2413 Third Avenue is an elevator apartment building built in 2021 in Bronx, 10451. It has 200 residential units across 27 floors. The owner of record is Rxr 2413 Third Owner LLC. HPD has recorded 27 housing violations here, most recently on October 6, 2026. 27 of the 27 most recent violations are still open. City tax records listed 175 rent-stabilized apartments here in 2024.
- HPD violations
- 27
- DOB violations
- 12
- ECB violations
- 37
- HPD complaints
- 19
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 27
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story
Oct 6, 2026
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected, 1st story
Oct 6, 2026
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper., 1st story
Oct 6, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox, 1st story
Oct 6, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings
Oct 6, 2026
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor, 1st story
Oct 6, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Oct 6, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
May 11, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations deffective in the entire apartment located at apt 609, 6th story, 1st apartment from north at east
Mar 4, 2026 · Apt 609
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules deffective in the entire apartment located at apt 609, 6th story, 1st apartment from north at east
Mar 4, 2026 · Apt 609
Open — Nov sent out
Show 17 more ↓
- BHazardous
Properly repair or replace the broken or defective ptec heating system unit in the 3rd room from east located at apt 609, 6th story, 1st apartment from north at east
Mar 4, 2026 · Apt 609
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ptec heating system unit in the 1st room from east located at apt 609, 6th story, 1st apartment from north at east
Mar 4, 2026 · Apt 609
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective ptec heating system unit in the 2nd room from east located at apt 609, 6th story, 1st apartment from north at east
Mar 4, 2026 · Apt 609
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood laminate floor in the 1st room from north at west located at apt 705, 7th story, 1st apartment from west at north
Mar 1, 2026 · Apt 705
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood laminate floor in the foyer located at apt 705, 7th story, 1st apartment from west at north
Mar 1, 2026 · Apt 705
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood laminate floor in the 1st room from north at east located at apt 705, 7th story, 1st apartment from west at north
Mar 1, 2026 · Apt 705
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 1st room from north at east located at apt 705, 7th story, 1st apartment from west at north
Mar 1, 2026 · Apt 705
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, south wall, and the west wall in the 1st room from north at west located at apt 705, 7th story, 1st apartment from west at north
Mar 1, 2026 · Apt 705
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the closet in the 1st room from north at west located at apt 705, 7th story, 1st apartment from west at north
Mar 1, 2026 · Apt 705
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood laminate floor in the closet in the 1st room from north at west located at apt 705, 7th story, 1st apartment from west at north
Mar 1, 2026 · Apt 705
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 705, 7th story, 1st apartment from west at north
Mar 1, 2026 · Apt 705
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchen located at apt 705, 7th story, 1st apartment from west at north
Mar 1, 2026 · Apt 705
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood laminate floor in the closet in the kitchen located at apt 705, 7th story, 1st apartment from west at north
Mar 1, 2026 · Apt 705
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the closet in the kitchen located at apt 705, 7th story, 1st apartment from west at north
Mar 1, 2026 · Apt 705
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, south wall, and the west wall in the foyer located at apt 705, 7th story, 1st apartment from west at north
