361 East 163 Street
Bronx, NY 10451BBL 2-02424-0110Map
Owner of record: East 163 LLC
361 East 163 Street is a walk-up apartment building built in 1929 in Bronx, 10451. It has 59 residential units across 5 floors. The owner of record is East 163 LLC. HPD has recorded 2,983 housing violations here, most recently on October 10, 2026. 27 of the 50 most recent violations are still open. City tax records listed 59 rent-stabilized apartments here in 2024.
- HPD violations
- 2,983
- DOB violations
- 7
- ECB violations
- 9
- HPD complaints
- 3,651
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 2,983
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 4th room from east located at apt 5h, 5th story, 1st apartment from south at west
Oct 10, 2026 · Apt 5H
Open — Violation open - BHazardous
Repair the roof so that it will not leak above the ceiling in the 4th room from east located at apt 5h, 5th story, 1st apartment from south at west
Oct 10, 2026 · Apt 5H
Open — Violation open - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east located at apt 3b, 3rd story, 1st apartment from south at west
Sep 14, 2026 · Apt 3B
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective floor in the kitchen located at apt 3b, 3rd story, 1st apartment from south at west
Sep 14, 2026 · Apt 3B
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective refrigerator seal in the kitchen located at apt 3b, 3rd story, 1st apartment from south at west
Sep 14, 2026 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly at building entrance door at basement, section ''361''
Sep 5, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door at basement, section ''361''
Sep 5, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tile at floor in the 2nd room from north located at apt 3b, 3rd story, 1st apartment from west at north
Jul 28, 2026 · Apt 3B
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 1st apartment from west at north
Jul 28, 2026 · Apt 3B
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper chute door at public hall, section ''357''
Jul 22, 2026
Open — Not complied with
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective latch set and assemblies at building entrance door at 1st story (section 361)
Jul 22, 2026
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door at 1st story (section 361)
Jul 22, 2026
Open — Not complied with - ANon-hazardous
Cleanse to the satisfaction of this department the mold in grout at east wall in the bathroom located at apt 3b, 3rd story, 1st apartment from south at west
Jul 15, 2026 · Apt 3B
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective wooden floor in the 2nd room from east located at apt 3b, 3rd story, 1st apartment from south at west
Jul 15, 2026 · Apt 3B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east, the kitchen , the 4th room from east located at apt 3b, 3rd story, 1st apartment from south at west
Jul 15, 2026 · Apt 3B
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 1o square feet at the south wall in the 4th room from east located at apt 5h, 5th story, 1st apartment from south at west
Jul 10, 2026 · Apt 5H
Open — Invalid certification - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the kitchen located at apt 5h, 5th story, 1st apartment from south at west
Jul 10, 2026 · Apt 5H
Open — Invalid certification - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 2nd room from east located at apt 5h, 5th story, 1st apartment from south at west
Jul 10, 2026 · Apt 5H
Open — Invalid certification - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east, the bathroom located at apt 5h, 5th story, 1st apartment from south at west
Jul 10, 2026 · Apt 5H
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5h, 5th story, 1st apartment from south at west
Jul 10, 2026 · Apt 5H
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from east at south wall, west wall in the kitchen located at apt 5h, 5th story, 1st apartment from south at west
Jul 10, 2026 · Apt 5H
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the 2nd room from east located at apt 5h, 5th story, 1st apartment from south at west
Jul 10, 2026 · Apt 5H
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over the ceiling in the 4th room from east located at apt 5h, 5th story, 1st apartment from south at west
Jul 10, 2026 · Apt 5H
Closed — Violation dismissed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 24, 2026
Open — Not complied with - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 2nd window frame from west at north wall in the 2nd room from east located at apt 3b, 3rd story, 1st apartment from south at west , section ''367''
Jun 24, 2026 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 4th room from east located at apt 3b, 3rd story, 1st apartment from south at west , section ''367''
Jun 24, 2026 · Apt 3B
Closed — Violation closed - ANon-hazardous
