760 Grand Concourse
Bronx, NY 10451BBL 2-02458-0072Map
Owner of record: 760 Grand Concourse Corp
760 Grand Concourse is an elevator apartment building built in 1928 in Bronx, 10451. It has 91 residential units across 6 floors. The owner of record is 760 Grand Concourse Corp. HPD has recorded 393 housing violations here, most recently on October 2, 2026. 50 of the 50 most recent violations are still open. City tax records listed 87 rent-stabilized apartments here in 2024.
- HPD violations
- 393
- DOB violations
- 54
- ECB violations
- 27
- HPD complaints
- 520
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 393
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door at public hall, 4th story
Oct 2, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Oct 2, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 4th room from north at west located at apt 4b, 4th story, 1st apartment from south at west , section ''north''
Oct 2, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective marble saddle at entrance in the bathroom located at apt 4b, 4th story, 1st apartment from south at west , section ''north''
Oct 2, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt 4b, 4th story, 1st apartment from south at west , section ''north''
Oct 2, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the 1st room from north located at apt 4b, 4th story, 1st apartment from south at west , section ''north''
Oct 2, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 4b, 4th story, 1st apartment from south at west , section ''north''
Oct 2, 2026 · Apt 4B
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of free standing steam radiator at public hall, 1st story
Sep 5, 2026
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .... in the bathroom located at apt 10, 1st story, 1st apartment from south at west
Sep 5, 2026 · Apt 10
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq . ft. on north and west walls in the bathroom located at apt 10, 1st story, 1st apartment from south at west
Sep 5, 2026 · Apt 10
Open — Notice of issuance sent to tenant
Show 40 more ↓
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling in the bathroom located at apt 3c, 3rd story, 2nd apartment from south at west
Sep 4, 2026 · Apt 3C
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak at west ceiling in the kitchen located at apt 3c, 3rd story, 2nd apartment from south at west
Sep 4, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3c, 3rd story, 2nd apartment from south at west
Sep 4, 2026 · Apt 3C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3c, 3rd story, 2nd apartment from south at west
Sep 4, 2026 · Apt 3C
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3c, 3rd story, 2nd apartment from south at west
Sep 4, 2026 · Apt 3C
Open — Notice of issuance sent to tenant - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling in the kitchen located at apt 3c, 3rd story, 2nd apartment from south at west
Sep 4, 2026 · Apt 3C
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective outlet cover at north wall in the 4th room from east located at apt 3c, 3rd story, 2nd apartment from south at west
Sep 4, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel tub by way of reglaze in the bathroom located at apt 3c, 3rd story, 2nd apartment from south at west
Sep 4, 2026 · Apt 3C
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft under sink base cabinet in the kitchen located at apt 5n, 5th story, 2nd apartment from east at south
Sep 3, 2026 · Apt 5N
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5n, 5th story, 2nd apartment from east at south
Sep 3, 2026 · Apt 5N
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3g, 3rd story, 2nd apartment from north at east
Aug 28, 2026 · Apt 3G
Open — Notice of issuance sent to tenant - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3g, 3rd story, 2nd apartment from north at east
Aug 28, 2026 · Apt 3G
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from east located at apt 3g, 3rd story, 2nd apartment from north at east
Aug 28, 2026 · Apt 3G
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from south at west wall, 1st closet from south at west wall door, 2nd closet from south at west wall door in the 1st room from east at north located at apt 6k, 6th story, 5th apartment from north at east
Aug 26, 2026 · Apt 6K
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the kitchen located at apt 6k, 6th story, 5th apartment from north at east
Aug 26, 2026 · Apt 6K
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective hard wood floor in the 1st room from east at north located at apt 6k, 6th story, 5th apartment from north at east
Aug 26, 2026 · Apt 6K
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from south at west wall, 1st closet from south at west wall door, 2nd closet from south at west wall door in the 1st room from east at north located at apt 6k, 6th story, 5th apartment from north at east
Aug 26, 2026 · Apt 6K
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door frame from south at west wall, 1st door frame from south at west wall, 1st closet from south at west wall door frame, 2nd closet from south at west wall door frame in the 1st room from east at north located at apt 6k, 6th story, 5th apartment from north at east
