128 Seaman Avenue
Manhattan, NY 10034BBL 1-02248-0092Map
Owner of record: Windy Realty Associates LLC
128 Seaman Avenue is a walk-up apartment building built in 1920 in Manhattan, 10034. It has 259 residential units across 5 floors. The owner of record is Windy Realty Associates LLC. HPD has recorded 4,665 housing violations here, most recently on October 9, 2026. 50 of the 50 most recent violations are still open. City tax records listed 140 rent-stabilized apartments here in 2024.
- HPD violations
- 4,665
- DOB violations
- 59
- ECB violations
- 14
- HPD complaints
- 5,879
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 4,665
- BHazardous
Fire escape defective. replace with new the broken, defective and/or missing guidestop at drop ladder at building front at fire escape
Oct 9, 2026
Open — Violation open - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set , 1st story
Oct 4, 2026
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 5th room from north located at apt 3b, 3rd story, 1st apartment from south at west
Oct 3, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at north wall in the 5th room from north located at apt 3b, 3rd story, 1st apartment from south at west
Oct 3, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in at waste line at bathtub in the bathroom located at apt 3b, 3rd story, 1st apartment from south at west
Oct 3, 2026 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at apt 4i, 4th story, 1st apartment from east at south
Oct 1, 2026 · Apt 4I
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 4i, 4th story, 1st apartment from east at south
Oct 1, 2026 · Apt 4I
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the kitchen located at apt 4i, 4th story, 1st apartment from east at south
Oct 1, 2026 · Apt 4I
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 4i, 4th story, 1st apartment from east at south
Oct 1, 2026 · Apt 4I
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4i, 4th story, 1st apartment from east at south
Oct 1, 2026 · Apt 4I
Open — Notice of issuance sent to tenant
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4i, 4th story, 1st apartment from east at south
Oct 1, 2026 · Apt 4I
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4i, 4th story, 1st apartment from east at south
Oct 1, 2026 · Apt 4I
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the bathroom located at apt 4i, 4th story, 1st apartment from east at south
Oct 1, 2026 · Apt 4I
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the private hallway located at apt 2b, 2nd story, 1st apartment from east at south
Sep 23, 2026 · Apt 2B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4f, 4th story, 1st apartment from east at south
Sep 23, 2026 · Apt 4F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at apt 2k, 2nd story, 1st apartment from west at north
Sep 23, 2026 · Apt 2K
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at ceiling and all walls in the bathroom located at apt 2k, 2nd story, 1st apartment from west at north
Sep 23, 2026 · Apt 2K
Open — Notice of issuance sent to tenant - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2k, 2nd story, 1st apartment from west at north
Sep 23, 2026 · Apt 2K
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2b, 2nd story, 1st apartment from east at south
Sep 23, 2026 · Apt 2B
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective electrical outlet at east wall in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south
Sep 23, 2026 · Apt 2B
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from north at east located at apt 2b, 2nd story, 1st apartment from east at south
Sep 23, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Properly secure the loose west wall cabinet in the kitchen located at apt 2e, 2nd story, 1st apartment from east at south
Sep 23, 2026 · Apt 2E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wash basin cabinet in the bathroom located at apt 2e, 2nd story, 1st apartment from east at south
Sep 23, 2026 · Apt 2E
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3a, 3rd story, 1st apartment from west at north
Sep 23, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the kitchen located at apt 3a, 3rd story, 1st apartment from west at north
Sep 23, 2026 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective intercom system from building entrance to tenant electronic device in the entire apartment located at apt 3a, 3rd story, 1st apartment from west at north
Sep 23, 2026 · Apt 3A
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1e, 1st story, 1st apartment from west at north
Sep 23, 2026 · Apt 1E
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 4f, 4th story, 1st apartment from east at south
Sep 23, 2026 · Apt 4F
Open — Nov sent out - BHazardous
Provide dwelling with a janitor or responsible person or janitorial service.
