500 Exterior Street
Bronx, NY 10451BBL 2-02351-0022Map
Owner of record: New Jai Ganesh Realty LLC
500 Exterior Street is an elevator apartment building built in 2019 in Bronx, 10451. It has 66 residential units across 13 floors. The owner of record is New Jai Ganesh Realty LLC. HPD has recorded 49 housing violations here, most recently on October 2, 2026. 30 of the 49 most recent violations are still open. City tax records listed 66 rent-stabilized apartments here in 2024.
- HPD violations
- 49
- DOB violations
- 11
- ECB violations
- 72
- HPD complaints
- 71
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 49
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 2nd apartment from south at west
Oct 2, 2026 · Apt 2C
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective connection the drain pipe under sink in the kitchen located at apt 2c, 2nd story, 2nd apartment from south at west
Oct 2, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 2nd apartment from west at north
Jun 17, 2026 · Apt 2C
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective latch set and assembly at entrance door in the 1st room from north at west located at apt 2c, 2nd story, 2nd apartment from west at north
Jun 17, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing consisting garbage cans at compactor closet
Jun 17, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 3f, 3rd story, 2nd apartment from east at south
Mar 14, 2026 · Apt 3F
Open — Nov sent out - BHazardous
Properly secure the loose light. fixture at ceiling in the kitchen located at apt 3f, 3rd story, 2nd apartment from east at south
Mar 14, 2026 · Apt 3F
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water supply exceeding 130f degrees in the entire apartment located at apt 3f, 3rd story, 2nd apartment from east at south
Mar 14, 2026 · Apt 3F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 3f, 3rd story, 2nd apartment from east at south
Mar 9, 2026 · Apt 3F
Open — Nov sent out - BHazardous
Properly secure the loose light fixtures at ceiling in the kitchen located at apt 3f, 3rd story, 2nd apartment from east at south
Mar 9, 2026 · Apt 3F
Open — Nov sent out
Show 39 more ↓
- BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Mar 9, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3d, 3rd story, 1st apartment from west at north
Mar 8, 2026 · Apt 3D
Open — Notice of issuance sent to tenant - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3d, 3rd story, 1st apartment from west at north
Mar 8, 2026 · Apt 3D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color around window frame at east wall in the 2nd room from east at north located at apt 6c, 6th story, 2nd apartment from west at north
Feb 15, 2026 · Apt 6C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color around window frame at east wall in the 3rd room from north located at apt 6c, 6th story, 2nd apartment from west at north
Feb 15, 2026 · Apt 6C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color around window frame, at east wall in the 1st room from east located at apt 6c, 6th story, 2nd apartment from west at north
Feb 15, 2026 · Apt 6C
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6c, 6th story, 2nd apartment from north at east
Nov 18, 2025 · Apt 6C
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq. ft at ceiling in the 1st bathroom from east located at apt 9c, 9th story, 2nd apartment from west at north
Aug 19, 2025 · Apt 9C
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 9c, 9th story, 2nd apartment from west at north
Aug 19, 2025 · Apt 9C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective doors at base cabinet sink in the kitchen located at apt 9c, 9th story, 2nd apartment from west at north
Aug 19, 2025 · Apt 9C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 9c, 9th story, 2nd apartment from west at north
Aug 19, 2025 · Apt 9C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 9c, 9th story, 2nd apartment from west at north
Aug 19, 2025 · Apt 9C
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 9c, 9th story, 2nd apartment from west at north
Aug 19, 2025 · Apt 9C
Open — Notice of issuance sent to tenant - CImmediately hazardous
