roofy

495 East 158 Street

Bronx, NY 10451BBL 2-02364-0045Map

Owner of record: Cs Melrose Site B LLC

495 East 158 Street is an elevator apartment building built in 2009 in Bronx, 10451. It has 107 residential units across 8 floors. The owner of record is Cs Melrose Site B LLC. HPD has recorded 101 housing violations here, most recently on September 23, 2026. 16 of the 50 most recent violations are still open. City tax records listed 106 rent-stabilized apartments here in 2024.

HPD violations
101
DOB violations
29
ECB violations
17
HPD complaints
125

What to know

Concern
8 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 23, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
106
About 99% of the building's 107 apartments
Down from 107 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 101

  • C

    Replace or repair the self-closing doors that is missing or defective door in the entrance located at apt 5d, 5th story, 2nd apartment from south at west

    Sep 23, 2026 · Apt 5D

    Open — Violation will be reinspected
  • B

    Properly repair or replace the broken or defective lower window sash at 1 st window from south at west. in the 1st room from north at west located at apt 5d, 5th story, 2nd apartment from south at west

    Sep 23, 2026 · Apt 5D

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective lower window sash at west in the 2nd room from north at west located at apt 5d, 5th story, 2nd apartment from south at west

    Sep 23, 2026 · Apt 5D

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling. in the bathroom located at apt 5d, 5th story, 2nd apartment from south at west

    Sep 23, 2026 · Apt 5D

    Open — Notice of issuance sent to tenant
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 5d, 5th story, 2nd apartment from south at west

    Sep 23, 2026 · Apt 5D

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in at wash basin drain pipe in the bathroom located at apt 5d, 5th story, 2nd apartment from south at west

    Sep 23, 2026 · Apt 5D

    Open — Violation will be reinspected
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 4n, 4th story, 2nd apartment from north at east , section at north

    Sep 9, 2026 · Apt 4N

    Open — Violation will be reinspected
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 4o, 4th story

    Jul 15, 2026 · Apt 4O

    Open — Notice of issuance sent to tenant
  • C

    Properly repair with similar material the broken or defective wood flooring causing a trip hazard in the foyer located at apt 7d, 7th story

    Jul 15, 2026 · Apt 7D

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling in the bathroom located at apt 2n, 2nd story

    Jul 15, 2026 · Apt 2N

    Open — Notice of issuance sent to tenant
Show 40 more ↓
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 4n, 4th story, 2nd apartment from north at east

    Jun 27, 2026 · Apt 4N

    Closed — Violation closed
  • B

    Refit door in the entrance located at apt 4o, 44th story, 1st apartment from west at north

    May 27, 2026 · Apt 4O

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 4o, 44th story, 1st apartment from west at north

    May 27, 2026 · Apt 4O

    Open — Not complied with
  • B

    Properly repair or replace the broken or defective base cabinet drawer east wall in the kitchen located at apt 7d, 7th story, 1st apartment from south at west

    Mar 20, 2026 · Apt 7D

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective base cabinet at west wall in the kitchen located at apt 7d, 7th story, 1st apartment from south at west

    Mar 20, 2026 · Apt 7D

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, south and north walls in the private hallway located at apt 7d, 7th story, 1st apartment from south at west

    Mar 20, 2026 · Apt 7D

    Closed — Violation closed
  • B

    Replace the broken or defective wash basin vanity ( missing ) in the bathroom located at apt 7d, 7th story, 1st apartment from south at west

    Mar 20, 2026 · Apt 7D

    Closed — Violation dismissed
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 7d, 7th story, 1st apartment from south at west

    Mar 20, 2026 · Apt 7D

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the bathroom located at apt 7d, 7th story, 1st apartment from south at west

    Mar 20, 2026 · Apt 7D

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at ceiling, east, west and north walls in the bathroom located at apt 7d, 7th story, 1st apartment from south at west

    Mar 20, 2026 · Apt 7D

    Open — Defect letter issued
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallway located at apt 7d, 7th story, 1st apartment from south at west

