125 Post Avenue
Manhattan, NY 10034BBL 1-02219-0015Map
Owner of record: 125-127 Post Ave. Residence LLC
125 Post Avenue is a walk-up apartment building built in 1920 in Manhattan, 10034. It has 10 residential units across 5 floors. The owner of record is 125-127 Post Ave. Residence LLC. HPD has recorded 239 housing violations here, most recently on April 9, 2026. 36 of the 50 most recent violations are still open. City tax records listed 11 rent-stabilized apartments here in 2024.
- HPD violations
- 239
- DOB violations
- 10
- ECB violations
- 0
- HPD complaints
- 142
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 239
- CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color approximately 3 square feet of unkeyed plaster at ceiling in the 1st room from north at west located at apt 1c, 3rd story, 1st apartment from west at north
Apr 9, 2026 · Apt 1C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the kitchen located at apt 1c, 3rd story, 1st apartment from west at north
Apr 9, 2026 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1c, 3rd story, 1st apartment from west at north
Apr 9, 2026 · Apt 1C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the bathroom located at apt 1c, 3rd story, 1st apartment from west at north
Apr 9, 2026 · Apt 1C
Closed — Violation dismissed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at leading to west court yard at public hall, 1st story
Aug 19, 2025
Closed — Violation dismissed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at south bulkhead door at public hall, 5th story
Aug 19, 2025
Closed — Violation dismissed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at north bulkhead at public hall, 5th story
Aug 19, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch set at north bulkhead door at public hall, 5th story
Aug 19, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch set at south bulkhead door at public hall, 5th story
Aug 19, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective south bulkhead door at public hall, 5th story
Aug 19, 2025
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Properly repair with similar material the broken or defective laminate floor tile in the kitchen located at apt 1a, 1st story, 1st apartment from east at south
Jun 4, 2025 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Jun 4, 2025 · Apt 1A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Jun 4, 2025 · Apt 1A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west
Aug 17, 2024 · Apt 1A
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 1a, 1st story, 1st apartment from south at west
Aug 17, 2024 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1a, 1st story, 1st apartment from south at west
Aug 17, 2024 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 1a, 1st story, 1st apartment from south at west
Aug 17, 2024 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west
Aug 17, 2024 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1a, 1st story, 1st apartment from south at west
Aug 17, 2024 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 1a, 1st story, 1st apartment from south at west
Aug 17, 2024 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at east in the bathroom located at apt 1a, 1st story, 1st apartment from south at west
Aug 17, 2024 · Apt 1A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 1a, 1st story, 1st apartment from south at west
Aug 17, 2024 · Apt 1A
Open — Nov sent out - BHazardous
Repair or replace the smoke detector missing located at apt 1a, 1st story, 1st apartment from south at west
Aug 17, 2024 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west
Aug 13, 2024 · Apt 1A
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1a, 1st story, 1st apartment from south at west
Aug 13, 2024 · Apt 1A
Open — Certification postponment denied - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1a, 1st story, 1st apartment from south at west
Aug 13, 2024 · Apt 1A
Open — Certification postponment denied - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the private hallway located at apt 1a, 1st story, 1st apartment from south at west
Aug 13, 2024 · Apt 1A
Open — Certification postponment denied - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at east wall in the bathroom located at apt 1a, 1st story, 1st apartment from south at west
Aug 13, 2024 · Apt 1A
Open — Certification postponment denied - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 1a, 1st story, 1st apartment from south at west
Aug 13, 2024 · Apt 1A
Open — Certification postponment denied - BHazardous
Properly repair or replace the broken or defective eletrical outlets at north and east walls in the 1st room from east located at apt 1a, 1st story, 1st apartment from south at west
Aug 13, 2024 · Apt 1A
Open — Certification postponment denied - BHazardous
Replace with new the missing upper escutcheon plate at heat riser pipe. in the 2nd room from east located at apt 1a, 1st story, 1st apartment from south at west
Aug 13, 2024 · Apt 1A
Open — Certification postponment denied - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east located at apt 1a, 1st story, 1st apartment from south at west
Aug 13, 2024 · Apt 1A
Open — Certification postponment denied - BHazardous
Properly repair or replace the broken or defective lighting fixture at ceiling in the 1st room from east located at apt 1a, 1st story, 1st apartment from south at west
Aug 13, 2024 · Apt 1A
Open — Certification postponment denied - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 1a, 1st story, 1st apartment from south at west
Aug 13, 2024 · Apt 1A
Open — Certification postponment denied - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 2nd room from east located at apt 1a, 1st story, 1st apartment from south at west
Aug 13, 2024 · Apt 1A
Open — Certification postponment denied - BHazardous
Properly repair or replace the broken or defective upper cabinet at north wall in the kitchen located at apt 1a, 1st story, 1st apartment from south at west
