456 East 149 Street
Bronx, NY 10455BBL 2-02293-0056Map
Owner of record: 456 E LLC
456 East 149 Street is a walk-up apartment building built in 1905 in Bronx, 10455. It has 16 residential units across 5 floors. The owner of record is 456 E LLC. HPD has recorded 273 housing violations here, most recently on January 27, 2026. 5 of the 50 most recent violations are still open. City tax records listed 16 rent-stabilized apartments here in 2024.
- HPD violations
- 273
- DOB violations
- 29
- ECB violations
- 14
- HPD complaints
- 733
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 273
- CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st wall cabinet from north at east wall in the private hallway located at apt 2b, 3rd story, 1st apartment from west at north
Jan 27, 2026 · Apt 2B
Open — Defect letter issued - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq. ft. at ceiling in the bathroom located at apt 2b, 3rd story, 1st apartment from west at north
Jan 27, 2026 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st closet from south at west wall door frame in the private hallway located at apt 2b, 3rd story, 1st apartment from west at north
Jan 27, 2026 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable in the entire apartment located at apt 2b, 3rd story, 1st apartment from west at north
Jan 27, 2026 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 2b, 3rd story, 1st apartment from west at north
Jan 27, 2026 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2b, 3rd story, 1st apartment from west at north
Jan 27, 2026 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective shut-off knob at north radiator in the 2nd room from east located at apt 2b, 3rd story, 1st apartment from west at north
Jan 27, 2026 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective air valve at north radiator in the bathroom located at apt 2b, 3rd story, 1st apartment from west at north
Jan 27, 2026 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2b, 3rd story, 1st apartment from west at north
Jan 27, 2026 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at upper window sash at north wall in the kitchen located at apt 2b, 3rd story, 1st apartment from west at north
Jan 27, 2026 · Apt 2B
Closed — Violation dismissed
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from south at west wall door in the private hallway located at apt 2b, 3rd story, 1st apartment from west at north
Jan 27, 2026 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing consisting or rope at door to south yard at public hall, 1st story
Sep 13, 2025
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak the north wall in the kitchen located at apt 2b, 3rd story, 1st apartment from west at north
Aug 17, 2025 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from west at north wall in the kitchen located at apt 2b, 3rd story, 1st apartment from west at north
Aug 17, 2025 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from north at east wall in the kitchen located at apt 2b, 3rd story, 1st apartment from west at north
Aug 17, 2025 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2b, 3rd story, 1st apartment from west at north
Aug 17, 2025 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 3rd story, 1st apartment from west at north
Aug 17, 2025 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 2b, 3rd story, 1st apartment from west at north
Aug 17, 2025 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at upper and lower sash window at north wall in the 2nd room from east located at apt 2b, 3rd story, 1st apartment from west at north
Aug 17, 2025 · Apt 2B
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection wasteline at sink in the kitchen located at apt 2b, 3rd story, 1st apartment from west at north
Aug 17, 2025 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of vinyl tiles at floor in the kitchen located at apt 2b, 3rd story, 1st apartment from west at north
Aug 17, 2025 · Apt 2B
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 20 sqft at 1st window frame from west at north wall in the bathroom located at apt 2b, 3rd story, 1st apartment from west at north
