402 East 162 Street
Bronx, NY 10451BBL 2-02383-0005Map
Owner of record: 402 E 162 LLC
402 East 162 Street is a walk-up apartment building built in 1914 in Bronx, 10451. It has 26 residential units across 6 floors. The owner of record is 402 E 162 LLC. HPD has recorded 944 housing violations here, most recently on October 2, 2026. 11 of the 50 most recent violations are still open. City tax records listed 22 rent-stabilized apartments here in 2024.
- HPD violations
- 944
- DOB violations
- 13
- ECB violations
- 12
- HPD complaints
- 1,011
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 944
- BHazardous
Provide an adequate supply of gas to the fixtures at range in the entire apartment located at apt 1n, 1st story, 1st apartment from south at west
Oct 2, 2026 · Apt 1N
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 1c, 2nd story, 2nd apartment from north at east
Sep 13, 2026 · Apt 1C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door , 1st story
Aug 3, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective latch at vestibule door , 1st story
Aug 3, 2026
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective base cabinet at washbasin in the bathroom located at apt 2a, 1st story, 1st apartment from south at west
Jul 20, 2026 · Apt 2A
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective base cabinet at sink in the kitchen located at apt 2a, 1st story, 1st apartment from south at west
Jul 20, 2026 · Apt 2A
Open — Civ14 mailed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the are at building front at public hall, 1st story
Jun 30, 2026
Closed — Violation closed - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint at fire escape at south exterior wall
Jun 30, 2026
Open — Nov certified on time - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the bathroom located at apt 2a, 3rd story, 1st apartment from south at west
Jun 10, 2026 · Apt 2A
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the mold at tiled/grouted surfaces at east wall, south wall, north wall in the bathroom located at apt 2a, 3rd story, 1st apartment from south at west
Jun 10, 2026 · Apt 2A
Closed — Violation closed
Show 40 more ↓
- ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchen located at apt 2a, 3rd story, 1st apartment from south at west
Jun 10, 2026 · Apt 2A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from south at west wall door frame in the foyer located at apt 2a, 3rd story, 1st apartment from south at west
Jun 10, 2026 · Apt 2A
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the bathroom located at apt 2a, 3rd story, 1st apartment from south at west
Jun 10, 2026 · Apt 2A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchen located at apt 2a, 3rd story, 1st apartment from south at west
Jun 10, 2026 · Apt 2A
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from north at east wall in the kitchen located at apt 2a, 3rd story, 1st apartment from south at west
Jun 10, 2026 · Apt 2A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from south at west wall door in the foyer located at apt 2a, 3rd story, 1st apartment from south at west
Jun 10, 2026 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the foyer located at apt 2a, 3rd story, 1st apartment from south at west
Jun 10, 2026 · Apt 2A
Open — Defect letter issued - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 2a, 3rd story, 1st apartment from south at west
Jun 10, 2026 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from south at west wall, east wall, 1st window frame from north at east wall in the bathroom located at apt 2a, 3rd story, 1st apartment from south at west
Jun 10, 2026 · Apt 2A
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, south wall, east wall, west wall in the kitchen located at apt 2a, 3rd story, 1st apartment from south at west
Jun 10, 2026 · Apt 2A
Open — Defect letter issued - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2a, 3rd story, 1st apartment from south at west
Jun 10, 2026 · Apt 2A
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2a, 3rd story, 1st apartment from south at west
Jun 10, 2026 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 3rd story, 1st apartment from south at west
Jun 10, 2026 · Apt 2A
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 2a, 3rd story, 1st apartment from south at west
Jun 10, 2026 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2a, 3rd story, 1st apartment from south at west
Jun 10, 2026 · Apt 2A
Open — Not complied with - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet : in the bathroom located at apt 2a, 3rd story, 1st apartment from south at west
Nov 20, 2025 · Apt 2A
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 2a, 3rd story, 1st apartment from south at west
Nov 20, 2025 · Apt 2A
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 2a, 3rd story, 1st apartment from south at west
Nov 20, 2025 · Apt 2A
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the mold at tiled/grouted surfaces at east wall, south wall, west wall in the bathroom located at apt 2a, 3rd story, 1st apartment from south at west
Nov 20, 2025 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2a, 3rd story, 1st apartment from south at west
Nov 20, 2025 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2a, 3rd story, 1st apartment from south at west
Nov 20, 2025 · Apt 2A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 3rd story, 1st apartment from south at west
