854 West 180 Street
Manhattan, NY 10033BBL 1-02177-0163Map
Owner of record: Liv Hudson Heights LLC
854 West 180 Street is an elevator apartment building built in 1910 in Manhattan, 10033. It has 48 residential units across 6 floors. The owner of record is Liv Hudson Heights LLC. HPD has recorded 206 housing violations here, most recently on April 29, 2026. 12 of the 50 most recent violations are still open. City tax records listed 30 rent-stabilized apartments here in 2024.
- HPD violations
- 206
- DOB violations
- 37
- ECB violations
- 65
- HPD complaints
- 363
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 206
- ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the south yard
Aug 19, 2025
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Aug 19, 2025
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic ceiling in the private hallway located at bsmt-apt b1, 1st bsmt-apt from north at east
Jul 24, 2024 · Apt B1
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at all walls in the bathroom located at bsmt-apt b1, 1st bsmt-apt from north at east
Jul 24, 2024 · Apt B1
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of rodents observed evidence of droppings, traps, and dampness. (rats) in the entire apartment located at bsmt-apt b1, 1st bsmt-apt from north at east
Jul 24, 2024 · Apt B1
Closed — Violation closed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Jul 24, 2024
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic ceiling(suspended ceiling) in the bathroom located at bsmt-apt b1, 1st bsmt-apt from north at east
Jul 24, 2024 · Apt B1
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic ceiling in the 1st room from north located at bsmt-apt b1, 1st bsmt-apt from north at east
Jul 24, 2024 · Apt B1
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of mice at laundry room, section ''basement''
Jul 24, 2024
Closed — Violation closed
Show 40 more ↓
- ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic ceiling in the 2nd room from north located at bsmt-apt b1, 1st bsmt-apt from north at east
Jul 24, 2024 · Apt B1
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective intercom bell buzzer system from building entrance to east wall in the private hallway located at apt 3f, 3rd story, 1st apartment from south at west
Jun 17, 2024 · Apt 3F
Open — Not complied with - BHazardous
Replace the broken or defective water closet tank in the bathroom located at apt 3f, 3rd story, 1st apartment from south at west
Jun 17, 2024 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective broken ceramic tiles at east wall, north wall and south wall in the bathroom located at bsmt-apt b1, 1st bsmt-apt from north at east
Apr 29, 2024 · Apt B1
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration acoustic drop ceiling tiles through out in the entire apartment located at bsmt-apt b1, 1st bsmt-apt from north at east
Apr 29, 2024 · Apt B1
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at bsmt-apt b1, 1st bsmt-apt from north at east
Apr 29, 2024 · Apt B1
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at bsmt-apt b1, 1st bsmt-apt from north at east
Apr 29, 2024 · Apt B1
Closed — Violation closed - BHazardous
Fire egress defective. remove obstructing bars or unlawful gates from at least 1 window or provide approved type gate in the entire apartment located at bsmt-apt b1, 1st bsmt-apt from north at east
Apr 29, 2024 · Apt B1
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective intercom system from building entrance to panel at east wall in the 3rd room from east located at apt 3f, 3rd story, 1st apartment from south at west
Dec 6, 2023 · Apt 3F
Open — Not complied with - BHazardous
Repair the leaky and/or defective water supply pipe at water closet in the bathroom located at apt 3f, 3rd story, 1st apartment from south at west
Dec 6, 2023 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Provide security in event of a power outage by means to heavy duty lockset at building entrance door
Nov 20, 2023
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening unacceptable electro magnetic lock set at building entrance door
Nov 20, 2023
Closed — Violation closed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Nov 20, 2023
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 2b, 2nd story, 1st apartment from west at north
Nov 20, 2023 · Apt 2B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 2b, 2nd story, 1st apartment from west at north
Nov 20, 2023 · Apt 2B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 2b, 2nd story, 1st apartment from west at north
Nov 20, 2023 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2b, 2nd story, 1st apartment from west at north
Nov 20, 2023 · Apt 2B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west and north wall around windows in the kitchen located at apt 2b, 2nd story, 1st apartment from west at north
Nov 20, 2023 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2b, 2nd story, 1st apartment from west at north
Nov 20, 2023 · Apt 2B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 2b, 2nd story, 1st apartment from west at north
Nov 20, 2023 · Apt 2B
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective . in the entrance located at apt 4g, 4th story, 1st apartment from west at north
Apr 19, 2023 · Apt 4G
Closed — Violation closed - ANon-hazardous
Repair the leaky and/or defective faucets at bathtub in the 1st bathroom from north located at apt 4g, 4th story, 1st apartment from west at north
Apr 19, 2023 · Apt 4G
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 16, 2023
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 2, 2022