Aug 26, 2026 · Apt 6K
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from east at north located at apt 6k, 6th story, 5th apartment from north at east
Aug 26, 2026 · Apt 6K
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from east at north located at apt 6k, 6th story, 5th apartment from north at east
Aug 26, 2026 · Apt 6K
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6k, 6th story, 5th apartment from north at east
Aug 26, 2026 · Apt 6K
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 6k, 6th story, 5th apartment from north at east
Aug 26, 2026 · Apt 6K
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6k, 6th story, 5th apartment from north at east
Aug 26, 2026 · Apt 6K
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 6k, 6th story, 5th apartment from north at east
Aug 26, 2026 · Apt 6K
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the bathroom located at apt 6k, 6th story, 5th apartment from north at east
Aug 26, 2026 · Apt 6K
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from west at north wall, east wall, west wall, south wall in the bathroom located at apt 6k, 6th story, 5th apartment from north at east
Aug 26, 2026 · Apt 6K
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, ceiling in the private hallway located at apt 6k, 6th story, 5th apartment from north at east
Aug 26, 2026 · Apt 6K
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the foyer located at apt 6k, 6th story, 5th apartment from north at east
Aug 26, 2026 · Apt 6K
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from west at north wall, north wall, west wall, ceiling, south wall in the kitchen located at apt 6k, 6th story, 5th apartment from north at east
Aug 26, 2026 · Apt 6K
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from north at east wall in the 1st room from east at north located at apt 6k, 6th story, 5th apartment from north at east
Aug 26, 2026 · Apt 6K
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from east at south wall in the kitchen located at apt 6k, 6th story, 5th apartment from north at east
Aug 26, 2026 · Apt 6K
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from south at west wall, 2nd window frame from north at east wall in the 1st room from east at south located at apt 6k, 6th story, 5th apartment from north at east
Aug 26, 2026 · Apt 6K
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from east at south wall in the bathroom located at apt 6k, 6th story, 5th apartment from north at east
Aug 26, 2026 · Apt 6K
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from west at north wall door frame in the private hallway located at apt 6k, 6th story, 5th apartment from north at east
Aug 26, 2026 · Apt 6K
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from west at north wall door in the private hallway located at apt 6k, 6th story, 5th apartment from north at east
Aug 26, 2026 · Apt 6K
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from south at west wall, 1st door frame from south at west wall in the foyer located at apt 6k, 6th story, 5th apartment from north at east
Aug 26, 2026 · Apt 6K
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower window sash spring balances in the kitchen located at apt 6k, 6th story, 5th apartment from north at east
Aug 26, 2026 · Apt 6K
Open — Civ14 mailed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.
Jul 13, 2026
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Jul 13, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3l, 3rd story, 2nd apartment from north at east
Jul 2, 2026 · Apt 3L
Open — Notice of issuance sent to tenant
DOB building violations · 54
- Immediate emergency anythingoptional
Remedy: install approximately 30 linear feet of sidewalk shed along exposure #4 (east 156th street) to safeguard the public and property from potential falling debris
Jul 6, 2026
Dob violation - dismissed - Construction other optional
Noted section of brick 1x5 ft next to window on 2nd floor exp 4 side along 156 street has displaced and fallen to ground. inspection of entire facade needed to check for detached brick
Jul 4, 2026
Dob violation - active - Construction other optional
Emergency work order due to loose/detached metal guard rail at roof level facing exposure 1 (w. elev) grand concourse. remedy: immediately repair loose/detached metal. provide safety measures under supervision of nys registered licensed design professional
Aug 1, 2025
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jun 26, 2024
Dob violation - active - Construction other optional
Emerg work ord due to cracked facade masonry bricks at mult location btw 2 & roof. all exp. exp1(w elev), exp2(n ele),exp3 (e elev) exp4(s ele). remedy: immediately take& provide saf measures to security & pro tect the pub & install public protection at exp1(2) & exp2(n ele).make immed repairs under supervision of lic prof.rem/secure loose material
Apr 19, 2024
Dob violation - active - Landmark none
Landmk-landmark none
Aug 25, 2023
Dob violation - active - Landmark none
Landmk-landmark none
Aug 25, 2023
Dob violation - active - Landmark none
Landmk-landmark none
Aug 25, 2023
Dob violation - active - Landmark none
Landmk-landmark none
Aug 25, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed
Show 40 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jul 8, 2019
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 8, 2019
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2016 cat 1 insp/tst
Jan 26, 2018
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 24, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 24, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 25, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 25, 2015
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 4, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 4, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 2, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 2, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 26, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 26, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 24, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 24, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 13, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 13, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 6, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 6, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 11, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 11, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 6, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 6, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 6, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 19, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 19, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 19, 2004
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 31, 2003
Dob violation - resolved - Elevator elevatorrequired
2p70
Dec 6, 2002
Dob violation - resolved - Elevator elevatorrequired
2p69
Dec 6, 2002
Dob violation - resolved - Elevator elevatorrequired
2p70
Mar 7, 2002
Dob violation - resolved - Elevator elevatorrequired
2p69
Mar 7, 2002
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boiler boiler optional
B-boiler boiler optional
Jul 24, 1997
Vh*-violation hazardous dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 27
- Class - 1
Failure to maintain exterior building facade and appurtenances. note: at the time of inspection observed 1(1)broken/cracked window glass at 4th and 5th floor at exp #1(west elev). remedy: maintain exterior buil
Sep 12, 2026 · Penalty $5,000
Active - Class - 1
Failure to provide unobstructed exit passageway. note: at the time of inspection observed many water bottles(big sizes) on fire escape at exp #4(south elev.). remedy: remove obstruction.
Sep 12, 2026 · Penalty $2,500
Active - Class - 2
Class 2 items: in-car communication inoperative asme a17.1 section 8.6, no access to elevator machine room asme a17.1 section 8.11, provide to correct proper fastening of the ropes on counterweight and car, pro
Jul 28, 2026 · Penalty $625
Resolve - Class - 1
Cease use item cease use item: door zone restrictor inoperative, creating a hazardous condition per 1rcny11-02. remedy: restore to service immediatley and e-mail the elevator division at [email protected] f
Jul 28, 2026 · Penalty $1,250
Resolve - Class - 1
Noted section of brick 1x5 ft next to window on 2nd floor exp 4 side along 156 street has displaced and fallen to ground. loose brick creates hazard to pedestrians, repair and/replace; install 40 linear shed al
Jul 4, 2026 · Penalty $2,530
Resolve - Class - 2
Failure to conduct or file a final isnpection of permittied work with the department. atoi at #1f 769 grand concourse bronx ny job #220764334-01-ew-01 which expired on 1-31-2021 has not been closed. 1-signed-of
May 29, 2024 · Penalty $6,250
Active - Class - 1
Failure to maintain exterior building facade and appurtenances.note:observed(1)at exposure#1(west elev),exp#2(nort),exposure#3(east elev)andexposure#4(south elev)cracked facade masonry bricks,stepped cracks and
Apr 19, 2024 · Penalty $12,500
Active - Class - 2
Observed in basement soil stack broken and back up on sewer line, repair and/or replace
Jun 13, 2023 · Penalty $1,562
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation#39015121l issued on 11/19/2019 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.no permit or applicati
May 10, 2021
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons.violation #39015121l issued on 11-19-19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.work without a permit c
Mar 11, 2021
Resolve
Show 17 more ↓
- Class - 1
Failure to comply w/ commissioner's order contained in summons/violation#39015121l issued on 1/19/19 & to file certificate of correction pursuant to 28-201.1&1rcny102-01.work w/o permit.comply w/ commissioner's
Jan 13, 2021
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons.violation #39015121l issued on 11-19-19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-02.b101: wor without a perm
Oct 15, 2020
Resolve - Class - 2
Failure to provide approved/accepted plan at job site at time of inspection. premises under alt-2 job#220704334 loc folder. at time of inspection no plan provided at job site to conduct inspection. remedy:provi
Sep 28, 2020
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation#39015121l issued on 11/19/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.b101:work w/o a permit.