Nov 20, 2025 · Apt 2A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 4b, 5th story, 1st apartment from west at north
Sep 26, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall and at ceiling in the bathroom located at apt 4b, 5th story, 1st apartment from west at north
Sep 26, 2025 · Apt 4B
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the mold at tiled/grouted surfaces at north wall, east wall, south wall in the bathroom located at apt 4b, 5th story, 1st apartment from west at north
Sep 26, 2025 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches located at apt 4b, 5th story, 1st apartment from west at north
Sep 26, 2025 · Apt 4B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 4b, 5th story, 1st apartment from west at north
Sep 26, 2025 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 2nd story, 1st apartment from west at north
Aug 10, 2025 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling ceiling in the bathroom located at apt 4b, 5th story, 1st apartment from west at north
Mar 8, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the bathroom located at apt 4b, 5th story, 1st apartment from west at north
Mar 8, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak the north wall in the 4th room from east at north located at apt 4b, 5th story, 1st apartment from west at north
Mar 8, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 4th room from east at north located at apt 4b, 5th story, 1st apartment from west at north
Mar 8, 2025 · Apt 4B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 4th room from east at north located at apt 4b, 5th story, 1st apartment from west at north
Mar 8, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the kitchen located at apt 4b, 5th story, 1st apartment from west at north
Mar 8, 2025 · Apt 4B
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of key operated dead bolt installed on entrance door leading to fire escape window exit in the 1st room from east located at apt 5d, 6th story, 1st apartment from north at east , section ''402e162st''
Mar 5, 2025 · Apt 5D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective lower sash spring balances window at south wall in the 3rd room from east located at apt 5d, 6th story, 1st apartment from north at east , section ''402e162st''
Mar 5, 2025 · Apt 5D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mortise locking device at door in the entrance located at apt 5d, 6th story, 1st apartment from north at east , section ''402e162st''
Mar 5, 2025 · Apt 5D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective lower sash glass at south window in the 1st room from east located at apt 5d, 6th story, 1st apartment from north at east , section ''402e162st''
Mar 5, 2025 · Apt 5D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5d, 6th story, 1st apartment from north at east , section ''402e162st''
Mar 5, 2025 · Apt 5D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective porcelain finish enamel at bathtub interior in the bathroom located at apt 5d, 6th story, 1st apartment from north at east , section ''402e162st''
Mar 5, 2025 · Apt 5D
Closed — Violation dismissed
DOB building violations · 13
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 27, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 15, 2017
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed
Show 3 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 12
- Class - 1
Work does not conform to approved construction documents and/or approved amendments for summons 39082249k. observed at the 1st floor commercial space, the 24hr fire-rated partition was removed to merge (2) stor
Apr 27, 2026 · Penalty $6,250
Active - Class - 1
Work does not conform to approved construction documents and/or approved amendments. noted: at time of inspection at 1st flr commercial space, a 24 hr fire rated partition wall shown on flr plan of permitted al
Mar 24, 2023 · Penalty $2,500
Active - Class - 2
W/o a permit. noted: at 1st flr - 24 hr fire rated wall between 2 commercial businesses was removed., obtain all permits
Mar 24, 2023 · Penalty $1,250
Active - Class - 2
Failure to conduct or file a final inspection of permitted work with the department. noted: at time of inspection no request/final inspection or withdrawal found for permitted work. job #'s 240690802, 220362355
Mar 24, 2023 · Penalty $1,250
Active - Class - 2
Work w/o a permit. @ the time of insp in apt.#3b noted new sheetrock, plywood subfloor,shower body,water lines,electrical panel, outlets switches & wiring. the work is around 60% completed. sheetrock is on all
Apr 3, 2019 · Penalty $6,250
Active - Class - 2
Work w/o a permit. @ the time of insp noted apt. #3d with new sheetrock,plywood,sub floor,electrical panel box,outlets,switches,wiring,new plumbing,water and waste lines. plaster removed from walls. the work is
Apr 3, 2019 · Penalty $6,250
Active - Class - 3
Work w/out a permit restaurant (lupita's) installed sign, awning, illuminated no permit on file.rem:obatin permit.
Jul 18, 2018
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#352939 issued on( )& to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Dec 22, 2017
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35293988z issued on 10/04/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Nov 13, 2017 · Penalty $800
Resolve - Class - 1
Failure to maintain bldg in a code compliant manner. noted: observed there is combustible debris stored on stair platform at 1st rear. remedy: comply w/violation.
