340 East 151 Street
Bronx, NY 10451BBL 2-02410-0040Map
Owner of record: Lord & Rocce Enterpr
340 East 151 Street is a walk-up apartment building built in 1911 in Bronx, 10451. It has 31 residential units across 5 floors. The owner of record is Lord & Rocce Enterpr. HPD has recorded 298 housing violations here, most recently on June 10, 2026. 5 of the 50 most recent violations are still open. City tax records listed 31 rent-stabilized apartments here in 2024.
- HPD violations
- 298
- DOB violations
- 9
- ECB violations
- 9
- HPD complaints
- 234
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 298
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north, the bathroom located at apt 23, 4th story, 2nd apartment from south at west
Jun 10, 2026 · Apt 23
Open — Civ14 mailed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall in the foyer located at apt 23, 4th story, 2nd apartment from south at west
Jun 10, 2026 · Apt 23
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door frame from north at east wall in the foyer located at apt 23, 4th story, 2nd apartment from south at west
Jun 10, 2026 · Apt 23
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 23, 4th story, 2nd apartment from south at west
Jun 10, 2026 · Apt 23
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 23, 4th story, 2nd apartment from south at west
Jun 10, 2026 · Apt 23
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the 1st room from north, the 1st private hallway from north located at apt 26, 5th story, 2nd apartment from north at east
Jun 10, 2026 · Apt 26
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 26, 5th story, 2nd apartment from north at east
Jun 10, 2026 · Apt 26
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower sash at window at east in the 1st private hallway from north located at apt 5, 2nd story, 2nd apartment from north at east
Jun 8, 2026 · Apt 5
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the foyer , the bathroom located at apt 5, 2nd story, 2nd apartment from north at east
Jun 8, 2026 · Apt 5
Closed — Violation closed - ANon-hazardous
Refit upper sash at window at east in the 3rd room from north located at apt 5, 2nd story, 2nd apartment from north at east
Jun 8, 2026 · Apt 5
Closed — Violation closed
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective connection between intercom panel at entrance of building and intercom panel at south wall in the foyer located at apt 5, 2nd story, 2nd apartment from north at east
Jun 8, 2026 · Apt 5
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5, 2nd story, 2nd apartment from north at east
Jun 8, 2026 · Apt 5
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective porcelain finish in bathtub in the bathroom located at apt 5, 2nd story, 2nd apartment from north at east
Jun 8, 2026 · Apt 5
Closed — Violation closed - ANon-hazardous
Replace the broken or defective ceramic washbasin bowl in the bathroom located at apt 5, 2nd story, 2nd apartment from north at east
Jun 8, 2026 · Apt 5
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the mold at tiled/grouted surfaces at north wall, east wall in the bathroom located at apt 5, 2nd story, 2nd apartment from north at east
Jun 8, 2026 · Apt 5
Closed — Violation closed - BHazardous
Abate the nuisance consisting of pests. evidence of spiders in the entire apartment located at apt 5, 2nd story, 2nd apartment from north at east
Jun 8, 2026 · Apt 5
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electric outlet at north wall in the 2nd room from north located at apt 5, 2nd story, 2nd apartment from north at east
Jun 8, 2026 · Apt 5
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from east at south wall, 1st window frame from west at north wall in the kitchen located at apt 21, 4th story, 1st apartment from west at north
Jun 3, 2026 · Apt 21
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the bathroom located at apt 21, 4th story, 1st apartment from west at north
Jun 3, 2026 · Apt 21
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, north wall in the bathroom located at apt 21, 4th story, 1st apartment from west at north
Jun 3, 2026 · Apt 21
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from west at north wall in the 3rd room from east at south located at apt 21, 4th story, 1st apartment from west at north
Jun 3, 2026 · Apt 21
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from west at north wall in the 3rd room from east at south located at apt 21, 4th story, 1st apartment from west at north
Jun 3, 2026 · Apt 21
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, 1st door frame from east at south wall in the foyer located at apt 21, 4th story, 1st apartment from west at north
Jun 3, 2026 · Apt 21
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 1st room from east at south located at apt 21, 4th story, 1st apartment from west at north
Jun 3, 2026 · Apt 21
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from west at north wall in the 1st room from east at south located at apt 21, 4th story, 1st apartment from west at north
Jun 3, 2026 · Apt 21
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from east at south wall in the foyer located at apt 21, 4th story, 1st apartment from west at north
Jun 3, 2026 · Apt 21
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from north at east wall, 1st window frame from west at north wall in the 1st room from east at south located at apt 21, 4th story, 1st apartment from west at north
Jun 3, 2026 · Apt 21
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower sash at east wall window in the 1st room from east located at apt 18, 4th story, 3rd apartment from north at east
Jun 3, 2026 · Apt 18
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective cracked glass pane at lower sash at west wall window in the 3rd room from north located at apt 23, 4th story, 2nd apartment from south at west
Jun 3, 2026 · Apt 23
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the 2nd room from east at north located at apt 11, 3rd story, 3rd apartment from north at east
Jun 3, 2026 · Apt 11
