550 Ft Washington Avenue
Manhattan, NY 10033BBL 1-02180-0032Map
Owner of record: 550 Fort Washington Ave HDFC
550 Ft Washington Avenue is a walk-up apartment building built in 1922 in Manhattan, 10033. It has 29 residential units across 5 floors. The owner of record is 550 Fort Washington Ave HDFC. HPD has recorded 72 housing violations here, most recently on April 1, 2021. 16 of the 50 most recent violations are still open.
- HPD violations
- 72
- DOB violations
- 3
- ECB violations
- 2
- HPD complaints
- 13
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
No rent-stabilized units in 2018–2024 tax bills
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 72
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 1, 2021
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall, 1st radiator from south at west wall, 1st window frame from south at west wall in the 4th room from north located at apt 2e, 2nd story, 1st apartment from south at west
Aug 30, 2019 · Apt 2E
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st window frame from south at west wall in the bathroom located at apt 2e, 2nd story, 1st apartment from south at west
Aug 30, 2019 · Apt 2E
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall ceiling, 1st closet from north at east wall wall in the private hallway located at apt 2e, 2nd story, 1st apartment from south at west
Aug 30, 2019 · Apt 2E
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the kitchen located at apt 2e, 2nd story, 1st apartment from south at west
Aug 30, 2019 · Apt 2E
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 4d, 4th story, 1st apartment from east at south , 1st section from south at west
Aug 23, 2019 · Apt 4D
Closed — Violation dismissed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration consisting of suspended ceiling in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east , section at east
Aug 23, 2019 · Apt 2B
Closed — Violation dismissed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from window to fire escape or provide approved type gate .. in the 4th room from north at east located at apt 5c, 5th story, 1st apartment from east at south , section at east
Aug 23, 2019 · Apt 5C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east, south, and west walls in the foyer located at apt 5c, 5th story, 1st apartment from east at south , section at east
Aug 23, 2019 · Apt 5C
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the foyer located at apt 5c, 5th story, 1st apartment from east at south , section at east
Aug 23, 2019 · Apt 5C
Closed — Violation closed
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and north wall in the 1st room from north located at apt 2b, 2nd story, 1st apartment from north at east , section at east
Jun 14, 2018 · Apt 2B
Closed — Violation closed - BHazardous
Properly repair the broken or defective base cabinet at wash/basin in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east , section at east
Jun 14, 2018 · Apt 2B
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective caulking around bathtub area in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east , section at east
Jun 14, 2018 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 2b, 2nd story, 1st apartment from north at east , section at east
Jun 14, 2018 · Apt 2B
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation radiator in the 1st room from north located at apt 2b, 2nd story, 1st apartment from north at east , section at east
Jun 14, 2018 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Remove device preventing door from being self-closing consisting of wood stopper at fire doors all stories at public hall
Jun 14, 2018
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 1st story
Jun 14, 2018
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 2nd story, section at east
Jun 14, 2018
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 2b, 2nd story, 1st apartment from north at east , section at east
Jun 14, 2018 · Apt 2B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 4th story, section at east
Jun 14, 2018
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 4th story, section at west
Jun 14, 2018
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 5th story, section at east
Jun 14, 2018
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 5th story, section at east
Jun 14, 2018
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retatrdent material at ceiling at public hall, 5th story, section at east
Jun 14, 2018
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 5th story, section at west
Jun 14, 2018
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retatrdent material at ceiling at public hall, 5th story, section at west
Jun 14, 2018
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 2b, 2nd story, 1st apartment from north at east , section at east
Jun 14, 2018 · Apt 2B
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation radiator in the 3rd room from north located at apt 2b, 2nd story, 1st apartment from north at east , section at east
Jun 14, 2018 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 3rd room from north located at apt 2b, 2nd story, 1st apartment from north at east , section at east
Jun 14, 2018 · Apt 2B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the 3rd room from north located at apt 2b, 2nd story, 1st apartment from north at east , section at east
Jun 14, 2018 · Apt 2B
