286 East 163 Street
Bronx, NY 10451BBL 2-02422-0015Map
Owner of record: 286 East 163rd Street, LLC
286 East 163 Street is an elevator apartment building built in 2022 in Bronx, 10451. It has 18 residential units across 4 floors. The owner of record is 286 East 163rd Street, LLC. HPD has recorded 9 housing violations here, most recently on October 16, 2026. 6 of the 9 most recent violations are still open. City tax records listed 18 rent-stabilized apartments here in 2024.
- HPD violations
- 9
- DOB violations
- 0
- ECB violations
- 16
- HPD complaints
- 24
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 9
- ANon-hazardous
Trace and repair the source and abate the visible mold condition... observed less than 10sq ft at east wall. in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south
Oct 16, 2026 · Apt 2C
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective mechanical ventilation system at cealing. in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south
Oct 16, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ventilation system at ceiling in the kitchen located at apt 1b, 1st story, 1st apartment from north at east
Oct 6, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroom located at apt 1b, 1st story, 1st apartment from north at east
Feb 11, 2026 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latchset in the entrance located at apt 1b, 1st story, 1st apartment from north at east
Feb 11, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latchset and assemblies at door in the entrance located at apt 1b, 1st story, 1st apartment from north at east
Feb 11, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Mar 21, 2025
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story
Mar 21, 2025
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 18, 2024
Closed — Violation dismissed
DOB building violations · 0
No DOB violations on record
ECB violations · 16
- Class - 2
At the time of inspection 6 stories nb i observed 1st fl framing required steel beam w12x 22 used w10x22 at cl b. e-w direction, on 2nd fl framing required to install w12x22 n-s direc at staircase area they use
Jun 21, 2023
Resolve - Class - 1
At the time of inspection 6 stories nb i observed facade work was completed @ exp#1 as well bulked site was on fswo on 06-02-2023 by inspector d cohen denied access. under cm# 2366890 comparing with previous in
Jun 21, 2023 · Penalty $5,000
Resolve - Class - 2
Active construction site. ongoing stuco work at exposure #1 by 3 workers, when i tried to get into the site, gate was padlocked and access was denied. the gc and cs both could not be reached through their phone
Jun 2, 2023 · Penalty $1,250
Resolve - Class - 2
6 story nb active site at 4 fl concrete pour.observed cold form steel in place on cellar,1,2,3 floors. observed missing blocking in place. no details for blocking with double flange attached to cold form steel.
Feb 13, 2023
Resolve - Class - 2
6 story nb active site at 4 fl concrete pour.i observed cold form steel in place on cellar,1,2,3 floors. observed missing blocking in place in separate areas.plans onsite pg s-005.01/004.02/002.02/001.02 inadeq
Feb 13, 2023
Resolve - Class - 2
A 6 story nb active site at 4 fl concrete pour. i observed cold form steel in place on all floors. upon request to contractor or competent person onsite fo special inspections report or technical report tr-1.no
Feb 13, 2023
Resolve - Class - 2
A proposed 6 story nb active site at concrete pouring faze on 4 floor working deck. i observed no concrete washout box in place or onsite. observed unfiltered concrete chemicals water mix along street going apr
Feb 13, 2023 · Penalty $2,500
Resolve - Class - 1
Observed ongoing installation of cmu blocks at exposure 2 2nd floor of jobsite. the work in place is approx. 5 feet away from adjoining property with no protection provided to the windows of said property.*swo
Jan 9, 2023
Resolve - Class - 1
Observed cold form steel 1st floor exposure 1 of jobsite. upon review of dob approved drawings observed that in details of s-1 & s-3 that structural 1 beam is to be installed however it is not provided. * stop