Aug 17, 2025 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at upper and lower sash window at north wall in the kitchen located at apt 2b, 3rd story, 1st apartment from west at north
Aug 17, 2025 · Apt 2B
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 20 sqft at east wall in the bathroom located at apt 2b, 3rd story, 1st apartment from west at north
Aug 17, 2025 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door at south wall in the foyer located at apt 2b, 3rd story, 1st apartment from west at north
Aug 17, 2025 · Apt 2B
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 20 sqft at north wall, north wall, ceiling, east wall in the bathroom located at apt 2b, 3rd story, 1st apartment from west at north
Aug 17, 2025 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, 1st window frame from west at north wall in the bathroom located at apt 2b, 3rd story, 1st apartment from west at north
Aug 17, 2025 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) north wall in the kitchen located at apt 2b, 3rd story, 1st apartment from west at north
Aug 17, 2025 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the kitchen located at apt 2b, 3rd story, 1st apartment from west at north
Aug 17, 2025 · Apt 2B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east located at apt 2b, 3rd story, 1st apartment from west at north
Aug 17, 2025 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the foyer located at apt 2b, 3rd story, 1st apartment from west at north
Aug 17, 2025 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at bulkhead door 5th story
Nov 19, 2024
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch set at bulkhead door 5th story
Nov 19, 2024
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective latch set at roof door at 1st public hall bulkhead from north, 5th story
Oct 22, 2024
Closed — Violation closed - BHazardous
Provide spark arrestor at chimney
Oct 22, 2024
Open — Not complied with - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Oct 22, 2024
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling inside vestibule at public hall, 1st story
Oct 22, 2024
Closed — Violation closed - CImmediately hazardous
Properly secure the loose light fixture at ceiling inside vestibule at public hall, 1st story
Oct 22, 2024
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of rodents rats at south yard
Oct 22, 2024
Open — Not complied with - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north wall in the 3rd room from east located at apt 3d, 5th story, 1st apartment from north at east
Oct 22, 2024 · Apt 3D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling , east and north walls in the 1st room from east located at apt 3d, 5th story, 1st apartment from north at east
Oct 22, 2024 · Apt 3D
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over the ceiling in the 1st room from east located at apt 3d, 5th story, 1st apartment from north at east
Oct 22, 2024 · Apt 3D
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective vertical crack from parapet wall down to 4th story at southeast corner (brook ave side)
Oct 22, 2024
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective vertical crack from parapet wall down to 4th story at southwest corner at west exterior wall
Oct 22, 2024
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective eroded brick and mortar joints at parapet wall at south east corner of building (brook ave side)
Oct 22, 2024
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north wall in the 3rd room from east located at apt 3d, 5th story, 1st apartment from north at east original violation 17371712 issued 22-oct-24 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Oct 22, 2024 · Apt 3D
Open — First no access to re- inspect violation - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling inside closet at west wall in the foyer located at apt 3d, 5th story, 1st apartment from north at east
Oct 22, 2024 · Apt 3D
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling, west wall and north wall in the foyer located at apt 3d, 5th story, 1st apartment from north at east
Oct 22, 2024 · Apt 3D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling inside vestibule at public hall, 1st story
Oct 22, 2024
Closed — Violation closed - ANon-hazardous
