237 Willis Avenue
Bronx, NY 10454BBL 2-02301-0028Map
Owner of record: Point Willis Partners LLC
237 Willis Avenue is a walk-up apartment building built in 1931 in Bronx, 10454. It has 8 residential units across 5 floors. The owner of record is Point Willis Partners LLC. HPD has recorded 704 housing violations here, most recently on August 12, 2026. 25 of the 50 most recent violations are still open. City tax records listed 4 rent-stabilized apartments here in 2024.
- HPD violations
- 704
- DOB violations
- 14
- ECB violations
- 21
- HPD complaints
- 726
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 704
- CImmediately hazardous
Provide ready access to buildings heating system door locked at basment at boiler room
Aug 12, 2026
Open — Violation will be reinspected - BHazardous
Properly secure the loose light fixture at ceiling in the 5th room from east located at apt 5s, 5th story, 1st apartment from east at south
Aug 12, 2026 · Apt 5S
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch at building entrance door , 1st story
Aug 12, 2026
Open — Violation will be reinspected - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door , 1st story
Aug 12, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at 1st public hall bulkhead from east
Aug 12, 2026
Open — Violation will be reinspected - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling at 1st public hall bulkhead from east
Aug 12, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the private hallway located at apt 5s, 5th story, 1st apartment from east at south
Aug 12, 2026 · Apt 5S
Open — Violation will be reinspected - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 5s, 5th story, 1st apartment from east at south
Aug 12, 2026 · Apt 5S
Open — Violation will be reinspected - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of at south wall in the bathroom located at apt 5s, 5th story, 1st apartment from east at south
Aug 12, 2026 · Apt 5S
Open — Violation will be reinspected - BHazardous
Replace with new the missing washbasin at east wall in the bathroom located at apt 5s, 5th story, 1st apartment from east at south
Aug 12, 2026 · Apt 5S
Open — Violation will be reinspected
Show 40 more ↓
- BHazardous
Repair the broken or defective connection at wasteline pipe under sink in the kitchen located at apt 5s, 5th story, 1st apartment from east at south
Aug 12, 2026 · Apt 5S
Open — Violation will be reinspected - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 5s, 5th story, 1st apartment from east at south
Aug 12, 2026 · Apt 5S
Open — Violation will be reinspected - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5s, 5th story, 1st apartment from east at south
Aug 12, 2026 · Apt 5S
Open — Notice of issuance sent to tenant - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Aug 12, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at 1st public hall bulkhead from east
Aug 12, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2n, 2nd story, 1st apartment from west at north
Aug 12, 2026 · Apt 2N
Open — Violation will be reinspected - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5s, 5th story, 1st apartment from east at south
Aug 12, 2026 · Apt 5S
Open — Violation will be reinspected - CImmediately hazardous
Properly repair or replace the broken or defective locking device at building entrance door , 1st story
Jun 29, 2026
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective latch set at building entrance door at public hall, 1st story
Jun 17, 2026
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door at public hall, 1st story
Jun 17, 2026
Open — Not complied with - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at front areaway yard
Jun 17, 2026
Open — Not complied with - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the all visible garbage accumulation at rear yard
Jun 15, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective porcelain floor tiles in the bathroom located at apt 2n, 2nd story
Jun 15, 2026 · Apt 2N
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0;wg to install = 0, wg to replace = 0;wg to repair = 1;wg to repair = 1 in the entire apartment located at apt 2n, 2nd story, 1st apartment from west at north
Jun 15, 2026 · Apt 2N
Open — Not complied with - ANon-hazardous
Cleanse to the satisfaction of this department the garbage containers at building front
Jun 15, 2026
Closed — Violation closed - ANon-hazardous
Repair the broken or defective connection at waste line at washbasin in the bathroom located at apt 2n, 2nd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2N
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 1 in the entire apartment located at apt 2n, 2nd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2N