Mar 1, 2026 · Apt 705
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, east wall, and the west wall at public hall, 7th story
Mar 1, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at the north wall, east wall, and the west wall at public hall, 7th story
Mar 1, 2026
Open — Nov sent out
DOB building violations · 12
- Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 29, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 8, 2015
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 16, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 25, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 14, 2007
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 6, 2007
Dob violation - resolved
Show 2 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Oct 14, 2004
Dob violation - resolved - Construction other optional
C-construction other optional
Jan 24, 2001
Dob violation - dismissed
ECB violations · 37
- Class - 2
At time of inspection, observed at exp. 1 on left side on adjacent property a section of sidewalk shed that was removed without building department approval. on site safety plan this section is label as sidewal
Sep 8, 2023 · Penalty $1,250
Resolve - Class - 1
Observed suspended scaffolds at all exposures of jobsite on roof.review of approved cd5 show tie backs to l angles to be installed to concrete slab on ground, l angles are installed on ceiling of bulk head and
Mar 29, 2023 · Penalty $625
Resolve - Class - 1
Observed suspended scaffolds on all exposures of jobsite on roof and 24 floor of jobsite. upon request for the manufactures specs for the outrigger beams and a frames in use, none were provided.*stop all use of
Mar 29, 2023 · Penalty $625
Resolve - Class - 2
27 story nb active site. i observed multipoint suspended scaffold attached to building with wire rope and outriggers in place at exp#1,2. permit#x00676759 with masonary work incomplete.observed lifeline anchora
Jan 30, 2023 · Penalty $625
Resolve - Class - 2
27 nb active site. observed heavy construction materials (bricks, steel, posts)/debris stored on top of shed. as per bc 3307.6.5.4, no items shall be stored or be placed upon a sidewalk shed. observed no parape
Jan 30, 2023
Resolve - Class - 1
A 27-story nb active site. observed suspended scaffold in use at all expos. observed 2in foam underneath mudsill base level, lifelines/wirerope on structural members unprotected, turnbuckles on tiebacks all con
Jan 30, 2023 · Penalty $625
Resolve - Class - 2
27 story nb active site.observed temporary construction in place at exp#2.overhead protection with supported scaffolding on top overhead protection had bricks/heavy construction materials.upon request to contra
Jan 30, 2023 · Penalty $1,280
Resolve - Class - 2
27 story nb active site. observed inadequate housekeeping in multiple areas on-site. workers walking on top of sheetrock debris in close proximately and wires on floor creating a potential tripping hazard. cons
Jan 30, 2023 · Penalty $1,280
Resolve - Class - 1
A 27 story nb active. observed sidewalk shed in place at exp#1 with supported scaffolding on top approximately 70 ft at exp#2 in use. further inspection it was observed that shed was missing guardrails also sca
Jan 30, 2023 · Penalty $5,030
Resolve - Class - 1
A 27-story nb active site. observed workers on suspended scaffold at all expos. observed angled tiebacks at roof level for lifelines and scaffold. upon request for pull test for safe anchorage to ensure anchora
Jan 30, 2023 · Penalty $625
Resolve
Show 27 more ↓
- Class - 1
Failure to safeguard person and property (ies) - partial stop work order to all windows installation / operation due to a panal approx 2' x 5' operable window pane fell off the 27th floor to adjoining property
Dec 12, 2022 · Penalty $25,000
Resolve - Class - 2
Failure to institute safety measure: carpenter caring 8ft long 4 metal flat stocks himself from 4th to 3rd floor, tripped on steps & fell to 3rd floor. went hospital by ambulance. long metal flat stocks suppose
Nov 14, 2022 · Penalty $5,000
Resolve - Class - 1