Post, in the form approved by the commissioner, and maintain the notice about prevention, detection and removal of bedbug infestation required by §27-2018.1 in common area of the building or provide to each tenant, according to the certification made on such annual bedbug report.
Oct 22, 2024
Open — First no access to re- inspect violation
DOB building violations · 29
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 30, 2012
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed
Show 19 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Emergency none
Aka 531 brook avenue
Mar 5, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Emergency none
Egncy-emergency none
May 28, 1999
Dob violation - active - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
May 28, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Electric signs none
Es-electric signs none
Oct 1, 1993
Dob violation - dismissed - Electric signs none
Es-electric signs none
Oct 1, 1993
Dob violation - dismissed - Electric signs none
Es-electric signs none
Oct 1, 1993
Dob violation - dismissed - Electric signs none
Es-electric signs none
Oct 1, 1993
Dob violation - dismissed - Electric signs none
Es-electric signs none
Oct 1, 1993
Dob violation - dismissed - Electric signs none
Es-electric signs none
Oct 1, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 22, 1991
Vp*-violation unserved ecb- dismissed
ECB violations · 14
- Class - 2
At exposure 2, above 3rd and 4th floor windows keystone block leaning and section missing,at rear corner hairline vertical crack appears from 3rd floor to parapet., maintain exterior building wall
Oct 23, 2024 · Penalty $1,250
Active - Class - 1
Occupancy contrary to that allowed by the building dept records. noteddob indicate to be legally 16 class'a' apts. now premises illegally occupied at 2nd floor,apt 4a,southeast section of building a 1 class'a'
Mar 7, 2012 · Penalty $2,400
Resolve - Class - 1
Work w/o a permit. noted: at 2nd story apt 4a,southeast section of building,a class'a' apt,living room area at east of apt erected 1 full height partition w/door to create a room occupied as an sro & in the
Mar 7, 2012 · Penalty $400
Resolve - Class - 1
Failure to maintain building in code-complaint manner. defect noted: @2nd story,apt 4a,southeast section of building in the kitchen area,wood floor has a 1 foot square hole,under gas stove. on the private hall
Mar 7, 2012 · Penalty $250
Resolve - Hazardous
Failure to maintain interior of bldg defect:@ the"sunny nail"salon,theceiling has collapsed.the opening is approx 4'x 4'.there is also waterleak from bathtub from above fl.plaster & wood lathe fell from ceiling
Feb 26, 2007 · Penalty $2,500
Resolve - Hazardous
Failure to maintain exterior building wall. defect is at the norht elevation above the 5th floor window the stucco parapet wall has partially collapsed onto the public sidewalk and is in danger of futher collap
Feb 23, 2004 · Penalty $800
Resolve - Hazardous
Failure to maintain exterior building wall.loose brick on parapet walland motar in spalling throughout wall.remedy:provide sidewalk shed and make all necessary repairs immediately.
Feb 27, 2001 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain exterior building wall. defect: cracked ,defectiveand leaning inward ,brick parapet wall approx 55'x3' rear south exterior parapet wall. remedy: provide sidewalk shed,obtain approvals and pe
Jun 9, 2000 · Penalty $180
Resolve - Non-hazardous
Failure to maintain exterior bldg wall. defect is: cement stucco is cracked, bulging & missing & bricks are loose, missing & exposed on front & east parapet walls creating an immediate danger to public side
May 27, 1999 · Penalty $800
Resolve - Non-hazardous
Failure to provide adequate protection for sidewalk during construction operations. removing bricks & concrete stucco from parapet wall at east side. stop all work. remedy: provide protection immediately and
Sep 18, 1998 · Penalty $2,000
Resolve
Show 4 more ↓
- Non-hazardous
Failure to maintain building wall.section of cement coating on parapet wall at the north elevation are cracked and missing remedy make all necessary repairs.
Oct 12, 1995 · Penalty $1,000
Resolve - Non-hazardous