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is defective in the entire apartment located at apt 18, 4th story, 3rd apartment from north at east
Jun 3, 2026 · Apt 18
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower sash at east wall window in the 3rd room from north located at apt 12, 3rd story, 2nd apartment from north at east
Jun 3, 2026 · Apt 12
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft around west wall window in the bathroom located at apt 21, 4th story, 1st apartment from west at north
Jun 3, 2026 · Apt 21
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 21, 4th story, 1st apartment from west at north
Jun 3, 2026 · Apt 21
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from west at north wall, 1st window frame from west at north wall in the 3rd room from east at south located at apt 21, 4th story, 1st apartment from west at north
Jun 3, 2026 · Apt 21
Closed — Violation closed - BHazardous
Refit upper and lower sash at east wall window in the 1st room from east located at apt 25, 5th story, 3rd apartment from north at east
Jun 3, 2026 · Apt 25
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 26, 5th story, 2nd apartment from north at east
Jun 3, 2026 · Apt 26
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 26, 5th story, 2nd apartment from north at east
Jun 3, 2026 · Apt 26
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st riser from east at south wall, north wall in the bathroom located at apt 21, 4th story, 1st apartment from west at north
Jun 3, 2026 · Apt 21
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from west at north wall in the kitchen located at apt 21, 4th story, 1st apartment from west at north
Jun 3, 2026 · Apt 21
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from east at south wall in the 2nd room from east at north located at apt 11, 3rd story, 3rd apartment from north at east
Jun 3, 2026 · Apt 11
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 1st room from east located at apt 11, 3rd story, 3rd apartment from north at east
Jun 3, 2026 · Apt 11
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from east located at apt 11, 3rd story, 3rd apartment from north at east
Jun 3, 2026 · Apt 11
Open — Civ14 mailed - CImmediately hazardous
M/d law abate the nuisance consisting of a key operated lock installed at door leading to fire escape window in the 1st room from east located at apt 18, 4th story, 3rd apartment from north at east
Jun 3, 2026 · Apt 18
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq f at west wall in the bathroom located at apt 11, 3rd story, 3rd apartment from north at east original violation 18988609 issued 03-jun-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jun 3, 2026 · Apt 11
Open — Notice of issuance sent to tenant - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq f at west wall in the bathroom located at apt 11, 3rd story, 3rd apartment from north at east
Jun 3, 2026 · Apt 11
Closed — Violation closed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing (missing) 2nd standard from north at east, at east exterior wall fire escape, 3rd story
Jun 3, 2026
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective in the entire apartment located at apt 18, 4th story, 3rd apartment from north at east
Jun 3, 2026 · Apt 18
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 15, 3rd story, 3rd apartment from south at west
May 25, 2026 · Apt 15
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east at south located at apt 15, 3rd story, 3rd apartment from south at west
May 25, 2026 · Apt 15
Closed — Violation dismissed
DOB building violations · 9
- Immediate emergency anythingoptional
Seal the building. secure all compromised openings at the ground floor commercial space and affected residential units to prevent unauthoriz entry and protect public safety
Mar 2, 2026
Dob violation - dismissed - Construction other optional
Structure rendered non-compliant due to fire at ground level commercial space. at the time of inspection observed extensive fire,water and smoke damage at ground floor commercial space and also to 6 residential units. windows removed and some charring to non structural members of the structure.
Feb 28, 2026
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2018
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Apr 23, 1993
Dob violation - dismissed
ECB violations · 9
- Class - 2
Failure to maintain building in code compliant manner: use of prohibited door and/or hardware per bc 1008.1.8; 27-371(j). noted: at time of inspection - key locking devices were observed installed at bdrm entry
May 28, 2026
Resolve - Class - 1
Failure to obey a vacate order from the commissioner per 28-207.4. noted: at time of inspection - apts 13, 19, 20 were observed re-occupied by male & female occupants contrary to vacate order x58/2026., comply
May 28, 2026 · Penalty $10,000
Active - Class - 2
W/o a permit. noted: water & waste lines removed for bthrm sink in apt 19., obtain all permits
May 28, 2026 · Penalty $1,250
Active - Class - 2
W/o a permit. noted: at 2nd flr apt 6 - window frames & stools were observed replaced throughout the apt at multiple windows., obtain all permits
May 28, 2026 · Penalty $1,250
Active - Class - 1
Failure to maintain building in code compliant manner. noted: 1. exposed electrical wiring observed at ceiling light fixtures in apt 20; 2. cracked glass pane at fire escape window in apt 20; 3. gas meter obser
May 28, 2026 · Penalty $2,500
Resolve - Class - 1
Occupancy in contrary to that allowed by c/o or dept of bldg recods. illegally created b-room at cellar with full kitchen increasieng bldg occupancy. partitions mad eup of wood/metal stud and sheetrock plaster
Dec 28, 2017 · Penalty $2,400
Active - Non-hazardous
Failure to maintain. defect is: spaulding and defective concrete ceil-ing throughout the cellar. remedy: provide a structural stability re- port for concrete floor 1st floor grocery store from engineer and make
Aug 2, 2000 · Penalty $350
Resolve - Non-hazardous
Plumbing work without a permit. found new gas line for cooking apt 11.also found all new drain lines and water lines in bathroom. remedy: obtain a permit if feasible or restore to prior legal condition.
