25 Seaman Avenue
Manhattan, NY 10034BBL 1-02237-0023Map
Owner of record: 25 Cummings Realty LLC
25 Seaman Avenue is a walk-up apartment building built in 1930 in Manhattan, 10034. It has 70 residential units across 5 floors. The owner of record is 25 Cummings Realty LLC. HPD has recorded 872 housing violations here, most recently on October 1, 2026. 50 of the 50 most recent violations are still open. City tax records listed 71 rent-stabilized apartments here in 2024.
- HPD violations
- 872
- DOB violations
- 8
- ECB violations
- 15
- HPD complaints
- 1,387
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 872
- CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 1k, 1st story, 6th apartment from north at east
Oct 1, 2026 · Apt 1K
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the foyer located at apt 1k, 1st story, 6th apartment from north at east
Oct 1, 2026 · Apt 1K
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st riser from north at east wall in the 1st room from east located at apt 1k, 1st story, 6th apartment from north at east
Oct 1, 2026 · Apt 1K
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the kitchen located at apt 1k, 1st story, 6th apartment from north at east
Oct 1, 2026 · Apt 1K
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east at north located at apt 1k, 1st story, 6th apartment from north at east
Oct 1, 2026 · Apt 1K
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall in the bathroom located at apt 1k, 1st story, 6th apartment from north at east
Oct 1, 2026 · Apt 1K
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the bathroom located at apt 1k, 1st story, 6th apartment from north at east
Oct 1, 2026 · Apt 1K
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall in the bathroom located at apt 1k, 1st story, 6th apartment from north at east
Oct 1, 2026 · Apt 1K
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the kitchen located at apt 1k, 1st story, 6th apartment from north at east
Oct 1, 2026 · Apt 1K
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, east wall, ceiling in the kitchen located at apt 1k, 1st story, 6th apartment from north at east
Oct 1, 2026 · Apt 1K
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 2nd window frame from north at east wall, 1st door frame from south at west wall in the 1st room from east located at apt 1k, 1st story, 6th apartment from north at east
Oct 1, 2026 · Apt 1K
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the foyer located at apt 1k, 1st story, 6th apartment from north at east
Oct 1, 2026 · Apt 1K
Open — Nov sent out - ANon-hazardous
Refit door at entrance in the bathroom located at apt 1k, 1st story, 6th apartment from north at east
Oct 1, 2026 · Apt 1K
Open — Nov sent out - ANon-hazardous
Properly secure the loose wash basin at the south wall in the bathroom located at apt 1k, 1st story, 6th apartment from north at east
Oct 1, 2026 · Apt 1K
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the mold on grout and ceramic tiles at south wall in the bathroom located at apt 1k, 1st story, 6th apartment from north at east
Oct 1, 2026 · Apt 1K
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east located at apt 1k, 1st story, 6th apartment from north at east
Oct 1, 2026 · Apt 1K
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1k, 1st story, 6th apartment from north at east
Oct 1, 2026 · Apt 1K
Open — Notice of issuance sent to tenant - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east at north located at apt 1k, 1st story, 6th apartment from north at east
Oct 1, 2026 · Apt 1K
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective intercom system from building entrance to the panel at the east wall in the foyer located at apt 1k, 1st story, 6th apartment from north at east
Oct 1, 2026 · Apt 1K
Open — Nov sent out - BHazardous
Properly secure the loose buzzer/ intercom system panel at vestibule at north wall
Sep 6, 2026
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 1st story balcony at 1st fire escape from east at south exterior wall
Aug 18, 2026
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at heat riser pipe at west wall in the bathroom located at apt 1g, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish at bathtub in the bathroom located at apt 1g, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at all walls in the bathroom located at apt 1g, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 1g, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective bell buzzer from building entrance to panel at south wall in the kitchen located at apt 1g, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 1st room from north located at apt 1g, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the 2nd room from north located at apt 1g, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 2nd room from north located at apt 1g, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood flooring in the 1st room from north located at apt 1g, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Replace with new the missing upper escutcheon plate at heat riser pipe at west wall in the 2nd room from north located at apt 1g, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet in the bathroom located at apt 1g, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical wall outlet at east wall in the 2nd room from north located at apt 1g, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balance at lower window sash at west wall in the 2nd room from north located at apt 1g, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1G