Failure to maintain exterior building wall. defect-portions of cementstucco on parapelt wall at the north elevation cracked, defective and missing. remedy: make all necessary repairs in a lawfull manner.
Jan 5, 1995 · Penalty $350
Resolve - Non-hazardous
Failure to maintain exterior building wall: defect is: partion of cement stucco on parapet wall at the north elevation missing cracked and defective. remedy- make all necessary repairs to parapet wall
Apr 18, 1994
Resolve - Non-hazardous
Failure to maintain exterior building wall. defect is:portions of cement stucco on parapet wall at the north elevation are missing,cracked&defective. remedy:make all repairs to parapet wall in a safe&lawful man
Nov 22, 1991 · Penalty $1,000
Resolve
Complaints
- Electric
No lighting
Oct 16, 2026 · Apt 2B
Open - Door/window
Window frame
Oct 16, 2026 · Apt 2B
Open - Door/window
Window frame
Oct 16, 2026 · Apt 2B
Open - Heat/hot water
Apartment only
Oct 7, 2026 · Apt 4D
Close - Heat/hot water
Apartment only
Feb 23, 2026 · Apt 2
Close - Water leak
Slow leak
Jan 26, 2026 · Apt 2B
Close - Door/window
Window frame
Jan 26, 2026 · Apt 2B
Close - Plumbing
Basin/sink
Jan 26, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Jan 26, 2026 · Apt 2B
Close - Plumbing
Basin/sink
Jan 26, 2026 · Apt 2B
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Jan 26, 2026 · Apt 2B
Close - Plumbing
Radiator
Jan 26, 2026 · Apt 2B
Close - Door/window
Window pane
Jan 26, 2026 · Apt 2B
Close - Water leak
Slow leak
Dec 5, 2025 · Apt 4C
Close - Door/window
Window frame
Dec 5, 2025 · Apt 4C
Close - Paint/plaster
Ceiling
Dec 5, 2025 · Apt 4C
Close - Paint/plaster
Ceiling
Dec 5, 2025 · Apt 4C
Close - Flooring/stairs
Floor
Aug 9, 2025 · Apt 2B
Close - Door/window
Window frame
Aug 9, 2025 · Apt 2B
Close - Water leak
Heavy flow
Aug 9, 2025 · Apt 2B
Close - Paint/plaster
Ceiling
Aug 9, 2025 · Apt 2B
Close - Paint/plaster
Ceiling
Sep 25, 2024 · Apt 2C
Close - Unsanitary condition
Mold
Sep 25, 2024 · Apt 2C
Close - Door/window
Window frame
Sep 25, 2024 · Apt 2C
Close - Water leak
Heavy flow
Sep 25, 2024 · Apt 2C
Close - Door/window
Window frame
Mar 21, 2024 · Apt 3A
Close - Water leak
Heavy flow
Mar 21, 2024 · Apt 3A
Close - Paint/plaster
Ceiling
Mar 21, 2024 · Apt 3A
Close - Appliance
Refrigerator
Mar 21, 2024 · Apt 3A
Close - Unsanitary condition
Mold
Mar 21, 2024 · Apt 3A
Close - Water leak
Heavy flow
Mar 21, 2024 · Apt 3A
Close - Plumbing
Radiator
Feb 8, 2024 · Apt D4
Close - Plumbing
Radiator
Feb 8, 2024 · Apt D4
Close - Plumbing
Radiator
Feb 8, 2024 · Apt D4
Close - Plumbing
Radiator
Feb 8, 2024 · Apt D4
Close - Electric
No lighting
Feb 8, 2024 · Apt D4
Close - Electric
No lighting
Feb 8, 2024 · Apt D4
Close - Water leak
Slow leak
Feb 8, 2024 · Apt D4
Close - Water leak
Slow leak
Feb 8, 2024 · Apt D4
Close - Flooring/stairs
Floor
Feb 8, 2024 · Apt D4
Close - Heat/hot water
Entire building
Oct 17, 2023 · Apt 4B
Close - Door/window
Window frame
Mar 24, 2023 · Apt 2B
Close - Door/window
Window frame
Jan 25, 2023 · Apt 2B
Close - Door/window
Door frame
Jan 25, 2023 · Apt 2B
Close - Flooring/stairs
Floor
Jan 25, 2023 · Apt 2B
Close - Plumbing
Basin/sink
Jan 25, 2023 · Apt 2B
Close - Flooring/stairs
Floor
Oct 18, 2022 · Apt 4C
Close - Paint/plaster
Ceiling
Oct 18, 2022 · Apt 4C
Close - Door/window
Window frame
Oct 18, 2022 · Apt 4C
Close - Paint/plaster
Wall
Oct 18, 2022 · Apt 4C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1905
- Floors
- 5
- Residential units
- 16
- Building area
- 15,060 ft²
- Lot area
- 3,177 ft²
- Zoning
- C4-4
- Community board
- 201
- Council district
- 17
- Block / lot
- 2293 / 56
- Assessed value
- $1,397,700
- Landmark / historic district
- No
HPD registration #200973, last renewed Aug 12, 2025.
Questions about 456 East 149 Street
Who owns 456 East 149 Street?
The owner of record in NYC Department of City Planning PLUTO data is 456 E LLC.
Does 456 East 149 Street have violations?
Yes. NYC HPD has recorded 273 housing violations at this property.
Is 456 East 149 Street rent stabilized?
NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 100% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 456 East 149 Street built?
City records list 1905 as the year it was built.
How many apartments are in 456 East 149 Street?
It has 16 residential units and 20 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.