Apr 24, 2000
Resolve - Non-hazardous
Plumbing work without permit in that new gas distribution,water distribution,waste and vent piping has been installed in apts 4,11,18 & 25 without permit being obtained.remedy:obtain permit and inspections.
Mar 2, 2000
Resolve
Complaints
- General
Mailbox
Oct 13, 2026 · Apt 7
Open - Electric
Outlet/switch
Jun 1, 2026 · Apt 5
Close - Paint/plaster
Wall
Jun 1, 2026 · Apt 5
Close - Paint/plaster
Ceiling
Jun 1, 2026 · Apt 5
Close - Door/window
Door
Jun 1, 2026 · Apt 5
Close - Door/window
Window frame
Jun 1, 2026 · Apt 5
Close - Door/window
Window frame
May 26, 2026 · Apt 19
Close - Unsanitary condition
Pests
May 23, 2026 · Apt 15
Close - Appliance
Electric/gas range
May 23, 2026 · Apt 15
Close - Paint/plaster
Ceiling
May 23, 2026 · Apt 15
Close
Show 40 more ↓
- Appliance
Refrigerator
May 23, 2026 · Apt 15
Close - Unsanitary condition
Pests
May 23, 2026 · Apt 15
Close - Door/window
Window frame
May 20, 2026 · Apt APT17
Close - Appliance
Refrigerator
May 20, 2026 · Apt APT17
Close - Water leak
Slow leak
May 20, 2026 · Apt APT17
Close - Unsanitary condition
Mold
May 20, 2026 · Apt APT17
Close - Door/window
Door
May 19, 2026 · Apt 6
Close - Flooring/stairs
Floor
May 19, 2026 · Apt 6
Close - Plumbing
Toilet
May 19, 2026 · Apt 6
Close - Plumbing
Water supply
May 19, 2026 · Apt 6
Close - Paint/plaster
Wall
May 19, 2026 · Apt 6
Close - Plumbing
Bathtub/shower
May 19, 2026 · Apt 6
Close - Door/window
Window pane
May 19, 2026 · Apt 6
Close - Appliance
Refrigerator
May 19, 2026 · Apt 6
Close - Plumbing
Basin/sink
May 19, 2026 · Apt 6
Close - Plumbing
Basin/sink
May 15, 2026 · Apt 14
Close - Heat/hot water
Entire building
May 15, 2026 · Apt 14
Close - Heat/hot water
Entire building
May 15, 2026 · Apt 25
Close - Heat/hot water
Entire building
May 15, 2026 · Apt 11
Close - Heat/hot water
Entire building
May 15, 2026 · Apt BLDG
Close - Flooring/stairs
Floor
Apr 27, 2026 · Apt 7
Close - Safety
Smoke detector
Mar 10, 2026 · Apt 25
Close - Door/window
Door frame
Mar 10, 2026 · Apt 25
Close - Unsanitary condition
Pests
Mar 10, 2026 · Apt 25
Close - Unsanitary condition
Mold
Mar 10, 2026 · Apt 25
Close - General
Cabinet
Mar 10, 2026 · Apt 25
Close - Door/window
Window frame
Mar 10, 2026 · Apt 25
Close - Plumbing
Bathtub/shower
Mar 10, 2026 · Apt 25
Close - Appliance
Refrigerator
Mar 10, 2026 · Apt 25
Close - Flooring/stairs
Floor
Mar 10, 2026 · Apt 25
Close - Unsanitary condition
Pests
Mar 10, 2026 · Apt 25
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 22, 2025 · Apt BLDG
Close - Electric
Outlet/switch
Nov 1, 2025 · Apt 21
Close - Flooring/stairs
Floor
Nov 1, 2025 · Apt 21
Close - Plumbing
Radiator
Nov 1, 2025 · Apt 21
Close - Safety
Smoke detector
Nov 1, 2025 · Apt 21
Close - Heat/hot water
Apartment only
May 11, 2025 · Apt 7
Close - Heat/hot water
Entire building
Feb 7, 2025 · Apt BLDG
Close - Flooring/stairs
Floor
Feb 2, 2025 · Apt 21
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1911
- Floors
- 5
- Residential units
- 31
- Building area
- 23,115 ft²
- Lot area
- 5,920 ft²
- Zoning
- R6
- Community board
- 201
- Council district
- 17
- Block / lot
- 2410 / 40
- Assessed value
- $756,900
- Landmark / historic district
- No
HPD registration #211238, last renewed Oct 2, 2025.
Questions about 340 East 151 Street
Who owns 340 East 151 Street?
The owner of record in NYC Department of City Planning PLUTO data is Lord & Rocce Enterpr.
Does 340 East 151 Street have violations?
Yes. NYC HPD has recorded 298 housing violations at this property.
Is 340 East 151 Street rent stabilized?
NYC Department of Finance tax bills listed 31 rent-stabilized units here in 2024 (about 100% of its 31 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 340 East 151 Street built?
City records list 1911 as the year it was built.
How many apartments are in 340 East 151 Street?
It has 31 residential units and 34 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.