roofy

500 Exterior Street

Bronx, NY 10451BBL 2-02351-0022Map

Owner of record: New Jai Ganesh Realty LLC

500 Exterior Street is an elevator apartment building built in 2019 in Bronx, 10451. It has 66 residential units across 13 floors. The owner of record is New Jai Ganesh Realty LLC. HPD has recorded 49 housing violations here, most recently on October 2, 2026. 30 of the 49 most recent violations are still open. City tax records listed 66 rent-stabilized apartments here in 2024.

HPD violations
49
DOB violations
11
ECB violations
72
HPD complaints
71

What to know

Concern
8 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 2, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
66
About 100% of the building's 66 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 49

  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 2nd apartment from south at west

    Oct 2, 2026 · Apt 2C

    Open — Notice of issuance sent to tenant
  • B

    Repair the broken or defective connection the drain pipe under sink in the kitchen located at apt 2c, 2nd story, 2nd apartment from south at west

    Oct 2, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 17, 2026 · Apt 2C

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective latch set and assembly at entrance door in the 1st room from north at west located at apt 2c, 2nd story, 2nd apartment from west at north

    Jun 17, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Remove device preventing door from being self-closing consisting garbage cans at compactor closet

    Jun 17, 2026

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 3f, 3rd story, 2nd apartment from east at south

    Mar 14, 2026 · Apt 3F

    Open — Nov sent out
  • B

    Properly secure the loose light. fixture at ceiling in the kitchen located at apt 3f, 3rd story, 2nd apartment from east at south

    Mar 14, 2026 · Apt 3F

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of hot water supply exceeding 130f degrees in the entire apartment located at apt 3f, 3rd story, 2nd apartment from east at south

    Mar 14, 2026 · Apt 3F

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 3f, 3rd story, 2nd apartment from east at south

    Mar 9, 2026 · Apt 3F

    Open — Nov sent out
  • B

    Properly secure the loose light fixtures at ceiling in the kitchen located at apt 3f, 3rd story, 2nd apartment from east at south

    Mar 9, 2026 · Apt 3F

    Open — Nov sent out
Show 39 more ↓
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Mar 9, 2026

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3d, 3rd story, 1st apartment from west at north

    Mar 8, 2026 · Apt 3D

    Open — Notice of issuance sent to tenant
  • A

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3d, 3rd story, 1st apartment from west at north

    Mar 8, 2026 · Apt 3D

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color around window frame at east wall in the 2nd room from east at north located at apt 6c, 6th story, 2nd apartment from west at north

    Feb 15, 2026 · Apt 6C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color around window frame at east wall in the 3rd room from north located at apt 6c, 6th story, 2nd apartment from west at north

    Feb 15, 2026 · Apt 6C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color around window frame, at east wall in the 1st room from east located at apt 6c, 6th story, 2nd apartment from west at north

    Feb 15, 2026 · Apt 6C

    Open — Nov sent out
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 6c, 6th story, 2nd apartment from north at east

    Nov 18, 2025 · Apt 6C

    Open — Nov sent out
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 17, 2025

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq. ft at ceiling in the 1st bathroom from east located at apt 9c, 9th story, 2nd apartment from west at north

    Aug 19, 2025 · Apt 9C

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 9c, 9th story, 2nd apartment from west at north

    Aug 19, 2025 · Apt 9C

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective doors at base cabinet sink in the kitchen located at apt 9c, 9th story, 2nd apartment from west at north

    Aug 19, 2025 · Apt 9C

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 9c, 9th story, 2nd apartment from west at north

    Aug 19, 2025 · Apt 9C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 9c, 9th story, 2nd apartment from west at north

    Aug 19, 2025 · Apt 9C

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 9c, 9th story, 2nd apartment from west at north

    Aug 19, 2025 · Apt 9C

    Open — Notice of issuance sent to tenant
  • C

    M/d law abate the nuisance consisting of screws protruding in wood base cabinet at sink in the kitchen located at apt 9c, 9th story, 2nd apartment from west at north

    Aug 19, 2025 · Apt 9C

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10 sq. ft at ceiling in the 1st bathroom from east located at apt 9c, 9th story, 2nd apartment from west at north original violation 18169801 issued 19-aug-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Aug 19, 2025 · Apt 9C