M/d law abate the nuisance consisting of screws protruding in wood base cabinet at sink in the kitchen located at apt 9c, 9th story, 2nd apartment from west at north
Aug 19, 2025 · Apt 9C
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq. ft at ceiling in the 1st bathroom from east located at apt 9c, 9th story, 2nd apartment from west at north original violation 18169801 issued 19-aug-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Aug 19, 2025 · Apt 9C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective door lock in the entrance located at apt 7b, 7th story, 1st apartment from north at east
May 13, 2025 · Apt 7B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color window sill at east wall in the 1st room from east located at apt 7b, 7th story, 1st apartment from north at east
May 13, 2025 · Apt 7B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective closet door off the track at west wall in the private hallway located at apt 7b, 7th story, 1st apartment from north at east
May 13, 2025 · Apt 7B
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd bathroom from north located at apt 7e, 7th story, 1st apartment from south at west
Apr 12, 2025 · Apt 7E
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). (in-line) defective in the entire apartment located at apt 7e, 7th story, 1st apartment from south at west
Apr 12, 2025 · Apt 7E
Open — Nov sent out - BHazardous
Repair or replace the smoke detector (in-line) defective in the entire apartment located at apt 7e, 7th story, 1st apartment from south at west
Apr 12, 2025 · Apt 7E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lock and assemblies (latch) at rm entrance door in the 2nd room from north located at apt 7e, 7th story, 1st apartment from south at west
Apr 12, 2025 · Apt 7E
Open — Nov sent out - ANon-hazardous
Provide and maintain approved mail receptacles and directories for the persons residing in the dwelling as provided in the u.s. postal regulations., 1st story
Feb 19, 2025
Closed — Violation closed - ANon-hazardous
Provide and maintain approved mail receptacles and directories for the persons residing in the dwelling as provided in the u.s. postal regulations., 1st story
Feb 19, 2025
Closed — Violation closed - ANon-hazardous
Provide and maintain approved mail receptacles and directories for the persons residing in the dwelling as provided in the u.s. postal regulations., 1st story
Feb 19, 2025
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling and south wall above apartment # 1a at public hall, 1st story
Sep 24, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective spring hinges at door at compactor closet
Sep 24, 2024
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration hopper door {observed hopper door sealed at time of inspecrtioon) at compactor closet
Sep 24, 2024
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Sep 24, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Sep 24, 2024
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Sep 24, 2024
Closed — Violation dismissed - ANon-hazardous
Provide a mirror in self-service elevator arranged so as to enable a person entering, to view inside of elevator number 2p0991949
Sep 24, 2024
Closed — Violation dismissed - ANon-hazardous
Provide place within the building for the storage of waste receptacles and disinfect same regularly.
Sep 24, 2024
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Sep 24, 2024
Open — Nov certified late - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Sep 24, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Sep 24, 2024
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Sep 24, 2024
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling and south wall above apartment # 1a at public hall, 1st story original violation 17298546 issued 24-sep-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Sep 24, 2024
Closed — Violation dismissed
DOB building violations · 11
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2021
Aug 21, 2022
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 15, 2021
Vp*-violation unserved ecb- dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 22, 2012
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Apr 21, 2008
