1 Marble Hill Avenue
Manhattan, NY 10463BBL 1-02215-0465Map
Owner of record: 1 Marble Hill LLC
1 Marble Hill Avenue is an elevator apartment building built in 1927 in Manhattan, 10463. It has 84 residential units across 6 floors. The owner of record is 1 Marble Hill LLC. HPD has recorded 1,575 housing violations here, most recently on August 12, 2026. 45 of the 50 most recent violations are still open. City tax records listed 81 rent-stabilized apartments here in 2024.
- HPD violations
- 1,575
- DOB violations
- 35
- ECB violations
- 20
- HPD complaints
- 2,247
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,575
- BHazardous
Properly repair the source and abate the evidence of a water leak at east wall and ceiling in the bathroom located at apt 1n, 1st story, 2nd apartment from east at south
Aug 12, 2026 · Apt 1N
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Aug 10, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2f, 2nd story, 1st apartment from south at west , section ''south''
Aug 10, 2026 · Apt 2F
Open — Nov sent out - ANon-hazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wiring at west wall in the 4th room from north located at apt 6d, 6th story, 2nd apartment from east at south , section at south
Aug 7, 2026 · Apt 6D
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6d, 6th story, 2nd apartment from east at south , section at south
Aug 7, 2026 · Apt 6D
Open — Notice of issuance sent to tenant - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 4th room from north located at apt 6d, 6th story, 2nd apartment from east at south , section at south
Aug 7, 2026 · Apt 6D
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective ceramic floor tile in the bathroom located at apt 6d, 6th story, 2nd apartment from east at south , section at south
Aug 7, 2026 · Apt 6D
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6d, 6th story, 2nd apartment from east at south , section at south
Aug 7, 2026 · Apt 6D
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective bell/buzzer/intercom system from building front to panel at north wall in the foyer located at apt 2f, 2nd story, 2nd apartment from south at west , section at south
Aug 7, 2026 · Apt 2F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from north located at apt 6d, 6th story, 2nd apartment from east at south , section at south
Aug 7, 2026 · Apt 6D
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0, wg to replace = 1, wg to repair = 0 in the entire apartment located at apt 6d, 6th story, 2nd apartment from east at south , section at south
Aug 7, 2026 · Apt 6D
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt 5d, 5th story, 2nd apartment from east at south , section at south
Aug 7, 2026 · Apt 5D
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Jul 11, 2026
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 6p, 6th story, 2nd apartment from north at east
Jul 11, 2026 · Apt 6P
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall
Jul 11, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and west wall at public hall, 6th story
Jul 11, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at ceiling and west wall at public hall, 6th story
Jul 11, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from north located at apt 6p, 6th story, 2nd apartment from north at east
Jul 11, 2026 · Apt 6P
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 6p, 6th story, 2nd apartment from north at east
Jul 11, 2026 · Apt 6P
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door dividing east and west sections at public hall, 3rd story
Jul 9, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door dividing east and west sections at public hall, 2nd story
Jul 9, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door dividing east and west sections at public hall, 4th story
Jul 9, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door dividing east and west sections at public hall, 5th story
Jul 9, 2026
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5m, 5th story, 1st apartment from north at east
Jul 7, 2026 · Apt 5M
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north located at apt 6c, 6th story, 1st apartment from east at south
Jun 29, 2026 · Apt 6C
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from north located at apt 6c, 6th story, 1st apartment from east at south
Jun 29, 2026 · Apt 6C
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 25, 2026
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner on balcony at west at fire escape, 5th story
Jun 25, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2f, 2nd story, 2nd apartment from west at north
Jun 23, 2026 · Apt 2F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 1st room from east at north located at apt 2m, 2nd story, 1st apartment from east at south
Jun 23, 2026 · Apt 2M
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the kitchen located at apt 2m, 2nd story, 1st apartment from east at south
Jun 23, 2026 · Apt 2M
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 2nd room from east located at apt 5m, 5th story, 1st apartment from east at south
Jun 16, 2026 · Apt 5M
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the 2nd room from north located at apt 5m, 5th story, 1st apartment from east at south
Jun 16, 2026 · Apt 5M
