583 West 215 Street
Manhattan, NY 10034BBL 1-02250-0050Map
Owner of record: 174th Tic Owner LLC
583 West 215 Street is an elevator apartment building built in 1930 in Manhattan, 10034. It has 67 residential units across 6 floors. The owner of record is 174th Tic Owner LLC. HPD has recorded 202 housing violations here, most recently on June 1, 2026. 13 of the 50 most recent violations are still open. City tax records listed 38 rent-stabilized apartments here in 2024.
- HPD violations
- 202
- DOB violations
- 34
- ECB violations
- 30
- HPD complaints
- 609
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 202
- CImmediately hazardous
Abate the infestation consisting of roaches at basement
Jun 1, 2026
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice at basement
Jun 1, 2026
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling less then 10 square feet in the bathroom located at apt f8, 6th story, 1st apartment from west at north original violation 18825373 issued 29-apr-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Apr 29, 2026 · Apt F8
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt f8, 6th story, 1st apartment from west at north
Apr 29, 2026 · Apt F8
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling less then 10 square feet in the bathroom located at apt f8, 6th story, 1st apartment from west at north
Apr 29, 2026 · Apt F8
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the 5th room from east located at apt f8, 6th story, 1st apartment from west at north
Apr 29, 2026 · Apt F8
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Apr 29, 2026
Closed — Violation closed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Apr 13, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper door at north wall at public hall, 4th story
Mar 18, 2026
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper door at north wall at public hall, 3rd story
Mar 18, 2026
Open — Not complied with
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt d2, 2nd story, 4th apartment from north at east
Mar 18, 2026 · Apt D2
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt d2, 2nd story, 4th apartment from north at east
Mar 18, 2026 · Apt D2
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt d2, 2nd story, 4th apartment from north at east
Mar 18, 2026 · Apt D2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt d2, 2nd story, 4th apartment from north at east
Mar 18, 2026 · Apt D2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt a8, 1st story, 2nd apartment from south at west
Mar 18, 2026 · Apt A8
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt d8, 4th story, 1st apartment from west at north
Feb 24, 2026 · Apt D8
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt d8, 4th story, 1st apartment from west at north
Feb 24, 2026 · Apt D8
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Feb 21, 2026
Open — Nov certified late - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt c10, 3rd story, 2nd apartment from north at east , section ''north''
Feb 21, 2026 · Apt C10
Closed — Violation closed - BHazardous
Refit window in the kitchen located at apt a8, 1st story, 1st apartment from south at west
Feb 7, 2026 · Apt A8
Closed — Violation dismissed - BHazardous
Refit windows in the 2nd room from north located at apt a8, 1st story, 1st apartment from south at west
Feb 7, 2026 · Apt A8
Closed — Violation dismissed - BHazardous
Refit window in the 3rd room from north located at apt a8, 1st story, 1st apartment from south at west
Feb 7, 2026 · Apt A8
Closed — Violation dismissed - BHazardous
Refit windows in the 1st room from north located at apt a8, 1st story, 1st apartment from south at west
Feb 7, 2026 · Apt A8
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective concrete floor at basement
Jan 14, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt a8, 1st story, 2nd apartment from south at west
Jan 14, 2026 · Apt A8
Open — Not complied with - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt d2, 4th story, 4th apartment from north at east
Jan 7, 2026 · Apt D2
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt b8, 2nd story, 1st apartment from south at west
Dec 15, 2025 · Apt B8
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement
Dec 3, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 1st room from north located at apt a8, 1st story, 1st apartment from south at west
Dec 3, 2025 · Apt A8
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the 1st room from north located at apt a8, 1st story, 1st apartment from south at west
Dec 3, 2025 · Apt A8
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective lower window sash at north wall in the 1st room from north at east located at apt b10, 2nd story, 2nd apartment from north at east
Nov 9, 2025 · Apt B10
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective lower window sash at north wall in the kitchen located at apt b10, 2nd story, 2nd apartment from north at east
Nov 9, 2025 · Apt B10
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation radiator at north wall in the 1st room from east located at apt b10, 2nd story, 2nd apartment from north at east
Nov 9, 2025 · Apt B10
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective lower window sash at north wall in the 1st room from east located at apt b10, 2nd story, 2nd apartment from north at east
Nov 9, 2025 · Apt B10
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the 1st room from east located at apt b10, 2nd story, 2nd apartment from north at east
Nov 9, 2025 · Apt B10
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective porcelain enamel reglaze of bathtub in the bathroom located at apt b10, 2nd story, 2nd apartment from north at east
Nov 9, 2025 · Apt B10
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the bathroom located at apt b10, 2nd story, 2nd apartment from north at east
Nov 9, 2025 · Apt B10
