
2p1413
Feb 11, 2002
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - active - Construction other optional
C-construction other optional
Aug 25, 2000
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 25, 2000
Dob violation - dismissed - Construction other optional
Location installed an awning without a permit
Jun 2, 2000
Vw*-violation - work w/o permit dismissed - Elevator elevatorrequired
2p1413
May 8, 2000
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Elevator elevatorrequired
2p1413
Apr 27, 1999
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 20, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 9, 1992
Vp*-violation unserved ecb- dismissed - Facade facade optional
Ll1080-local law 10/80 - facade facade optional
Jul 1, 1992
Dob violation - dismissed - Elevator elevatorrequired
(01) when stop switch engaged alarm must ring (74)properly secure lights switch in motor room
May 15, 1990
Dob violation - resolved - Elevator elevatorrequired
(73)restore elev to service
Nov 8, 1989
Dob violation - resolved - Elevator elevatoroptional
1
Oct 12, 1989
Dob violation - dismissed - Elevator elevatorrequired
(51) replace missing splice box covers. (52) file bn for car button station installed with the department to be tested (53) repair light switch in motor room
Nov 21, 1988
Dob violation - resolved
ECB violations · 23
- Class - 1
Responding to a 311 complaint. found the device is stiil under cease order . and not lifted. cease use violatoin issued for. recurring conditions. the only device in building. remedy; repair then contact nycdob
Apr 6, 2026 · Penalty $3,125
Active - Class - 1
Cease use 44-h-11 main traction sheave worn lost motion, provide dlm improperly installed on this device, no fireman's service present in controller, install fireman's service so dlm is in compliance with secti
Dec 30, 2025 · Penalty $1,250
Active - Class - 2
Observed 4 gas-fired commercial clothes dryers installed in basement, without sprinkler system as per 903.2.11.13 bc laundry drying areas an automatic sprinkler system shall be installed in spaces in which two
Dec 8, 2025 · Penalty $1,250
Active - Class - 2
Observed gas, water and waste piping installed, connecting 3 active commercial washing machines and 4 active commercial gas fired clothes dryers, also laundry was created with out reflecting on certificate of o
Dec 8, 2025 · Penalty $1,250
Active - Class - 2
Observed approximately 14ft of new cast iron piping, along with fittings and rubber couplings, installed in the building's waste pipe located in laundry room . all work was performed without permits filed with
Dec 8, 2025
Resolve - Class - 2
Observed prohibited flexible connectors installed on 4 gas-fired commercial clothes dryers as per ppn submitted 1994 "please see supporting document in the evidence package", also observed improper future conne
Dec 8, 2025 · Penalty $1,250
Active - Class - 1
Gas is being supplied to 4 commercial clothes dryers, gas valves for all dryers are open and active. no permit for installation for piping to laundry room. therefore no certification from dob to supply gas to c
Dec 8, 2025 · Penalty $2,500
Active - Class - 2
Failure to maintain building exterior facade and appurtenances. at time of inspectionnit was observed vertical cracks and step cracks, spalling masonry and deteriorated mortar joints throughout all exposures. a
Aug 15, 2024 · Penalty $1,250
Resolve - Class - 1
Failure to maintain exterior building facade and appurtenances. severecracks on all exposure, missing windows in exposure(2), river side, exp. (1) 109 exp. cracks and spalling in the parapet on 6th floor exposu
Apr 22, 2024 · Penalty $2,500
Active - Class - 1
Failure to provide unobstructed exit on fires escape.note:obstruction from the fire escapes on exposure#3 at the time of inspection observedflower pots and vases on exposure 3.rem:remove obstruction immediately
Apr 22, 2024 · Penalty $1,250
Resolve
Show 13 more ↓
- Class - 2
Noted on exp 2 side that stone at base had holes and loos mortar joints. also noted crackng in fire exit passage and throught facade., repair and/or replace; repair stone and mortar. repair cracking. review str
Feb 25, 2024 · Penalty $625
Resolve - Class - 1
Class 1 violation issued , no door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. remedy, file application, install dlm and, perform and file test with nyc
Jul 27, 2022 · Penalty $3,125
Active - Class - 2
Failure to maintain building in code-compliant manner. at time of inspection, observed at first floor level at san jose restaurant approximately 6 inch. by 12 inch. hole and (cracks) crevices on ceiling due to
Apr 16, 2021 · Penalty $310
Resolve - Class - 2
16-j-1,8-v-1,41-d-6,13-l-13=16-j-1 all hoistway door slamming adjust 8-v-1 41-d-6 13-l-10
Oct 28, 2019
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons/violation# 35261982l issued on 09/12/2017, and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01(d)(2). an acceptible cer
Nov 20, 2018 · Penalty $1,250
Resolve - Class - 2
8v1,58h10,70o2. 8-car floor to landing sill in lobby not level adjust; 58-bearing worn repair; 70-pit dirty clean.
Jan 7, 2018 · Penalty $500
Resolve - Class - 2
45m13,40p16,70o02-45m13)provide led seal and secure governor. 40p16)no key put in place for access. no one around, provide key for access to motor room. 70o02)clean oil in shaftway.