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective door lock in the entrance located at apt 7b, 7th story, 1st apartment from north at east

    May 13, 2025 · Apt 7B

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color window sill at east wall in the 1st room from east located at apt 7b, 7th story, 1st apartment from north at east

    May 13, 2025 · Apt 7B

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective closet door off the track at west wall in the private hallway located at apt 7b, 7th story, 1st apartment from north at east

    May 13, 2025 · Apt 7B

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd bathroom from north located at apt 7e, 7th story, 1st apartment from south at west

    Apr 12, 2025 · Apt 7E

    Open — Nov sent out
  • B

    Repair or replace the carbon monoxide detecting device(s). (in-line) defective in the entire apartment located at apt 7e, 7th story, 1st apartment from south at west

    Apr 12, 2025 · Apt 7E

    Open — Nov sent out
  • B

    Repair or replace the smoke detector (in-line) defective in the entire apartment located at apt 7e, 7th story, 1st apartment from south at west

    Apr 12, 2025 · Apt 7E

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective lock and assemblies (latch) at rm entrance door in the 2nd room from north located at apt 7e, 7th story, 1st apartment from south at west

    Apr 12, 2025 · Apt 7E

    Open — Nov sent out
  • A

    Provide and maintain approved mail receptacles and directories for the persons residing in the dwelling as provided in the u.s. postal regulations., 1st story

    Feb 19, 2025

    Closed — Violation closed
  • A

    Provide and maintain approved mail receptacles and directories for the persons residing in the dwelling as provided in the u.s. postal regulations., 1st story

    Feb 19, 2025

    Closed — Violation closed
  • A

    Provide and maintain approved mail receptacles and directories for the persons residing in the dwelling as provided in the u.s. postal regulations., 1st story

    Feb 19, 2025

    Closed — Violation closed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling and south wall above apartment # 1a at public hall, 1st story

    Sep 24, 2024

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective spring hinges at door at compactor closet

    Sep 24, 2024

    Closed — Violation closed
  • A

    § 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration hopper door {observed hopper door sealed at time of inspecrtioon) at compactor closet

    Sep 24, 2024

    Closed — Violation dismissed
  • A

    § 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story

    Sep 24, 2024

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Sep 24, 2024

    Closed — Violation dismissed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Sep 24, 2024

    Closed — Violation dismissed
  • A

    Provide a mirror in self-service elevator arranged so as to enable a person entering, to view inside of elevator number 2p0991949

    Sep 24, 2024

    Closed — Violation dismissed
  • A

    Provide place within the building for the storage of waste receptacles and disinfect same regularly.

    Sep 24, 2024

    Closed — Violation dismissed
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story

    Sep 24, 2024

    Open — Nov certified late
  • A

    Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story

    Sep 24, 2024

    Closed — Violation dismissed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Sep 24, 2024

    Closed — Violation dismissed
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Sep 24, 2024

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling and south wall above apartment # 1a at public hall, 1st story original violation 17298546 issued 24-sep-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Sep 24, 2024

    Closed — Violation dismissed

DOB building violations · 11

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2021

    Aug 21, 2022

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Jun 15, 2021

    Vp*-violation unserved ecb- dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2016 inspection/test

    Sep 15, 2017

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2015 inspection/test

    Dec 1, 2016

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 22, 2012

    Dob violation - dismissed
  • Unsafe buildings none

    Ub-unsafe buildings none

    Apr 21, 2008

    Dob violation - dismissed
  • Unsafe buildings none

    Ub-unsafe buildings none

    Apr 21, 2008

    Dob violation - dismissed
Show 1 more ↓
  • Construction other optional

    C-construction other optional

    Mar 22, 2007

    Dob violation - dismissed

ECB violations · 72

  • Class - 2

    At time of inspection of class1 vio#39509665j for standpipe not in state of readiness, site is closed unable to verify correction of violating conditions. upon checking department records, no certificate of cor

    Apr 25, 2023 · Penalty $3,125

    Resolve
  • Class - 2

    At time of inspection on a 13 story new building i observed no compliance from respondent for previously issued class 1 violation 39509665j issued on 11/29/22 for failure to have stand pipe in a state of readin

