roofy

108 Park Terrace East

Manhattan, NY 10034BBL 1-02243-0278Map

Owner of record: 108 Park Terrace Realty,

108 Park Terrace East is a walk-up apartment building built in 1925 in Manhattan, 10034. It has 34 residential units across 5 floors. The owner of record is 108 Park Terrace Realty,. HPD has recorded 143 housing violations here, most recently on September 19, 2026. 6 of the 50 most recent violations are still open. City tax records listed 28 rent-stabilized apartments here in 2024.

HPD violations
143
DOB violations
6
ECB violations
5
HPD complaints
376

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 19, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
28
About 82% of the building's 34 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 143

  • C

    Provide ready access to buildings heating system locked door at basement at boiler room

    Sep 19, 2026

    Open — Violation will be reinspected
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2d, 3rd story, 1st apartment from east at south

    Sep 19, 2026 · Apt 2D

    Open — Violation will be reinspected
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at vestibule door , 1st story

    Jan 21, 2026

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from north at west located at apt 2d, 2nd story, 1st apartment from east at south

    Jan 9, 2026 · Apt 2D

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 2d, 2nd story, 1st apartment from east at south

    Jan 9, 2026 · Apt 2D

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... found mold to be less than 10sq ft at north wall in the 5th room from north located at apt 2b, 1st story, 2nd apartment from south at west

    Sep 8, 2025 · Apt 2B

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the 5th room from north located at apt 2b, 1st story, 2nd apartment from south at west

    Sep 8, 2025 · Apt 2B

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the 5th room from north located at apt 2b, 1st story, 2nd apartment from south at west

    Sep 8, 2025 · Apt 2B

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at vestibule leading to public hall at basement , 1st story

    Jul 13, 2025

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at bsmt-apt 3a, 2nd bsmt-apt from south at west

    Jun 10, 2025 · Apt 3A

    Closed — Violation dismissed
Show 40 more ↓
  • C

    Abate the infestation consisting of mice in the entire apartment located at bsmt-apt 3a, 2nd bsmt-apt from south at west

    Jun 10, 2025 · Apt 3A

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from east located at apt 3a, 2nd apartment from south at west

    Jun 10, 2025 · Apt 3A

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at bsmt-apt 3a, 2nd bsmt-apt from south at west

    Jun 2, 2025 · Apt 3A

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at bulkhead door leading to roof , 5th story

    Jun 2, 2025

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at bsmt-apt 3a, 2nd bsmt-apt from south at west

    Jun 2, 2025 · Apt 3A

    Closed — Violation dismissed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.

    Dec 27, 2024

    Closed — Violation dismissed
  • A

    Cleanse to the satisfaction of this department the mold on tiles around bathtub at south and west walls in the bathroom located at apt 2d, 3rd story, 1st apartment from east at south

    Oct 3, 2024 · Apt 2D

    Closed — Violation dismissed
  • A

    And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint drop ladder at 2nd fire escape from north at west

    Sep 6, 2024

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective vinyl floor tiles in the closet in the foyer located at apt 2d, 3rd story, 1st apartment from east at south

    Aug 20, 2024 · Apt 2D

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department window frame at 1st window from south at west in the 5th room from east located at apt 2d, 3rd story, 1st apartment from east at south

    Oct 17, 2023 · Apt 2D

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department window frame at 1st window from east at south in the 1st room from east located at apt 2d, 3rd story, 1st apartment from east at south

    Oct 17, 2023 · Apt 2D

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east and south wall in the 1st room from east located at apt 2d, 3rd story, 1st apartment from east at south

    Oct 17, 2023 · Apt 2D

    Closed — Violation closed
  • B

    Fire escape defective. replace with new the broken, defective and/or missing drop ladder at 2nd fire escape from north at building front

    Mar 3, 2023

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing located at apt e3, 3rd story, 1st apartment from east at south

    Aug 29, 2022 · Apt E3

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt e3, 3rd story, 1st apartment from east at south

    Aug 29, 2022 · Apt E3

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt e3, 5th story, 1st apartment from east at south

    Aug 5, 2022 · Apt E3

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt e3, 5th story, 1st apartment from east at south

    Aug 5, 2022 · Apt E3

    Open — First no access to re- inspect violation
  • B

    Trace and repair the source and abate the visible mold condition... at south wall 15 approx sq.ft in the bathroom located at apt 2d, 3rd story, 1st apartment from east at south