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west wall in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east , section at east
Jun 14, 2018 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation steam riser in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east , section at east
Jun 14, 2018 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at south wall in the bathroom located at apt 2b, 2nd story, 1st apartment from north at east , section at east
Jun 14, 2018 · Apt 2B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 3rd story, section at east
Jun 14, 2018
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over the ceiling at public hall, 5th story, section at east
Jun 14, 2018
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at public hall, 5th story, section at west
Jun 14, 2018
Closed — Violation closed - ANon-hazardous
Remove device preventing door from being self-closing fire doors at all stories at public hall
Jun 7, 2018
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 5c, 5th story, 1st apartment from east at south
May 15, 2017 · Apt 5C
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
May 15, 2017
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing located at apt 5c, 5th story, 1st apartment from east at south
May 15, 2017 · Apt 5C
Open — Not complied with - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story
Mar 31, 2017
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroom located at apt 2a, 2nd story, 2nd apartment from west at north
Feb 28, 2013 · Apt 2A
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 3rd room from north at west located at apt 2a, 2nd story, 2nd apartment from west at north
Feb 28, 2013 · Apt 2A
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north at west located at apt 2a, 2nd story, 2nd apartment from west at north
Feb 28, 2013 · Apt 2A
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the foyer located at apt 2a, 2nd story, 2nd apartment from west at north
Feb 28, 2013 · Apt 2A
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls in the 3rd room from north at east located at apt 2a, 2nd story, 2nd apartment from west at north
Feb 28, 2013 · Apt 2A
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north at east located at apt 2a, 2nd story, 2nd apartment from west at north
Feb 28, 2013 · Apt 2A
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the kitchen located at apt 2a, 2nd story, 2nd apartment from west at north
Feb 28, 2013 · Apt 2A
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls in the 1st room from north at east located at apt 2a, 2nd story, 2nd apartment from west at north
Feb 28, 2013 · Apt 2A
Open — First no access to re- inspect violation - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north at east located at apt 2a, 2nd story, 2nd apartment from west at north
Feb 28, 2013 · Apt 2A
Open — First no access to re- inspect violation
DOB building violations · 3
- Plumbing none
Right of entry denied. access to premises to inspect approved work under job #120521453 has been denied by male at approxim. 09:55am
Dec 17, 2016
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 1, 1994
Dob violation - dismissed
ECB violations · 2
- Class - 2
Work without a permit, i observed new electrical installation in the kitchen area, upto 40 ft of new wiring, upto 7 outlet boxes and 1 conjunction box homerun wiring to electrical panel. work about 50% in progr
Jul 24, 2023
Resolve - Non-hazardous
Failure to maintain bldg defect noted:at rear of bldg balcony/walkway has l brackets for bracing one of which has fallen due to possible corrosion of steel also cracks in areas of cement @ balcony/walkway area
Jun 1, 2006 · Penalty $800
Resolve
Complaints
- Heat/hot water
Entire building
Nov 8, 2019 · Apt BLDG
Close - Heat/hot water
Apartment only
May 13, 2017 · Apt 5C
Close - Heat/hot water
Entire building
Mar 30, 2017 · Apt 1B
Close - Plumbing
Water-leaks
Feb 22, 2013 · Apt 2A
Close - Plumbing
Water-leaks
Feb 22, 2013 · Apt 2A
Close - Paint/plaster
Wall
Feb 22, 2013 · Apt 2A
Close - Paint/plaster
Wall
Feb 22, 2013 · Apt 2A
Close - General
Mold
Feb 22, 2013 · Apt 2A
Close - General
Mold
Feb 22, 2013 · Apt 2A
Close - Plumbing
Basin/sink
Feb 22, 2013 · Apt 2A
Close
Show 3 more ↓
- Construction
Roof
Apr 11, 2012 · Apt 3B
Close - General
Mold
Jul 6, 2007 · Apt 2A
Close - General
Mold
Jul 6, 2007 · Apt 2A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C6)
- Year built
- 1922
- Floors
- 5
- Residential units
- 29
- Building area
- 28,775 ft²
- Lot area
- 7,875 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2180 / 32
- Assessed value
- $1,303,200
- Landmark / historic district
- No
HPD registration #107352, last renewed Dec 23, 2025.
Questions about 550 Ft Washington Avenue
Who owns 550 Ft Washington Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 550 Fort Washington Ave HDFC.
Does 550 Ft Washington Avenue have violations?
Yes. NYC HPD has recorded 72 housing violations at this property.
Is 550 Ft Washington Avenue rent stabilized?
No rent-stabilized units appear in its 2018–2024 tax bills. Individual apartments can still be regulated, so request the rent history from NYS Homes and Community Renewal if unsure.
When was 550 Ft Washington Avenue built?
City records list 1922 as the year it was built.
How many apartments are in 550 Ft Washington Avenue?
It has 29 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.