Failure to notify department of incident that resulted in fatality or injury.note:worker carrying eight foot long piece of metal form work tripped on confuits experienced shoulder pain taken to hospital.as per
Oct 20, 2022 · Penalty $5,000
Resolve - Class - 1
Note: worker tripped with electrical conduit cable lay down on floor at lobby, when caring metal form, working on 27th floor. went to hospital by ambulance. also observed accident evidence related materials 8ft
Sep 22, 2022 · Penalty $6,250
Resolve - Class - 1
Failure to institute safety measure: worker tripped with electrical conduit cable lay down on floor(3303.4.1.2) at lobby, when caring metal form, working on 27th floor. went to hospital by ambulance with should
Sep 22, 2022 · Penalty $10,030
Resolve - Class - 1
Note: worker tripped with electrical conduit cable lay down on floor at lobby, when caring metal form, working on 27th floor. also observed toe board missing on guard rail system at 6th floor exp1,2,4, creating
Sep 22, 2022 · Penalty $12,500
Resolve - Class - 1
Note: worker tripped with electrical conduit cable lay down on floor at lobby, when caring metal form, working on 27th floor. also observed rebar caps missing at roof level creating impale hazard when people( 1
Sep 22, 2022 · Penalty $2,500
Resolve - Class - 2
Note: worker tripped with electrical conduit cable lay down on floor at lobby, when caring metal form, working on 27th floor. also observed holes around ducting, around pipes on several floor area creating debr
Sep 22, 2022 · Penalty $5,030
Resolve - Class - 1
Respondent permitted tower crane cn#1045/20 cd#5554 to perfrom construction activities without ensuring that climbing frame was lowered to just above tie-in #1 as per phase 2 drawing # tc-003.01. crane climbed
Jul 19, 2022 · Penalty $6,250
Resolve - Class - 1
Respondent(master rigger) climbed crane to phase 2 on 06/15/22 but did not lower climbing frame to just above tie-in #1 as per approved drawing #tc-003.01 approved 06/10/22., conform work to approved constructi
Jul 19, 2022 · Penalty $2,500
Resolve - Class - 1
Respondent signed cd8 stating that tower crane cn#1045/20 cd#5554 was in its amended phase 2, (lowered to just above tie-in #1 as per phase 2 drawing # tc-003.01.) but it was not. crane climbed 06/15/22. phase
Jul 19, 2022 · Penalty $2,500
Resolve - Class - 1
Respondent used tower crane cn#1045/20 cd#5554 to perfrom construction activities without ensuring that climbing frame was lowered to just above tie-in #1 as per phase 2 drawing # tc-003.01. crane climbed 06/15
Jul 19, 2022 · Penalty $2,500
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments-work contrary to site safety plan ssp-120.00 noted:at time of inspection of proposed 27 story nb at 6 floor level active site
May 10, 2022 · Penalty $2,500
Resolve - Class - 1
Failure to maintain/institute safety measures or temporary construction or equipment-no toe boards at 5th floor exp #1.noted:at time of inspection of proposed 27 story nb active jobsite at 6 floor level observe
May 10, 2022 · Penalty $5,030
Resolve - Class - 2
Failure to maintain/display onsite docs required by bcch33-no dob approved structural plans onsite noted:atoi of proposed 27stynb active jobsite@6fl level.upon request for dob approved plans for structural.none
May 10, 2022
Resolve - Class - 2
Failure to maintain/display onsite docs required by bcch33-no manufacturer specs/insp log for fall arrest systems also no pe installation letter for bigfoot system noted:atoi of proposed 27stynb active jobsite.
May 10, 2022
Resolve - Class - 2
Work doesnt conform to approved const docs &or approved amendments-work contrary to pe drawing&ssps noted:atoi of proposed 27stynb active site.workers on 6fl installing formwork for concrete pour.i observed wor
May 10, 2022
Resolve - Class - 1
Bc3301.2 failure to institute/maintain safety measures onsite-no rebarcaps/inadequate control access zones/all persons to protect onsite noted:atoi of proposed 27stynb active site@6fl level performing concrete
May 10, 2022 · Penalty $6,250
Resolve - Class - 1
Unsafe storage of materials during costruction or demolition.noted:at time of inspection of proposed 27 story nb active jobsite observed on 5th floor at exp #1 metal reshoring stored aprox 4 ft next to leading
