1000 Grand Concourse
Bronx, NY 10456BBL 2-02461-0090Map
Owner of record: 1000 LLC
1000 Grand Concourse is an elevator apartment building built in 1935 in Bronx, 10456. It has 104 residential units across 10 floors. The owner of record is 1000 LLC. HPD has recorded 1,371 housing violations here, most recently on October 7, 2026. 43 of the 50 most recent violations are still open. City tax records listed 99 rent-stabilized apartments here in 2024.
- HPD violations
- 1,371
- DOB violations
- 104
- ECB violations
- 106
- HPD complaints
- 1,852
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,371
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 10c, 10th story, 1st apartment from south at west
Oct 7, 2026 · Apt 10C
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 10c, 10th story, 1st apartment from south at west
Oct 7, 2026 · Apt 10C
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 1st apartment from west at north
Oct 7, 2026 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system boiler room lock at boiler room
Oct 7, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 10c, 10th story, 1st apartment from south at west
Oct 7, 2026 · Apt 10C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 10c, 10th story, 1st apartment from south at west
Oct 7, 2026 · Apt 10C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set and assemblies at stair case a door at south wall at public hall, 4th story
Oct 7, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 10c, 10th story, 1st apartment from south at west
Oct 7, 2026 · Apt 10C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set and its assemblies at stair case a door at south wall at public hall, 4th story
Oct 7, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from north located at apt 10c, 10th story, 1st apartment from south at west
Oct 7, 2026 · Apt 10C
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the roof so that it will not leak at ceiling in the kitchen located at apt 10c, 10th story, 1st apartment from south at west
Oct 7, 2026 · Apt 10C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 10c, 10th story, 1st apartment from south at west
Oct 7, 2026 · Apt 10C
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3h, 3rd story, 1st apartment from south at west
Sep 12, 2026 · Apt 3H
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3h, 3rd story, 1st apartment from south at west , section ''souyh''
Sep 2, 2026 · Apt 3H
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 9c, 9th story, 1st apartment from east at south
Jul 23, 2026 · Apt 9C
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the kitchen located at apt 9c, 9th story, 1st apartment from east at south
Jul 23, 2026 · Apt 9C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 10bb, 10th story, 2nd apartment from south at west
Jul 4, 2026 · Apt 10BB
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective pocelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 10bb, 10th story, 2nd apartment from south at west
Jul 4, 2026 · Apt 10BB
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 10bb, 10th story, 2nd apartment from south at west
Jul 4, 2026 · Apt 10BB
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 10bb, 10th story, 2nd apartment from south at west
Jul 4, 2026 · Apt 10BB
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 10bb, 10th story, 2nd apartment from south at west
Jul 4, 2026 · Apt 10BB
Open — Notice of issuance sent to tenant - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10sq ft less than 30sq at ceiling and west wall in the bathroom located at apt 10bb, 10th story, 2nd apartment from south at west
Jul 4, 2026 · Apt 10BB
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the private hallway located at apt 10bb, 10th story, 2nd apartment from south at west
Jul 4, 2026 · Apt 10BB
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the private hallway located at apt 10bb, 10th story, 2nd apartment from south at west
Jul 4, 2026 · Apt 10BB
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tile at floor (cracked, splintered) in the 3rd room from north at west located at apt 10bb, 10th story, 2nd apartment from south at west
Jul 4, 2026 · Apt 10BB
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tile at floor (cracked, splintering) in the 4th room from north located at apt 10bb, 10th story, 2nd apartment from south at west
Jul 4, 2026 · Apt 10BB
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 10bb, 10th story, 2nd apartment from south at west
Jul 4, 2026 · Apt 10BB
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective wash base sink in the bathroom located at apt 10bb, 10th story, 2nd apartment from south at west