    Mar 8, 2026 · Apt 7D

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 7d, 7th story, 1st apartment from south at west

    Mar 8, 2026 · Apt 7D

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling and all walls in the bathroom located at apt 7d, 7th story, 1st apartment from south at west

    Mar 8, 2026 · Apt 7D

    Closed — Violation closed
  • A

    Properly repair or replace the broken or defective light fixture at ceiling in the kitchen located at apt 4f, 4th story, 4th apartment from east at south

    Mar 8, 2026 · Apt 4F

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective ptec heating unit system at west wall in the 3rd room from north located at apt 4f, 4th story, 4th apartment from east at south

    Mar 8, 2026 · Apt 4F

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling in the bathroom located at apt 4f, 4th story, 4th apartment from east at south

    Mar 8, 2026 · Apt 4F

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules deffective in the entire apartment located at apt 7d, 7th story, 1st apartment from south at west

    Mar 8, 2026 · Apt 7D

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations deffective in the entire apartment located at apt 7d, 7th story, 1st apartment from south at west

    Mar 8, 2026 · Apt 7D

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective ptec heating unit system at west wall in the 2nd room from north located at apt 4f, 4th story, 4th apartment from east at south

    Mar 8, 2026 · Apt 4F

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective mortise lock and assembly in the entrance located at apt 4f, 4th story, 4th apartment from east at south

    Mar 8, 2026 · Apt 4F

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective mortise lock and assembly at sliding glass door leading to balcony at west wall in the kitchen located at apt 7d, 7th story, 1st apartment from south at west

    Mar 8, 2026 · Apt 7D

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 7d, 7th story, 1st apartment from south at west

    Mar 8, 2026 · Apt 7D

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective at sink base cabinet in the bathroom located at apt 7d, 7th story, 1st apartment from south at west

    Mar 8, 2026 · Apt 7D

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective electrical hvac ac heating unit at east wall in the 1st room from north located at apt 3k, 3rd story, 1st apartment from east at south

    Dec 10, 2025 · Apt 3K

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 5n, 5th story, 1st apartment from south at west

    Nov 6, 2025 · Apt 5N

    Open — First no access to re- inspect violation
  • C

    Trace and repair the source and abate the visible mold condition... greater than 30 sq ft at ceiling and all walls in the bathroom located at apt 5n, 5th story, 1st apartment from south at west

    Nov 6, 2025 · Apt 5N

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 5n, 5th story, 1st apartment from south at west

    Oct 7, 2025 · Apt 5N

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color behind entrance door in the foyer located at apt 5n, 5th story, 1st apartment from south at west

    Oct 7, 2025 · Apt 5N

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from north located at apt 3n, 3rd story, 2nd apartment from north at east

    Sep 29, 2025 · Apt 3N

    Closed — Violation dismissed
  • A

    Cleanse to the satisfaction of this department the caulking around bathtub in the bathroom located at apt 3n, 3rd story, 2nd apartment from north at east

    Sep 29, 2025 · Apt 3N

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective ventilation system at ceiling in the bathroom located at apt 2n, 2nd story, 2nd apartment from north at east

    Sep 11, 2025 · Apt 2N

    Open — False certification
  • C

    Trace and repair the source and abate the visible mold condition... greater than 10 sqft at ceiling, east and south walls in the bathroom located at apt 7a, 7th story, 1st apartment from west at north original violation 18172725 issued 14-aug-25 has been upgraded to class c per administrative code 27-2017.3a(5)(a) or (b).

