25 Cooper Street
Manhattan, NY 10034BBL 1-02238-0011Map
Owner of record: 25 Cooper, LLC
25 Cooper Street is an elevator apartment building built in 1937 in Manhattan, 10034. It has 43 residential units across 6 floors. The owner of record is 25 Cooper, LLC. HPD has recorded 109 housing violations here, most recently on June 3, 2024. 21 of the 50 most recent violations are still open. City tax records listed 36 rent-stabilized apartments here in 2024.
- HPD violations
- 109
- DOB violations
- 29
- ECB violations
- 35
- HPD complaints
- 321
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 109
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 3rd room from east located at apt 4d, 4th story, 2nd apartment from south at west
Jun 3, 2024 · Apt 4D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the 3rd room from east located at apt 4d, 4th story, 2nd apartment from south at west
Jun 3, 2024 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... approx 36 sq fts at north wall and 4 sq fts at ceiling in the 3rd room from east located at apt 4d, 4th story, 2nd apartment from south at west
Jun 3, 2024 · Apt 4D
Open — Notice of issuance sent to tenant - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling approximately 6 sq. ft. in the bathroom located at apt 5e, 5th story, 3rd apartment from south at west
Oct 20, 2023 · Apt 5E
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective base cabinet in the kitchen located at apt 5e, 5th story, 3rd apartment from south at west
Oct 20, 2023 · Apt 5E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the kitchen located at apt 5e, 5th story, 3rd apartment from south at west
Oct 20, 2023 · Apt 5E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective 1st window counter balance lower sash at east wall in the 1st room from east located at apt 5e, 5th story, 3rd apartment from south at west
Oct 20, 2023 · Apt 5E
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 5e, 5th story, 3rd apartment from south at west
Oct 20, 2023 · Apt 5E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective at window lower counter balance sash in the 5th room from east located at apt 5e, 5th story, 3rd apartment from south at west
Oct 20, 2023 · Apt 5E
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from east located at apt 5e, 5th story, 3rd apartment from south at west
Oct 20, 2023 · Apt 5E
Open — Nov sent out
Show 40 more ↓
- BHazardous
Replace the broken or defective washbasin in the bathroom located at apt 5e, 5th story, 3rd apartment from south at west
Oct 20, 2023 · Apt 5E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the bathroom located at apt 5e, 5th story, 3rd apartment from south at west
Oct 20, 2023 · Apt 5E
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic tile floor in the bathroom located at apt 5e, 5th story, 3rd apartment from south at west
Oct 20, 2023 · Apt 5E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at west wall in the bathroom located at apt 5e, 5th story, 3rd apartment from south at west
Oct 20, 2023 · Apt 5E
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective lower escutcheon plate at riser in the bathroom located at apt 5e, 5th story, 3rd apartment from south at west
Oct 20, 2023 · Apt 5E
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling approximately 6 sq. ft. in the bathroom located at apt 5e, 5th story, 3rd apartment from south at west original violation 16323974 issued 20-oct-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Oct 20, 2023 · Apt 5E
Open — First no access to re- inspect violation - BHazardous
Repair or replace the smoke detector defective located at apt 5b, 5th story, 1st apartment from north at east
Dec 20, 2022 · Apt 5B
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 5b, 5th story, 1st apartment from north at east
Dec 20, 2022 · Apt 5B
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening push bar at door to roof does not allow re-entry into building , 6th story
Oct 7, 2022
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over the ceiling in the 4th room from east located at apt 6f, 6th story, 1st apartment from west at north
May 20, 2021 · Apt 6F
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tile floor in the 2nd bathroom from east located at apt 6f, 6th story, 1st apartment from west at north
May 20, 2021 · Apt 6F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall inside the closet in the foyer located at apt 6f, 6th story, 1st apartment from west at north
May 20, 2021 · Apt 6F
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling inside the closet in the foyer located at apt 6f, 6th story, 1st apartment from west at north
May 20, 2021 · Apt 6F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the kitchen located at apt 6f, 6th story, 1st apartment from west at north
May 20, 2021 · Apt 6F
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tile at east wall in the 1st bathroom from east located at apt 6f, 6th story, 1st apartment from west at north
May 20, 2021 · Apt 6F
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tile floor in the 1st bathroom from east located at apt 6f, 6th story, 1st apartment from west at north
May 20, 2021 · Apt 6F
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation radiator in the 3rd room from east at north located at apt 6f, 6th story, 1st apartment from west at north
May 20, 2021 · Apt 6F
Closed — Violation dismissed - CImmediately hazardous
Replace with new the broken or defective glass pane at lower window sash at east wall in the 3rd room from east at north located at apt 6f, 6th story, 1st apartment from west at north
May 20, 2021 · Apt 6F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall and ceiling in the 3rd room from east at north located at apt 6f, 6th story, 1st apartment from west at north
May 20, 2021 · Apt 6F