Aug 20, 2020
Resolve - Class - 1
Work without a permit. at time of inspection, i noticed pipes were removed, and new pipes installed without a permit or approvals from dob, obtain permit; obtain permit.
Nov 19, 2019
Resolve - Class - 2
Work w/o a permit.noted: awning,apprx 16'wide x 3'high x 3'overhang across sidewalk, is of indeterminate weight and matl; with inscription"la reina del sur restaurant" was done with a permit.note:restaurant
Aug 19, 2015
Resolve - Class - 3
Failure to maintain buidling in code compliant manner.noted:exposed electrical cable & wires (in open boxes) under illegal awning,along east156th street. remedy: comply with the notice of violation.
Aug 19, 2015
Resolve - Class - 2
Work w/o a permit work.noted:removed a 13"x13" section of brick install exhasust.from 1 flr to roof installed an exhaust 13"x13" duct work.note:work was done @ grocery store on 156 st.rem:obtain permit.
Feb 18, 2012 · Penalty $800
Resolve - Non-hazardous
Occupancy contrary to special grand concourse preservation zoning district as per certificate of occupancy#100.legal use :residential tenement illegal use:commercial:neopeds medical service.remedy:discontinue i
Aug 22, 2003 · Penalty $480
Resolve - Non-hazardous
Occupancy contrary to that allowed by the certificate of occupancy # 100 location:first floor from legal use:multiple dwelling to illegal use:neopeds medical service.remedy;discontinue illegal use.
Aug 22, 2003
Resolve - Non-hazardous
Occupancy contrary to special grand concourse preservation zoning district as per certificate of occupancy #1841. legal use: residential illegal use: commercial-bn cleaners. remedy: discontinue illegal use and
Aug 22, 2003
Resolve - Non-hazardous
Occupancy contrary to that allowed by the certificate of occupancy #1841. location: first floor from legal use: multiple dwelling to illegal use: bn cleaners. remedy: discontinue illegal use.
Aug 22, 2003
Resolve - Non-hazardous
39i7/ 52y2/ 32m7/ 62o2/ 63o2/ 64o2/ (39) provide missing cover on contract on controller (32) exposed wires on top of car provide cover
Nov 19, 2002
Resolve - Non-hazardous
62o2/ 66k10/ 67k10/ 32m7/ 16b1/ 39g7/ 39g9/ 48k12/ 63o2/ 64o2/(32) exposed wire under provide cover (16) adjust bment hoistway door closers all floors (39) provide proper fuse 10 any or remove wire jump
Nov 19, 2002 · Penalty $180
Resolve - Non-hazardous
Regarding 37 you were notified thru official notice for internal inspection.but you failed to arrange the boiler for said inspection.submit proof of internal inspection for 1999-2000.
Mar 7, 2000 · Penalty $350
Resolve - Non-hazardous
36,49. 36-boiler not registered. 49-replace boiler.
Jan 9, 1998 · Penalty $400
Resolve - Non-hazardous
Failure to maintain exterior building wall defect is broken and defective and missing mortor joints on concrete sill under south east cornerat 3rd story window. remedy:make all necessary repairs.
