276 Sherman Avenue
Manhattan, NY 10034BBL 1-02228-0037Map
Owner of record: 276 Realty LLC
276 Sherman Avenue is a walk-up apartment building built in 1926 in Manhattan, 10034. It has 52 residential units across 5 floors. The owner of record is 276 Realty LLC. HPD has recorded 706 housing violations here, most recently on December 16, 2025. 5 of the 50 most recent violations are still open. City tax records listed 55 rent-stabilized apartments here in 2024.
- HPD violations
- 706
- DOB violations
- 3
- ECB violations
- 4
- HPD complaints
- 859
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 706
- BHazardous
Properly repair or replace the broken or defective latch at bulding entrance door , 1st story, section ''276''
Dec 16, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door , 1st story, section ''276''
Dec 16, 2025
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of key operated lock at door leading to fire escape in the 1st room from north at east located at apt 4e, 4th story, 1st apartment from west at north , section ''276''
Dec 16, 2025 · Apt 4E
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the 4th room from north at east, the bathroom , the kitchen , the 4th room from north at west located at apt 3a, 3rd story, 1st apartment from east at south
Dec 12, 2025 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 2nd room from north at west located at apt 3a, 3rd story, 1st apartment from east at south
Dec 12, 2025 · Apt 3A
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 1st room from north located at apt 3a, 3rd story, 1st apartment from east at south
Dec 12, 2025 · Apt 3A
Open — Defect letter issued - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st radiator from north at east wall in the 2nd room from north at west located at apt 3a, 3rd story, 1st apartment from east at south
Dec 12, 2025 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall, west wall in the 1st room from north located at apt 3a, 3rd story, 1st apartment from east at south
Dec 12, 2025 · Apt 3A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from north located at apt 3a, 3rd story, 1st apartment from east at south
Dec 12, 2025 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame in the foyer located at apt 3a, 3rd story, 1st apartment from east at south
Dec 12, 2025 · Apt 3A
Open — Defect letter issued
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at baseboard at north wall in the 1st room from north located at apt 3a, 3rd story, 1st apartment from east at south
Dec 12, 2025 · Apt 3A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch at building entrance door at building 278 , 1st story
Dec 8, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door at building 278 , 1st story
Dec 8, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch at building entrance door at building 276 , 1st story
Dec 8, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door at building 276 , 1st story
Dec 8, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door , 1st story
Nov 25, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door
Nov 8, 2025
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of key operated lock installed at door leading to fire escape window in the 1st room from north at east located at apt 5j, 5th story, 1st apartment from north at east
Sep 2, 2025 · Apt 5J
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 5j, 5th story, 1st apartment from north at east
Sep 2, 2025 · Apt 5J
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 5j, 5th story, 1st apartment from north at east
Sep 2, 2025 · Apt 5J
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, west wall in the kitchen located at apt 5l, 5th story, 2nd apartment from east at south
Aug 28, 2025 · Apt 5L
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, south wall, east wall, west wall in the bathroom located at apt 5l, 5th story, 2nd apartment from east at south
Aug 28, 2025 · Apt 5L
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, south wall, east wall, west wall in the 3rd room from north located at apt 5l, 5th story, 2nd apartment from east at south
Aug 28, 2025 · Apt 5L
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, south wall, east wall, west wall in the 1st room from north at east located at apt 5l, 5th story, 2nd apartment from east at south
Aug 28, 2025 · Apt 5L
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 1st room from north at east located at apt 5l, 5th story, 2nd apartment from east at south
Aug 28, 2025 · Apt 5L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st window frame from south at west wall in the bathroom located at apt 5l, 5th story, 2nd apartment from east at south
Aug 28, 2025 · Apt 5L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the kitchen located at apt 5l, 5th story, 2nd apartment from east at south
Aug 28, 2025 · Apt 5L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall in the kitchen located at apt 5l, 5th story, 2nd apartment from east at south
Aug 28, 2025 · Apt 5L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the foyer located at apt 5l, 5th story, 2nd apartment from east at south
Aug 28, 2025 · Apt 5L
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, 1st window frame from south at west wall in the 3rd room from north located at apt 5l, 5th story, 2nd apartment from east at south
Aug 28, 2025 · Apt 5L
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... more than 10 sq ft at ceiling, north, east walls and windwo casing at north wall in the bathroom located at apt 3k, 3rd story, 1st apartment from east at south , section ''278''
Aug 22, 2025 · Apt 3K
Closed — Violation closed - BHazardous
Provide escutcheon plate at ceiling of riser in the bathroom located at apt 3k, 3rd story, 1st apartment from east at south , section ''278''
Aug 22, 2025 · Apt 3K
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.
