roofy

125 Post Avenue

Manhattan, NY 10034BBL 1-02219-0015Map

Owner of record: 125-127 Post Ave. Residence LLC

125 Post Avenue is a walk-up apartment building built in 1920 in Manhattan, 10034. It has 10 residential units across 5 floors. The owner of record is 125-127 Post Ave. Residence LLC. HPD has recorded 239 housing violations here, most recently on April 9, 2026. 36 of the 50 most recent violations are still open. City tax records listed 11 rent-stabilized apartments here in 2024.

HPD violations
239
DOB violations
10
ECB violations
0
HPD complaints
142

What to know

Concern
5 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Apr 9, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
11
About 100% of the building's 10 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 239

  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color approximately 3 square feet of unkeyed plaster at ceiling in the 1st room from north at west located at apt 1c, 3rd story, 1st apartment from west at north

    Apr 9, 2026 · Apt 1C

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the kitchen located at apt 1c, 3rd story, 1st apartment from west at north

    Apr 9, 2026 · Apt 1C

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1c, 3rd story, 1st apartment from west at north

    Apr 9, 2026 · Apt 1C

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroom located at apt 1c, 3rd story, 1st apartment from west at north

    Apr 9, 2026 · Apt 1C

    Closed — Violation dismissed
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at leading to west court yard at public hall, 1st story

    Aug 19, 2025

    Closed — Violation dismissed
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at south bulkhead door at public hall, 5th story

    Aug 19, 2025

    Closed — Violation dismissed
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at north bulkhead at public hall, 5th story

    Aug 19, 2025

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective latch set at north bulkhead door at public hall, 5th story

    Aug 19, 2025

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective latch set at south bulkhead door at public hall, 5th story

    Aug 19, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective south bulkhead door at public hall, 5th story

    Aug 19, 2025

    Closed — Violation closed
Show 40 more ↓
  • C

    Properly repair with similar material the broken or defective laminate floor tile in the kitchen located at apt 1a, 1st story, 1st apartment from east at south

    Jun 4, 2025 · Apt 1A

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Jun 4, 2025 · Apt 1A

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Jun 4, 2025 · Apt 1A

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Aug 17, 2024 · Apt 1A

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 1a, 1st story, 1st apartment from south at west

    Aug 17, 2024 · Apt 1A

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1a, 1st story, 1st apartment from south at west

    Aug 17, 2024 · Apt 1A

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 1a, 1st story, 1st apartment from south at west

    Aug 17, 2024 · Apt 1A

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Aug 17, 2024 · Apt 1A

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1a, 1st story, 1st apartment from south at west

    Aug 17, 2024 · Apt 1A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 1a, 1st story, 1st apartment from south at west

    Aug 17, 2024 · Apt 1A

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic wall tiles at east in the bathroom located at apt 1a, 1st story, 1st apartment from south at west

    Aug 17, 2024 · Apt 1A

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 1a, 1st story, 1st apartment from south at west

    Aug 17, 2024 · Apt 1A

    Open — Nov sent out
  • B

    Repair or replace the smoke detector missing located at apt 1a, 1st story, 1st apartment from south at west

    Aug 17, 2024 · Apt 1A

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Aug 13, 2024 · Apt 1A

    Open — Nov certified late
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1a, 1st story, 1st apartment from south at west

    Aug 13, 2024 · Apt 1A

    Open — Certification postponment denied
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1a, 1st story, 1st apartment from south at west

    Aug 13, 2024 · Apt 1A

    Open — Certification postponment denied
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the private hallway located at apt 1a, 1st story, 1st apartment from south at west

    Aug 13, 2024 · Apt 1A

    Open — Certification postponment denied
  • B

    Properly repair with similar material the broken or defective ceramic wall tiles at east wall in the bathroom located at apt 1a, 1st story, 1st apartment from south at west