Aug 23, 1993
Resolve
Complaints
- Heat/hot water
Apartment only
Oct 23, 2026 · Apt 2E
Open - Unsanitary condition
Pests
Oct 23, 2026 · Apt 6G
Open - Plumbing
Basin/sink
Oct 23, 2026 · Apt 6G
Open - Electric
Lighting
Oct 23, 2026 · Apt 6G
Open - Flooring/stairs
Floor
Oct 23, 2026 · Apt 6G
Open - Water leak
Slow leak
Oct 23, 2026 · Apt 6G
Open - Heat/hot water
Entire building
Oct 23, 2026 · Apt 1B
Open - Heat/hot water
Entire building
Oct 23, 2026 · Apt 5P
Open - Heat/hot water
Entire building
Oct 22, 2026 · Apt 3C
Open - Heat/hot water
Entire building
Oct 19, 2026 · Apt BLDG
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Oct 1, 2026 · Apt 4B
Close - Flooring/stairs
Floor
Oct 1, 2026 · Apt 4B
Close - Paint/plaster
Wall
Oct 1, 2026 · Apt 4B
Close - Paint/plaster
Ceiling
Oct 1, 2026 · Apt 4B
Close - Plumbing
Toilet
Sep 21, 2026 · Apt 1L
Close - Plumbing
Bathtub/shower
Sep 21, 2026 · Apt 1L
Close - Unsanitary condition
Garbage/recycling storage
Sep 15, 2026 · Apt BLDG
Close - Flooring/stairs
Floor
Aug 24, 2026 · Apt 6K
Close - Paint/plaster
Ceiling
Aug 24, 2026 · Apt 6K
Close - Paint/plaster
Ceiling
Aug 24, 2026 · Apt 6K
Close - Plumbing
Toilet
Aug 23, 2026 · Apt 10
Close - Unsanitary condition
Mold
Aug 23, 2026 · Apt 10
Close - Water leak
Heavy flow
Aug 20, 2026 · Apt 6J
Close - General
Cabinet
Aug 11, 2026 · Apt 3G
Close - Paint/plaster
Wall
Aug 11, 2026 · Apt 3G
Close - Unsanitary condition
Mold
Aug 10, 2026 · Apt 3C
Close - Door/window
Window pane
Aug 10, 2026 · Apt 3C
Close - General
Cabinet
Aug 4, 2026 · Apt 3G
Close - Water leak
Damp spot
Aug 4, 2026 · Apt 3G
Close - Unsanitary condition
Garbage/recycling storage
Jul 13, 2026 · Apt BLDG
Close - General
Janitor/super
Jul 4, 2026 · Apt 5O
Close - Unsanitary condition
Sewage
Jul 3, 2026 · Apt 1M
Close - Unsanitary condition
Sewage
Jun 30, 2026 · Apt 1M
Close - Unsanitary condition
Garbage/recycling storage
Jun 24, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jun 24, 2026 · Apt BASMEN
Close - General
Janitor/super
Jun 22, 2026 · Apt APT5P
Close - Heat/hot water
Apartment only
Jun 1, 2026 · Apt 5P
Close - Unsanitary condition
Pests
Jun 1, 2026 · Apt LOBBY
Close - Heat/hot water
Entire building
Jun 1, 2026 · Apt 6E
Close - Water leak
Slow leak
May 30, 2026 · Apt 1L
Close - General
Ventilation system
May 28, 2026 · Apt 5N
Close - Electric
Wiring
May 28, 2026 · Apt 5N
Close - Water leak
Damp spot
May 28, 2026 · Apt 5N
Close - Unsanitary condition
Pests
May 28, 2026 · Apt 1A
Close - Flooring/stairs
Floor
May 28, 2026 · Apt 5N
Close - Unsanitary condition
Garbage/recycling storage
May 27, 2026 · Apt 3L
Close - Unsanitary condition
Pests
May 27, 2026 · Apt 3L
Close - Unsanitary condition
Garbage/recycling storage
May 25, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
May 16, 2026 · Apt BASEME
Close - Unsanitary condition
Pests
May 11, 2026 · Apt 2N
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 1928
- Floors
- 6
- Residential units
- 91
- Building area
- 126,760 ft²
- Lot area
- 25,299 ft²
- Zoning
- R8
- Community board
- 204
- Council district
- 16
- Block / lot
- 2458 / 72
- Assessed value
- $1,777,050
- Landmark / historic district
- Grand Concourse Historic District
HPD registration #206487, last renewed Jul 7, 2025.
Questions about 760 Grand Concourse
Who owns 760 Grand Concourse?
The owner of record in NYC Department of City Planning PLUTO data is 760 Grand Concourse Corp.
Does 760 Grand Concourse have violations?
Yes. NYC HPD has recorded 393 housing violations at this property.
Is 760 Grand Concourse rent stabilized?
NYC Department of Finance tax bills listed 87 rent-stabilized units here in 2024 (about 96% of its 91 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 760 Grand Concourse built?
City records list 1928 as the year it was built.
How many apartments are in 760 Grand Concourse?
It has 91 residential units and 96 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.