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tile at east wall in the 2nd bathroom from east located at apt 6f, 6th story, 1st apartment from west at north
May 20, 2021 · Apt 6F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north and west walls in the 4th room from east located at apt 6f, 6th story, 1st apartment from west at north
May 20, 2021 · Apt 6F
Closed — Violation closed - BHazardous
Properly repair the broken or defective spring balance at lower windows sash at west wall in the 3rd room from east at south located at apt 6f, 6th story, 1st apartment from west at north
May 20, 2021 · Apt 6F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall and ceiling in the 3rd room from east at south located at apt 6f, 6th story, 1st apartment from west at north
May 20, 2021 · Apt 6F
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate . in the 3rd room from east at south located at apt 6f, 6th story, 1st apartment from west at north
May 20, 2021 · Apt 6F
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tile floor in the kitchen located at apt 6f, 6th story, 1st apartment from west at north
May 20, 2021 · Apt 6F
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north and west walls at bulkhead stairs, 6 , 6th story
May 1, 2020
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north and west walls at bulkhead stairs, 6sty , 6th story
May 1, 2020
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak water penetrating north and west walls at bulkhead stairs , 6th story
May 1, 2020
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective broken glass pane upper sash at 7th window from east at building front , 5th story
Feb 25, 2020
Closed — Violation closed - CImmediately hazardous
Remove the illegal double cylinder key operated locking device at door ... in the entrance located at apt 5b, 5th story, 1st apartment from north at east
Feb 25, 2020 · Apt 5B
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5b, 5th story, 1st apartment from north at east
Feb 25, 2020 · Apt 5B
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of commercial dryer venting at west court yard at basement
Feb 25, 2020
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 5, 2018
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 3rd room from north located at apt 2c, 2nd story, 1st apartment from west at north
Dec 18, 2016 · Apt 2C
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall in the bathroom located at apt 2c, 2nd story, 1st apartment from west at north
Dec 18, 2016 · Apt 2C
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 1st room from north at west located at apt 2c, 2nd story, 1st apartment from west at north
Dec 18, 2016 · Apt 2C
Open — Defect letter issued - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the 1st room from north at east, the kitchen located at apt 2c, 2nd story, 1st apartment from west at north
Dec 18, 2016 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame in the foyer located at apt 2c, 2nd story, 1st apartment from west at north
Dec 18, 2016 · Apt 2C
Open — Defect letter issued - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 1st room from north at west located at apt 2c, 2nd story, 1st apartment from west at north
Dec 18, 2016 · Apt 2C
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st window frame from west at north wall in the 1st room from north at west located at apt 2c, 2nd story, 1st apartment from west at north
Dec 18, 2016 · Apt 2C
Closed — Violation dismissed
DOB building violations · 29
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 23, 2024
Dob violation - active - Failure to correct swarmp conditions (facade) facade required
Failure to correct swarmp conditions
Nov 1, 2023
Dob violation - active - Hazardous condition (facade) facade required
Cycle 9b unsafe report filed
Feb 21, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 11, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 29, 2017
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst
Jan 3, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 23, 2016
Dob violation - resolved
Show 19 more ↓
- Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2014 cat 1 insp/tst
Nov 14, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 1, 2016
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 29, 2013
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - active - Facade facade optional
Unsafe local law 11/98 report filed
Mar 22, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 16, 2012
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 24, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 3, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 27, 2009
Dob violation - resolved - Facade facade required
L1198-local law 11/98 - facade facade required
Jun 25, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 25, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 11, 2005
Dob violation - resolved - Facade facade optional
Ll10/80-local law 10/80 - facade facade optional
Mar 1, 2002
Dob violation - dismissed - Elevator elevatorrequired
1p12065
May 2, 2000
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
May 23, 1995
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
(74)cover all fixtures on car top and provide work light
Feb 26, 1990
Dob violation - resolved - Elevator elevatorrequired
(35)provide access to motor room (18)replace missing interlock covers (31)enclose wiring top of car (11)replace light under car
Oct 20, 1989
Dob violation - resolved
ECB violations · 35
- Class - 2
Observed side walk shed erected at exposure 1 of a 6 story residential building. at time of inspection observed sws was no complaint as per code . defected mudsills, unleveled mudsills and missing required brac
Aug 31, 2026 · Penalty $2,400
Active - Class - 2
Observed side walk shed erected. upon review side walk shed permit is expired 07/28/2026 and no active permit is on file.