Oct 4, 2017 · Penalty $1,250
Active
Show 2 more ↓
- Class - 1
Failure to maintain blg in a code compliant manner. defects noted: at time of inspection there is combustible debris stored on stair platform at first floor rear and at alleyways at cellar level throughout.rmdy
Aug 16, 2017 · Penalty $1,000
Resolve - Hazardous
Failure to maintain exterior building wall noted: approx. 4'x5' foot area of bricks have collapse onto sidewalk, location northwest corner at roof remedy: erect sidewalk shed immediately and make all repairs, o
Jun 27, 2002 · Penalty $800
Resolve
Complaints
- General
Cooking gas
Sep 29, 2026 · Apt BLDG
Close - General
Cooking gas
Sep 10, 2026 · Apt BLDG
Close - Flooring/stairs
Floor
Jun 8, 2026 · Apt 2A
Close - Unsanitary condition
Mold
Jun 8, 2026 · Apt 2A
Close - Safety
Fire escape
Jun 8, 2026 · Apt 6B
Close - Unsanitary condition
Garbage/recycling storage
Jun 8, 2026 · Apt 6B
Close - Unsanitary condition
Pests
Mar 27, 2026 · Apt 1S
Close - Unsanitary condition
Mold
Mar 27, 2026 · Apt 1S
Close - Paint/plaster
Wall
Mar 27, 2026 · Apt 1S
Close - Unsanitary condition
Garbage/recycling storage
Mar 27, 2026 · Apt 1S
Close
Show 40 more ↓
- Unsanitary condition
Mold
Nov 18, 2025 · Apt 2A
Close - Plumbing
Steam pipe/riser
Nov 18, 2025 · Apt 2A
Close - Paint/plaster
Wall
Nov 18, 2025 · Apt 2A
Close - Water leak
Heavy flow
Oct 27, 2025 · Apt 4B
Close - Unsanitary condition
Sewage
Oct 27, 2025 · Apt 4B
Close - Electric
Lighting
Oct 27, 2025 · Apt 4B
Close - Door/window
Window frame
Oct 27, 2025 · Apt 4B
Close - Electric
Lighting
Oct 27, 2025 · Apt 4B
Close - Paint/plaster
Ceiling
Oct 27, 2025 · Apt 4B
Close - Unsanitary condition
Pests
May 7, 2025 · Apt 1B
Close - General
Cabinet
May 7, 2025 · Apt 1B
Close - Flooring/stairs
Floor
May 7, 2025 · Apt 1B
Close - Paint/plaster
Ceiling
May 7, 2025 · Apt 1B
Close - Paint/plaster
Wall
May 7, 2025 · Apt 1B
Close - Flooring/stairs
Floor
May 7, 2025 · Apt 1B
Close - Water leak
Heavy flow
Mar 6, 2025 · Apt 4B
Close - Water leak
Slow leak
Jan 27, 2025 · Apt 4B
Close - Paint/plaster
Wall
Dec 22, 2024 · Apt 4B
Close - Heat/hot water
Entire building
Dec 22, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 22, 2024 · Apt 4B
Close - Water leak
Slow leak
Dec 22, 2024 · Apt 4B
Close - Heat/hot water
Apartment only
Dec 22, 2024 · Apt 1N
Close - Door/window
Window pane
Dec 17, 2024 · Apt 5D
Close - Unsanitary condition
Mold
Dec 17, 2024 · Apt 5D
Close - Unsanitary condition
Pests
Dec 17, 2024 · Apt 5D
Close - Plumbing
Steam pipe/riser
Dec 10, 2024 · Apt 2A
Close - Unsanitary condition
Mold
Dec 6, 2024 · Apt 5D
Close - Flooring/stairs
Floor
Dec 6, 2024 · Apt 5D
Close - Water leak
Damp spot
Dec 6, 2024 · Apt 5D
Close - Unsanitary condition
Pests
Dec 6, 2024 · Apt 5D
Close - Door/window
Window pane
Dec 6, 2024 · Apt 5D
Close - Heat/hot water
Entire building
Dec 6, 2024 · Apt 5D
Close - Door/window
Door
Dec 6, 2024 · Apt 5D
Close - Door/window
Window frame
Nov 7, 2024 · Apt 4B
Close - General
Bell/buzzer/intercom
Oct 10, 2024 · Apt 2A
Close - Plumbing
Bathtub/shower
Oct 10, 2024 · Apt 2A
Close - Unsanitary condition
Pests
Jun 11, 2024 · Apt 3A
Close - Unsanitary condition
Pests
Jun 11, 2024 · Apt 3A
Close - Safety
Smoke detector
Jun 7, 2024 · Apt 1B
Close - Door/window
Door
Jun 7, 2024 · Apt 3D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1914
- Floors
- 6
- Residential units
- 26
- Building area
- 13,420 ft²
- Lot area
- 3,332 ft²
- Zoning
- R7-2
- Community board
- 203
- Council district
- 17
- Block / lot
- 2383 / 5
- Assessed value
- $935,550
- Landmark / historic district
- No
HPD registration #210824, last renewed Aug 11, 2025.
Questions about 402 East 162 Street
Who owns 402 East 162 Street?
The owner of record in NYC Department of City Planning PLUTO data is 402 E 162 LLC.
Does 402 East 162 Street have violations?
Yes. NYC HPD has recorded 944 housing violations at this property.
Is 402 East 162 Street rent stabilized?
NYC Department of Finance tax bills listed 22 rent-stabilized units here in 2024 (about 85% of its 26 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 402 East 162 Street built?
City records list 1914 as the year it was built.
How many apartments are in 402 East 162 Street?
It has 26 residential units and 28 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.