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Apr 21, 2008
Dob violation - dismissed
Show 1 more ↓
- Construction other optional
C-construction other optional
Mar 22, 2007
Dob violation - dismissed
ECB violations · 72
- Class - 2
At time of inspection of class1 vio#39509665j for standpipe not in state of readiness, site is closed unable to verify correction of violating conditions. upon checking department records, no certificate of cor
Apr 25, 2023 · Penalty $3,125
Resolve - Class - 2
At time of inspection on a 13 story new building i observed no compliance from respondent for previously issued class 1 violation 39509665j issued on 11/29/22 for failure to have stand pipe in a state of readin
Feb 7, 2023 · Penalty $3,125
Resolve - Class - 1
Failure to provide standby in state of readiness. during construction operational demolition operations. greater than 70 feet percomply with code
Nov 29, 2022 · Penalty $3,125
Resolve - Class - 2
Pedestrian protection does not meet code specifications.note at the time of my inspection at an a non-active jobsite,i observed that the sidewalk shed had several unsafe conditions that posed a major public haz
Apr 28, 2022
Resolve - Class - 2
Fence not constructed or maintained pursuant to subsection.note at thetime of my inspection on a non-active jobsite,i observed that the construction fence has been poorly maintained.1 vision panel at exp1 not p
Apr 28, 2022 · Penalty $1,000
Resolve - Class - 1
Failure to maintain adequate housekeeping per section requirements.note at the time of inspection on an non-active jobsite,i observed inadequate housekeeping consisting of large amounts of debris,combustible ma
Apr 28, 2022 · Penalty $2,500
Resolve - Class - 2
3314.4.8 failure to maintain pipe scaffold as per code.at time of inspection on an active 13 story nb construction site notice pipe scaffolding at 211 four exposures of the bldg also observed that the contracto
May 6, 2021
Resolve - Class - 2
Bc 3301.7 failure to provide p.e. approved design drawings.as noted:attime of inspection at an active construction site observed on several floors cut slab with exposed re-bar with no means of methods for repai
Oct 5, 2020
Resolve - Class - 1
Bc 3310.8 failure to perform duties(site safety manager).at the time of inspection i observe active jobsite with construction activities on-going.ssm present on jobsite at time of inspection failed to institute
Jul 21, 2020
Resolve - Class - 1
Bc 3301.6.1 design drawing for temporary platform/specific temporary structure.at the time of inpsection i observe active jobsite with construction activities on-going.upon request for design drawing for platfo
Jul 21, 2020 · Penalty $2,500
Resolve
Show 40 more ↓
- Class - 1
Work does not conform to approved construction documents/admendment(site safety plan).at the time of inspection i observe active jobsite with construction activities on-going.upon review of ssp provided i noted
Jul 21, 2020 · Penalty $2,500
Resolve - Class - 1
Bc 3301.2 failing to maintain/institute safe operation standards during construction.at the time of inspection i observe active jobsite withconstruction activities on-going.at exp# 1 on the street i observe che
Jul 21, 2020 · Penalty $2,500
Resolve - Class - 1
Work does not conform approved construction document & amemdment.(sws)at the time of inspection i observe active jobsite with construction activities on going upon request for sws dd.i noted existing sws instal
Jun 30, 2020 · Penalty $2,500
Resolve - Class - 1
Supported pipe scaffold daily inspection log book.at the time of inspection i observe active jobsite with construction activities sm-going upon request for existing supported pipe scaffold exp#1x2x3x4 daily ins
Jun 30, 2020 · Penalty $5,000
Resolve - Class - 2
Failure to maintain(sws).at the time of inspection i observe active jobsite with on-going construction activities.i noted existing sws in place at exp#1&2 with uncapped protruding sharp bolts.this conditions cr
Jun 30, 2020 · Penalty $2,400
Resolve - Class - 2
Work does not conform to aproved construction documents and/or approved amendments.note:at the time of inspection i observed active construction site at 13 story new building.installed temporary hoist at exp#4