Properly secure the loose vinyl tiles at floor in the 2nd room from east located at apt 3b, 3rd story, 1st apartment from south at west , section ''367''
Jun 24, 2026 · Apt 3B
Open — Not complied with - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jun 7, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jun 7, 2026
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 4th story balcony at 3rd fire escape from south at east exterior wall at fire escape
Jun 7, 2026
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items and flower pots at 2nd story balcony at south exterior wall at fire escape
Jun 7, 2026
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air condition unit protruding beyond window sill at 3rd story balcony window 1st fire escape from south at east exterior wall at fire escape
Jun 7, 2026
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 3rd , 4th and 5th story balconies at 2nd fire escape from south at east exterior wall at fire escape
Jun 7, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch and its assembly at entrance door ( street to vestibule ) at public hall, 1st story
Jun 7, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at entrance door-(from street to vestibule) at public hall, 1st story
Jun 7, 2026
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from west at north wall in the kitchen located at apt 3b, 3rd story, 1st apartment from south at west , section ''367''
May 31, 2026 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the kitchen located at apt 3b, 3rd story, 1st apartment from south at west , section ''367''
May 31, 2026 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame, 1st door frame from north at east wall, 1st window frame from south at west wall in the 4th room from east located at apt 3b, 3rd story, 1st apartment from south at west , section ''367''
May 31, 2026 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame in the private hallway located at apt 3b, 3rd story, 1st apartment from south at west , section ''367''
May 31, 2026 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 3b, 3rd story, 1st apartment from south at west , section ''367''
May 31, 2026 · Apt 3B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, 1st window frame from west at north wall in the 2nd room from east located at apt 3b, 3rd story, 1st apartment from south at west , section ''367''
May 31, 2026 · Apt 3B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east located at apt 5h, 5th story, 1st apartment from south at west
May 31, 2026 · Apt 5H
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective marble tread 1st ,6th and 7th from bottom at public hall, 3rd story
May 31, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective marble tread 6th from bottom at 1st public hall bulkhead from north, 6th story
May 31, 2026
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling in the 4th room from east located at apt 5h, 5th story, 1st apartment from south at west
May 31, 2026 · Apt 5H
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, 1st door frame from south at west wall in the foyer located at apt 3b, 3rd story, 1st apartment from south at west , section ''367''
May 31, 2026 · Apt 3B
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of discarted house hold items at public hall, 2nd story
May 23, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles under water closet in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east
May 23, 2026 · Apt 3B
Closed — Violation closed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east
May 23, 2026 · Apt 3B
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at south wall in the bathroom located at apt 3b, 3rd story, 1st apartment from north at east
May 23, 2026 · Apt 3B
Closed — Violation closed
DOB building violations · 7
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Construction other optional
Due to fire
Feb 3, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2010 inspection report
Dec 13, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed
ECB violations · 9
- Class - 2
Failure to comply w/the comm's order contained in summons/vio#39036215p issued on 02/11/21 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. for failure to comply w/vacate order#x029/2019 issu
Apr 1, 2021 · Penalty $625
Resolve - Class - 1
Failure to comply with vacate order- x029/2019, issued-02/03/2019 for entire 5th floor. at time of appointment, building was fully renovated. however, observed 3 "class a" unit- 5k, 5i & 5h on 5th floor level i
Feb 11, 2021 · Penalty $4,800
Resolve - Class - 2
Failure to maintain building in code compliant manner. at time of appointment inspection, observed, at 5th floor level- 5h apartment's bedroom, closet and bathroom's celling and side wall have cracks, mold, pee
Feb 11, 2021
Resolve - Class - 1
Failure to maintain adequate housekeeping during construction operations. large quantity of combustible debris at front fire passageway below fire escape. rmdy: stop all work remove debris immediately.