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2n, 2nd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2N
Open — Notice of issuance sent to tenant - ANon-hazardous
Repair the leaky and/or defective faucets at washbasin in the bathroom located at apt 2n, 2nd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2N
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 4th room from north at west located at apt 2n, 2nd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2N
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch at gate at window to fire escape in the kitchen located at apt 2n, 2nd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2N
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the : ground yard at northwest
Jun 3, 2026
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective ceiling with fire retardand material at public hall, 1st story
Jun 3, 2026
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 2n, 2nd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2N
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at west wall in the private hallway located at apt 2n, 2nd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2N
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 4th room from north at west located at apt 2n, 2nd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2N
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at 1st window frame from south at west wall in the 4th room from north at west located at apt 2n, 2nd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2N
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 1st story
Jun 3, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall in the 4th room from north at west located at apt 2n, 2nd story, 1st apartment from west at north
Jun 3, 2026 · Apt 2N
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective door frame jamb at entrance in the 2nd room from north at west located at apt 2n, 2nd story, 1st apartment from west at north
May 27, 2026 · Apt 2N
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls in the private hallway located at apt 2n, 2nd story, 1st apartment from west at north
May 27, 2026 · Apt 2N
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2n, 2nd story, 1st apartment from west at north
May 27, 2026 · Apt 2N
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls in the 2nd room from north at west located at apt 2n, 2nd story, 1st apartment from west at north
May 27, 2026 · Apt 2N
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at west located at apt 2n, 2nd story, 1st apartment from west at north
May 27, 2026 · Apt 2N
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Apr 8, 2026
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5n, 5th story, 1st apartment from west at north
Apr 8, 2026 · Apt 5N
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5n, 5th story, 1st apartment from west at north
Apr 8, 2026 · Apt 5N
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5n, 5th story, 1st apartment from west at north
Apr 8, 2026 · Apt 5N
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tiled floor in the bathroom located at apt 2n, 1st apartment from west at north
Feb 27, 2026 · Apt 2N
Closed — Violation closed
DOB building violations · 14
- Construction other optional
Requesting engineering report. at time of inspection observed exposure 3(back) at 3,4 & 5th floors vertical cracks & missing mortar at bricks, interior bulkhead ceiling water penetration peeling, expo 1(front) around main entrance deteriorated and cracking cement structural stability in question.
Feb 17, 2026
Dob violation - active - Plumbing none
Based on commissioner's suspension notification intends to revoke all plumbing approvals and permit issued under job# x00930170 due to suspension of license master plumber #1138. stop all plumbing work under above mentioned permit immediately.
Jun 4, 2025
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 13, 2024
Dob violation - dismissed - Construction other optional
Failure to maintain at time of inspection observed mutiple cracks in facade at exp#2 also cracked bricks under window seal on floor two and three.
Sep 10, 2024
Dob violation - active - Construction other optional
Failure to maintain at time of inspection observed mutiple cracks in facade at exp#2 also cracked bricks under window seal on floor two and three.
Sep 10, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 3, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Jan 17, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 7, 2018
Dob violation - dismissed
Show 4 more ↓
- Construction other optional
C-construction other optional
Aug 23, 2017