Aug 13, 2024 · Apt 1A
Open — Certification postponment denied - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west
Aug 13, 2024 · Apt 1A
Open — Certification postponment denied - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west
Aug 13, 2024 · Apt 1A
Open — Certification postponment denied - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1a, 1st story, 1st apartment from east at south
Jul 24, 2024 · Apt 1A
Open — Certification postponment denied - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from east located at apt 1a, 1st story, 1st apartment from east at south
Jul 24, 2024 · Apt 1A
Open — Certification postponment denied - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 3rd room from east located at apt 1a, 1st story, 1st apartment from east at south
Jul 24, 2024 · Apt 1A
Open — Certification postponment denied - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Jul 24, 2024 · Apt 1A
Open — Certification postponment denied - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Jul 24, 2024 · Apt 1A
Open — Nov certified late - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south
Jul 24, 2024 · Apt 1A
Open — Nov certified late - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 1a, 1st story, 1st apartment from east at south
Jul 24, 2024 · Apt 1A
Open — Certification postponment denied - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east at south located at apt 1a, 1st story, 1st apartment from east at south
Jul 24, 2024 · Apt 1A
Open — Certification postponment denied - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from east at south located at apt 1a, 1st story, 1st apartment from east at south
Jul 24, 2024 · Apt 1A
Open — Certification postponment denied - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at north wall in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Jul 24, 2024 · Apt 1A
Open — Certification postponment denied - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at south wall in the bathroom located at apt 1a, 1st story, 1st apartment from east at south
Jul 24, 2024 · Apt 1A
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 1a, 1st story, 1st apartment from east at south
Jul 24, 2024 · Apt 1A
Open — Certification postponment denied
DOB building violations · 10
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2011 inspection report
Mar 1, 2013
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Door/window
Door
Aug 27, 2026 · Apt 1D
Close - Electric
No lighting
Aug 27, 2026 · Apt 1D
Close - Electric
Outlet/switch
Aug 27, 2026 · Apt 1D
Close - Electric
Lighting
Aug 27, 2026 · Apt 1D
Close - Water leak
Slow leak
Aug 13, 2026 · Apt 1C
Close - Paint/plaster
Ceiling
Aug 13, 2026 · Apt 1C
Close - Unsanitary condition
Pests
Jul 4, 2026 · Apt 1A
Close - Paint/plaster
Ceiling
Apr 9, 2026 · Apt 1C
Close - Outside building
Roof door/hatch
Mar 24, 2025 · Apt BLDG
Close - Door/window
Door
Mar 20, 2025 · Apt 2C
Close
Show 40 more ↓
- Plumbing
Basin/sink
Mar 20, 2025 · Apt 2C
Close - Plumbing
Bathtub/shower
Mar 20, 2025 · Apt 2C
Close - Door/window
Door frame
Mar 20, 2025 · Apt 2C
Close - Unsanitary condition
Mold
Aug 17, 2024 · Apt 1A
Close - Electric
Outlet/switch
Aug 17, 2024 · Apt 1A
Close - Paint/plaster
Ceiling
Aug 17, 2024 · Apt 1A
Close - Flooring/stairs
Floor
Aug 17, 2024 · Apt 1A
Close - Electric
Lighting
Aug 17, 2024 · Apt 1A
Close - Unsanitary condition
Pests
Aug 17, 2024 · Apt 1A
Close - Flooring/stairs
Floor
Aug 17, 2024 · Apt 1A
Close - Unsanitary condition
Pests
Aug 17, 2024 · Apt 1A
Close - Flooring/stairs
Floor
Aug 17, 2024 · Apt 1A
Close - Flooring/stairs
Floor
Aug 17, 2024 · Apt 1A
Close - Electric
Outlet/switch
Aug 13, 2024 · Apt 1A
Close - General
Cabinet
Aug 13, 2024 · Apt 1A
Close - Paint/plaster
Ceiling
Aug 13, 2024 · Apt 1A
Close - Electric
Lighting
Aug 13, 2024 · Apt 1A
Close - Unsanitary condition
Pests
Aug 13, 2024 · Apt 1A
Close - Paint/plaster
Wall
Aug 13, 2024 · Apt 1A
Close - Flooring/stairs
Floor
Aug 13, 2024 · Apt 1A
Close - Paint/plaster
Ceiling
Aug 13, 2024 · Apt 1A
Close - Flooring/stairs
Floor
Aug 13, 2024 · Apt 1A
Close - Flooring/stairs
Floor
Aug 13, 2024 · Apt 1A
Close - Paint/plaster
Ceiling
Jul 23, 2024 · Apt 1A
Close - Unsanitary condition
Pests
Jul 23, 2024 · Apt 1A
Close - Unsanitary condition
Pests
Jul 23, 2024 · Apt 1A
Close - General
Cabinet
Jul 23, 2024 · Apt 1A
Close - Flooring/stairs
Floor
Jul 23, 2024 · Apt 1A
Close - Paint/plaster
Ceiling
Jul 23, 2024 · Apt 1A
Close - Door/window
Door
Jul 23, 2024 · Apt 1A
Close - Flooring/stairs
Floor
Jul 23, 2024 · Apt 1A
Close - Flooring/stairs
Floor
Jul 23, 2024 · Apt 1A
Close - Safety
Smoke detector
Apr 2, 2024 · Apt B1
Close - Unsanitary condition
Pests
Apr 2, 2024 · Apt B1
Close - Unsanitary condition
Pests
Mar 23, 2024 · Apt B1
Close - Unsanitary condition
Pests
Mar 23, 2024 · Apt B1
Close - Unsanitary condition
Pests
Feb 11, 2021 · Apt 1A
Close - Flooring/stairs
Floor
Feb 11, 2021 · Apt 1A
Close - Paint/plaster
Wall
Feb 11, 2021 · Apt 1A
Close - Unsanitary condition
Pests
Feb 11, 2021 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1920
- Floors
- 5
- Residential units
- 10
- Building area
- 9,050 ft²
- Lot area
- 2,250 ft²
- Zoning
- R7A
- Community board
- 112
- Council district
- 10
- Block / lot
- 2219 / 15
- Assessed value
- $365,400
- Landmark / historic district
- No
HPD registration #127164, last renewed Sep 19, 2025.
Questions about 125 Post Avenue
Who owns 125 Post Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 125-127 Post Ave. Residence LLC.
Does 125 Post Avenue have violations?
Yes. NYC HPD has recorded 239 housing violations at this property.
Is 125 Post Avenue rent stabilized?
NYC Department of Finance tax bills listed 11 rent-stabilized units here in 2024 (about 100% of its 10 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 125 Post Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 125 Post Avenue?
It has 10 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.