roofy

128 Seaman Avenue

Manhattan, NY 10034BBL 1-02248-0092Map

Owner of record: Windy Realty Associates LLC

128 Seaman Avenue is a walk-up apartment building built in 1920 in Manhattan, 10034. It has 259 residential units across 5 floors. The owner of record is Windy Realty Associates LLC. HPD has recorded 4,665 housing violations here, most recently on October 9, 2026. 50 of the 50 most recent violations are still open. City tax records listed 140 rent-stabilized apartments here in 2024.

HPD violations
4,665
DOB violations
59
ECB violations
14
HPD complaints
5,879

What to know

Concern
7 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 9, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
140
About 54% of the building's 259 apartments
Down from 142 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 4,665

  • B

    Fire escape defective. replace with new the broken, defective and/or missing guidestop at drop ladder at building front at fire escape

    Oct 9, 2026

    Open — Violation open
  • C

    Replace or repair the self-closing doors that is missing or defective latch set , 1st story

    Oct 4, 2026

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 5th room from north located at apt 3b, 3rd story, 1st apartment from south at west

    Oct 3, 2026 · Apt 3B

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at north wall in the 5th room from north located at apt 3b, 3rd story, 1st apartment from south at west

    Oct 3, 2026 · Apt 3B

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in at waste line at bathtub in the bathroom located at apt 3b, 3rd story, 1st apartment from south at west

    Oct 3, 2026 · Apt 3B

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the foyer located at apt 4i, 4th story, 1st apartment from east at south

    Oct 1, 2026 · Apt 4I

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 4i, 4th story, 1st apartment from east at south

    Oct 1, 2026 · Apt 4I

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the kitchen located at apt 4i, 4th story, 1st apartment from east at south

    Oct 1, 2026 · Apt 4I

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 4i, 4th story, 1st apartment from east at south

    Oct 1, 2026 · Apt 4I

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 4i, 4th story, 1st apartment from east at south

    Oct 1, 2026 · Apt 4I

    Open — Notice of issuance sent to tenant
Show 40 more ↓
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 4i, 4th story, 1st apartment from east at south

    Oct 1, 2026 · Apt 4I

    Open — Notice of issuance sent to tenant
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4i, 4th story, 1st apartment from east at south

    Oct 1, 2026 · Apt 4I

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the bathroom located at apt 4i, 4th story, 1st apartment from east at south

    Oct 1, 2026 · Apt 4I

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the private hallway located at apt 2b, 2nd story, 1st apartment from east at south

    Sep 23, 2026 · Apt 2B

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4f, 4th story, 1st apartment from east at south

    Sep 23, 2026 · Apt 4F

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east at south located at apt 2k, 2nd story, 1st apartment from west at north

    Sep 23, 2026 · Apt 2K

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at ceiling and all walls in the bathroom located at apt 2k, 2nd story, 1st apartment from west at north

    Sep 23, 2026 · Apt 2K

    Open — Notice of issuance sent to tenant
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 2k, 2nd story, 1st apartment from west at north

    Sep 23, 2026 · Apt 2K

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2b, 2nd story, 1st apartment from east at south

    Sep 23, 2026 · Apt 2B

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective electrical outlet at east wall in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south

    Sep 23, 2026 · Apt 2B

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from north at east located at apt 2b, 2nd story, 1st apartment from east at south

    Sep 23, 2026 · Apt 2B

    Open — Nov sent out
  • B

    Properly secure the loose west wall cabinet in the kitchen located at apt 2e, 2nd story, 1st apartment from east at south

    Sep 23, 2026 · Apt 2E

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective wash basin cabinet in the bathroom located at apt 2e, 2nd story, 1st apartment from east at south

    Sep 23, 2026 · Apt 2E

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 3a, 3rd story, 1st apartment from west at north

    Sep 23, 2026 · Apt 3A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the kitchen located at apt 3a, 3rd story, 1st apartment from west at north

    Sep 23, 2026 · Apt 3A

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective intercom system from building entrance to tenant electronic device in the entire apartment located at apt 3a, 3rd story, 1st apartment from west at north

    Sep 23, 2026 · Apt 3A

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1e, 1st story, 1st apartment from west at north

    Sep 23, 2026 · Apt 1E

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 4f, 4th story, 1st apartment from east at south

    Sep 23, 2026 · Apt 4F

    Open — Nov sent out
  • B

    Provide dwelling with a janitor or responsible person or janitorial service.