Vp*-violation unserved ecb- dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 21, 2016
Dob violation - dismissed - Immediate emergency anythingoptional
Ftm / sws
Jun 30, 2016
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed
ECB violations · 21
- Class - 1
I observed replacement of line side raceway due to electrical short and 200 amp service panel and meter enclosure installed without and electrical permit on file., obtain permit; obtain electrical panel
Aug 15, 2026 · Penalty $2,500
Active - Class - 1
I observed unsafe unsuitable electrical conditions, open breaker panels and main line box without covers subject to electrocution or potential fire., comply with ec; fix all conditions as per nec and nyc amendm
Aug 15, 2026 · Penalty $1,600
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted: main entrance/exit door was not readily openable from the egress side. level hardware failed to fully retract making it difficult to open or close correct
Jul 1, 2026 · Penalty $6,250
Resolve - Class - 1
Failure to maintain building in code-compliant manner. noted: at roof level, interior bulkhead has water penetrations creating water damage to ceiling. at the time of inspection, also at the main entrance crack
Jul 1, 2026 · Penalty $6,250
Resolve - Class - 1
At time of inspection observed exposure 3(back) at 3,4 & 5th floors vertical cracks & missing mortar at bricks, interior bulkhead ceiling water penetration peeling, expo 1(front) around main entrance deteriorat
Feb 17, 2026 · Penalty $6,250
Resolve - Class - 1
Failure to maintain building in code-compliant manner: use of prohibited door and/or hardware. at time of inspection observed on the 1st floor main entrance door, illegal interior locking not functioning unable
Feb 17, 2026 · Penalty $6,250
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted; main entrance/exit door was not readily openable from the egress side. lever hardware failed to fully retract latch under normal operation, requiring mani
Feb 12, 2026 · Penalty $2,500
Resolve - Class - 2
Failure to certify corrections for violation number 39124496k, file a certificate of correction
Apr 10, 2025 · Penalty $625
Resolve - Class - 1
Failure to maintain at time of inspection observed mutiple cracks in facade at exp#2 also cracked bricks under window seal on floor two and three., repair and/replace
Sep 10, 2024 · Penalty $1,250
Resolve - Class - 1
Unlawful acts: failure to comply with the commissioners order contained in summons#35678358l issued on 09/05/23 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01., comply with commis
Jan 3, 2024 · Penalty $625
Resolve
Show 11 more ↓
- Class - 1
Unlawful acts: failure to comply with the commissioners order contained in summons#35678359n issued on 09/05/23 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01., comply with commis
Jan 3, 2024 · Penalty $1,250
Resolve - Class - 1
Opening of new corner deli. i didn't get access to the basement. on ground floor i observed electrical installations of light fixtures, business two sign 25'l x 2'h x 6"d and five hvac units without permit on f
Oct 12, 2023 · Penalty $800
Resolve - Class - 1
Work without permit working plumbing, electrical construction was done on commercial space without permits. the entire job was/is being done without permits. remedy: obtain permit.
Sep 5, 2023 · Penalty $2,500
Resolve - Class - 1
Performed unlicensed electrical work time of inspection after doing research in dob now and bis there is no license contractor on file for such work that was and is being done. remedy: comply with ec code.
Sep 5, 2023 · Penalty $4,800
Resolve - Class - 1
Unapproved/unsafe/unsuitable electrical equipment, apparatus, material, devices, appliances or wireing in use. time of inspection i observed 3 workers on site performing unsafe unsuitable electrical installed b
Sep 5, 2023
Resolve - Class - 2
As per class2 (b265)failure to file a complete boiler inspection report as per d.o.b records submit a current bo-9 report...not done since 2014 cal/year
May 29, 2019 · Penalty $1,562
Resolve - Class - 2
Failure to maintain building in code compliant manner.noted:at time ofinspection found mutual/connected stairs newly installed without fall protection no handrail installed.building actively occupied by nu
Aug 23, 2017 · Penalty $250
Resolve - Class - 1
Failure to maintain bldg walls or appurtenances. noted: decorative brownstone over main entrance to dwelling is loose,cracked spalling & defective. also decorative brownstone edges at various locations & elevat
Jun 27, 2016 · Penalty $2,500
Resolve - Class - 2
Failure to provide/post sign at jobsite prusuant to subsection. noted:upon inspection contractor sign missing from sidewalk shed. rmdy: provide contractor sign.