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from east located at apt 5m, 5th story, 1st apartment from east at south
Jun 16, 2026 · Apt 5M
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation heat riser pipe at north wall in the 1st room from east located at apt 5m, 5th story, 1st apartment from east at south
Jun 16, 2026 · Apt 5M
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak ceiling in the 1st room from east located at apt 5m, 5th story, 1st apartment from east at south
Jun 16, 2026 · Apt 5M
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the 1st room from north located at apt 5m, 5th story, 1st apartment from east at south
Jun 16, 2026 · Apt 5M
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5m, 5th story, 1st apartment from east at south
Jun 16, 2026 · Apt 5M
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5m, 5th story, 1st apartment from east at south
Jun 16, 2026 · Apt 5M
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and south wall in the kitchen located at apt 5m, 5th story, 1st apartment from east at south
Jun 16, 2026 · Apt 5M
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 5m, 5th story, 1st apartment from east at south
Jun 16, 2026 · Apt 5M
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at south wall in the bathroom located at apt 5m, 5th story, 1st apartment from east at south
Jun 16, 2026 · Apt 5M
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the bathroom located at apt 5m, 5th story, 1st apartment from east at south
Jun 16, 2026 · Apt 5M
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel reglaze of bathtub in the bathroom located at apt 5m, 5th story, 1st apartment from east at south
Jun 16, 2026 · Apt 5M
Open — Nov sent out - BHazardous
Replace with new the missing upper escutcheon plate at heat riser pipe at north wall in the 1st room from east located at apt 5m, 5th story, 1st apartment from east at south
Jun 16, 2026 · Apt 5M
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 1st room from east located at apt 5m, 5th story, 1st apartment from east at south
Jun 16, 2026 · Apt 5M
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east and west walls in the private hallway located at apt 5m, 5th story, 1st apartment from east at south
Jun 16, 2026 · Apt 5M
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the private hallway located at apt 5m, 5th story, 1st apartment from east at south
Jun 16, 2026 · Apt 5M
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5m, 5th story, 1st apartment from east at south
Jun 14, 2026 · Apt 5M
Open — Nov sent out - BHazardous
Replace with new the missing east handrail at stairs in the entraance to building court
Jun 13, 2026
Open — Nov sent out
DOB building violations · 35
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - dismissed - Hazardous condition (facade) facade required
Cycle 9a unsafe report filed
Feb 21, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 3, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 25, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2020
Dob violation - dismissed
Show 25 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 16, 2019
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
May 4, 2018
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 21, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 29, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 30, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 1, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 11, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 29, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 4, 2004
Dob violation - resolved - Elevator elevatorrequired
1p8067
Jul 26, 2002
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 11, 1991
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
#35- replace cover on light switch motor room
Dec 14, 1990
Dob violation - resolved - Elevator elevatorrequired
#74-provide capacity plate in car #35-provide access to motor room
Oct 20, 1990
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 17, 1990
Dob violation - resolved - Elevator elevatorrequired
(75) repair vent in cab
Jul 13, 1989
Dob violation - resolved - Elevator elevatorrequired
(47) provide access to motor room
Apr 3, 1989
Dob violation - resolved - Elevator elevatorrequired
(01)renew contacts where needed (50)overhead (51)clean car top (52)repair push button sta in elev
Dec 12, 1988
Dob violation - resolved
ECB violations · 20
- Class - 1
Class 1 (cu):failure to maintain building in code compliant manner passenger elevator equipment as per bc3001.2 & 27-987. upon inspection,door zone restrictor on elevator tampered with/disassembled and is there
May 28, 2026 · Penalty $3,125
Resolve - Class - 1
Class 1 (cu):failure to maintain building in code compliant manner. service elevator equipment as per bc3001.2 & 27-987. upon inspection, door zone restrictor on elevator needs adjustment at the moment is not k
Nov 19, 2025 · Penalty $1,250
Resolve - Class - 2
Class 1 item: inoperative disc brake monitor. parameter set to zero. prevent intermittent relevelling of device. evidence of water condition in pit; check all circuits for grounds. unguarded sump pump. make nec
Jun 17, 2024 · Penalty $625
Active - Class - 2
Failure to file acceptable amended cycle 9a report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control#907341.rem:file acceptable report.