    Aug 14, 2025 · Apt 7A

    Open — Defect letter issued
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the kitchen located at apt 7a, 7th story, 1st apartment from west at north

    Aug 14, 2025 · Apt 7A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the 2nd bathroom from east located at apt 2g, 2nd story, 1st apartment from west at north

    Aug 14, 2025 · Apt 2G

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 sqft at ceiling, east and south walls in the bathroom located at apt 7a, 7th story, 1st apartment from west at north

    Aug 14, 2025 · Apt 7A

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 8h, 8th story, 3rd apartment from west at north

    Dec 26, 2024 · Apt 8H

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective spring balance at lower sash at 1st window from west at north wall in the 2nd room from north located at apt 8h, 8th story, 3rd apartment from west at north

    Dec 26, 2024 · Apt 8H

    Closed — Violation dismissed
  • C

    Replace the broken or defective (cracked) water closet tank cover in the bathroom located at apt 8h, 8th story, 3rd apartment from west at north

    Dec 26, 2024 · Apt 8H

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective latch set at door in the entrance located at apt 8h, 8th story, 3rd apartment from west at north

    Dec 26, 2024 · Apt 8H

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at door in the entrance located at apt 8h, 8th story, 3rd apartment from west at north

    Dec 26, 2024 · Apt 8H

    Closed — Violation dismissed

DOB building violations · 29

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 11, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 11, 2024

    Dob violation - dismissed
  • Construction other optional

    Noted 3 workers removing coping stones of parapet on 8th floor. work has left coping stones unsecured. also noted stones missing mortar and not properly seated. no permit filed for work on record. work preformed over unprotected sidewalk and courtyard with debris noted having fallen to street below on 3rd ave and brook ave.

    Oct 5, 2024

    Dob violation - dismissed
  • Immediate emergency anythingoptional

    Erect sidewalk sheds to ensure public safety & compliance with safety regulations during the removal and repair of the coping stones.specifi cally install 20 linear feet @ 3108 3rd ave expo#1, 30 linear feet in the court uyard expo # 2/3 and 20 linear feet at the intersection of b rook ave and 3118 3rd ave expo#3/4 to the total installation will cove

    Oct 5, 2024

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2023

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2022

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 9, 2021

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 9, 2021

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 10, 2020

    Dob violation - resolved
Show 19 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 10, 2020

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Dec 26, 2019

    Dob violation - dismissed
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst

    Sep 6, 2019

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 12, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 12, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 12, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 20, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 20, 2015

    Dob violation - resolved
  • Failure to submit eer none

    Failure to submit an energy efficiency report in 2014 per ad. code sec. 28-308.4

    Dec 31, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 24, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 24, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 24, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 24, 2013

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jan 1, 2012

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    May 23, 1990

    Vp-violation unserved ecb-active

ECB violations · 17

  • Class - 2

    Failure to certify corrections for violation number 39126703n, file a certificate of correction

    Feb 12, 2026 · Penalty $625

    Resolve
  • Class - 2

    Class 2 rts: failure to maintain building in code compliant manner. service elevator equipment as per bc3001.2 & 27-987. upon inspection,the elevator is found to be out of service, creating a hazardous conditio

    Jan 21, 2026 · Penalty $312

    Active
  • Class - 1

    : failure to maintain building in code compliant manner. service elevator equipment as per bc3001.2 & 27-987. upon inspection, the device is found to be out of service, creating a hazardous condition per 1rcny

    Dec 15, 2025 · Penalty $1,250

    Resolve
  • Class - 1

    Noted loose coping stones on parapet. stone in sections was missing mortar and not secured properly., repair and/replace; obtain permit and repair. submit inspection report

    Oct 5, 2024

    Resolve
  • Class - 1

    Noted 3 workers removing coping stones of parapet on 8th floor. no permit filed for work on record. work preformed over unprotected sidewalk and courtyard with debris noted having fallen to street below. work c

    Oct 5, 2024 · Penalty $10,000

    Resolve
  • Class - 2

    Class 2 violation issued, items,/ brake disc pad worn, remedy; repair,/ hoist motor oil remedy; re-seal, / brake tag expired, remedy; provide up to date tag, / dirty car top with oil leak, remedy; clean.

    Feb 25, 2022

    Resolve
  • Class - 2

    Machine brake/expired tag/tag device, phone/inoperative/repair.