Mar 27, 2019
Resolve - Class - 2
Work does not conform to approved plans.job number 220677346 non- conforming work noted. 1) complete removal of fire rated material at walls and ceilings at numerous apartment 2) new metal frame
Mar 17, 2019
Resolve - Class - 2
B254/42/44c/50a/50b/50c/16/50d/50a-peephole, glass broken/50b-flue pipe not properly sealed to chimney/50c-flue pipe need support/50d-removewaste oil form boiler room/50e-oil pump leaking
Nov 20, 2010 · Penalty $500
Resolve - Non-hazardous
Exit passageway:total obstruction:at front both windows @ 2fl are totally obstructed w/full height metal window guards.at rear,one window istotally obstructed w/full height metal windows guards.all windows ment
Feb 2, 2007
Resolve - Hazardous
Failure to file 10f prior to start of controlled work remedy file 10f form forthwith failure to file 10e controlled inspection report after completion of controlled work. remedy: file 10e form forthwith. note t
Jul 26, 1991 · Penalty $10,000
Resolve - Hazardous
Failrue to file 10f prior to start of controlled work remed file 10f form forthwith failure to file 10e controlled inspection report after completion of controlled work remedy file 10e form forthwith
Oct 10, 1990 · Penalty $1,000
Resolve
Complaints
- Water leak
Heavy flow
Oct 8, 2026 · Apt 3B
Open - Flooring/stairs
Floor
Oct 8, 2026 · Apt 3B
Open - Flooring/stairs
Floor
Oct 8, 2026 · Apt 3B
Open - Paint/plaster
Wall
Oct 8, 2026 · Apt 3B
Open - Plumbing
Bathtub/shower
Oct 5, 2026 · Apt 1I
Open - Door/window
Window frame
Oct 5, 2026 · Apt 1I
Open - Paint/plaster
Wall
Oct 5, 2026 · Apt 1I
Open - Safety
Smoke detector
Oct 5, 2026 · Apt 1I
Open - Electric
Outlet/switch
Oct 5, 2026 · Apt 1I
Open - Door/window
Door frame
Oct 5, 2026 · Apt 1I
Open
Show 40 more ↓
- Water leak
Heavy flow
Oct 3, 2026 · Apt 3B
Open - Paint/plaster
Ceiling
Oct 1, 2026 · Apt 5H
Open - Water leak
Heavy flow
Oct 1, 2026 · Apt 5H
Open - Water leak
Damp spot
Sep 29, 2026 · Apt 3B
Close - Flooring/stairs
Floor
Sep 29, 2026 · Apt 3B
Close - Appliance
Refrigerator
Sep 29, 2026 · Apt 3B
Close - Paint/plaster
Wall
Sep 29, 2026 · Apt 3B
Close - Paint/plaster
Ceiling
Sep 29, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Sep 2, 2026 · Apt W1
Close - Paint/plaster
Wall
Aug 29, 2026 · Apt 3B
Close - Safety
Carbon monoxide detector
Aug 10, 2026 · Apt APTW1
Close - Safety
Smoke detector
Aug 10, 2026 · Apt APTW1
Close - Flooring/stairs
Floor
Aug 8, 2026 · Apt 3B
Close - Flooring/stairs
Floor
Aug 8, 2026 · Apt 3B
Close - Paint/plaster
Wall
Aug 8, 2026 · Apt 3B
Close - Plumbing
Toilet
Aug 8, 2026 · Apt 3B
Close - Paint/plaster
Wall
Aug 8, 2026 · Apt 3B
Close - Paint/plaster
Wall
Jul 14, 2026 · Apt 3B
Close - Flooring/stairs
Floor
Jul 14, 2026 · Apt 3B
Close - Paint/plaster
Wall
Jul 14, 2026 · Apt 3B
Close - Plumbing
Toilet
Jul 14, 2026 · Apt 3B
Close - Unsanitary condition
Mold
Jul 14, 2026 · Apt 3B
Close - Water leak
Heavy flow
Jun 29, 2026 · Apt 5
Close - Flooring/stairs
Floor
Jun 18, 2026 · Apt 3B
Close - Paint/plaster
Wall
Jun 18, 2026 · Apt 3B
Close - Appliance
Electric/gas range
Jun 18, 2026 · Apt 3B
Close - Appliance
Electric/gas range
Jun 16, 2026 · Apt 3D
Close - Flooring/stairs
Floor
Jun 16, 2026 · Apt 3D
Close - Appliance
Refrigerator
Jun 16, 2026 · Apt 3D
Close - Paint/plaster
Wall
Jun 16, 2026 · Apt 3D
Close - Paint/plaster
Wall
Jun 16, 2026 · Apt 3D
Close - Appliance
Electric/gas range
Jun 11, 2026 · Apt 3B
Close - Appliance
Refrigerator
Jun 11, 2026 · Apt 3B
Close - Electric
Outlet/switch
Jun 10, 2026 · Apt 1I
Close - Door/window
Door
Jun 10, 2026 · Apt 1I
Close - Safety
Smoke detector
Jun 10, 2026 · Apt 1I
Close - Plumbing
Toilet
May 26, 2026 · Apt 3B
Close - Paint/plaster
Wall
May 26, 2026 · Apt 3B
Close - Water leak
Slow leak
May 26, 2026 · Apt 3B
Close - Appliance
Refrigerator
May 26, 2026 · Apt 2I
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1929
- Floors
- 5
- Residential units
- 59
- Building area
- 42,000 ft²
- Lot area
- 17,113 ft²
- Zoning
- R7-1
- Community board
- 204
- Council district
- 16
- Block / lot
- 2424 / 110
- Assessed value
- $1,448,100
- Landmark / historic district
- No
HPD registration #215560, last renewed Aug 30, 2025.
Questions about 361 East 163 Street
Who owns 361 East 163 Street?
The owner of record in NYC Department of City Planning PLUTO data is East 163 LLC.
Does 361 East 163 Street have violations?
Yes. NYC HPD has recorded 2,983 housing violations at this property.
Is 361 East 163 Street rent stabilized?
NYC Department of Finance tax bills listed 59 rent-stabilized units here in 2024 (about 100% of its 59 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 361 East 163 Street built?
City records list 1929 as the year it was built.
How many apartments are in 361 East 163 Street?
It has 59 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.