    Aug 13, 2024 · Apt 1A

    Open — Certification postponment denied
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 1a, 1st story, 1st apartment from south at west

    Aug 13, 2024 · Apt 1A

    Open — Certification postponment denied
  • B

    Properly repair or replace the broken or defective eletrical outlets at north and east walls in the 1st room from east located at apt 1a, 1st story, 1st apartment from south at west

    Aug 13, 2024 · Apt 1A

    Open — Certification postponment denied
  • B

    Replace with new the missing upper escutcheon plate at heat riser pipe. in the 2nd room from east located at apt 1a, 1st story, 1st apartment from south at west

    Aug 13, 2024 · Apt 1A

    Open — Certification postponment denied
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east located at apt 1a, 1st story, 1st apartment from south at west

    Aug 13, 2024 · Apt 1A

    Open — Certification postponment denied
  • B

    Properly repair or replace the broken or defective lighting fixture at ceiling in the 1st room from east located at apt 1a, 1st story, 1st apartment from south at west

    Aug 13, 2024 · Apt 1A

    Open — Certification postponment denied
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 1a, 1st story, 1st apartment from south at west

    Aug 13, 2024 · Apt 1A

    Open — Certification postponment denied
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the 2nd room from east located at apt 1a, 1st story, 1st apartment from south at west

    Aug 13, 2024 · Apt 1A

    Open — Certification postponment denied
  • B

    Properly repair or replace the broken or defective upper cabinet at north wall in the kitchen located at apt 1a, 1st story, 1st apartment from south at west

    Aug 13, 2024 · Apt 1A

    Open — Certification postponment denied
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Aug 13, 2024 · Apt 1A

    Open — Certification postponment denied
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west

    Aug 13, 2024 · Apt 1A

    Open — Certification postponment denied
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1a, 1st story, 1st apartment from east at south

    Jul 24, 2024 · Apt 1A

    Open — Certification postponment denied
  • B

    Properly repair with similar material the broken or defective wood floor in the 3rd room from east located at apt 1a, 1st story, 1st apartment from east at south

    Jul 24, 2024 · Apt 1A

    Open — Certification postponment denied
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from east located at apt 1a, 1st story, 1st apartment from east at south

    Jul 24, 2024 · Apt 1A

    Open — Certification postponment denied
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Jul 24, 2024 · Apt 1A

    Open — Certification postponment denied
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Jul 24, 2024 · Apt 1A

    Open — Nov certified late
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Jul 24, 2024 · Apt 1A

    Open — Nov certified late
  • B

    Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 1a, 1st story, 1st apartment from east at south

    Jul 24, 2024 · Apt 1A

    Open — Certification postponment denied
  • B

    Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east at south located at apt 1a, 1st story, 1st apartment from east at south

    Jul 24, 2024 · Apt 1A

    Open — Certification postponment denied
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from east at south located at apt 1a, 1st story, 1st apartment from east at south

    Jul 24, 2024 · Apt 1A

    Open — Certification postponment denied
  • B

    Properly repair with similar material the broken or defective ceramic wall tiles at north wall in the bathroom located at apt 1a, 1st story, 1st apartment from east at south

    Jul 24, 2024 · Apt 1A

    Open — Certification postponment denied
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at south wall in the bathroom located at apt 1a, 1st story, 1st apartment from east at south

    Jul 24, 2024 · Apt 1A

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 1a, 1st story, 1st apartment from east at south

    Jul 24, 2024 · Apt 1A

    Open — Certification postponment denied

DOB building violations · 10

  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 3, 2008

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 31, 2005

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 27, 2001

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 18, 1993

    Dob violation - dismissed

ECB violations · 0

No ECB violations on record

Complaints

  • Door/window

    Door

    Aug 27, 2026 · Apt 1D

    Close
  • Electric

    No lighting

    Aug 27, 2026 · Apt 1D

    Close
  • Electric

    Outlet/switch

    Aug 27, 2026 · Apt 1D

    Close
  • Electric

    Lighting

    Aug 27, 2026 · Apt 1D

    Close
  • Water leak

    Slow leak

    Aug 13, 2026 · Apt 1C

    Close
  • Paint/plaster

    Ceiling

    Aug 13, 2026 · Apt 1C

    Close
  • Unsanitary condition

    Pests

    Jul 4, 2026 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    Apr 9, 2026 · Apt 1C