    Feb 7, 2023 · Penalty $3,125

    Resolve
  • Class - 1

    Failure to provide standby in state of readiness. during construction operational demolition operations. greater than 70 feet percomply with code

    Nov 29, 2022 · Penalty $3,125

    Resolve
  • Class - 2

    Pedestrian protection does not meet code specifications.note at the time of my inspection at an a non-active jobsite,i observed that the sidewalk shed had several unsafe conditions that posed a major public haz

    Apr 28, 2022

    Resolve
  • Class - 2

    Fence not constructed or maintained pursuant to subsection.note at thetime of my inspection on a non-active jobsite,i observed that the construction fence has been poorly maintained.1 vision panel at exp1 not p

    Apr 28, 2022 · Penalty $1,000

    Resolve
  • Class - 1

    Failure to maintain adequate housekeeping per section requirements.note at the time of inspection on an non-active jobsite,i observed inadequate housekeeping consisting of large amounts of debris,combustible ma

    Apr 28, 2022 · Penalty $2,500

    Resolve
  • Class - 2

    3314.4.8 failure to maintain pipe scaffold as per code.at time of inspection on an active 13 story nb construction site notice pipe scaffolding at 211 four exposures of the bldg also observed that the contracto

    May 6, 2021

    Resolve
  • Class - 2

    Bc 3301.7 failure to provide p.e. approved design drawings.as noted:attime of inspection at an active construction site observed on several floors cut slab with exposed re-bar with no means of methods for repai

    Oct 5, 2020

    Resolve
  • Class - 1

    Bc 3310.8 failure to perform duties(site safety manager).at the time of inspection i observe active jobsite with construction activities on-going.ssm present on jobsite at time of inspection failed to institute

    Jul 21, 2020

    Resolve
  • Class - 1

    Bc 3301.6.1 design drawing for temporary platform/specific temporary structure.at the time of inpsection i observe active jobsite with construction activities on-going.upon request for design drawing for platfo

    Jul 21, 2020 · Penalty $2,500

    Resolve
Show 40 more ↓
  • Class - 1

    Work does not conform to approved construction documents/admendment(site safety plan).at the time of inspection i observe active jobsite with construction activities on-going.upon review of ssp provided i noted

    Jul 21, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Bc 3301.2 failing to maintain/institute safe operation standards during construction.at the time of inspection i observe active jobsite withconstruction activities on-going.at exp# 1 on the street i observe che

    Jul 21, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Work does not conform approved construction document & amemdment.(sws)at the time of inspection i observe active jobsite with construction activities on going upon request for sws dd.i noted existing sws instal

    Jun 30, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Supported pipe scaffold daily inspection log book.at the time of inspection i observe active jobsite with construction activities sm-going upon request for existing supported pipe scaffold exp#1x2x3x4 daily ins

    Jun 30, 2020 · Penalty $5,000

    Resolve
  • Class - 2

    Failure to maintain(sws).at the time of inspection i observe active jobsite with on-going construction activities.i noted existing sws in place at exp#1&2 with uncapped protruding sharp bolts.this conditions cr

    Jun 30, 2020 · Penalty $2,400

    Resolve
  • Class - 2

    Work does not conform to aproved construction documents and/or approved amendments.note:at the time of inspection i observed active construction site at 13 story new building.installed temporary hoist at exp#4

    Mar 16, 2020 · Penalty $1,250

    Resolve
  • Class - 1

    Work does not conform to approved construction documents and/or approved amendments.at the time of my inspection i observed active construction site at 13 story new building.installed temporary platform-protect

    Mar 16, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Bc 1704.24.1.5 readiness. no stand pipe system shall be considered in readiness until there has been a successful hydrostatic pressure test.@time of my inspection of 13 sty building, i observed an active jobsit

    Jan 15, 2020 · Penalty $2,500

    Resolve
  • Class - 1

    Bc 3303.16 contractors sheds and offices at the time of my inspection it was observed that on active construction site with formwork operations there was a contractors shanty located @exp #1 made out of combust