Aug 22, 2025
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and north wall in the bathroom located at apt 4e, 4th story, 1st apartment from west at north
Aug 15, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective lower sash window at north in the 1st room from north located at apt 4e, 4th story, 1st apartment from west at north
Aug 15, 2025 · Apt 4E
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3f, 3rd story, 1st apartment from north at east
Aug 15, 2025 · Apt 3F
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south
Aug 15, 2025 · Apt 2A
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household storage at balcony 3rd stack from south at front at fire escape, 4th story
Aug 15, 2025
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5j, 5th story, 1st apartment from north at east
Aug 15, 2025 · Apt 5J
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3f, 3rd story, 1st apartment from north at east
Aug 15, 2025 · Apt 3F
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household storage at balcony 2nd stack from south at front at fire escape, 2nd story
Aug 15, 2025
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household storage at balcony 2nd stack from south at front at fire escape, 4th story
Aug 15, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door and frame in the entrance located at apt 5j, 5th story, 1st apartment from north at east
Aug 15, 2025 · Apt 5J
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 square feet north wall and ceiling in the bathroom located at apt 4e, 4th story, 1st apartment from west at north
Aug 15, 2025 · Apt 4E
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 4, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at public hall, 1st story
May 5, 2025
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Apr 17, 2025 · Apt 3A
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes large blue plastic tub at east at fire escape, 3rd story
Apr 15, 2025
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes potted plants and cloth material at east at fire escape, 4th story
Apr 15, 2025
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1d, 1st story, 2nd apartment from east at south
Jan 13, 2025 · Apt 1D
Closed — Violation closed
DOB building violations · 3
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2019
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 21, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed
ECB violations · 4
- Class - 2
B254 missing dogs on front and rear clean clean out doors, reseal clean out doors front and rear, remove storage from boiler room. correct all violating conditions and submit a certificate of correction
Feb 24, 2020 · Penalty $312
Resolve - Class - 2
B254 15 16 21a 42 50a 50b 50c. 50a-improper support of pipping w/strings & banded iron- replace w/threaded rods, 50b-defective valves w/o valve levers, 50c-no pully guard @ transfer pump. repair/replace all def
Dec 2, 2011
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations. observed suspended scaffold being used for facade repair directly over front door of bldg, hoist line to roof w/i 5' of entry
Sep 21, 2008 · Penalty $2,400
Active - Non-hazardous
Occupancy contrary to that allowed by the certificate of occupancy c of o 11052 indicate 1st to 5th story apartments,cellar storage-now arranged and occupied with two apt with kitchen,bathroom & bedroom at cell
Apr 3, 2001 · Penalty $800
Active
Complaints
- Paint/plaster
Ceiling
Oct 3, 2026 · Apt 3H
Open - Door/window
Door
Oct 3, 2026 · Apt 3H
Open - Water leak
Heavy flow
Oct 3, 2026 · Apt 3H
Open - Paint/plaster
Wall
Oct 3, 2026 · Apt 3H
Open - Unsanitary condition
Sewage
Oct 3, 2026 · Apt 3H
Open - Plumbing
Bathtub/shower
Oct 3, 2026 · Apt 3H
Open - Unsanitary condition
Mold
Oct 3, 2026 · Apt 3H
Open - Electric
Wiring
Oct 3, 2026 · Apt 3H
Open - Plumbing
Basin/sink
Oct 3, 2026 · Apt 3H
Open - Electric
Power outage
Jul 28, 2026 · Apt 3A
Close
Show 40 more ↓
- Unsanitary condition
Pests
Jul 28, 2026 · Apt 3A
Close - Plumbing
Basin/sink
Jul 27, 2026 · Apt 3A
Close - Door/window
Window frame
Jul 27, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Mar 28, 2026 · Apt 3A
Close - Water leak
Heavy flow
Feb 12, 2026 · Apt 3A
Close - Unsanitary condition
Pests
Feb 12, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt 2A
Close - Heat/hot water
Apartment only
Dec 22, 2025 · Apt 3A
Close - Plumbing
Radiator
Dec 22, 2025 · Apt 3A
Close - Plumbing
Water supply
Dec 22, 2025 · Apt 3A
Close - Heat/hot water
Apartment only
Dec 9, 2025 · Apt 3K
Close - Heat/hot water
Apartment only
Dec 9, 2025 · Apt 3K
Close - Heat/hot water
Apartment only
Dec 9, 2025 · Apt 3K
Close - Heat/hot water
Apartment only
Dec 9, 2025 · Apt 3K
Close - Heat/hot water
Entire building
Dec 9, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 6, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 6, 2025 · Apt 3A
Close - Heat/hot water
Entire building
Dec 6, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 6, 2025 · Apt 2K
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 23, 2025 · Apt 5E
Close - Flooring/stairs
Floor
Nov 23, 2025 · Apt 5E
Close - Door/window
Door
Nov 23, 2025 · Apt 5E
Close - Heat/hot water
Entire building
Nov 6, 2025 · Apt 1B
Close - Heat/hot water
Entire building
May 4, 2025 · Apt BLDG
Close - Plumbing
Bathtub/shower
Apr 10, 2025 · Apt 3A
Close - Heat/hot water
Apartment only
Jan 10, 2025 · Apt 5E
Close - Heat/hot water
Apartment only
Jan 9, 2025 · Apt 5E
Close - Heat/hot water
Entire building
Jan 3, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 2, 2025 · Apt 5E
Close - Heat/hot water
Apartment only
Jan 2, 2025 · Apt 5E
Close - Heat/hot water
Entire building
Dec 31, 2024 · Apt 3A
Close - Unsanitary condition
Mold
Dec 30, 2024 · Apt 5E
Close - Heat/hot water
Apartment only
Dec 30, 2024 · Apt 5E
Close - Heat/hot water
Entire building
Dec 23, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 22, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 14, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 13, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 13, 2024 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1926
- Floors
- 5
- Residential units
- 52
- Building area
- 36,415 ft²
- Lot area
- 11,500 ft²
- Zoning
- R7A
- Community board
- 112
- Council district
- 10
- Block / lot
- 2228 / 37
- Assessed value
- $1,110,150
- Landmark / historic district
- No
HPD registration #108717, last renewed Sep 15, 2025.
Questions about 276 Sherman Avenue
Who owns 276 Sherman Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 276 Realty LLC.
Does 276 Sherman Avenue have violations?
Yes. NYC HPD has recorded 706 housing violations at this property.
Is 276 Sherman Avenue rent stabilized?
NYC Department of Finance tax bills listed 55 rent-stabilized units here in 2024 (about 100% of its 52 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 276 Sherman Avenue built?
City records list 1926 as the year it was built.
How many apartments are in 276 Sherman Avenue?
It has 52 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.