Jan 16, 2024 · Penalty $1,250
Resolve - Class - 2
Class 2: hoist ropes worn replace all ropes. car guide shoes misaligned and loose adjust. handrail loose secure to back wall. unmarked key switch on car button station. mark switch. evacuation sign missing on 5
Nov 30, 2023 · Penalty $625
Active - Class - 2
Failure to maintain exterior building wall or appurtenances at exposure 4 front horizontal & vertical crack from 2nd & 3rd floor noted defective parging.rem:maintain exterior building wall.
Jul 26, 2021 · Penalty $1,250
Resolve - Class - 2
Failure to comply with commissioner's order to file a certificate of correction w/ the dob.noted:at time of inspection the respondent did not file a certificate of correction and did not comply to previous viol
Nov 2, 2020 · Penalty $1,250
Resolve - Class - 1
Failure to provide required safety measures such as sidewalkshed,netting;etc.where required to protect the public from documented unsafe facade as per 1rcny 103-04.note:at time of inspection observed no safety
Nov 2, 2020 · Penalty $10,000
Resolve - Class - 3
Failure to maintain building in code-compliant at the time of my inspection the exterior wall condition certificate was not posted in the interior of the building(cobby or vestibule).rem:comply with the code as
Aug 27, 2020 · Penalty $500
Resolve - Class - 1
Failure to provide required safety measures,such as shed netting,etc.where required to protect and secure public safety from documented unsafe facade as per 1rcny 103-04.note:at the time of my inspection observ
Aug 27, 2020 · Penalty $10,000
Resolve
Show 10 more ↓
- Class - 2
Failure to maintain exterior building facade and appurtenances. note: exp 1, south elevtion on 7th floor window at southeast facade observedcrack/spalled decorative stone/terra cotta stone at window arch. ii-cr
May 9, 2018 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35294812j issued 12/01/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for:defective floor at kitc
Feb 17, 2018 · Penalty $800
Resolve - Class - 1
Failure to manintain building in code compliant manner at the time of my inspection at the above address on the above date i observed the floor in apt 2f kitchen was sloping.i also observed several cracks in th
Dec 1, 2017 · Penalty $1,000
Resolve - Non-hazardous
36d06.36m07.16l10.21l10.66o02.60u6 36d06 provide lock for door 36m07 provide work light 1621 l10 pulling on 3rd fl hoistway door stops elevator in flight 60u16 tag with city id #'s
Jun 2, 2008 · Penalty $350
Resolve - Non-hazardous
05i11,15m07,36t07,38q03,40t07,41p06,55y13,59q03,60t07. 05i11-replace damaged car door vision glass.36q03-install guard for light on top of car. 41d06-secure relay on controller. 60t07-provide company sticker
Jan 29, 2008 · Penalty $350
Resolve - Non-hazardous
57o02,50y11,39h08,08v01.
Nov 30, 2000 · Penalty $300
Resolve - Non-hazardous
14m,73o,31q,50y,35r,57r,73u,36w,40h. 14 card 35 gaspipe 57 pump or file to install as per code.
Feb 7, 1996 · Penalty $250
Resolve - Non-hazardous
14m,17r,73o,35p,31q,50y.17-with wire glass.