    Nov 21, 2019 · Penalty $625

    Resolve
  • Class - 1

    3307.2;inadequate pedestrian walkway at time of inspection of a actiev 9 sty nb currently @ grade lvel i obseevred 1) work ongoing @ exp 1 exterior condidting of removal of gravel with a min excavator gravel lo

    Oct 11, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    3307.2.2;no valid dot permit at time of inspection fo a activ 9 sty bn currently @ grade level i obseerved work ongoing exp #1 exteiror min:excavator removing gravel from pedestrian walkway without th eproper 1

    Oct 11, 2019

    Resolve
  • Class - 1

    No flagman(person)at time of inspection of a actiev 9 sty nb currently @ grade level i observed work ongoing @ exp1 exteiror consisting gravel located in pedestrian walkway street gravel located in pedestrian

    Oct 11, 2019 · Penalty $625

    Resolve
  • Class - 1

    Work contrary to plan at time of inspection of a actiev 9 sty nb currently @ grade level i observed work ongoing contrary to ssp awording to ssp pedestrian walkway should be located @ exp1 and none was provide

    Oct 11, 2019 · Penalty $2,500

    Resolve
  • Class - 1

    No d steel plans/drawings for adjacent building foundation wall at expo#4 at time of inspection active construction site notice at expo#4 of new building an opening an the foundation of the adjacent buidling th

    May 28, 2019

    Resolve
  • Class - 2

    Failure to perform proper concrete washout water procedures at the time of inspection of an active constructing site i observed that concrete washout water shall be collected and contained in a ore manufactured

    May 28, 2019 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirmenet .at time of inspection of active construction site i observed construction debris throughout the site concrete bags and concrete mis spillag ewa

    May 28, 2019

    Resolve
  • Class - 2

    Failure to maintain const fence.@time of insp i observed a const fenceon an excavation site w/panels starting to bow towards sidewalk which can lead to a hazardous condition (suck)as pedestrians being struck by

    Apr 10, 2019

    Resolve
  • Class - 1

    Failure to notify the department prior to commencment of earthwork at the time of inspection it was observed that the contractors were in teh soe phase removing dirt from the site. contractors had a notific

    Sep 14, 2018 · Penalty $6,250

    Resolve
  • Class - 2

    28-108.12.8 work is not in accordance with site safety plan.at the time of inspection it was observed that the constractors failed to follow the site safety plan as the site safety plan showed 2 ladders to

    Sep 14, 2018

    Resolve
  • Class - 1

    Construction superintendent failed to perform duties as per code. at the time of inspection it was observed that under the supervision of john sadowski the superintendent failed to perform his duties by

    Sep 14, 2018 · Penalty $12,500

    Resolve
  • Class - 1

    3304.7 failure to provide at least one safe means of egress from excavation.note:at time of inspection i observed the contractor failed to have a 45% slope or ladder on site to have at least 1 safe means of

    Sep 14, 2018 · Penalty $6,250

    Resolve
  • Class - 2

    Failure to maintain display on site documents.required by chapter 23 at time of inspection i obseved that the contractore failed to providethe inspection reports for the sob work they performed.as per code ins

    Sep 14, 2018

    Resolve
  • Class - 1

    Work does not comform to approved construction documents and or approved amendments. at the time of inspection it was observed that the contractors failed to follow the dob approved plans as contractor

    Sep 14, 2018 · Penalty $6,250

    Resolve
  • Class - 1

    3309.6 failure to monitor adjoining structure for movement in all direction during excavation elated activities that may adversely affect adjoining structures.at the time of inspection it was observed that

    Sep 14, 2018 · Penalty $6,250

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section. note at time ofinspection observed accumulation of combustible materials consist of various site of lumber,plywood and other construction materials in a

    Dec 19, 2015

    Resolve
  • Class - 1

    Bc3314.4.11 materials on scaffold while work not in progress and modified support scaffold w/o a scaffold user card at time of inspection observed loose planking on scaffold, not tied down exp2,and 3. endpcs

    Dec 19, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    28-105.1 work after hours w/o a variance.permit contrary to 28-106.2.5.note at time of inspection apprx 7:30am observed workers on site moving construction materials,masonry worker adjusting reshores and sweep

    Dec 19, 2015 · Penalty $400

    Resolve
  • Class - 2

    Work does not conform to approved construction documents or amendment site safety plans. note at time of inspection observed supported pipe scaffold installed at exp1,2,3,4 and not indicated on the approved sit