    Jul 25, 2022 · Apt 2D

    Closed — Violation closed
  • B

    Replace with new the broken or defective marble saddle in the entrance located at apt 3c, 2nd story, 1st apartment from east at south

    Jul 25, 2022 · Apt 3C

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 3c, 2nd story, 1st apartment from east at south

    Jul 25, 2022 · Apt 3C

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 3c, 2nd story, 1st apartment from east at south

    Jul 25, 2022 · Apt 3C

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen located at apt 3c, 2nd story, 1st apartment from east at south

    Jul 25, 2022 · Apt 3C

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 3c, 2nd story, 1st apartment from east at south

    Jul 25, 2022 · Apt 3C

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective electrical outlet at west wall in the foyer located at apt 2d, 3rd story, 1st apartment from east at south

    Jul 25, 2022 · Apt 2D

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the 3rd room from east located at apt 2d, 3rd story, 1st apartment from east at south

    Jan 5, 2022 · Apt 2D

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective north closet door frame in the private hallway located at apt 2d, 3rd story, 1st apartment from east at south

    Jan 5, 2022 · Apt 2D

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling ,east and west wall in north closet in the private hallway located at apt 2d, 3rd story, 1st apartment from east at south

    Jan 5, 2022 · Apt 2D

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in south closet in the 3rd room from east located at apt 2d, 3rd story, 1st apartment from east at south

    Jan 5, 2022 · Apt 2D

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective door frame south closet in the 3rd room from east located at apt 2d, 3rd story, 1st apartment from east at south

    Jan 5, 2022 · Apt 2D

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 2d, 3rd story, 1st apartment from east at south

    Jan 5, 2022 · Apt 2D

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 2d, 3rd story, 1st apartment from east at south

    Oct 23, 2021 · Apt 2D

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 2d, 3rd story, 1st apartment from east at south

    Oct 23, 2021 · Apt 2D

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the kitchen located at apt 2d, 3rd story, 1st apartment from east at south

    Oct 23, 2021 · Apt 2D

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 2d, 3rd story, 1st apartment from east at south

    Oct 23, 2021 · Apt 2D

    Closed — Violation closed
  • B

    Properly repair the broken or defective light fixture at east wall in the 2nd room from east located at apt 2d, 3rd story, 1st apartment from east at south

    Oct 23, 2021 · Apt 2D

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall and ceiling in the 1st room from east located at apt 2d, 3rd story, 1st apartment from east at south

    Oct 7, 2021 · Apt 2D

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2d, 3rd story, 1st apartment from east at south

    Oct 7, 2021 · Apt 2D

    Open — Defect letter issued
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2d, 3rd story, 1st apartment from east at south

    Oct 7, 2021 · Apt 2D

    Open — Defect letter issued
  • B

    Replace with new the broken or defective base cabinet at sink in the kitchen located at apt 2d, 3rd story

    Oct 7, 2021 · Apt 2D

    Closed — Violation closed
  • B

    Replace with new the broken or defective glass pane at the vestibule partition at public hall, 1st story

    Sep 7, 2021

    Closed — Violation dismissed

DOB building violations · 6

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 28, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 28, 2018

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 19, 2007

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 26, 2002

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed

ECB violations · 5

  • Class - 2

    Observed rear facade exterior bricks wall instate of disrepair conditions with holes, missing bricks, spalling bricks and deteriorated throughout., repair and/or replace

    Aug 14, 2024

    Resolve
  • Class - 1

    Filed a certificate, form, application etc., containing a material false statement(s). i observed in the basement area where the meters are located 34 new meter bars and new gas piping. no gas work listed under

    Feb 8, 2018

    Resolve
  • Class - 1

    Work w/o a permit. i observed in the basement area where the meter arelocated, 34 new meter bars and new gas piping. all hour sewer service co didn't have a permit to do gas work at the premises or to replace m

    Feb 8, 2018

    Resolve
  • Class - 1

    Unapproved/unsafe/unsuitable electrical equipment, apparatus, materials, devices, appliances or wiring in use. the entire apt 4b: defective openwiring are in use,defective receptacle outlets are in use,flexible

    Dec 18, 2013 · Penalty $1,600

    Resolve
  • Class - 2

    Failure to properly bond electrical systems. bsmt service equipment, 100 amp service switch for plp: service entrance conductor service neutral bar not bonded to enclosure. remedy: provide proper bonding.