Sep 28, 2017 · Penalty $250
Resolve - Class - 2
Work does not comform to approved const docs &/or approved amendments for job #220593105 dated 04-20-2017 noted:opening of approx 8' x 7' created between the two stored not on plan.rem:comform to approved const
Sep 12, 2017 · Penalty $500
Resolve - Class - 2
08v01,40p07,70o02,39o02,34o02,09i10,26i10. 34-clean entire shaftway car floor tiles damaged; 26-emergency exit inside car damaged repair
Nov 9, 2016
Resolve - Class - 2
Failure to maintain building wall(s) or appurtenances. decorative wooden pieces at exterior facade are deteriorating missing & loose in danger of falling onto public sidewalk. also observed cracked bricks along
Mar 27, 2012 · Penalty $500
Resolve - Hazardous
Failure to maintain exterior building wall defects are: (1) at the north side of building facade missing mortar joints at various location throughout (2) missing coping stoves (2) at the west side of building a
Jul 21, 2003 · Penalty $2,500
Resolve - Non-hazardous
5#1,8v1,9b7,14m7,21x11,48#7,57o2,74m7. (5)car door has big gap when close (9)missing second car door gibb (21)lobby indicator inoperative 43 missing backup binder 52 pit dirty 74 missing.
May 15, 2001 · Penalty $180
Resolve - Non-hazardous
35p,28h,08v,17i. 35 provide access to motor room.
Oct 20, 1993 · Penalty $100
Resolve
Complaints
- Heat/hot water
Apartment only
Sep 26, 2026 · Apt 26C
Close - Electric
No lighting
Sep 25, 2026 · Apt 25C
Close - Plumbing
Basin/sink
Sep 25, 2026 · Apt 25C
Close - Paint/plaster
Wall
Sep 25, 2026 · Apt 25C
Close - Plumbing
Toilet
Sep 25, 2026 · Apt 25C
Close - Flooring/stairs
Stairs
Sep 19, 2026 · Apt BASEME
Close - Flooring/stairs
Floor
Sep 19, 2026 · Apt BASEME
Close - Flooring/stairs
Stairs
Sep 19, 2026 · Apt BASEME
Close - Unsanitary condition
Mold
Sep 9, 2026 · Apt 24D
Close - Plumbing
Water supply
Jul 7, 2026 · Apt BLDG
Close
Show 40 more ↓
- Electric
Power outage
Jun 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 8, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
May 23, 2026 · Apt 26C
Close - Heat/hot water
Entire building
May 18, 2026 · Apt 24D
Close - Plumbing
Water supply
May 18, 2026 · Apt 24D
Close - Water leak
Slow leak
May 18, 2026 · Apt 24D
Close - Unsanitary condition
Mold
May 18, 2026 · Apt 24D
Close - Heat/hot water
Entire building
May 7, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
May 6, 2026 · Apt BLDG
Close - General
Cooking gas
May 6, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Apr 27, 2026 · Apt BLDG
Close - General
Cooking gas
Apr 27, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 25, 2026 · Apt 26C
Close - Electric
Power outage
Apr 21, 2026 · Apt 29G
Close - Heat/hot water
Apartment only
Apr 21, 2026 · Apt 29G
Close - Electric
Power outage
Apr 21, 2026 · Apt 26C
Close - Heat/hot water
Entire building
Apr 21, 2026 · Apt 26C
Close - Door/window
Window frame
Mar 15, 2026 · Apt 24G
Close - Plumbing
Basin/sink
Mar 15, 2026 · Apt 24G
Close - Plumbing
Toilet
Mar 15, 2026 · Apt 24G
Close - Plumbing
Bathtub/shower
Mar 15, 2026 · Apt 24G
Close - Heat/hot water
Apartment only
Mar 14, 2026 · Apt 26C
Close - Heat/hot water
Apartment only
Feb 21, 2026 · Apt 26C
Close - Flooring/stairs
Floor
Jan 21, 2026 · Apt 24B
Open - Unsanitary condition
Mold
Jan 21, 2026 · Apt 24B
Open - Heat/hot water
Apartment only
Jan 21, 2026 · Apt 24B
Open - Paint/plaster
Wall
Jan 21, 2026 · Apt 24B
Open - Electric
Lighting
Jan 21, 2026 · Apt 24B
Open - Appliance
Electric/gas range
Jan 21, 2026 · Apt 24B
Open - Electric
Lighting
Jan 21, 2026 · Apt 24B
Open - Plumbing
Toilet
Jan 21, 2026 · Apt 24B
Open - Paint/plaster
Ceiling
Jan 4, 2026 · Apt 27D
Close - Water leak
Slow leak
Jan 4, 2026 · Apt 27D
Close - Heat/hot water
Apartment only
Jan 4, 2026 · Apt 27D
Close - Heat/hot water
Apartment only
Jan 4, 2026 · Apt 27D
Close - Electric
No lighting
Dec 28, 2025 · Apt 1
Close - Paint/plaster
Ceiling
Dec 28, 2025 · Apt 1
Close - Heat/hot water
Entire building
Dec 26, 2025 · Apt 25C
Close - Heat/hot water
Entire building
Dec 17, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 17, 2025 · Apt 26C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 1931
- Floors
- 6
- Residential units
- 60
- Building area
- 66,678 ft²
- Lot area
- 15,000 ft²
- Zoning
- R8
- Community board
- 204
- Council district
- 16
- Block / lot
- 2482 / 1
- Assessed value
- $1,323,000
- Landmark / historic district
- Grand Concourse Historic District
HPD registration #208491, last renewed Dec 2, 2025.
Questions about 109 East 153 Street
Who owns 109 East 153 Street?
The owner of record in NYC Department of City Planning PLUTO data is 153 Realty Asscoaties.
Does 109 East 153 Street have violations?
Yes. NYC HPD has recorded 780 housing violations at this property.
Is 109 East 153 Street rent stabilized?
NYC Department of Finance tax bills listed 58 rent-stabilized units here in 2024 (about 97% of its 60 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 109 East 153 Street built?
City records list 1931 as the year it was built.
How many apartments are in 109 East 153 Street?
It has 60 residential units and 63 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.