Jul 4, 2026 · Apt 10BB
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at door in the entrance located at apt 6f, 6th story, 2nd apartment from east at south
Jun 20, 2026 · Apt 6F
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak over the ceiling near elevator at public hall, 9th story
Jun 20, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 9th story
Jun 20, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 9th story
Jun 20, 2026
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 9c, 9th story, 1st apartment from east at south
Jun 20, 2026 · Apt 9C
Open — False certification - BHazardous
Properly repair the source and abate the evidence of a water leak over the ceiling in the kitchen located at apt 9c, 9th story, 1st apartment from east at south
Jun 20, 2026 · Apt 9C
Open — False certification - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling near elevator at public hall, 9th story
Jun 20, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at door leading to staircase b at south wall at public hall, 5th story
Jun 20, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling near elevator at public hall, 9th story
Jun 20, 2026
Closed — Violation closed - BHazardous
Properly secure the loose at cabinet at west wall in the kitchen located at apt 10bb, 10th story, 1st apartment from south at west
Jun 17, 2026 · Apt 10BB
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than 20sqft at window at west wall, and less than 10sqft at ceiling in the bathroom located at apt 10bb, 10th story, 1st apartment from south at west
Jun 17, 2026 · Apt 10BB
Open — Notice of issuance sent to tenant - BHazardous
Properly secure the loose washbasin in the bathroom located at apt 10bb, 10th story, 1st apartment from south at west
Jun 17, 2026 · Apt 10BB
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective chipped marble tile at floor (causing cut hazard) in the 3rd room from north located at apt 10bb, 10th story, 1st apartment from south at west
Jun 17, 2026 · Apt 10BB
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 3rd room from north located at apt 10bb, 10th story, 1st apartment from south at west
Jun 17, 2026 · Apt 10BB
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north 1 window from west in the 3rd room from north located at apt 10bb, 10th story, 1st apartment from south at west
Jun 17, 2026 · Apt 10BB
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south 1 window from west in the 3rd room from north located at apt 10bb, 10th story, 1st apartment from south at west
Jun 17, 2026 · Apt 10BB
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at lower sash at west 2 window from south in the 2nd room from north located at apt 10bb, 10th story, 1st apartment from south at west
Jun 17, 2026 · Apt 10BB
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 10bb, 10th story, 1st apartment from south at west
Jun 17, 2026 · Apt 10BB
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 10bb, 10th story, 1st apartment from south at west
Jun 17, 2026 · Apt 10BB
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls in the 4th room from north located at apt 10bb, 10th story, 1st apartment from south at west
Jun 17, 2026 · Apt 10BB
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the foyer located at apt 10bb, 10th story, 1st apartment from south at west
Jun 17, 2026 · Apt 10BB
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls in the 2nd room from north located at apt 10bb, 10th story, 1st apartment from south at west
Jun 17, 2026 · Apt 10BB
Open — Nov sent out
DOB building violations · 104
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 11, 2022
Dob violation - dismissed - Construction other optional
Emergency work order due to facade defects, loose metal guards at window at west elevations and loose bricks at multiple locations remedy: immed remove/replace or secure all loose material at all elevations(west, north, east and south)
Feb 10, 2022
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 15, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 15, 2021
Dob violation - resolved - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 3, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 3, 2021
Dob violation - dismissed
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Aug 27, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 26, 2020
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 30, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 30, 2019
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 9, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 13, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 13, 2018