Jan 9, 2023
Resolve - Class - 1
Observed ongoing construction operations with approx. 10 workers on jobsite. upon review on bis and dob now, it was observed that nb permit 220717927 has not yet been issued. *stop all work entire jobsiteobtain
Jan 9, 2023
Resolve
Show 6 more ↓
- Class - 1
Observed on newly poured 2nd floor large amounts of construction tools and materials (cement mixer, cmu blocks and frame scaffold). upon requesting for loads capacity letter from pe stating the floor can withst
Jan 9, 2023
Resolve - Class - 1
Observed on going construction operations on jobsite. upon inspection observed that all fire extinguishers on jobsite are inadequate (missing fdny inspection tags, discharged, pulled pins and incorrect size)pro
Jan 9, 2023
Resolve - Class - 2
A 4 story nb at soe phase active site. support of excavation work at exp4. observed work contrary to plans pg003.02 missing lower horizontal whaler connections from raker to adjoining property rubble wall. exis
Sep 21, 2022
Resolve - Class - 1
Bc1704.1.2 sia failed to perform duties-spc insp report submitted to dept dated1/19/21,signed&sealed by respondent,checked "pass" for insp item "underpinning box pits checked".however,photos included in report
Apr 4, 2022 · Penalty $2,500
Resolve - Class - 1
Bc1704.1.2 sia failed to perform duties-spc insp report submitted to dept dated1/6/21,signed&sealed by respondent,checked "pass" for insp item "underpinning box pits checked" however,photos included in report s
Apr 4, 2022 · Penalty $2,500
Resolve - Class - 1
Failure to protect adjoining structures during excavation.at time of inspection of excavation proposed 6 story new building review of approved document for underpining operation and drawing are not sufficient t
Feb 17, 2022 · Penalty $5,000
Resolve
Complaints
- Electric
No lighting
Oct 16, 2026 · Apt 4A
Close - Electric
Power outage
Oct 15, 2026 · Apt 2C
Close - Unsanitary condition
Pests
Sep 28, 2026 · Apt 1B
Close - General
Ventilation system
Sep 28, 2026 · Apt 1B
Close - General
Janitor/super
Sep 28, 2026 · Apt 1B
Close - Unsanitary condition
Garbage/recycling storage
Sep 28, 2026 · Apt 1B
Close - Plumbing
Basin/sink
Aug 23, 2026 · Apt 2A
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Paint/plaster
Wall
Jan 15, 2026 · Apt 1B
Close - General
Ventilation system
Jan 15, 2026 · Apt 1B
Close
Show 14 more ↓
- Door/window
Door
Jan 15, 2026 · Apt 1B
Close - Unsanitary condition
Pests
Jan 15, 2026 · Apt 1B
Close - General
Cabinet
Jan 15, 2026 · Apt 1B
Close - Plumbing
Toilet
Jan 15, 2026 · Apt 1B
Close - Flooring/stairs
Floor
Jan 15, 2026 · Apt 1B
Close - Heat/hot water
Entire building
Dec 13, 2025 · Apt BLDG
Close - Unsanitary condition
Sewage
Nov 24, 2025 · Apt BASEME
Close - Unsanitary condition
Mold
Nov 24, 2025 · Apt BASEME
Close - Unsanitary condition
Pests
Nov 24, 2025 · Apt BASEME
Close - General
Ventilation system
Nov 24, 2025 · Apt BASEME
Close - General
Signage missing
Mar 21, 2025 · Apt BLDG
Close - Safety
Fire escape
Mar 21, 2025 · Apt BLDG
Close - General
Signage missing
Nov 27, 2024 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Nov 27, 2024 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2022
- Floors
- 4
- Residential units
- 18
- Building area
- 12,000 ft²
- Lot area
- 1,898 ft²
- Zoning
- R7-1
- Community board
- 204
- Council district
- 16
- Block / lot
- 2422 / 15
- Assessed value
- $961,200
- Landmark / historic district
- No
HPD registration #228933, last renewed Aug 26, 2025.
Questions about 286 East 163 Street
Who owns 286 East 163 Street?
The owner of record in NYC Department of City Planning PLUTO data is 286 East 163rd Street, LLC.
Does 286 East 163 Street have violations?
Yes. NYC HPD has recorded 9 housing violations at this property.
Is 286 East 163 Street rent stabilized?
NYC Department of Finance tax bills listed 18 rent-stabilized units here in 2024 (about 100% of its 18 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 286 East 163 Street built?
City records list 2022 as the year it was built.
How many apartments are in 286 East 163 Street?
It has 18 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.