Aug 31, 2026 · Penalty $1,250
Active - Class - 2
Failure to file acceptable amended cycle 8b, 9b, and 10b report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #1007365. remedy: file acceptable
Apr 20, 2026 · Penalty $1,250
Active - Class - 2
At time of inspection observed sidewalk shed in place with permit m00934175 expired 6-11-2025 causing hazardous conditions.
Oct 2, 2025
Resolve - Class - 2
Failure to maintain exterior building facade and appurtenances. note: observed at exposures 2, 3, 4(east/south/west elevations) cracks in masonry, spalling sills, and deteriorated mortar joints. at exposure 1 n
Dec 26, 2024 · Penalty $1,250
Active - Class - 1
At time of inspection of 6 story residential building observed sidewalk shed in place with lighting installed without electrical permit creating hazardous conditions.
Oct 17, 2024 · Penalty $800
Resolve - Class - 2
At time of inspection observe sidewalk shed erected at exposure-1 missing approx 12feet of the sidewalk shed bridge.missing platform,parapet panels .damage mudsill, and hanging light fixture. create an unsafe
Mar 25, 2024 · Penalty $2,400
Active - Class - 2
At time of inspection observed sidewalk shed erected at exposure-1-missing contractors sign, 311 sign as required.
Mar 25, 2024 · Penalty $1,250
Active - Class - 2
Failure to file acceptable amended cycle 8b and 9b report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#907365.rem:file acceptable report.
Jan 16, 2024 · Penalty $1,250
Active - Class - 2
Failure to submit an acceptable required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#807365.agg1:prior nov#37021312m under 2
Oct 19, 2022 · Penalty $3,125
Active
Show 25 more ↓
- Class - 1
Dlm improperly installed on this device . no fireman's service present in controller . install fireman's service so dlm is in compliance with section 3.10.12 of appendix k3 , apply for permit and be tested in f
Feb 10, 2022
Resolve - Class - 2
Failure to submit an acceptable required cycle 8b report of critical exmination documenting condition of etxeior wall and appurtenances required by 28-302.4 for control 807365 agg1 prior nov 37013705n
Jun 1, 2021 · Penalty $3,125
Active - Class - 1
Class 1 violation issued, no dlm installed in this controller as mandated by 3.10.12. of appendix k3 of the 2014 remedy; file application, install dlm and perform and file test with nycdob.
Feb 12, 2021 · Penalty $1,250
Resolve - Class - 2
Faliure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #807365.rem:submit required technical report
Oct 15, 2018 · Penalty $1,250
Active - Class - 2
2m7,40o2,71m7. 2m7-outside comm missing provide; 40o2- motor room dirty clean; 71m7- pit light missing provide.