Sep 23, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balance at upper sash window at west wall in the 1st room from north located at apt 2j, 2nd story, 1st apartment from south at west
Sep 22, 2026 · Apt 2J
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective elecrical outlet at the north wall in the 1st room from north at east located at apt 4a, 4th story, 2nd apartment from west at north
Sep 22, 2026 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4a, 4th story, 2nd apartment from west at north
Sep 22, 2026 · Apt 4A
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4c, 4th story, 1st apartment from south at west
Sep 22, 2026 · Apt 4C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4c, 4th story, 1st apartment from south at west
Sep 22, 2026 · Apt 4C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 5th room from north located at apt 4b, 4th story, 1st apartment from west at north
Sep 22, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at east wall in the 1st room from north located at apt 4c, 4th story, 1st apartment from south at west
Sep 22, 2026 · Apt 4C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 4c, 4th story, 1st apartment from south at west
Sep 22, 2026 · Apt 4C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, south and east walls in the 5th room from north located at apt 4c, 4th story, 1st apartment from south at west
Sep 22, 2026 · Apt 4C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at door in the entrance located at apt 1k, 1st story, 1st apartment from west at north
Sep 22, 2026 · Apt 1K
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 1k, 1st story, 1st apartment from west at north
Sep 22, 2026 · Apt 1K
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 1k, 1st story, 1st apartment from west at north
Sep 22, 2026 · Apt 1K
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 2j, 2nd story, 1st apartment from south at west
Sep 22, 2026 · Apt 2J
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balance at lower sash window at west wall in the bathroom located at apt 2j, 2nd story, 1st apartment from south at west
Sep 22, 2026 · Apt 2J
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 2j, 2nd story, 1st apartment from south at west
Sep 22, 2026 · Apt 2J
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic-tiles at north wall in the bathroom located at apt 1d, 1st story, 1st apartment from east at south
Sep 22, 2026 · Apt 1D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish at bathtub by method of reglzing in the bathroom located at apt 1d, 1st story, 1st apartment from east at south
Sep 22, 2026 · Apt 1D
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in wasteline at bathtub in the bathroom located at apt 1d, 1st story, 1st apartment from east at south
Sep 22, 2026 · Apt 1D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt 1d, 1st story, 1st apartment from east at south
Sep 22, 2026 · Apt 1D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north located at apt 1d, 1st story, 1st apartment from east at south
Sep 22, 2026 · Apt 1D
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective rotted wood bottom shelf at the sink base cabinet in the kitchen located at apt 4b, 4th story, 1st apartment from west at north
Sep 22, 2026 · Apt 4B
Open — Nov sent out
DOB building violations · 59
- Retaining wall none
Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09
Dec 15, 2022
Dob violation - dismissed - Retaining wall none
Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09
Dec 15, 2022
Dob violation - dismissed - Retaining wall none
Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09
Dec 15, 2022
Dob violation - dismissed - Retaining wall none
Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09
Dec 15, 2022
Dob violation - dismissed - Retaining wall none
Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09
Dec 15, 2022
Dob violation - dismissed - Retaining wall none
Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09
Dec 15, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed
Show 40 more ↓
- Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed
ECB violations · 14
- Class - 2
Atoi, observed multiple superficial cracks in the retaining wall within the exposure 2 rear yard passageway., maintain exterior building wall; restore retaining wall to code compliant conditions.
May 7, 2026 · Penalty $2,500
Active - Class - 2
At time of inspection of 6 story residential building observed sidewalk shed in place with bracing not secure causing a hazad.maintain
Sep 15, 2025 · Penalty $10,000
Active - Class - 2
At time of inspection observed sidewalk shed in place without information panel on parapet causing a hazardous condition.provide information panel
Sep 15, 2025 · Penalty $6,250
Active - Class - 2
1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not recieved a retaining wall condition assess
Feb 25, 2025
Resolve - Class - 2
1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not recieved a retaining wall condition assess
Feb 25, 2025
Resolve - Class - 2
1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not recieved a retaining wall condition assess
Feb 25, 2025
Resolve - Class - 2
1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not recieved a retaining wall condition assess
Feb 25, 2025
Resolve - Class - 2
1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not recieved a retaining wall condition assess
Feb 25, 2025
Resolve - Class - 2
1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not recieved a retaining wall condition assess
Feb 25, 2025
Resolve - Class - 2
Failure to maintain building in code compliant manner.observed at basement level ceramic block walls very unstable with movement to the touch.partition walls not load bearing.one wall to left side near entrance
Mar 20, 2023 · Penalty $625
Active
Show 4 more ↓
- Hazardous
Failure to post contractor's sign. remedy : provide contractor's sign
Oct 26, 2006 · Penalty $250
Resolve - Hazardous
Sidewalk does not meet bldg code specification @ no lights:note @ front & side of bldg sidewalk shed does not have any lighting. remedy:conform shed to bldg code specification.