Mar 16, 2020 · Penalty $1,250
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments.at the time of my inspection i observed active construction site at 13 story new building.installed temporary platform-protect
Mar 16, 2020 · Penalty $2,500
Resolve - Class - 1
Bc 1704.24.1.5 readiness. no stand pipe system shall be considered in readiness until there has been a successful hydrostatic pressure test.@time of my inspection of 13 sty building, i observed an active jobsit
Jan 15, 2020 · Penalty $2,500
Resolve - Class - 1
Bc 3303.16 contractors sheds and offices at the time of my inspection it was observed that on active construction site with formwork operations there was a contractors shanty located @exp #1 made out of combust
Nov 21, 2019 · Penalty $625
Resolve - Class - 1
3307.2;inadequate pedestrian walkway at time of inspection of a actiev 9 sty nb currently @ grade lvel i obseevred 1) work ongoing @ exp 1 exterior condidting of removal of gravel with a min excavator gravel lo
Oct 11, 2019 · Penalty $2,500
Resolve - Class - 2
3307.2.2;no valid dot permit at time of inspection fo a activ 9 sty bn currently @ grade level i obseerved work ongoing exp #1 exteiror min:excavator removing gravel from pedestrian walkway without th eproper 1
Oct 11, 2019
Resolve - Class - 1
No flagman(person)at time of inspection of a actiev 9 sty nb currently @ grade level i observed work ongoing @ exp1 exteiror consisting gravel located in pedestrian walkway street gravel located in pedestrian
Oct 11, 2019 · Penalty $625
Resolve - Class - 1
Work contrary to plan at time of inspection of a actiev 9 sty nb currently @ grade level i observed work ongoing contrary to ssp awording to ssp pedestrian walkway should be located @ exp1 and none was provide
Oct 11, 2019 · Penalty $2,500
Resolve - Class - 1
No d steel plans/drawings for adjacent building foundation wall at expo#4 at time of inspection active construction site notice at expo#4 of new building an opening an the foundation of the adjacent buidling th
May 28, 2019
Resolve - Class - 2
Failure to perform proper concrete washout water procedures at the time of inspection of an active constructing site i observed that concrete washout water shall be collected and contained in a ore manufactured
May 28, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirmenet .at time of inspection of active construction site i observed construction debris throughout the site concrete bags and concrete mis spillag ewa
May 28, 2019
Resolve - Class - 2
Failure to maintain const fence.@time of insp i observed a const fenceon an excavation site w/panels starting to bow towards sidewalk which can lead to a hazardous condition (suck)as pedestrians being struck by
Apr 10, 2019
Resolve - Class - 1
Failure to notify the department prior to commencment of earthwork at the time of inspection it was observed that the contractors were in teh soe phase removing dirt from the site. contractors had a notific
Sep 14, 2018 · Penalty $6,250
Resolve - Class - 2
28-108.12.8 work is not in accordance with site safety plan.at the time of inspection it was observed that the constractors failed to follow the site safety plan as the site safety plan showed 2 ladders to
Sep 14, 2018
Resolve - Class - 1
Construction superintendent failed to perform duties as per code. at the time of inspection it was observed that under the supervision of john sadowski the superintendent failed to perform his duties by
Sep 14, 2018 · Penalty $12,500
Resolve - Class - 1
3304.7 failure to provide at least one safe means of egress from excavation.note:at time of inspection i observed the contractor failed to have a 45% slope or ladder on site to have at least 1 safe means of
Sep 14, 2018 · Penalty $6,250
Resolve - Class - 2
Failure to maintain display on site documents.required by chapter 23 at time of inspection i obseved that the contractore failed to providethe inspection reports for the sob work they performed.as per code ins
Sep 14, 2018
Resolve - Class - 1
Work does not comform to approved construction documents and or approved amendments. at the time of inspection it was observed that the contractors failed to follow the dob approved plans as contractor
Sep 14, 2018 · Penalty $6,250