Jan 22, 2018 · Penalty $250
Resolve - Class - 2
Failure to maintain exterior bldg north elev exp1-flower pots on sill (6flr) masonry header at entrance eroded mortar south elev exp3 crack in lobby window sill step cracks-window header to sill 1st flr spallin
Jan 25, 2016 · Penalty $250
Resolve - Class - 2
Failure to maintain exterior bldg south elevation exp 3 observed largeclay flower pot stored on fire escape landing. east elevation, exp 2, south facing observed cracks and broken facade window pane. failure on
Apr 25, 2013
Resolve - Class - 2
28-302.5 failure to provide safety measures (ie:sidewalk shed,fence etc)where required to protect public from unsafe conditions as per 1 rcny 103-04. facade technical report filed unsafe by pe/ra 01/17/06. rem;
May 29, 2012 · Penalty $400
Resolve - Class - 2
Failure to maintain exterior building north elevation exposure #1 observe flower pot stored on facade sill on the 6th flr above entrance. south elevation exposure #3 observe flower pot stored on fire escape lan
May 29, 2012
Resolve - Class - 2
Sec. 28-302.5 failure to provide safety measure (sidewalk) to protect public from hazardous condition. unsafe (fisp) technical report file for cycle -6 on 1-17-06. remedy: provide safety measure as per (fisp)
May 20, 2011 · Penalty $500
Resolve - Class - 2
Failure to maintain exterior bldg north elevation exp#1 observe blocksof wood under a/c unit on the third flr;flower pots stored on fire escape landing on the 6th flr.rem:maintain exterior bldg,remove blocks
Apr 11, 2011
Resolve - Class - 2
Failure to maintain exterior bldg. north elevation observed blocks of wood improperly installed under ac units south elevation observe blocks of wood under ac units improperly installed. remedy: maintain
Jul 2, 2010 · Penalty $250
Resolve - Class - 2
Failure to provide safety measures, sidewalk shed where required according to the cycle #5 and #6 tr-6 filed as unsafe of the local law 11/98. remedy: provide safety measures where required according to the
Jul 2, 2010 · Penalty $10,000
Resolve - Class - 2
Failure to provide safety measures or sdwlk shed where required according to the cycle#6 technical report(tr-6)filed as unsafe of the local law 11/98 report.rem:provide safety measures where required according
Apr 19, 2010 · Penalty $2,400
Resolve - Class - 2
Failure to file an amended 6th round report acceptable to this dept indicating correction of unsafe conditions described in initial ll11/98 report.34682100jrem:file an amended report following remedial repairs
Mar 26, 2010 · Penalty $800
Resolve - Class - 3
Failure to file an amended 6th round report acceptable to this department indicating correction of unsafe conditions described in initial local law 11/98 report. remedy: file an amended report following remedia
May 9, 2008 · Penalty $700
Resolve - Non-hazardous
58y02.55y02.66o02.64l11.16j01.39o02.86bb15.59l11.38#06 38#06 car top wire exposed
Feb 11, 2008
Resolve - Hazardous
05l10,08v01,09i10,59l10,16l10,43h11.5l-car door timing is to fast when more than one call.8v-leveling 4fl.9i-car floor is damaged.59l-machine space lighting defective.16l-6fl door check.43h-overhead traction sh
Feb 28, 2007
Resolve - Non-hazardous
55y13/85b05. 85-b-05. the tag says 07- i do not understand that date.
Oct 17, 2005
Resolve - Non-hazardous
46l13 11q07 15b01 35p07 #46-l-13 not enough penetration of turning #15-b-01 adjust where needed 35-p07-key doesnot work.
May 23, 2001
Resolve - Non-hazardous
30o2,57o2,55x11,60d6,46u16,40u16,22#6,53x11,36i11,36w6. 40,22-as per code.
Apr 17, 1999
Resolve - Non-hazardous
21x,15l,18l,15m,38p,55x,57o,58o,59o,62m,. 21 x-pi (indications) 18l- bad contact 3rd floor 15l- make all doors self latching 15m- floor 3nimbers (inside) doors) 62m- toe ground.
Feb 15, 1996 · Penalty $250
Resolve - Non-hazardous
15l,21x,35i,75t. 15l-jammed (stuck) 1st floor 21-pi hall pb 351-ladder(2nd step).
Sep 27, 1994 · Penalty $100
Resolve - Non-hazardous
57z,36w,35d,53x,35i,11q. 35 smoke hole grating.
Nov 16, 1993
Resolve - Non-hazardous
18q,15#,18j,31q,22d,40#, (15)- access 18 make self latching when elevator if not at floor.