    Dec 19, 2015

    Resolve
  • Class - 2

    Bc3308.3 vertical safety netting not per code damaged and inadequate note at time of inspection vertical netting installed at 11h loose at the bottom unsecure due to no zero cables, and at 9,8,76 floor various

    Dec 19, 2015

    Resolve
  • Class - 2

    Holes/openings not covered.upon inspection as noted @ active construction site up to 11th fl forming there holes @ all levels 5-9th fl varying in size from approx 3"dia-6"dia no coverings are in place risking d

    Oct 17, 2015 · Penalty $1,200

    Resolve
  • Class - 1

    Horizontal safety netting not provided during new construction.pswo on all formwork,rebar & concrete operations issued pursuant to 28-207.2 & posted @ premises upon inspection as noted @ active construction sit

    Oct 17, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Reshores in proximity to facade w/in 10ft not secured.pswo on all formwork w/in 10ft of bldg edge.issued pursuant to 28-207.2 & posted @ premises.upon inspection as noted @ active construction site up to 11th f

    Oct 17, 2015 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements.upon inspection as noted @ active construction site up to 11th fl (forming) there is an excessive amount of debris on all levels,combustible di

    Oct 17, 2015 · Penalty $400

    Resolve
  • Class - 2

    Vertical safety netting not per code damaged & inadequate.pswo on all work w/in 20ft off bldg edge.issued pursuant to 28-207.2 & posted @ premises.upon inspection as noted @ active construction site forming @ 1

    Oct 17, 2015 · Penalty $400

    Resolve
  • Class - 1

    Bc3303.4.5.1 materials stored w/in 10ft.pswo on all work.w/in 10ft of bldg's edge (no storage) issued pursuant to 28-207.2 & posted @ premises.upon inspection as noted @ active construction site up to 11th fl t

    Oct 17, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Failure to provide design drawing pswo on all temporary platforms issued pursuant to 28-207.2 & posted @ premises.upon inspection as noted @active construction site up to 11th fl forming,there are temporary pla

    Oct 17, 2015

    Resolve
  • Class - 1

    3303.8 standpipe has not been provided new bldg has reached a height of more than 75' and no temporary or permanent standpipe system has been installed. partial stop work order issued pusuant to 28-207.2 and po

    Jul 9, 2015 · Penalty $1,600

    Resolve
  • Class - 1

    Work does not conform to approved construction documents.the temporaryplatform provided in elevator shaft used as a landing for(ladders)has not been erected as per the "safety stop,elevator opening support deta

    Jul 9, 2015 · Penalty $1,000

    Resolve
  • Class - 2

    3303.4 debris (including an excessive amount of wood)has not been cle aned of daily from upper floors. remedy:remove excessive amount of debris and clean floors daily.

    Jul 9, 2015

    Resolve
  • Class - 2

    3301.9.2.1 failure to post/provide required sidewalk shed sign as described in code. remedy: provide/post sidewalk shed sign at site as described in section of code.

    Jul 9, 2015

    Resolve

Complaints

  • Paint/plaster

    Window/frame

    Oct 9, 2026 · Apt 6

    Open
  • Water leak

    Heavy flow

    Oct 9, 2026 · Apt 6

    Open
  • Paint/plaster

    Wall

    Oct 9, 2026 · Apt 6

    Open
  • Water leak

    Slow leak

    Oct 8, 2026 · Apt 6B

    Open
  • Paint/plaster

    Ceiling

    Oct 8, 2026 · Apt 6B

    Open
  • Unsanitary condition

    Pests

    Sep 30, 2026 · Apt 2C

    Close
  • Unsanitary condition

    Pests

    Aug 25, 2026 · Apt 7B

    Close
  • Paint/plaster

    Wall

    Aug 25, 2026 · Apt 7B

    Close
  • Unsanitary condition

    Pests

    Jun 11, 2026 · Apt 2C

    Close
  • Flooring/stairs

    Floor

    Jun 11, 2026 · Apt 2C

    Close
Show 40 more ↓
  • Unsanitary condition

    Garbage/recycling storage

    Jun 11, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    May 6, 2026 · Apt 1B