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at heat riser in the kitchen located at apt b6, 2nd story, 2nd apartment from east at south
Nov 6, 2025 · Apt B6
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 1st room from east located at apt b6, 2nd story, 2nd apartment from east at south
Nov 6, 2025 · Apt B6
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at ceiling in the 1st room from east located at apt b6, 2nd story, 2nd apartment from east at south
Nov 6, 2025 · Apt B6
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from east located at apt b6, 2nd story, 2nd apartment from east at south
Nov 6, 2025 · Apt B6
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 1st room from east located at apt b6, 2nd story, 2nd apartment from east at south
Nov 6, 2025 · Apt B6
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door at public hall, 1st story
Jan 22, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latchset at building entrance door
Jan 22, 2025
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt a8, 1st story, 1st apartment from west at north
Dec 19, 2024 · Apt A8
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at cellar at boiler room
Dec 19, 2024
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper chute door at public hall, 6th story
Nov 4, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper chute door at public hall, 5th story
Nov 4, 2024
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt d2, 4th story, 5th apartment from west at north
Sep 23, 2024 · Apt D2
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt d2, 4th story, 5th apartment from west at north
Sep 23, 2024 · Apt D2
Open — Notice of issuance sent to tenant
DOB building violations · 34
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)
Jun 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - active - No report and / or late filing (facade) facade required
Failed to file fisp cycle 9b technical report by 2/21/2023
Feb 22, 2023
Dob violation - active - Retaining wall none
Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09
Dec 15, 2022
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2020
Jun 20, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 12, 2021
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2019
Dob violation - dismissed
Show 24 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 16, 2019
Dob violation - dismissed - Construction other optional
C-construction other optional
Nov 28, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 27, 2016
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 26, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 26, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 4, 2013
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 14, 2011
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Vcat1-elevator annual inspection / test elevatorrequired
Oct 8, 2010
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 18, 2010
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 26, 2006
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Oct 1, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2004
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Elevator elevatorrequired
(23)conduct 5 year test (35)provide access to motor room
Oct 1, 1990
Dob violation - resolved - Boiler boiler optional
36
Nov 28, 1989
Dob violation - dismissed
ECB violations · 30
- Class - 2
Class 2 item: right-side electromechanical brake plunger on the elevator machine brake assembly protrudes further than the left side. adjust to ensure proper brake operation (asme a17.1-2013 8.6.1.2).
Oct 19, 2026 · Penalty $625
Active - Class - 2
1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not recieved a retaining wall condition assess
Feb 25, 2025
Resolve - Class - 2
Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #907393. remedy: submit acceptable requ
Apr 11, 2024 · Penalty $1,250
Active - Class - 1
Class 1 item, no dlm installed in this controller as mandated by 3.10.12 of appendix k3 of the 2014 nycbc remedy; file application, install dlm and perform and file test with nycdob, class 2 no access in motor
Jan 28, 2021 · Penalty $1,250
Active - Class - 1
Defective electrical outlets throughout apartment a8, comply with ec; comply with code
Aug 11, 2020 · Penalty $400
Resolve - Class - 2
Failure to comply w/commissioner's order contained in summons/violation #35356036r issued on 11/27/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. rmdy: comply with commissione
Mar 14, 2019
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35356036r issued on 11/12/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commissi
Mar 14, 2019
Resolve - Class - 2
Failure to comply w/commissioner's order contained in summons/viola tion 35356036r issued on 11/27/18 and to file a certificate of correc tion pursuant to 28-201.1 and 1rcny 102-01.rmdy: comply with commiss
Mar 14, 2019
Resolve - Class - 2
Work does not conform to approved contruction documents and/or approved amendments.noted:i observed in apartments c3 nd b2 the installation of central sir units on ein each apartment.department of buildings app
Feb 13, 2019
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35355364l issued on 11/28/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commissi
Jan 7, 2019
Resolve
Show 20 more ↓
- Class - 2
Failure to comply with the commissioners order contained in summons/violation #35356036rissued on 11/27/18 and to file a certificate of cor rection pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commissi
Jan 7, 2019
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35356036r issued on 11-27-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Jan 7, 2019
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/violation #35356037z issued on 11/27/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for work without permit.