May 9, 1992
Resolve
Complaints
- General
Signage missing
Sep 30, 2026 · Apt BLDG
Close - General
Janitor/super
Sep 25, 2026 · Apt BLDG
Open - Unsanitary condition
Garbage/recycling storage
Sep 25, 2026 · Apt BLDG
Open - Safety
Window guard broken/missing
Aug 20, 2026 · Apt 3G
Close - Unsanitary condition
Garbage/recycling storage
Apr 7, 2026 · Apt BLDG
Close - Plumbing
Water supply
Oct 12, 2025 · Apt BLDG
Close - Plumbing
Water supply
Oct 12, 2025 · Apt BLDG
Close - Plumbing
Water supply
Oct 12, 2025 · Apt 1F
Close - Plumbing
Water supply
Oct 12, 2025 · Apt BLDG
Close - Plumbing
Water supply
Oct 12, 2025 · Apt BLDG
Close
Show 40 more ↓
- Plumbing
Water supply
Oct 12, 2025 · Apt BLDG
Close - Plumbing
Water supply
Oct 12, 2025 · Apt BLDG
Close - Plumbing
Water supply
Oct 12, 2025 · Apt 3E
Close - Plumbing
Water supply
Oct 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 22, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 20, 2025 · Apt 3E
Close - Heat/hot water
Apartment only
Dec 24, 2024 · Apt 1B
Close - Paint/plaster
Wall
Apr 6, 2024 · Apt 4D
Close - Paint/plaster
Ceiling
Apr 6, 2024 · Apt 4D
Close - Paint/plaster
Ceiling
Apr 6, 2024 · Apt 4D
Close - Paint/plaster
Wall
Apr 6, 2024 · Apt 4D
Close - Unsanitary condition
Pests
Jan 19, 2024 · Apt 1E
Close - Heat/hot water
Entire building
Dec 13, 2023 · Apt BLDG
Close - Unsanitary condition
Mold
Oct 2, 2023 · Apt 5E
Close - Plumbing
Basin/sink
Oct 2, 2023 · Apt 5E
Close - Unsanitary condition
Pests
Apr 26, 2023 · Apt 4D
Close - Door/window
Window frame
Apr 26, 2023 · Apt 4D
Close - Heat/hot water
Apartment only
Mar 22, 2023 · Apt 3E
Close - Heat/hot water
Apartment only
Mar 11, 2023 · Apt 3E
Close - Plumbing
Water supply
Dec 29, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 29, 2022 · Apt 3A
Close - Plumbing
Water supply
Dec 29, 2022 · Apt 2G
Close - Heat/hot water
Entire building
Oct 18, 2022 · Apt 3E
Close - Heat/hot water
Entire building
Oct 3, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 10, 2022 · Apt 3E
Close - General
Janitor/super
Dec 17, 2021 · Apt 2A
Close - Unsanitary condition
Garbage/recycling storage
Dec 17, 2021 · Apt 2A
Close - Flooring/stairs
Floor
May 20, 2021 · Apt 6F
Close - Paint/plaster
Ceiling
May 20, 2021 · Apt 6F
Close - Paint/plaster
Wall
May 20, 2021 · Apt 6F
Close - Door/window
Window frame
May 20, 2021 · Apt 6F
Close - Heat/hot water
Entire building
May 5, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
May 5, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 28, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 28, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 28, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 28, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 13, 2021 · Apt 3E
Close - Heat/hot water
Entire building
Jan 30, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 30, 2021 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1937
- Floors
- 6
- Residential units
- 43
- Building area
- 44,644 ft²
- Lot area
- 10,000 ft²
- Zoning
- R7A
- Community board
- 112
- Council district
- 10
- Block / lot
- 2238 / 11
- Assessed value
- $1,789,650
- Landmark / historic district
- No
HPD registration #119636, last renewed Aug 21, 2025.
Questions about 25 Cooper Street
Who owns 25 Cooper Street?
The owner of record in NYC Department of City Planning PLUTO data is 25 Cooper, LLC.
Does 25 Cooper Street have violations?
Yes. NYC HPD has recorded 109 housing violations at this property.
Is 25 Cooper Street rent stabilized?
NYC Department of Finance tax bills listed 36 rent-stabilized units here in 2024 (about 84% of its 43 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 25 Cooper Street built?
City records list 1937 as the year it was built.
How many apartments are in 25 Cooper Street?
It has 43 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.