Jun 4, 2006 · Penalty $2,000
Resolve - Non-hazardous
Failure to maintain building defects noted: leaks in apartment 4l 4th floor caused section of apt. 3l ceiling approx 42" x 42" 3rd floor bathroom clg. to collapsed exposing the wood beams from fire protection r
Oct 15, 2001 · Penalty $2,500
Resolve - Hazardous
Use of rigging equipment (scaffold) without a special riggers license operation o fhoisting equipment (scaffold) in an unsafe. manner scaffold over loaded with brick debris scaffold combined into one by bridgei
Dec 2, 1996 · Penalty $5,500
Resolve
Complaints
- Unsanitary condition
Pests
Oct 9, 2026 · Apt 5L
Open - Heat/hot water
Apartment only
Oct 9, 2026 · Apt 5L
Open - Heat/hot water
Apartment only
Oct 9, 2026 · Apt 4I
Close - Safety
Fire escape
Oct 9, 2026 · Apt 5L
Open - Unsanitary condition
Mold
Oct 5, 2026 · Apt 2J
Close - Heat/hot water
Entire building
Oct 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 3, 2026 · Apt BLDG
Close - Plumbing
Water supply
Oct 3, 2026 · Apt BLDG
Open - Heat/hot water
Entire building
Oct 3, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Oct 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 3, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Sep 30, 2026 · Apt 3L
Open - Heat/hot water
Apartment only
Sep 30, 2026 · Apt 1J
Close - Heat/hot water
Apartment only
Sep 30, 2026 · Apt 2J
Close - Unsanitary condition
Pests
Sep 30, 2026 · Apt 2J
Close - Unsanitary condition
Pests
Sep 30, 2026 · Apt 2J
Close - Unsanitary condition
Pests
Sep 30, 2026 · Apt 4I
Close - Paint/plaster
Ceiling
Sep 30, 2026 · Apt 4I
Close - Unsanitary condition
Pests
Sep 30, 2026 · Apt 4I
Close - Safety
Carbon monoxide detector
Sep 30, 2026 · Apt 3L
Open - Unsanitary condition
Pests
Sep 30, 2026 · Apt 3L
Open - Safety
Smoke detector
Sep 30, 2026 · Apt 3L
Open - Safety
Window guard broken/missing
Sep 27, 2026 · Apt 4B
Close - Safety
Window guard broken/missing
Sep 27, 2026 · Apt 4B
Open - Flooring/stairs
Floor
Sep 21, 2026 · Apt 2B
Close - Paint/plaster
Ceiling
Sep 21, 2026 · Apt 2B
Close - Water leak
Damp spot
Sep 21, 2026 · Apt 2B
Close - Plumbing
Bathtub/shower
Sep 21, 2026 · Apt 2B
Close - Plumbing
Bathtub/shower
Sep 21, 2026 · Apt 2B
Close - General
Cabinet
Sep 21, 2026 · Apt 2B
Close - Water leak
Slow leak
Sep 21, 2026 · Apt 2B
Close - Unsanitary condition
Mold
Sep 21, 2026 · Apt 2B
Close - Flooring/stairs
Floor
Sep 21, 2026 · Apt 2B
Close - Door/window
Door
Sep 21, 2026 · Apt 2B
Close - General
Bell/buzzer/intercom
Sep 21, 2026 · Apt 2B
Close - Unsanitary condition
Pests
Sep 21, 2026 · Apt 2B
Close - Unsanitary condition
Pests
Sep 21, 2026 · Apt 2B
Close - General
Bell/buzzer/intercom
Sep 21, 2026 · Apt 4I
Close - Unsanitary condition
Mold
Sep 21, 2026 · Apt 4I
Close - Flooring/stairs
Floor
Sep 21, 2026 · Apt 4I
Close - Plumbing
Radiator
Sep 21, 2026 · Apt 1E
Close - Electric
Lighting
Sep 21, 2026 · Apt 1E
Close - Water leak
Slow leak
Sep 21, 2026 · Apt 1E
Close - Unsanitary condition
Pests
Sep 21, 2026 · Apt 3I
Close - Plumbing
Basin/sink
Sep 21, 2026 · Apt 3I
Close - General
Bell/buzzer/intercom
Sep 21, 2026 · Apt 1E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1920
- Floors
- 5
- Residential units
- 259
- Building area
- 127,255 ft²
- Lot area
- 36,625 ft²
- Zoning
- R7A
- Community board
- 112
- Council district
- 10
- Block / lot
- 2248 / 92
- Assessed value
- $3,326,400
- Landmark / historic district
- No
HPD registration #109466, last renewed Mar 9, 2026.
Questions about 128 Seaman Avenue
Who owns 128 Seaman Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Windy Realty Associates LLC.
Does 128 Seaman Avenue have violations?
Yes. NYC HPD has recorded 4,665 housing violations at this property.
Is 128 Seaman Avenue rent stabilized?
NYC Department of Finance tax bills listed 140 rent-stabilized units here in 2024 (about 54% of its 259 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 128 Seaman Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 128 Seaman Avenue?
It has 259 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.