May 10, 2022 · Penalty $6,250
Resolve - Class - 1
Work doesnt conform to approved const docs &or approved amendments-no bridging for formwork reshores on plans/details noted:atoi of proposed27stynb 6fl active jobsite.i observed@1,2fl reshores (vert) 3 over hor
May 10, 2022 · Penalty $2,500
Resolve - Class - 1
Respondent permitted tower crane cn#1045/20 cd#5555 to perform construction activities without ensuring faa light was operational; no faa, comply with code; add fix or maintain light
Mar 3, 2022 · Penalty $2,500
Resolve - Class - 1
Tower crane cn#1045/20 cd#5554 erected and in operation respondent did not ensure faa light was operational; ., comply with code; fix faa light
Mar 3, 2022 · Penalty $2,530
Resolve - Class - 1
Sec. 28-401.4 illegally engaging in any business or occupation w/o a license or other authorization(license expired). at time of my inspection,i observed a active jobsite w/approx 7 workers onsite performing
Oct 18, 2021 · Penalty $5,000
Resolve - Class - 1
Failure to maintain onsite documents required by bc chapter 33. note: at time of my inspection at a active jobsite at excavation phase. i requested from ssm(s. mckay)vibration monotoring log book. as per ssm th
Oct 18, 2021
Resolve - Class - 1
Work does not conforms to approved construction documents &/or approved amendments.at the time of inspection i observed 5 stories bldg,demolition in progress.going through the site safety plan.it calls for the
Jun 16, 2021 · Penalty $6,250
Resolve - Class - 1
Bc3314.8 guardrail system & debris netting- inadequate scaffolding guardrails.at the time of inspection i observed demolition of 5 stories bldg.walking around the bldg i saw supported scaffolding on exp.#2,3,4
Jun 16, 2021 · Penalty $6,250
Resolve - Class - 1
Foot bridge/ramp/walkway w/inadequate guardrails.at the time of inspection i observed demolition of 5 stories bldg.walking around the job i saw ramp on exp.#2 connecting the scaffolding & 2nd fl w/out the guard
Jun 16, 2021 · Penalty $6,250
Resolve
Complaints
- Paint/plaster
Wall
Oct 15, 2026 · Apt 904
Open - Water leak
Damp spot
Oct 15, 2026 · Apt 904
Open - Water leak
Heavy flow
Sep 28, 2026 · Apt 1007
Open - Plumbing
Bathtub/shower
Sep 28, 2026 · Apt 1007
Open - Paint/plaster
Wall
Jul 25, 2026 · Apt 904
Close - Water leak
Damp spot
Jul 25, 2026 · Apt 904
Close - Heat/hot water
Entire building
May 6, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
May 6, 2026 · Apt 20FLOO
Close - Heat/hot water
Apartment only
Apr 30, 2026 · Apt 2008
Close - Heat/hot water
Apartment only
Mar 2, 2026 · Apt 609
Close
Show 9 more ↓
- Paint/plaster
Ceiling
Feb 28, 2026 · Apt 705
Close - Heat/hot water
Apartment only
Jan 29, 2026 · Apt 806
Close - Heat/hot water
Apartment only
Jan 22, 2026 · Apt 508
Close - Heat/hot water
Entire building
Dec 13, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Jun 20, 2025 · Apt 806
Close - Plumbing
Bathtub/shower
Jun 2, 2025 · Apt 902
Close - Flooring/stairs
Floor
Jun 27, 2024 · Apt 1503
Close - Paint/plaster
Wall
Jun 27, 2024 · Apt 1503
Close - Unsanitary condition
Mold
Jun 27, 2024 · Apt 1503
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 2021
- Floors
- 27
- Residential units
- 200
- Building area
- 218,695 ft²
- Lot area
- 27,730 ft²
- Zoning
- M1-3/R8
- Community board
- 201
- Council district
- 8
- Block / lot
- 2319 / 109
- Assessed value
- $16,187,400
- Landmark / historic district
- No
HPD registration #228793, last renewed Sep 19, 2025.
Questions about 2413 Third Avenue
Who owns 2413 Third Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Rxr 2413 Third Owner LLC.
Does 2413 Third Avenue have violations?
Yes. NYC HPD has recorded 27 housing violations at this property.
Is 2413 Third Avenue rent stabilized?
NYC Department of Finance tax bills listed 175 rent-stabilized units here in 2024 (about 88% of its 200 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2413 Third Avenue built?
City records list 2021 as the year it was built.
How many apartments are in 2413 Third Avenue?
It has 200 residential units and 201 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.