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1g, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1G
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1g, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1G
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 1g, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 1g, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the kitchen located at apt 1g, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower cabinet doors in the kitchen located at apt 1g, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 1st room from north located at apt 1g, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood flooring in the foyer located at apt 1g, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the foyer located at apt 1g, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the foyer located at apt 1g, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood flooring in the 2nd room from north located at apt 1g, 1st story, 1st apartment from south at west
Jun 1, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets sink in the kitchen located at apt 3m, 3rd story, 2nd apartment from west at north
May 15, 2026 · Apt 3M
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling at public hall, 1st story
May 15, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the foyer located at apt 3m, 3rd story, 2nd apartment from west at north
May 15, 2026 · Apt 3M
Open — Nov sent out - BHazardous
Refit door off hinges in the bathroom located at apt 3m, 3rd story, 2nd apartment from west at north
May 15, 2026 · Apt 3M
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall at public hall, 1st story
May 15, 2026
Open — Nov sent out
DOB building violations · 8
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 9, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 15, 2010
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 15, 2010
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Emergency none
Egncy-emergency none
Sep 23, 2010
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 10, 2010
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 4, 2004
Dob violation - dismissed
ECB violations · 15
- Class - 2
Observed water leaking from celling lobby into garbage cans which is contrary to code section pc 301.3, repair and/or replace
Jan 27, 2025
Resolve - Class - 2
Unapproved/unsafe/unsuitable electrical equipment,apparatus,materials,devices,appliances or wiring in use. apt 1c bedroom: defective receptacle outlet defective wiring are in use,flexible cords used as permance
Sep 21, 2015 · Penalty $400
Resolve - Class - 2
Failure to properly bond electrical systems service switches all thereservice switches 400amps service conductors service neutral bars are not bonded to the enclosures. remedy: provide proper bonding.
Sep 21, 2015 · Penalty $1,500
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c/c w/the dob for nov #34925097l issued on 3.28.12 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c/c.
Jun 8, 2012
Resolve - Class - 1
Failure to maintain building in code complaint manner;in that a section of floor in apt 1c adjacent to bathroom is defective. plywood( )floor is missing leaving floor beams (enforced). is temporary replacem
Mar 28, 2012 · Penalty $1,000
Resolve - Class - 1
Work w/o permit.observed the installation of several new gas meter bars,piping & service piping installed work was approved to be stated based on emergency work notification a 4369 submitted on 9/22/2010 & was
Oct 23, 2010
Resolve - Class - 1
Fgc407)piping not properly supported.observed that the main gas line is being supported by a 2"x8' piece of wood when 3 should be on actual pipe support.currently theres no way possible to install pipe support
Sep 21, 2010 · Penalty $1,600
Resolve - Class - 1
Pc308)piping not properly supported.observed that the water main in the oil tank room has no pipe supports.it is currently being supported by 2 2"x8' pieces of wood when it should have some sort of hangers or o
Sep 21, 2010 · Penalty $1,600
Resolve - Class - 1
Failure to maintain defect is section of concrete slab below courtyard collapsed onto cellar oil tank rem: vacate courtyard and laundry room immediately make site safe make repairs submit and engineers report a
Sep 13, 2010 · Penalty $1,000
Resolve - Class - 2
Failure to maintain exterior bldg walls or appurtenances west exteriorbrick facade allowing water to enter apt 5f from exterior water stains throughout bedroom wall & ceiling at inspection time remedy maintain