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 21, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 6, 2017
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 11, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 11, 2016
Dob violation - resolved - Landmark none
Landmk-landmark none
Aug 5, 2015
Dob violation - dismissed - Landmark none
Landmk-landmark none
Aug 5, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 29, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 27, 2015
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 8, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 8, 2014
Dob violation - resolved - Landmark none
Landmk-landmark none
Aug 15, 2013
Dob violation - dismissed - Landmark none
Landmk-landmark none
Aug 15, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 5, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 5, 2013
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 24, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 24, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 3, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 3, 2011
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 1, 2009
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2008
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 17, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 17, 2007
Dob violation - resolved - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 10, 2007
Dob violation - active
ECB violations · 106
- Class - 1
Failure to maintain building in code compliant manner. noted: roof observed sloping above apt 10bb bdrms creating excessive water damage to apt ceiling, walls, window frames. also, water damage observed to wall
Jun 18, 2026 · Penalty $2,500
Active - Class - 1
Contrary to c-of-o 52221 which indicates; (4) 10th flr apts: at time of inspection - (6) apts were observed with apt 10b being sub-divided creating apts 10b & 10bb. addl't apts included apts 10a through 10e., d
Jun 18, 2026 · Penalty $6,250
Active - Class - 1
Class 1: brake sleeve dust observed and brake pad not properly seated on drum. zip tie installed through door lock keeper/drop key opening, permitting access without proper drop key. unsafe condition and improp
Jun 3, 2026 · Penalty $1,250
Active - Class - 1
Certificate of occupancy #5221 show 4 apartments on 10 floor however 6 apartments are now present, discontinue illegal occupancy or amend c of o
May 15, 2026 · Penalty $25,000
Active - Class - 2
Failure to certify corrections and violations number 39142879r, file a certificate of correction
May 15, 2026 · Penalty $6,250
Active - Class - 1
Failure to certify corrections for violation number 39142881x, comply with commissioner's order
May 15, 2026 · Penalty $12,500
Active - Class - 2
Failure to certify corrections and violations number 39142887r, file a certificate of correction
May 15, 2026 · Penalty $6,250
Active - Class - 1
Failure to certify corrections and violations number 39142885n, comply with commissioner's order
May 15, 2026 · Penalty $12,500
Active - Class - 2
Failure to certify corrections and violations number 39142886p, file a certificate of correction
May 15, 2026 · Penalty $6,250
Active - Class - 1
I observed unsafe unsuitable electrical conditions in apt 10c and hallways,live wires, fixtures exposed subject to fire hazard and electrocution., comply with ec; fix all conditions as per nec and nyc amendment
Feb 18, 2026 · Penalty $1,600
Active
Show 40 more ↓
- Class - 1
I observed in apt 10c installation of general wiring and equipment including light fixtures, switches, receptacles and electric stove without an electrical permit on file., obtain permit; obtain electrical perm
Feb 18, 2026 · Penalty $2,500
Active - Class - 2
Occupancy contrary to that allowed by c of o and/or department of building records. illegally altered sub-divided class "a" apartment. apartment "10b" into apt. 10b and 10bb, creating an additional apt. on the
Aug 12, 2025 · Penalty $1,250
Active - Class - 2
Failure to submit an acceptable required cycle 8c and 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #907573. agg2 history of noncomp
Apr 8, 2025 · Penalty $10,000
Active - Class - 2
W/o a permit. noted: at 10th flr apt 10bb - water & waste lines installed for a 3 pc bthrm, residential sink at kitchen area., obtain all permits
Mar 25, 2025 · Penalty $1,250
Active - Class - 1
Failure to maintain building in code compliant manner. noted: at time of inspection in apt 10bb - badly cracked top window sash observed creating a cut hazard; 2. ceiling sheetrock observed with potential to co
Mar 25, 2025 · Penalty $2,500
Active - Class - 1