Resolve - Class - 1
3309.6 failure to monitor adjoining structure for movement in all direction during excavation elated activities that may adversely affect adjoining structures.at the time of inspection it was observed that
Sep 14, 2018 · Penalty $6,250
Resolve - Class - 2
Failure to maintain adequate housekeeping per section. note at time ofinspection observed accumulation of combustible materials consist of various site of lumber,plywood and other construction materials in a
Dec 19, 2015
Resolve - Class - 1
Bc3314.4.11 materials on scaffold while work not in progress and modified support scaffold w/o a scaffold user card at time of inspection observed loose planking on scaffold, not tied down exp2,and 3. endpcs
Dec 19, 2015 · Penalty $1,600
Resolve - Class - 1
28-105.1 work after hours w/o a variance.permit contrary to 28-106.2.5.note at time of inspection apprx 7:30am observed workers on site moving construction materials,masonry worker adjusting reshores and sweep
Dec 19, 2015 · Penalty $400
Resolve - Class - 2
Work does not conform to approved construction documents or amendment site safety plans. note at time of inspection observed supported pipe scaffold installed at exp1,2,3,4 and not indicated on the approved sit
Dec 19, 2015
Resolve - Class - 2
Bc3308.3 vertical safety netting not per code damaged and inadequate note at time of inspection vertical netting installed at 11h loose at the bottom unsecure due to no zero cables, and at 9,8,76 floor various
Dec 19, 2015
Resolve - Class - 2
Holes/openings not covered.upon inspection as noted @ active construction site up to 11th fl forming there holes @ all levels 5-9th fl varying in size from approx 3"dia-6"dia no coverings are in place risking d
Oct 17, 2015 · Penalty $1,200
Resolve - Class - 1
Horizontal safety netting not provided during new construction.pswo on all formwork,rebar & concrete operations issued pursuant to 28-207.2 & posted @ premises upon inspection as noted @ active construction sit
Oct 17, 2015 · Penalty $1,600
Resolve - Class - 1
Reshores in proximity to facade w/in 10ft not secured.pswo on all formwork w/in 10ft of bldg edge.issued pursuant to 28-207.2 & posted @ premises.upon inspection as noted @ active construction site up to 11th f
Oct 17, 2015 · Penalty $1,600
Resolve - Class - 2
Failure to maintain adequate housekeeping per section requirements.upon inspection as noted @ active construction site up to 11th fl (forming) there is an excessive amount of debris on all levels,combustible di
Oct 17, 2015 · Penalty $400
Resolve - Class - 2
Vertical safety netting not per code damaged & inadequate.pswo on all work w/in 20ft off bldg edge.issued pursuant to 28-207.2 & posted @ premises.upon inspection as noted @ active construction site forming @ 1
Oct 17, 2015 · Penalty $400
Resolve - Class - 1
Bc3303.4.5.1 materials stored w/in 10ft.pswo on all work.w/in 10ft of bldg's edge (no storage) issued pursuant to 28-207.2 & posted @ premises.upon inspection as noted @ active construction site up to 11th fl t
Oct 17, 2015 · Penalty $1,600
Resolve - Class - 1
Failure to provide design drawing pswo on all temporary platforms issued pursuant to 28-207.2 & posted @ premises.upon inspection as noted @active construction site up to 11th fl forming,there are temporary pla
Oct 17, 2015
Resolve - Class - 1
3303.8 standpipe has not been provided new bldg has reached a height of more than 75' and no temporary or permanent standpipe system has been installed. partial stop work order issued pusuant to 28-207.2 and po
Jul 9, 2015 · Penalty $1,600
Resolve - Class - 1
Work does not conform to approved construction documents.the temporaryplatform provided in elevator shaft used as a landing for(ladders)has not been erected as per the "safety stop,elevator opening support deta
Jul 9, 2015 · Penalty $1,000
Resolve - Class - 2
3303.4 debris (including an excessive amount of wood)has not been cle aned of daily from upper floors. remedy:remove excessive amount of debris and clean floors daily.
Jul 9, 2015
Resolve - Class - 2
3301.9.2.1 failure to post/provide required sidewalk shed sign as described in code. remedy: provide/post sidewalk shed sign at site as described in section of code.