Jun 16, 1995
Resolve - Non-hazardous
8v,50y,57z,73o,33p,35p,53m,53 light switch
Jun 11, 1991
Resolve - Non-hazardous
8v,50y,73o,33p,35p,14m,17i,28h
—
Resolve
Complaints
- General
Ventilation system
Oct 14, 2026 · Apt 5C
Open - Door/window
Door frame
Oct 14, 2026 · Apt 5C
Open - Unsanitary condition
Mold
Oct 14, 2026 · Apt 5C
Open - Unsanitary condition
Pests
Oct 7, 2026 · Apt 2F
Open - Heat/hot water
Apartment only
Oct 7, 2026 · Apt 5L
Close - Appliance
Electric/gas range
Oct 6, 2026 · Apt 4F
Open - Door/window
Door
Oct 6, 2026 · Apt 4F
Open - Water leak
Heavy flow
Sep 21, 2026 · Apt 2N
Close - Unsanitary condition
Pests
Sep 18, 2026 · Apt 3E
Close - Unsanitary condition
Pests
Sep 15, 2026 · Apt 5C
Close
Show 40 more ↓
- Water leak
Heavy flow
Sep 12, 2026 · Apt 2F
Close - Safety
Fire escape
Aug 12, 2026 · Apt 2F
Close - Paint/plaster
Wall
Aug 12, 2026 · Apt 2F
Close - Door/window
Door
Aug 12, 2026 · Apt 2F
Close - Unsanitary condition
Pests
Aug 10, 2026 · Apt 2D
Close - Water leak
Damp spot
Aug 9, 2026 · Apt 2N
Close - Unsanitary condition
Mold
Aug 9, 2026 · Apt 2N
Close - Heat/hot water
Apartment only
Aug 8, 2026 · Apt 2F
Close - Unsanitary condition
Pests
Aug 8, 2026 · Apt 2F
Close - Water leak
Heavy flow
Aug 3, 2026 · Apt 6D
Close - General
Cabinet
Aug 3, 2026 · Apt 6D
Close - Flooring/stairs
Floor
Aug 3, 2026 · Apt 6D
Close - Flooring/stairs
Floor
Aug 3, 2026 · Apt 6D
Close - Paint/plaster
Ceiling
Aug 3, 2026 · Apt 6D
Close - Unsanitary condition
Mold
Aug 3, 2026 · Apt 6D
Close - Safety
Window guard broken/missing
Aug 3, 2026 · Apt 6D
Close - Unsanitary condition
Pests
Aug 3, 2026 · Apt 6D
Close - Water leak
Damp spot
Aug 3, 2026 · Apt 6D
Close - Unsanitary condition
Pests
Aug 3, 2026 · Apt 6D
Close - Water leak
Slow leak
Aug 1, 2026 · Apt 1N
Close - General
Bell/buzzer/intercom
Jul 27, 2026 · Apt 2F
Close - Water leak
Slow leak
Jul 18, 2026 · Apt 5D
Close - Unsanitary condition
Mold
Jul 17, 2026 · Apt 2F
Close - Unsanitary condition
Pests
Jul 17, 2026 · Apt 2F
Close - Door/window
Door
Jul 17, 2026 · Apt 2F
Close - Plumbing
Basin/sink
Jul 8, 2026 · Apt 5M
Close - Paint/plaster
Wall
Jul 8, 2026 · Apt 5M
Close - Unsanitary condition
Pests
Jul 8, 2026 · Apt 5M
Close - Plumbing
Basin/sink
Jul 7, 2026 · Apt 6F
Close - Door/window
Window frame
Jul 7, 2026 · Apt 6F
Close - Paint/plaster
Wall
Jul 7, 2026 · Apt 6F
Close - Water leak
Damp spot
Jul 7, 2026 · Apt 6F
Close - Water leak
Slow leak
Jul 6, 2026 · Apt 5D
Close - Unsanitary condition
Garbage/recycling storage
Jul 3, 2026 · Apt 2F
Open - Unsanitary condition
Mold
Jul 3, 2026 · Apt 2F
Open - Unsanitary condition
Pests
Jul 3, 2026 · Apt 1B
Close - Door/window
Door
Jul 3, 2026 · Apt 1B
Close - Electric
Outlet/switch
Jul 3, 2026 · Apt 6G
Close - Paint/plaster
Ceiling
Jul 3, 2026 · Apt 6P
Close - Plumbing
Toilet
Jul 3, 2026 · Apt 6P
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Jun 17, 2026 | $7,400,000 | Rentals - elevator apartments | 84 |
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1927
- Floors
- 6
- Residential units
- 84
- Building area
- 77,820 ft²
- Lot area
- 18,050 ft²
- Zoning
- R6
- Community board
- 208
- Council district
- 10
- Block / lot
- 2215 / 465
- Assessed value
- $1,807,650
- Landmark / historic district
- No
HPD registration #119129, last renewed Sep 30, 2025.
Questions about 1 Marble Hill Avenue
Who owns 1 Marble Hill Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 1 Marble Hill LLC.
Does 1 Marble Hill Avenue have violations?
Yes. NYC HPD has recorded 1,575 housing violations at this property.
Is 1 Marble Hill Avenue rent stabilized?
NYC Department of Finance tax bills listed 81 rent-stabilized units here in 2024 (about 96% of its 84 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1 Marble Hill Avenue built?
City records list 1927 as the year it was built.
How many apartments are in 1 Marble Hill Avenue?
It has 84 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.