Contrary to c-of-o # 52221 which indicates (4) 10th flr apts: at time of inspection - 10th flr observed with 6 apts, changing floor occupancy and creating an egress condition., discontinue illegal occupancy or
Mar 25, 2025 · Penalty $2,500
Active - Class - 1
W/o a permit. noted: at 10th flr apt 10bb - electrical wiring installed: 220v line for stove; 110v lines in an unsafe manner for lights and outlets., obtain permit
Mar 25, 2025 · Penalty $2,500
Active - Class - 2
W/o a permit. noted: at 10th flr - full height partition walls erected to sub-divide & create apts 10bb & 10b; also, to create addl't bdrms & bthrm., obtain all permits
Mar 25, 2025 · Penalty $1,250
Active - Class - 2
Failure to maintain building in code compliant manner. noted: in 10th flr apt 10bb - excessive damage to ceiling, walls & window framing throughout apt, creating fire stopping hazards., repair and/or replace
Mar 25, 2025 · Penalty $1,250
Active - Class - 2
Contrary to c-of-o # 52221 which indicates 1st flr as: 1 apt, boiler rm, storage, (3) dr. offices: at time of inspection - 1st flr rear east at south observed created and used as a coin operated laundromat., di
Mar 25, 2025 · Penalty $1,250
Active - Class - 1
W/o a permit. noted: at 1st flr east at south - water & waste lines installed for 5 washers. gas line installed for 5 dryers., obtain permit
Mar 25, 2025 · Penalty $2,500
Active - Class - 1
Failure to maintain building in code compliant manner: lack of a system of automatic sprinklers where required per bc 903.2; 27-954. noted: at time of inspection at 1st flr east at south - observed no sprinkler
Mar 25, 2025 · Penalty $2,500
Active - Class - 1
Gas being supplied to building without inspection and certification by dob. noted: at time of inspection observed 1st flr east at south - gas line installed to supply 5 active gas dryers. no record of applicati
Mar 25, 2025 · Penalty $5,000
Active - Class - 1
Responding to a 311 elevator complaint, upon inspection, cease use violation issued for 30% of usage form broke shoe to drum, remedy; repair, then at time of inspection, test weight must be on site for test, co
Jan 29, 2025 · Penalty $1,250
Resolve - Class - 2
At time of inspection observed 10 story residential building sidewalk shed in place exposure #1 and #4 upon review dob now and bis sidewalk shed has been expire since 06/23/2023 permit# x00384486...
Oct 29, 2024 · Penalty $1,250
Active - Class - 2
At time of inspection observed sidewalk in place exposure#1 and #4 not being maintain as per code3307.6.5.1 serval lighting defective also sidewalk shed panel not secure and maintain exp#4 also cross bracings m
Oct 29, 2024
Resolve - Class - 2
At time of inspection observed sidewalk shed in place exp#1 and #4 upon reviewing sidewalk shed approve drawing does not conform to plan i observed elevation changes exp#1 and #4 not reflecting or indicating on
Oct 29, 2024
Resolve - Class - 2
Responding to a 311 elevator complaint upon inspection class 2 violation was issued ,. for 1/ damage lobby hoist way door vision panel,. remedy; replace, 2/ in car fan not working, remedy; repair, 3/ hoist moto
Jan 11, 2024
Resolve - Class - 2
Failure to submit acceptable required cycle8c report of critical exam documenting condition of exterior wall&appurtenances required by28-302.4 for control807573.agg2 hist of noncompliance on37018277z,36015883j,
Oct 19, 2022 · Penalty $6,250
Active - Class - 2
Failure to maintain exterior building facade/walls & appurtenances.note:cracked brick damanged mortar joints at exp #1 #2 #3 #4 damaged window lintels & sills & damaged metal guards for windows roof level step
Apr 11, 2022 · Penalty $6,250
Active - Class - 1
Failure to maintain exterior building facade and appurteances.at time of inspection observed at all elevations west,north,east,south exp #1 #2 #3 #4 cracked bricks damaged mortar joints at multiple locations
Feb 10, 2022 · Penalty $2,500
Active - Class - 1
Class 1 violation issued, / recurring , no door lock monitoring installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc. remedy; file application, install dlm and, perform and file
Feb 9, 2022 · Penalty $3,125
Resolve - Class - 1
No door lock monitoring installed in this controller as per 3.10.12 of appendix k3 of the 2014 nycbc. remedy; install dlm and perform and file test with nycdob.
Dec 9, 2020 · Penalty $1,250
Resolve - Class - 1
No door lock monitoring installed in this controller as per 3.10.12 of appendix k3 of the 2014 nycbc. remedy; install dlm and perform and file test with nycdob. lobby vision panel has broken glass.
Dec 9, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35318754y issued on 05/08/18,& to file a cert to correction pursuant to 28.201.1 & 1rcny 102-01(d)(2). remedy: file a certificate of correction.