Jul 9, 2015
Resolve
Complaints
- Paint/plaster
Window/frame
Oct 9, 2026 · Apt 6
Open - Water leak
Heavy flow
Oct 9, 2026 · Apt 6
Open - Paint/plaster
Wall
Oct 9, 2026 · Apt 6
Open - Water leak
Slow leak
Oct 8, 2026 · Apt 6B
Open - Paint/plaster
Ceiling
Oct 8, 2026 · Apt 6B
Open - Unsanitary condition
Pests
Sep 30, 2026 · Apt 2C
Close - Unsanitary condition
Pests
Aug 25, 2026 · Apt 7B
Close - Paint/plaster
Wall
Aug 25, 2026 · Apt 7B
Close - Unsanitary condition
Pests
Jun 11, 2026 · Apt 2C
Close - Flooring/stairs
Floor
Jun 11, 2026 · Apt 2C
Close
Show 40 more ↓
- Unsanitary condition
Garbage/recycling storage
Jun 11, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
May 6, 2026 · Apt 1B
Close - Unsanitary condition
Mold
May 6, 2026 · Apt 1B
Close - Heat/hot water
Apartment only
Mar 11, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Mar 8, 2026 · Apt 3F
Close - Paint/plaster
Ceiling
Mar 8, 2026 · Apt 3F
Close - Paint/plaster
Ceiling
Mar 7, 2026 · Apt 3F
Close - Heat/hot water
Apartment only
Mar 7, 2026 · Apt 3F
Close - Heat/hot water
Apartment only
Feb 14, 2026 · Apt 1A
Close - Heat/hot water
Apartment only
Feb 1, 2026 · Apt 2E
Close - Door/window
Window frame
Jan 28, 2026 · Apt 6C
Close - Paint/plaster
Wall
Jan 28, 2026 · Apt 6C
Close - Paint/plaster
Wall
Jan 28, 2026 · Apt 6C
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Dec 19, 2025 · Apt 3D
Close - Heat/hot water
Apartment only
Dec 9, 2025 · Apt 1A
Close - Heat/hot water
Entire building
Nov 18, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 17, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 16, 2025 · Apt 6C
Close - Heat/hot water
Apartment only
Nov 16, 2025 · Apt 9D
Close - Heat/hot water
Entire building
Nov 16, 2025 · Apt BLDG
Close - Door/window
Door
Oct 27, 2025 · Apt 7B
Close - Paint/plaster
Wall
Oct 27, 2025 · Apt 7B
Close - Door/window
Door
Oct 20, 2025 · Apt 7B
Close - Door/window
Door
Oct 20, 2025 · Apt 7B
Close - Paint/plaster
Wall
Oct 20, 2025 · Apt 7B
Close - Paint/plaster
Wall
Oct 2, 2025 · Apt 7B
Close - Door/window
Door
Oct 2, 2025 · Apt 7B
Close - Unsanitary condition
Pests
Oct 2, 2025 · Apt 7B
Close - General
Cabinet
Oct 2, 2025 · Apt 7B
Close - General
Bell/buzzer/intercom
Aug 10, 2025 · Apt 9C
Close - Water leak
Heavy flow
Aug 10, 2025 · Apt 9C
Close - General
Cabinet
Aug 10, 2025 · Apt 9C
Close - Unsanitary condition
Mold
Aug 10, 2025 · Apt 9C
Close - Water leak
Damp spot
Aug 10, 2025 · Apt 9C
Close - Door/window
Door frame
Jun 22, 2025 · Apt 7E
Close - Unsanitary condition
Pests
Jun 22, 2025 · Apt 7E
Close - Plumbing
Water supply
Jun 22, 2025 · Apt 7E
Close - Unsanitary condition
Pests
Jun 22, 2025 · Apt 7E
Close - General
Mailbox
May 24, 2025 · Apt 7E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D9)
- Year built
- 2019
- Floors
- 13
- Residential units
- 66
- Building area
- 63,785 ft²
- Lot area
- 8,948 ft²
- Zoning
- M1-4/R8A
- Community board
- 201
- Council district
- 8
- Block / lot
- 2351 / 22
- Assessed value
- $5,454,900
- Landmark / historic district
- No
HPD registration #228960, last renewed Jul 24, 2026.
Questions about 500 Exterior Street
Who owns 500 Exterior Street?
The owner of record in NYC Department of City Planning PLUTO data is New Jai Ganesh Realty LLC.
Does 500 Exterior Street have violations?
Yes. NYC HPD has recorded 49 housing violations at this property.
Is 500 Exterior Street rent stabilized?
NYC Department of Finance tax bills listed 66 rent-stabilized units here in 2024 (about 100% of its 66 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 500 Exterior Street built?
City records list 2019 as the year it was built.
How many apartments are in 500 Exterior Street?
It has 66 residential units and 67 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.