    Jul 13, 2020 · Penalty $625

    Resolve
  • Class - 1

    Car door restrictor defective repair/car brake shoe worn replace

    Dec 19, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    (cease use-5a10/59i10)(70o2/32i11/39x10/3i10/33i10)(2)cease use items(1)5a#altered car door restrictor,repair.(2)59i#damaged brake monitor device,repair and contact nycdob for reinspections on repair items(3)70

    Sep 28, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    97x17. elevator out-of-service. upon insp the device is found to be out of service creating hazardous condition as per 1rcny 11-02. rem: restore to service immediately & notify nyc dob the device has been retur

    Jul 23, 2018 · Penalty $1,250

    Resolve
Show 7 more ↓
  • Class - 2

    Failure to file annual certification that cooling tower 1000004968 hasbeen inspected,tested & disinfected & that a maintenance plan has beendeveloped and implemented,by november,1,2016.rem:file annual certifica

    Jun 20, 2017

    Resolve
  • Class - 2

    3307.6.5 failure to maintain proper side walk shed illumination. noted:lights are out in various points throughout side walk shed, (not working properly)at time of inspection.remedy:make comply w/notice of vio.

    Nov 8, 2010

    Resolve
  • Class - 2

    Failed to notify dept/obtain permit prior to use/inst off c-hooks in connection with suspended scaffold. stop work issued due to: no notification for c-hook w/suspended scaffold. remedy: notify the dept. stop

    Oct 13, 2010 · Penalty $4,000

    Resolve
  • Class - 2

    Operation of a crane cd # 4145 liebherr ltm 12205 year 2009 ser # 070495 w/o a certificate of onsite inspection noted: crane setup @ time ofinsp. & working no paper work on site no crane notice for inspector to

    Mar 29, 2010 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to provide approved plans @ job site @ time of insp. no approved plans on site to check crane setup if according to plan ( crane setup & working setting steel) @ time of insp. ( stop all crane work unti

    Mar 29, 2010

    Resolve
  • Class - 1

    3307.6.5. failure to maintain shed illumination side walk shed is found to be missing 30' of conduct and related lighting. remedy: comply with notice of violation.

    Jul 28, 2009 · Penalty $2,400

    Resolve
  • Non-hazardous

    Altered building occupied without a valid cert. of occupancy alt. 60087. remedy: discontinue unlawful use.