    Close
  • Unsanitary condition

    Mold

    May 6, 2026 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Mar 11, 2026 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Mar 8, 2026 · Apt 3F

    Close
  • Paint/plaster

    Ceiling

    Mar 8, 2026 · Apt 3F

    Close
  • Paint/plaster

    Ceiling

    Mar 7, 2026 · Apt 3F

    Close
  • Heat/hot water

    Apartment only

    Mar 7, 2026 · Apt 3F

    Close
  • Heat/hot water

    Apartment only

    Feb 14, 2026 · Apt 1A

    Close
  • Heat/hot water

    Apartment only

    Feb 1, 2026 · Apt 2E

    Close
  • Door/window

    Window frame

    Jan 28, 2026 · Apt 6C

    Close
  • Paint/plaster

    Wall

    Jan 28, 2026 · Apt 6C

    Close
  • Paint/plaster

    Wall

    Jan 28, 2026 · Apt 6C

    Close
  • Heat/hot water

    Entire building

    Jan 24, 2026 · Apt 3B

    Close
  • Unsanitary condition

    Pests

    Dec 19, 2025 · Apt 3D

    Close
  • Heat/hot water

    Apartment only

    Dec 9, 2025 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    Nov 18, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 17, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 16, 2025 · Apt 6C

    Close
  • Heat/hot water

    Apartment only

    Nov 16, 2025 · Apt 9D

    Close
  • Heat/hot water

    Entire building

    Nov 16, 2025 · Apt BLDG

    Close
  • Door/window

    Door

    Oct 27, 2025 · Apt 7B

    Close
  • Paint/plaster

    Wall

    Oct 27, 2025 · Apt 7B

    Close
  • Door/window

    Door

    Oct 20, 2025 · Apt 7B

    Close
  • Door/window

    Door

    Oct 20, 2025 · Apt 7B

    Close
  • Paint/plaster

    Wall

    Oct 20, 2025 · Apt 7B

    Close
  • Paint/plaster

    Wall

    Oct 2, 2025 · Apt 7B

    Close
  • Door/window

    Door

    Oct 2, 2025 · Apt 7B

    Close
  • Unsanitary condition

    Pests

    Oct 2, 2025 · Apt 7B

    Close
  • General

    Cabinet

    Oct 2, 2025 · Apt 7B

    Close
  • General

    Bell/buzzer/intercom

    Aug 10, 2025 · Apt 9C

    Close
  • Water leak

    Heavy flow

    Aug 10, 2025 · Apt 9C

    Close
  • General

    Cabinet

    Aug 10, 2025 · Apt 9C

    Close
  • Unsanitary condition

    Mold

    Aug 10, 2025 · Apt 9C

    Close
  • Water leak

    Damp spot

    Aug 10, 2025 · Apt 9C

    Close
  • Door/window

    Door frame

    Jun 22, 2025 · Apt 7E

    Close
  • Unsanitary condition

    Pests

    Jun 22, 2025 · Apt 7E

    Close
  • Plumbing

    Water supply

    Jun 22, 2025 · Apt 7E

    Close
  • Unsanitary condition

    Pests

    Jun 22, 2025 · Apt 7E

    Close
  • General

    Mailbox

    May 24, 2025 · Apt 7E

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D9)
Year built
2019
Floors
13
Residential units
66
Building area
63,785 ft²
Lot area
8,948 ft²
Zoning
M1-4/R8A
Community board
201
Council district
8
Block / lot
2351 / 22
Assessed value
$5,454,900
Landmark / historic district
No

HPD registration #228960, last renewed Jul 24, 2026.

Questions about 500 Exterior Street

Who owns 500 Exterior Street?

The owner of record in NYC Department of City Planning PLUTO data is New Jai Ganesh Realty LLC.

Does 500 Exterior Street have violations?

Yes. NYC HPD has recorded 49 housing violations at this property.

Is 500 Exterior Street rent stabilized?

NYC Department of Finance tax bills listed 66 rent-stabilized units here in 2024 (about 100% of its 66 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 500 Exterior Street built?

City records list 2019 as the year it was built.

How many apartments are in 500 Exterior Street?

It has 66 residential units and 67 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.