    Sep 23, 2026

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective counter balance at upper sash window at west wall in the 1st room from north located at apt 2j, 2nd story, 1st apartment from south at west

    Sep 22, 2026 · Apt 2J

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective elecrical outlet at the north wall in the 1st room from north at east located at apt 4a, 4th story, 2nd apartment from west at north

    Sep 22, 2026 · Apt 4A

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 4a, 4th story, 2nd apartment from west at north

    Sep 22, 2026 · Apt 4A

    Open — Notice of issuance sent to tenant
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4c, 4th story, 1st apartment from south at west

    Sep 22, 2026 · Apt 4C

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4c, 4th story, 1st apartment from south at west

    Sep 22, 2026 · Apt 4C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 5th room from north located at apt 4b, 4th story, 1st apartment from west at north

    Sep 22, 2026 · Apt 4B

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective electrical outlet at east wall in the 1st room from north located at apt 4c, 4th story, 1st apartment from south at west

    Sep 22, 2026 · Apt 4C

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 4c, 4th story, 1st apartment from south at west

    Sep 22, 2026 · Apt 4C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, south and east walls in the 5th room from north located at apt 4c, 4th story, 1st apartment from south at west

    Sep 22, 2026 · Apt 4C

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch set at door in the entrance located at apt 1k, 1st story, 1st apartment from west at north

    Sep 22, 2026 · Apt 1K

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 1k, 1st story, 1st apartment from west at north

    Sep 22, 2026 · Apt 1K

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 1k, 1st story, 1st apartment from west at north

    Sep 22, 2026 · Apt 1K

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 2j, 2nd story, 1st apartment from south at west

    Sep 22, 2026 · Apt 2J

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective counter balance at lower sash window at west wall in the bathroom located at apt 2j, 2nd story, 1st apartment from south at west

    Sep 22, 2026 · Apt 2J

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 2j, 2nd story, 1st apartment from south at west

    Sep 22, 2026 · Apt 2J

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic-tiles at north wall in the bathroom located at apt 1d, 1st story, 1st apartment from east at south

    Sep 22, 2026 · Apt 1D

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish at bathtub by method of reglzing in the bathroom located at apt 1d, 1st story, 1st apartment from east at south

    Sep 22, 2026 · Apt 1D

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in wasteline at bathtub in the bathroom located at apt 1d, 1st story, 1st apartment from east at south

    Sep 22, 2026 · Apt 1D

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt 1d, 1st story, 1st apartment from east at south

    Sep 22, 2026 · Apt 1D

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north located at apt 1d, 1st story, 1st apartment from east at south

    Sep 22, 2026 · Apt 1D

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective rotted wood bottom shelf at the sink base cabinet in the kitchen located at apt 4b, 4th story, 1st apartment from west at north

    Sep 22, 2026 · Apt 4B

    Open — Nov sent out

DOB building violations · 59

  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    Dec 15, 2022

    Dob violation - dismissed
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    Dec 15, 2022

    Dob violation - dismissed
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    Dec 15, 2022

    Dob violation - dismissed
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    Dec 15, 2022

    Dob violation - dismissed
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    Dec 15, 2022

    Dob violation - dismissed
  • Retaining wall none

    Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09

    Dec 15, 2022

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2017 inspection report

    Nov 8, 2019

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2012

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
Show 40 more ↓
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed

ECB violations · 14

  • Class - 2

    Atoi, observed multiple superficial cracks in the retaining wall within the exposure 2 rear yard passageway., maintain exterior building wall; restore retaining wall to code compliant conditions.

    May 7, 2026 · Penalty $2,500

    Active
  • Class - 2

    At time of inspection of 6 story residential building observed sidewalk shed in place with bracing not secure causing a hazad.maintain

    Sep 15, 2025 · Penalty $10,000

    Active
  • Class - 2

    At time of inspection observed sidewalk shed in place without information panel on parapet causing a hazardous condition.provide information panel

    Sep 15, 2025 · Penalty $6,250

    Active
  • Class - 2

    1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not recieved a retaining wall condition assess

    Feb 25, 2025

    Resolve
  • Class - 2

    1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not recieved a retaining wall condition assess

    Feb 25, 2025

    Resolve
  • Class - 2

    1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not recieved a retaining wall condition assess

    Feb 25, 2025

    Resolve
  • Class - 2

    1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not recieved a retaining wall condition assess

    Feb 25, 2025

    Resolve
  • Class - 2

    1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not recieved a retaining wall condition assess

    Feb 25, 2025

    Resolve
  • Class - 2

    1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not recieved a retaining wall condition assess

    Feb 25, 2025

    Resolve
  • Class - 2

    Failure to maintain building in code compliant manner.observed at basement level ceramic block walls very unstable with movement to the touch.partition walls not load bearing.one wall to left side near entrance

    Mar 20, 2023 · Penalty $625

    Active
Show 4 more ↓
  • Hazardous

    Failure to post contractor's sign. remedy : provide contractor's sign

    Oct 26, 2006 · Penalty $250

    Resolve
  • Hazardous

    Sidewalk does not meet bldg code specification @ no lights:note @ front & side of bldg sidewalk shed does not have any lighting. remedy:conform shed to bldg code specification.