    Nov 14, 1988 · Penalty $250

    Resolve

Complaints

  • Heat/hot water

    Apartment only

    Oct 21, 2026 · Apt 4O

    Open
  • Unsanitary condition

    Pests

    Oct 14, 2026 · Apt 4N

    Open
  • Appliance

    Electric/gas range

    Sep 25, 2026 · Apt 2O

    Open
  • Plumbing

    Bathtub/shower

    Sep 21, 2026 · Apt 5D

    Close
  • Paint/plaster

    Wall

    Sep 21, 2026 · Apt 5D

    Close
  • Plumbing

    Basin/sink

    Sep 21, 2026 · Apt 5D

    Close
  • Door/window

    Window frame

    Sep 21, 2026 · Apt 5D

    Close
  • Unsanitary condition

    Pests

    Aug 26, 2026 · Apt 4N

    Close
  • Plumbing

    Basin/sink

    Aug 16, 2026 · Apt 2P

    Close
  • Unsanitary condition

    Sewage

    Aug 16, 2026 · Apt 2P

    Close
Show 40 more ↓
  • Unsanitary condition

    Pests

    Jun 21, 2026 · Apt 4N

    Close
  • General

    Ventilation system

    Jun 12, 2026 · Apt 2N

    Close
  • Unsanitary condition

    Mold

    Jun 12, 2026 · Apt 2N

    Close
  • General

    Ventilation system

    Jun 12, 2026 · Apt 2N

    Close
  • Plumbing

    Bathtub/shower

    Jun 12, 2026 · Apt 2N

    Close
  • Plumbing

    Water supply

    Jun 12, 2026 · Apt 2N

    Close
  • Unsanitary condition

    Pests

    May 26, 2026 · Apt 2O

    Close
  • Unsanitary condition

    Pests

    Apr 17, 2026 · Apt 4N

    Close
  • Unsanitary condition

    Pests

    Apr 13, 2026 · Apt 4O

    Close
  • Heat/hot water

    Entire building

    Apr 8, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Mar 18, 2026 · Apt 7D

    Close
  • Paint/plaster

    Ceiling

    Mar 18, 2026 · Apt 7D

    Close
  • Door/window

    Door

    Mar 18, 2026 · Apt 7D

    Close
  • Door/window

    Window frame

    Mar 18, 2026 · Apt 7D

    Close
  • General

    Cabinet

    Mar 18, 2026 · Apt 7D

    Close
  • Paint/plaster

    Wall

    Mar 18, 2026 · Apt 7D

    Close
  • General

    Cabinet

    Mar 18, 2026 · Apt 7D

    Close
  • Unsanitary condition

    Mold

    Mar 6, 2026 · Apt 7D

    Close
  • Paint/plaster

    Ceiling

    Mar 6, 2026 · Apt 7D

    Close
  • Door/window

    Door

    Mar 6, 2026 · Apt 7D

    Close
  • Unsanitary condition

    Pests

    Feb 19, 2026 · Apt APT4O

    Close
  • Door/window

    Window frame

    Jan 27, 2026 · Apt 4E

    Close
  • Door/window

    Door

    Jan 27, 2026 · Apt 4F

    Close
  • Heat/hot water

    Apartment only

    Jan 15, 2026 · Apt 3K

    Close
  • Unsanitary condition

    Mold

    Jan 14, 2026 · Apt 8K

    Close
  • Door/window

    Window frame

    Jan 14, 2026 · Apt 8K

    Close
  • Heat/hot water

    Apartment only

    Dec 8, 2025 · Apt 3K

    Close
  • Heat/hot water

    Entire building

    Nov 24, 2025 · Apt 3B

    Close
  • Unsanitary condition

    Pests

    Nov 18, 2025 · Apt APT4N

    Close
  • Unsanitary condition

    Pests

    Nov 16, 2025 · Apt 4N

    Close
  • Heat/hot water

    Apartment only

    Nov 16, 2025 · Apt 5O

    Close
  • Unsanitary condition

    Mold

    Sep 1, 2025 · Apt 2N

    Close
  • Elevator

    Maintenance

    Jul 18, 2025 · Apt BLDG

    Close
  • Electric

    Power outage

    Jul 15, 2025 · Apt 5A

    Close
  • Elevator

    Maintenance

    Jul 14, 2025 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Mar 11, 2025 · Apt 6K

    Close
  • Heat/hot water

    Entire building

    Mar 2, 2025 · Apt 5K

    Close
  • Heat/hot water

    Apartment only

    Dec 22, 2024 · Apt 8H

    Close
  • Heat/hot water

    Apartment only

    Dec 14, 2024 · Apt 3G

    Close
  • Heat/hot water

    Apartment only

    Dec 13, 2024 · Apt 8H

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D7)
Year built
2009
Floors
8
Residential units
107
Building area
119,770 ft²
Lot area
7,613 ft²
Zoning
R8
Community board
201
Council district
17
Block / lot
2364 / 45
Assessed value
$2,069,100
Landmark / historic district
No

HPD registration #226470, last renewed Jul 9, 2026.

Questions about 495 East 158 Street

Who owns 495 East 158 Street?

The owner of record in NYC Department of City Planning PLUTO data is Cs Melrose Site B LLC.

Does 495 East 158 Street have violations?

Yes. NYC HPD has recorded 101 housing violations at this property.

Is 495 East 158 Street rent stabilized?

NYC Department of Finance tax bills listed 106 rent-stabilized units here in 2024 (about 99% of its 107 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 495 East 158 Street built?

City records list 2009 as the year it was built.

How many apartments are in 495 East 158 Street?

It has 107 residential units and 110 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.