Jan 7, 2019
Resolve - Class - 1
Failure to maintain building in code compliant manner; noted: apt b3 front corner bedroom having 12'x 12' (apprx) plaster ceiling in which large defective cracks,separation, and displacement present.structural
Nov 28, 2018
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperation. noted: premises 6story nfp multi-apt masonry frame bldg. at the time of inspection i observed interior renovation in progress apt
Nov 27, 2018
Resolve - Class - 2
Work w/o permit. noted: premises 6story nfp multi apt dwelling. at thetime of inspection i observed renovation in progress at entire apt b2. no permit obtained. also observed new metal framing, new plumbing
Nov 27, 2018 · Penalty $800
Active - Class - 1
Failure to take and provide safety measures (sidewalk shed netting etc) where requried to protect and secure public safety from documented unsafe facade as per 1rcny 103-04. facade technical report the unsafe
Dec 26, 2013 · Penalty $2,400
Resolve - Class - 2
Failure to maintain exterior building west elevation, exposure #3 observe cracks,swelling, deteriorating in parapet facade (south end); south elevation, exposure #1 observe cracks, deteriorating and displacemen
Dec 26, 2013 · Penalty $500
Resolve - Class - 2
Removal of safety measures,sidewalk shed w/o dept of buildings approval after filing of unsafe building 1-23-02 and not granted by the dept and acceptable amended report. rmdy: obtain approval from the building
Dec 26, 2013 · Penalty $800
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance with article 28-302 of the building code & dob rules & regulations.36017991p. respondent has demostrated a history of non compliance with
Jun 11, 2012 · Penalty $1,000
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliancewith code provisions: periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dept of buildings rules and
Dec 15, 2011 · Penalty $2,000
Resolve - Class - 2
Fail to maintain exterior bldg noted: south elevation (exp #1) step cracks @ parapet & other flrs deteriorated mortar joints unsupported a/c's west elevation (exp #2) step cracks @ parapet to there locations, v
Apr 8, 2011 · Penalty $1,250
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions periodic insp of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations rem:
Jan 25, 2011 · Penalty $2,000
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions periodic insp of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations rem:
Jun 4, 2010 · Penalty $2,000
Resolve - Class - 1
Fail to main bldg in code complaint manner.noted:two diagonal cracks in east/west walls of bldg lobby.they are each about 20 lf/run from ceiling to floor.remedy:repair/or replace
Dec 4, 2009 · Penalty $1,000
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 & the dob rules & regulations
Jan 23, 2009 · Penalty $800
Resolve - Non-hazardous
8j1,22d6,31r9,40e11. 8-adjust. 22-secure. 37-remove illegal electricalclips on back of controller. 40-repair governor eliminate noise.
Jun 1, 1999
Resolve - Non-hazardous
08v,17i,21l,28l,36t,46l, 38. top set. 46. landed.
Jun 3, 1992
Resolve - Non-hazardous
32,36,31a,47 remove rubbish from boiler room, install blowdown pipes, low water cutoff, water column, bottom blowdowns front and back, no threading at eno, breeching not properly supported.