Apr 1, 2010 · Penalty $1,200
Resolve
Show 5 more ↓
- Hazardous
Failure to provide required means of egress for every floor. defect noted: the fire escape dropped ladder obstructed by the fire escape decking creating hazardous condition. location: the fire escape dropped
Aug 4, 2004 · Penalty $2,500
Resolve - Hazardous
Exit door total obstruction noted the exit door leading from the fire refuge are to seaman ave totally obstructed with demolished roofing materials such as tar proper plastic sheeting empty potland cement bags
Jul 16, 2004 · Penalty $480
Resolve - Non-hazardous
Work without a permit work noted erected a sidewalk sted approx 9'-0 at the facade at cumming street without first obtaining a permit form building department remedy:obtain permit for current erected shed
Jul 16, 2004 · Penalty $500
Resolve - Hazardous
Work without a permit work noted removal of approx 6-0' high 60-0 brick parapet wall without first obtaining a permit from building department location:southeast section of parapet wall remedy:stop all work
Jul 15, 2004 · Penalty $800
Resolve - Hazardous
Use of rigging equip. without special riggers lic failure to provide center iron on swinging scaffold no center iron. use of rigging equip. wihtout proper danger signs
Sep 7, 1989 · Penalty $6,500
Resolve
Complaints
- Heat/hot water
Entire building
Oct 10, 2026 · Apt 5H
Open - General
Bell/buzzer/intercom
Oct 10, 2026 · Apt 5H
Open - Heat/hot water
Entire building
Oct 9, 2026 · Apt 5H
Close - General
Bell/buzzer/intercom
Oct 7, 2026 · Apt 5H
Open - Heat/hot water
Entire building
Oct 7, 2026 · Apt 5H
Close - General
Bell/buzzer/intercom
Sep 23, 2026 · Apt 5H
Open - Unsanitary condition
Pests
Sep 23, 2026 · Apt 1K
Close - Paint/plaster
Wall
Sep 23, 2026 · Apt 1K
Close - Flooring/stairs
Floor
Sep 23, 2026 · Apt 1K
Close - Paint/plaster
Wall
Sep 23, 2026 · Apt 1K
Close
Show 40 more ↓
- General
Bell/buzzer/intercom
Sep 23, 2026 · Apt 1K
Close - Unsanitary condition
Pests
Sep 23, 2026 · Apt 1K
Open - Unsanitary condition
Garbage/recycling storage
Sep 23, 2026 · Apt 1K
Open - General
Bell/buzzer/intercom
Sep 23, 2026 · Apt 1K
Open - General
Bell/buzzer/intercom
Sep 16, 2026 · Apt 5H
Open - General
Bell/buzzer/intercom
Sep 8, 2026 · Apt 3J
Open - Plumbing
Water supply
Sep 8, 2026 · Apt 3J
Close - Plumbing
Water supply
Sep 8, 2026 · Apt BLDG
Close - General
Bell/buzzer/intercom
Sep 1, 2026 · Apt 5H
Close - General
Bell/buzzer/intercom
Aug 28, 2026 · Apt 5H
Close - Water leak
Damp spot
Aug 24, 2026 · Apt 3M
Close - Water leak
Slow leak
Aug 6, 2026 · Apt 2N
Close - General
Bell/buzzer/intercom
Jul 30, 2026 · Apt 4R
Close - Door/window
Door
Jul 30, 2026 · Apt 4R
Close - Unsanitary condition
Mold
Jul 21, 2026 · Apt 4D
Close - Plumbing
Bathtub/shower
Jul 21, 2026 · Apt 4D
Close - Water leak
Heavy flow
Jul 8, 2026 · Apt 1G
Close - Unsanitary condition
Mold
Jun 18, 2026 · Apt 4D
Close - General
Bell/buzzer/intercom
May 29, 2026 · Apt 4R
Close - General
Cabinet
May 28, 2026 · Apt 1G
Close - Paint/plaster
Wall
May 28, 2026 · Apt 1G
Close - Paint/plaster
Ceiling
May 28, 2026 · Apt 1G
Close - Plumbing
Toilet
May 28, 2026 · Apt 1G
Close - Electric
Outlet/switch
May 28, 2026 · Apt 1G
Close - Door/window
Window frame
May 28, 2026 · Apt 1G
Close - Unsanitary condition
Pests
May 28, 2026 · Apt 1G
Close - General
Cabinet
May 28, 2026 · Apt 1G
Close - Paint/plaster
Wall
May 28, 2026 · Apt 1G
Close - Unsanitary condition
Mold
May 28, 2026 · Apt 1G
Close - Water leak
Slow leak
May 28, 2026 · Apt 1G
Close - Plumbing
Basin/sink
May 28, 2026 · Apt 1G
Close - Flooring/stairs
Floor
May 28, 2026 · Apt 1G
Close - Plumbing
Bathtub/shower
May 28, 2026 · Apt 1G
Close - Paint/plaster
Ceiling
May 14, 2026 · Apt 3M
Close - Door/window
Door
May 14, 2026 · Apt 3M
Close - General
Bell/buzzer/intercom
May 13, 2026 · Apt 4R
Close - Door/window
Door
May 11, 2026 · Apt 4N
Close - General
Bell/buzzer/intercom
May 11, 2026 · Apt 4N
Close - General
Bell/buzzer/intercom
May 10, 2026 · Apt 5H
Close - General
Bell/buzzer/intercom
May 9, 2026 · Apt 5H
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1930
- Floors
- 5
- Residential units
- 70
- Building area
- 56,370 ft²
- Lot area
- 15,925 ft²
- Zoning
- R7A
- Community board
- 112
- Council district
- 10
- Block / lot
- 2237 / 23
- Assessed value
- $1,983,600
- Landmark / historic district
- No
HPD registration #103469, last renewed Jul 18, 2025.
Questions about 25 Seaman Avenue
Who owns 25 Seaman Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 25 Cummings Realty LLC.
Does 25 Seaman Avenue have violations?
Yes. NYC HPD has recorded 872 housing violations at this property.
Is 25 Seaman Avenue rent stabilized?
NYC Department of Finance tax bills listed 71 rent-stabilized units here in 2024 (about 100% of its 70 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 25 Seaman Avenue built?
City records list 1930 as the year it was built.
How many apartments are in 25 Seaman Avenue?
It has 70 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.