Jan 7, 2014 · Penalty $4,000
Resolve - Non-hazardous
Failure to maintain exterior building wall. defect is at the north side building the exhaust fute from el car rito restaurant is missing third floor roof. remedy: repair flum
Jun 12, 2003 · Penalty $2,500
Resolve - Non-hazardous
Occupancy contrary to that allowed by the bldg dept records letter of no objection dated 12/13/00 was devided due to 2 open applications 200026694-renovation of store into an eating and drinking establishment.2
Dec 28, 2000 · Penalty $400
Resolve
Complaints
- Electric
Power outage
Aug 11, 2026 · Apt BLDG
Close - Door/window
Door
Jun 23, 2026 · Apt 2N
Close - Plumbing
Water supply
Jun 12, 2026 · Apt 2N
Close - Unsanitary condition
Pests
Jun 12, 2026 · Apt 2N
Close - Unsanitary condition
Sewage
Jun 12, 2026 · Apt 2N
Close - Unsanitary condition
Garbage/recycling storage
Jun 12, 2026 · Apt 2N
Close - Unsanitary condition
Garbage/recycling storage
May 29, 2026 · Apt 2N
Close - Paint/plaster
Ceiling
May 29, 2026 · Apt 2N
Close - Paint/plaster
Wall
May 29, 2026 · Apt 2N
Close - Plumbing
Water supply
May 29, 2026 · Apt 2N
Close
Show 40 more ↓
- Plumbing
Water supply
May 29, 2026 · Apt 2N
Close - Flooring/stairs
Floor
May 29, 2026 · Apt 2N
Close - Door/window
Window frame
May 29, 2026 · Apt 2N
Close - Door/window
Window frame
May 29, 2026 · Apt 2N
Close - Water leak
Slow leak
May 29, 2026 · Apt 2N
Close - Water leak
Heavy flow
May 19, 2026 · Apt 2N
Close - Heat/hot water
Entire building
Apr 21, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 21, 2026 · Apt 2N
Close - Heat/hot water
Apartment only
Apr 16, 2026 · Apt 2N
Close - Heat/hot water
Entire building
Apr 8, 2026 · Apt 2N
Close - Heat/hot water
Apartment only
Apr 7, 2026 · Apt 2N
Close - Heat/hot water
Apartment only
Apr 6, 2026 · Apt 2N
Close - Heat/hot water
Apartment only
Apr 6, 2026 · Apt 2N
Close - Heat/hot water
Apartment only
Apr 5, 2026 · Apt 2N
Close - General
Janitor/super
Feb 17, 2026 · Apt 2N
Close - Plumbing
Basin/sink
Feb 17, 2026 · Apt 2N
Close - Flooring/stairs
Floor
Feb 17, 2026 · Apt 2N
Close - Paint/plaster
Wall
Feb 17, 2026 · Apt 2N
Close - Plumbing
Radiator
Feb 17, 2026 · Apt 2N
Close - Unsanitary condition
Garbage/recycling storage
Feb 15, 2026 · Apt BLDG
Close - Door/window
Door
Feb 15, 2026 · Apt BLDG
Close - General
Janitor/super
Feb 15, 2026 · Apt 2N
Close - Door/window
Door
Feb 14, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 8, 2026 · Apt 5N
Close - Heat/hot water
Entire building
Feb 5, 2026 · Apt 2N
Close - Heat/hot water
Apartment only
Jan 31, 2026 · Apt 2N
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt 2N
Close - Plumbing
Steam pipe/riser
Jan 28, 2026 · Apt APT2N
Close - Door/window
Window frame
Jan 28, 2026 · Apt APT2N
Close - Heat/hot water
Apartment only
Jan 28, 2026 · Apt APT2N
Close - Heat/hot water
Apartment only
Jan 20, 2026 · Apt 5N
Close - Plumbing
Water supply
Jan 10, 2026 · Apt 5N
Close - Plumbing
Water supply
Jan 7, 2026 · Apt 5N
Close - Water leak
Heavy flow
Jan 4, 2026 · Apt 2N
Close - Door/window
Window frame
Jan 4, 2026 · Apt 2N
Close - Flooring/stairs
Floor
Jan 4, 2026 · Apt 2N
Close - Heat/hot water
Apartment only
Jan 4, 2026 · Apt 2N
Close - Unsanitary condition
Pests
Dec 28, 2025 · Apt 2N
Close - Door/window
Window frame
Dec 28, 2025 · Apt 2N
Close - Flooring/stairs
Floor
Dec 28, 2025 · Apt 2N
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1931
- Floors
- 5
- Residential units
- 8
- Building area
- 11,640 ft²
- Lot area
- 2,525 ft²
- Zoning
- R6
- Community board
- 201
- Council district
- 8
- Block / lot
- 2301 / 28
- Assessed value
- $656,100
- Landmark / historic district
- No
HPD registration #202358, last renewed Aug 20, 2025.
Questions about 237 Willis Avenue
Who owns 237 Willis Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Point Willis Partners LLC.
Does 237 Willis Avenue have violations?
Yes. NYC HPD has recorded 704 housing violations at this property.
Is 237 Willis Avenue rent stabilized?
NYC Department of Finance tax bills listed 4 rent-stabilized units here in 2024 (about 50% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 237 Willis Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 237 Willis Avenue?
It has 8 residential units and 11 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.