Jun 29, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35318753m issued on 05/08/18,& to file a cert to correction pursuant to 28.201.1 & 1rcny 102-01(d)(2). remedy: fila cert of correction.
Jun 29, 2020 · Penalty $1,250
Resolve - Class - 2
Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall & appurtenances required by 28-302.4 for control#807573. remedy: submit acceptable require
Feb 13, 2020 · Penalty $1,250
Active - Class - 2
2-x-10 ,56-o-2,16-j-1,70-o-2=2-x-10 phone inoperative repari 56-o-2 16-j-1 hoistway slamming adjust 70-o-2
Nov 7, 2019 · Penalty $625
Resolve - Class - 1
Failure to maintain exterior bldg facade & appurtenances as noted:exp#1 damaged mortar joints,damaged windows sills damages store joints above (entrance) stepcracks various locns inadequate a/c supports various
May 8, 2018 · Penalty $2,500
Active - Class - 1
1rcny 103-04 owner failed to repair conditions w/in time (frame) recommended by qewi.qewi recommended repairs be made by 6/21/15 as of 5/8/18 no such reapirs has been made as per 1rcny 103-04 the owner did not
May 8, 2018 · Penalty $2,500
Active - Class - 1
Open circuit breaker panels,service,switches & boxes,splize boxes, plus defective ,exposed unprotected wires in use throughout the electic closet;also defective in use in the hallway ceiling light fixture
Dec 26, 2017 · Penalty $1,600
Active - Class - 2
Work w/o permit.note:installed non illuminated three signs for law office without permit.the sign have size about (3ft x 5ft) and 2ft x 15ftremedy:comply with code/obtain permit.
Aug 8, 2017 · Penalty $800
Active - Class - 2
Partial swo issued for suspended scaffold pursuant 28-207.2 and postedon premises.failure to notify dept 24hr prior to suspended scaffold installation.noted:at time of inspection suspended scaffold in connectio
Jun 9, 2017 · Penalty $800
Active - Class - 1
Partial swo issued for suspended scaffold pursuant 28-207.2 and postedon premises.supervisors is not present at the site.note:at time of inspection suspended scaffold is being used at exp#4 without suspended sc
Jun 9, 2017 · Penalty $1,600
Active - Class - 2
Failure to file an acceptable 6th round technical report in compliancew/article 28-302 of the building code & dept of bldgs rules & regulations.(36018228x)respondent has demonstrated a history of non-compliance
Jul 20, 2012 · Penalty $2,000
Resolve - Class - 1
Work without permit. noted:on ground flr rear created living quarters accessible only through laundry room quarters have kitchen sink,4 burner gas stove,shower & toilet. emergency egress through window possible
Jan 25, 2012 · Penalty $1,600
Active - Class - 3
Occupancy contrary to bldg dept records noted: at ground level rear living quarters accessible only through laundry room occupied at time ofinspection. remedy: discontinue illegal use.
Jan 25, 2012 · Penalty $400
Active - Class - 3
Work w/o a permit. work noted in apt 5c at west elevation center inst alled a partition approx 8' high x 12' wide at the living room area tomake another room note (access was denied into room to note the use).
Jan 21, 2012 · Penalty $200
Active - Class - 2
Failure to file an acceptable 6th round technical report in compliancew/code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dob's rules & regulations.