    Jun 4, 2006 · Penalty $2,000

    Resolve
  • Non-hazardous

    Failure to maintain building defects noted: leaks in apartment 4l 4th floor caused section of apt. 3l ceiling approx 42" x 42" 3rd floor bathroom clg. to collapsed exposing the wood beams from fire protection r

    Oct 15, 2001 · Penalty $2,500

    Resolve
  • Hazardous

    Use of rigging equipment (scaffold) without a special riggers license operation o fhoisting equipment (scaffold) in an unsafe. manner scaffold over loaded with brick debris scaffold combined into one by bridgei

    Dec 2, 1996 · Penalty $5,500

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Oct 9, 2026 · Apt 5L

    Open
  • Heat/hot water

    Apartment only

    Oct 9, 2026 · Apt 5L

    Open
  • Heat/hot water

    Apartment only

    Oct 9, 2026 · Apt 4I

    Close
  • Safety

    Fire escape

    Oct 9, 2026 · Apt 5L

    Open
  • Unsanitary condition

    Mold

    Oct 5, 2026 · Apt 2J

    Close
  • Heat/hot water

    Entire building

    Oct 3, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 3, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 3, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Oct 3, 2026 · Apt BLDG

    Open
  • Heat/hot water

    Entire building

    Oct 3, 2026 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Oct 3, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 3, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 3, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 3, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 3, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Sep 30, 2026 · Apt 3L

    Open
  • Heat/hot water

    Apartment only

    Sep 30, 2026 · Apt 1J

    Close
  • Heat/hot water

    Apartment only

    Sep 30, 2026 · Apt 2J

    Close
  • Unsanitary condition

    Pests

    Sep 30, 2026 · Apt 2J

    Close
  • Unsanitary condition

    Pests

    Sep 30, 2026 · Apt 2J

    Close
  • Unsanitary condition

    Pests

    Sep 30, 2026 · Apt 4I

    Close
  • Paint/plaster

    Ceiling

    Sep 30, 2026 · Apt 4I

    Close
  • Unsanitary condition

    Pests

    Sep 30, 2026 · Apt 4I

    Close
  • Safety

    Carbon monoxide detector

    Sep 30, 2026 · Apt 3L

    Open
  • Unsanitary condition

    Pests

    Sep 30, 2026 · Apt 3L

    Open
  • Safety

    Smoke detector

    Sep 30, 2026 · Apt 3L

    Open
  • Safety

    Window guard broken/missing

    Sep 27, 2026 · Apt 4B

    Close
  • Safety

    Window guard broken/missing

    Sep 27, 2026 · Apt 4B

    Open
  • Flooring/stairs

    Floor

    Sep 21, 2026 · Apt 2B

    Close
  • Paint/plaster

    Ceiling

    Sep 21, 2026 · Apt 2B

    Close
  • Water leak

    Damp spot

    Sep 21, 2026 · Apt 2B

    Close
  • Plumbing

    Bathtub/shower

    Sep 21, 2026 · Apt 2B

    Close
  • Plumbing

    Bathtub/shower

    Sep 21, 2026 · Apt 2B

    Close
  • General

    Cabinet

    Sep 21, 2026 · Apt 2B

    Close
  • Water leak

    Slow leak

    Sep 21, 2026 · Apt 2B

    Close
  • Unsanitary condition

    Mold

    Sep 21, 2026 · Apt 2B

    Close
  • Flooring/stairs

    Floor

    Sep 21, 2026 · Apt 2B

    Close
  • Door/window

    Door

    Sep 21, 2026 · Apt 2B

    Close
  • General

    Bell/buzzer/intercom

    Sep 21, 2026 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Sep 21, 2026 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Sep 21, 2026 · Apt 2B

    Close
  • General

    Bell/buzzer/intercom

    Sep 21, 2026 · Apt 4I

    Close
  • Unsanitary condition

    Mold

    Sep 21, 2026 · Apt 4I

    Close
  • Flooring/stairs

    Floor

    Sep 21, 2026 · Apt 4I

    Close
  • Plumbing

    Radiator

    Sep 21, 2026 · Apt 1E

    Close
  • Electric

    Lighting

    Sep 21, 2026 · Apt 1E

    Close
  • Water leak

    Slow leak

    Sep 21, 2026 · Apt 1E

    Close
  • Unsanitary condition

    Pests

    Sep 21, 2026 · Apt 3I

    Close
  • Plumbing

    Basin/sink

    Sep 21, 2026 · Apt 3I

    Close
  • General

    Bell/buzzer/intercom

    Sep 21, 2026 · Apt 1E

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1920
Floors
5
Residential units
259
Building area
127,255 ft²
Lot area
36,625 ft²
Zoning
R7A
Community board
112
Council district
10
Block / lot
2248 / 92
Assessed value
$3,326,400
Landmark / historic district
No

HPD registration #109466, last renewed Mar 9, 2026.

Questions about 128 Seaman Avenue

Who owns 128 Seaman Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Windy Realty Associates LLC.

Does 128 Seaman Avenue have violations?

Yes. NYC HPD has recorded 4,665 housing violations at this property.

Is 128 Seaman Avenue rent stabilized?

NYC Department of Finance tax bills listed 140 rent-stabilized units here in 2024 (about 54% of its 259 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 128 Seaman Avenue built?

City records list 1920 as the year it was built.

How many apartments are in 128 Seaman Avenue?

It has 259 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.