    Dec 18, 2013 · Penalty $1,500

    Resolve

Complaints

  • Electric

    No lighting

    Sep 26, 2026 · Apt 2D

    Open
  • Heat/hot water

    Entire building

    Sep 17, 2026 · Apt 2D

    Close
  • Heat/hot water

    Entire building

    Sep 14, 2026 · Apt 2D

    Close
  • Heat/hot water

    Entire building

    Feb 12, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 20, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 19, 2026 · Apt 2D

    Close
  • Heat/hot water

    Entire building

    Jan 19, 2026 · Apt 2D

    Close
  • Heat/hot water

    Entire building

    Jan 8, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2026 · Apt 2D

    Close
  • Paint/plaster

    Wall

    Jan 3, 2026 · Apt 2D

    Close
Show 40 more ↓
  • Paint/plaster

    Cabinet

    Jan 3, 2026 · Apt 2D

    Close
  • Flooring/stairs

    Floor

    Jan 3, 2026 · Apt 2D

    Close
  • Unsanitary condition

    Mold

    Jan 3, 2026 · Apt 2D

    Close
  • Heat/hot water

    Entire building

    Dec 10, 2025 · Apt 2D

    Close
  • Heat/hot water

    Entire building

    Dec 2, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 23, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 23, 2025 · Apt BLDG

    Close
  • Water leak

    Heavy flow

    Oct 12, 2025 · Apt 3C

    Close
  • Plumbing

    Water supply

    Oct 12, 2025 · Apt E3

    Close
  • Paint/plaster

    Ceiling

    Sep 7, 2025 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Mar 3, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 3, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 2, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 24, 2025 · Apt 2D

    Close
  • Heat/hot water

    Apartment only

    Feb 17, 2025 · Apt 2D

    Close
  • Door/window

    Window frame

    Feb 17, 2025 · Apt 2D

    Close
  • Unsanitary condition

    Mold

    Feb 17, 2025 · Apt 2D

    Close
  • Paint/plaster

    Ceiling

    Feb 17, 2025 · Apt 2D

    Close
  • General

    Janitor/super

    Dec 12, 2024 · Apt 2B

    Close
  • Plumbing

    Toilet

    Dec 12, 2024 · Apt 2B

    Close
  • Flooring/stairs

    Floor

    Dec 3, 2024 · Apt 2D

    Close
  • Paint/plaster

    Window/frame

    Dec 3, 2024 · Apt 2D

    Close
  • Paint/plaster

    Wall

    Dec 3, 2024 · Apt 2D

    Close
  • Paint/plaster

    Wall

    Dec 3, 2024 · Apt 2D

    Close
  • General

    Cabinet

    Dec 3, 2024 · Apt 2D

    Close
  • Heat/hot water

    Entire building

    Nov 22, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 14, 2024 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    Nov 6, 2024 · Apt 2D

    Close
  • Paint/plaster

    Window/frame

    Nov 6, 2024 · Apt 2D

    Close
  • Paint/plaster

    Wall

    Nov 6, 2024 · Apt 2D

    Close
  • General

    Cabinet

    Nov 6, 2024 · Apt 2D

    Close
  • Paint/plaster

    Wall

    Nov 6, 2024 · Apt 2D

    Close
  • Heat/hot water

    Entire building

    Oct 27, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 27, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 14, 2024 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Oct 11, 2024 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Oct 11, 2024 · Apt 2B

    Close
  • Paint/plaster

    Wall

    Sep 27, 2024 · Apt 2D

    Close
  • Electric

    Wiring

    Sep 27, 2024 · Apt 2D

    Close
  • Plumbing

    Water supply

    Sep 27, 2024 · Apt 2D

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1925
Floors
5
Residential units
34
Building area
25,760 ft²
Lot area
6,500 ft²
Zoning
R7A
Community board
112
Council district
10
Block / lot
2243 / 278
Assessed value
$1,288,350
Landmark / historic district
No

HPD registration #110485, last renewed Jul 16, 2025.

Questions about 108 Park Terrace East

Who owns 108 Park Terrace East?

The owner of record in NYC Department of City Planning PLUTO data is 108 Park Terrace Realty,.

Does 108 Park Terrace East have violations?

Yes. NYC HPD has recorded 143 housing violations at this property.

Is 108 Park Terrace East rent stabilized?

NYC Department of Finance tax bills listed 28 rent-stabilized units here in 2024 (about 82% of its 34 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 108 Park Terrace East built?

City records list 1925 as the year it was built.

How many apartments are in 108 Park Terrace East?

It has 34 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.