Jan 15, 2012 · Penalty $2,000
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations.remed
Apr 15, 2011 · Penalty $2,000
Resolve
Complaints
- Heat/hot water
Entire building
Oct 15, 2026 · Apt 4B
Open - Heat/hot water
Entire building
Oct 13, 2026 · Apt 4B
Close - Heat/hot water
Entire building
Oct 7, 2026 · Apt 4B
Close - Heat/hot water
Entire building
Oct 6, 2026 · Apt 4B
Close - Water leak
Heavy flow
Sep 29, 2026 · Apt 10C
Close - Heat/hot water
Entire building
Sep 28, 2026 · Apt 4B
Close - Paint/plaster
Ceiling
Sep 22, 2026 · Apt 9G
Close - Water leak
Slow leak
Sep 22, 2026 · Apt 9G
Close - Flooring/stairs
Floor
Sep 17, 2026 · Apt 8D
Open - Appliance
Refrigerator
Sep 17, 2026 · Apt 8D
Open
Show 40 more ↓
- General
Cabinet
Sep 17, 2026 · Apt 8D
Open - Heat/hot water
Entire building
Sep 16, 2026 · Apt 4B
Close - Heat/hot water
Entire building
Sep 14, 2026 · Apt 4B
Close - Heat/hot water
Entire building
Sep 11, 2026 · Apt 4B
Close - General
Bell/buzzer/intercom
Sep 3, 2026 · Apt 3H
Close - Plumbing
Bathtub/shower
Sep 3, 2026 · Apt 3H
Close - Water leak
Slow leak
Aug 21, 2026 · Apt 9G
Close - General
Bell/buzzer/intercom
Aug 18, 2026 · Apt 3H
Close - Water leak
Heavy flow
Aug 18, 2026 · Apt 3H
Close - Unsanitary condition
Pests
Aug 18, 2026 · Apt 3H
Close - Electric
Power outage
Jul 24, 2026 · Apt 8GANDH
Close - Unsanitary condition
Mold
Jul 20, 2026 · Apt 3B
Close - Water leak
Slow leak
Jul 20, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Jul 20, 2026 · Apt 3B
Close - Paint/plaster
Ceiling
Jul 20, 2026 · Apt 3B
Close - Plumbing
Water supply
Jul 2, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jul 2, 2026 · Apt 9C
Close - Unsanitary condition
Pests
Jun 29, 2026 · Apt 10BB
Close - Plumbing
Basin/sink
Jun 16, 2026 · Apt 10BB
Close - Paint/plaster
Ceiling
Jun 16, 2026 · Apt 10BB
Close - Paint/plaster
Wall
Jun 16, 2026 · Apt 10BB
Close - Electric
Lighting
Jun 16, 2026 · Apt 10BB
Close - Paint/plaster
Ceiling
Jun 6, 2026 · Apt 4B
Close - Heat/hot water
Entire building
Jun 6, 2026 · Apt 4B
Close - Heat/hot water
Entire building
May 30, 2026 · Apt BLDG
Close - Paint/plaster
Ceiling
May 15, 2026 · Apt 4G
Close - Electric
Lighting
May 15, 2026 · Apt 4G
Close - Water leak
Slow leak
May 15, 2026 · Apt 4G
Close - Heat/hot water
Entire building
May 4, 2026 · Apt BLDG
Close - Plumbing
Water supply
Apr 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 20, 2026 · Apt 8L
Close - Heat/hot water
Entire building
Apr 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Door/window
Door
Mar 18, 2026 · Apt 4B
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt 4B
Close - Heat/hot water
Entire building
Mar 17, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Mar 15, 2026 · Apt 8E
Close - Heat/hot water
Apartment only
Feb 12, 2026 · Apt 2H
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D8)
- Year built
- 1935
- Floors
- 10
- Residential units
- 104
- Building area
- 131,600 ft²
- Lot area
- 20,647 ft²
- Zoning
- R8
- Community board
- 204
- Council district
- 16
- Block / lot
- 2461 / 90
- Assessed value
- $1,920,150
- Landmark / historic district
- Grand Concourse Historic District
HPD registration #200078, last renewed Oct 15, 2025.
Questions about 1000 Grand Concourse
Who owns 1000 Grand Concourse?
The owner of record in NYC Department of City Planning PLUTO data is 1000 LLC.
Does 1000 Grand Concourse have violations?
Yes. NYC HPD has recorded 1,371 housing violations at this property.
Is 1000 Grand Concourse rent stabilized?
NYC Department of Finance tax bills listed 99 rent-stabilized units here in 2024 (about 95% of its 104 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1000 Grand Concourse built?
City records list 1935 as the year it was built.
How many apartments are in 1000 Grand Concourse?
It has 104 residential units and 107 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.