Jan 12, 1990
Resolve - Hazardous
Use of rigging equipment without sp-ecial riggers license no spl riggers license failure to provide center iron on two point suspension scaffold no cneter iron
Oct 10, 1989
Resolve
Complaints
- Flooring/stairs
Floor
Oct 16, 2026 · Apt F1
Open - General
Bell/buzzer/intercom
Oct 16, 2026 · Apt F1
Open - Paint/plaster
Wall
Oct 16, 2026 · Apt F1
Open - Unsanitary condition
Mold
Oct 16, 2026 · Apt F1
Open - Paint/plaster
Radiator
Oct 16, 2026 · Apt F1
Open - Paint/plaster
Wall
Oct 16, 2026 · Apt F1
Open - Unsanitary condition
Pests
Oct 16, 2026 · Apt F1
Open - Flooring/stairs
Floor
Oct 16, 2026 · Apt F1
Open - Flooring/stairs
Floor
Oct 16, 2026 · Apt F1
Open - Appliance
Refrigerator
Oct 16, 2026 · Apt F1
Open
Show 40 more ↓
- Water leak
Slow leak
Oct 16, 2026 · Apt F1
Open - Unsanitary condition
Mold
Oct 16, 2026 · Apt F1
Open - Heat/hot water
Entire building
Oct 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 6, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Sep 24, 2026 · Apt F1
Close - Paint/plaster
Wall
Sep 24, 2026 · Apt F1
Close - Flooring/stairs
Floor
Sep 24, 2026 · Apt F1
Close - Unsanitary condition
Pests
Jul 12, 2026 · Apt E7
Close - Unsanitary condition
Pests
Jul 12, 2026 · Apt E7
Close - Unsanitary condition
Garbage/recycling storage
Jul 12, 2026 · Apt E7
Close - Flooring/stairs
Stairs
Jun 10, 2026 · Apt C3
Close - Unsanitary condition
Pests
May 28, 2026 · Apt E7
Close - Unsanitary condition
Pests
May 28, 2026 · Apt E7
Close - Unsanitary condition
Pests
May 28, 2026 · Apt E7
Close - Unsanitary condition
Pests
Apr 29, 2026 · Apt D24FLO
Close - Unsanitary condition
Pests
Apr 24, 2026 · Apt D2
Close - Unsanitary condition
Pests
Apr 24, 2026 · Apt D2
Close - Unsanitary condition
Pests
Apr 24, 2026 · Apt D2
Close - Unsanitary condition
Mold
Apr 19, 2026 · Apt E10
Close - Paint/plaster
Wall
Apr 10, 2026 · Apt F8
Close - Unsanitary condition
Mold
Apr 10, 2026 · Apt F8
Close - Heat/hot water
Entire building
Apr 9, 2026 · Apt BLDG
Close - Door/window
Window frame
Apr 9, 2026 · Apt A8
Close - Heat/hot water
Entire building
Apr 9, 2026 · Apt A8
Close - Door/window
Window frame
Apr 9, 2026 · Apt A8
Close - Heat/hot water
Apartment only
Apr 9, 2026 · Apt A8
Close - Heat/hot water
Apartment only
Apr 9, 2026 · Apt C10
Close - Heat/hot water
Entire building
Apr 9, 2026 · Apt B8
Close - Heat/hot water
Entire building
Apr 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 8, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 8, 2026 · Apt D8
Close - Heat/hot water
Entire building
Apr 7, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 7, 2026 · Apt E11
Close - Heat/hot water
Entire building
Apr 7, 2026 · Apt B8
Close - Heat/hot water
Apartment only
Apr 7, 2026 · Apt F8
Close - Unsanitary condition
Mold
Apr 7, 2026 · Apt F8
Close - Paint/plaster
Wall
Apr 7, 2026 · Apt F8
Close - Appliance
Electric/gas range
Apr 7, 2026 · Apt F8
Close - Heat/hot water
Apartment only
Apr 7, 2026 · Apt D8
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1930
- Floors
- 6
- Residential units
- 67
- Building area
- 68,592 ft²
- Lot area
- 15,000 ft²
- Zoning
- R7A
- Community board
- 112
- Council district
- 10
- Block / lot
- 2250 / 50
- Assessed value
- $3,166,650
- Landmark / historic district
- No
HPD registration #122212, last renewed Aug 30, 2025.
Questions about 583 West 215 Street
Who owns 583 West 215 Street?
The owner of record in NYC Department of City Planning PLUTO data is 174th Tic Owner LLC.
Does 583 West 215 Street have violations?
Yes. NYC HPD has recorded 202 housing violations at this property.
Is 583 West 215 Street rent stabilized?
NYC Department of Finance tax bills listed 38 rent-stabilized units here in 2024 (about 57% of its 67 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 583 West 215 Street built?
City records list 1930 as the year it was built.
How many apartments are in 583 West 215 Street?
It has 67 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.