    Close
  • Outside building

    Roof door/hatch

    Mar 24, 2025 · Apt BLDG

    Close
  • Door/window

    Door

    Mar 20, 2025 · Apt 2C

    Close
Show 40 more ↓
  • Plumbing

    Basin/sink

    Mar 20, 2025 · Apt 2C

    Close
  • Plumbing

    Bathtub/shower

    Mar 20, 2025 · Apt 2C

    Close
  • Door/window

    Door frame

    Mar 20, 2025 · Apt 2C

    Close
  • Unsanitary condition

    Mold

    Aug 17, 2024 · Apt 1A

    Close
  • Electric

    Outlet/switch

    Aug 17, 2024 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    Aug 17, 2024 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    Aug 17, 2024 · Apt 1A

    Close
  • Electric

    Lighting

    Aug 17, 2024 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Aug 17, 2024 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    Aug 17, 2024 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Aug 17, 2024 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    Aug 17, 2024 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    Aug 17, 2024 · Apt 1A

    Close
  • Electric

    Outlet/switch

    Aug 13, 2024 · Apt 1A

    Close
  • General

    Cabinet

    Aug 13, 2024 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    Aug 13, 2024 · Apt 1A

    Close
  • Electric

    Lighting

    Aug 13, 2024 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Aug 13, 2024 · Apt 1A

    Close
  • Paint/plaster

    Wall

    Aug 13, 2024 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    Aug 13, 2024 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    Aug 13, 2024 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    Aug 13, 2024 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    Aug 13, 2024 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    Jul 23, 2024 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Jul 23, 2024 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Jul 23, 2024 · Apt 1A

    Close
  • General

    Cabinet

    Jul 23, 2024 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    Jul 23, 2024 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    Jul 23, 2024 · Apt 1A

    Close
  • Door/window

    Door

    Jul 23, 2024 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    Jul 23, 2024 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    Jul 23, 2024 · Apt 1A

    Close
  • Safety

    Smoke detector

    Apr 2, 2024 · Apt B1

    Close
  • Unsanitary condition

    Pests

    Apr 2, 2024 · Apt B1

    Close
  • Unsanitary condition

    Pests

    Mar 23, 2024 · Apt B1

    Close
  • Unsanitary condition

    Pests

    Mar 23, 2024 · Apt B1

    Close
  • Unsanitary condition

    Pests

    Feb 11, 2021 · Apt 1A

    Close
  • Flooring/stairs

    Floor

    Feb 11, 2021 · Apt 1A

    Close
  • Paint/plaster

    Wall

    Feb 11, 2021 · Apt 1A

    Close
  • Unsanitary condition

    Pests

    Feb 11, 2021 · Apt 1A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1920
Floors
5
Residential units
10
Building area
9,050 ft²
Lot area
2,250 ft²
Zoning
R7A
Community board
112
Council district
10
Block / lot
2219 / 15
Assessed value
$365,400
Landmark / historic district
No

HPD registration #127164, last renewed Sep 19, 2025.

Questions about 125 Post Avenue

Who owns 125 Post Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 125-127 Post Ave. Residence LLC.

Does 125 Post Avenue have violations?

Yes. NYC HPD has recorded 239 housing violations at this property.

Is 125 Post Avenue rent stabilized?

NYC Department of Finance tax bills listed 11 rent-stabilized units here in 2024 (about 100% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 125 Post Avenue built?

City records list 1920 as the year it was built.

How many apartments are in 125 Post Avenue?

It has 10 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.