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting of electrical wire wrapped around the gate in the rear yard.(in closed position)
Apr 11, 2022
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in floor drain at east side of the rear yard
Apr 11, 2022
Open — Not complied with - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration dropped ceiling in the 2nd room from north located at bsmt-apt b1, 1st bsmt-apt from north at east
Oct 17, 2021 · Apt B1
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at entrance to apartment located at bsmt-apt b1, 1st bsmt-apt from north at east
Oct 17, 2021 · Apt B1
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at bsmt-apt b1, 1st bsmt-apt from north at east
Oct 17, 2021 · Apt B1
Closed — Violation closed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration dropped ceiling in the bathroom located at bsmt-apt b1, 1st bsmt-apt from north at east
Oct 17, 2021 · Apt B1
Open — Not complied with - BHazardous
Repair or replace the smoke detector inoperable located at apt 1d, 1st story, 2nd apartment from north at east
Feb 9, 2021 · Apt 1D
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperable located at apt 1d, 1st story, 2nd apartment from north at east
Feb 9, 2021 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; located at apt 1d, 1st story, 2nd apartment from north at east
Feb 9, 2021 · Apt 1D
Closed — Violation dismissed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wire at ceiling light fixture in the 1st room from north located at apt 1d, 1st story, 2nd apartment from north at east
Feb 4, 2021 · Apt 1D
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and walls in the 4th room from north located at bsmt-apt b1bell, 1st bsmt-apt from north at east
Oct 27, 2020 · Apt B1BELL
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls in the bathroom located at bsmt-apt b1bell, 1st bsmt-apt from north at east
Oct 27, 2020 · Apt B1BELL
Closed — Violation closed - ANon-hazardous
§ 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at building front at fire escape at north
Aug 4, 2020
Open — Not complied with - CImmediately hazardous
M/d law abate the nuisance consisting of splintered wood floor in the 3rd room from east located at apt 3f, 1st story, 1st apartment from south at west
Mar 15, 2020 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 3f, 1st story, 1st apartment from south at west
Mar 15, 2020 · Apt 3F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, south and east walls in the 4th room from east at north located at apt 3f, 3rd story, 1st apartment from south at west
Jan 19, 2020 · Apt 3F
Closed — Violation closed
DOB building violations · 37
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 16, 2019
Dob violation - dismissed - Plumbing none
The department of buildings intends to revoke all plumbing work under permit # 123560841 due to master plumber license being revoked lmp #2084. stop all plumbing work under above mentioned permit and obtain a new master plumber to supersede the plumbing permit
Mar 23, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 6, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 9, 2019
Dob violation - dismissed
Show 27 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 28, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 28, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 28, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 18, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 28, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 28, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 28, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 28, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 28, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2016
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 21, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 10, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 10, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 27, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 27, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 29, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 19, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 19, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 18, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 22, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 2, 2008
Dob violation - resolved - Construction other optional
C-construction other optional
Dec 11, 2006
Vpw*-violation unserved ecb-work without permit-dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 30, 2002
Dob violation - resolved - Elevator elevatorrequired
1p10348
Dec 1, 1999
Dob violation - resolved - Elevator elevatorrequired
Device #1p10348
May 1, 1991
Vp*-violation unserved ecb- dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 22, 1989
Dob violation - resolved - Elevator elevatorrequired
(03)guard.(21 & 24)reshackle.(34)guards.(38)covers. properly tag governor after conducting 2 yr. test. eliminate vibration in shaft
Oct 13, 1988
Dob violation - resolved
ECB violations · 65
- Class - 2
Failure to comply w/the comm's order contained in summons/vio#35347045y issued on 08-28-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Feb 4, 2020 · Penalty $625
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons/vio- lation# 35347045y issued on 8/28/2018 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102.01. occupancy contrary
Dec 17, 2019 · Penalty $625
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35347045y issued on 08/28/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rem: comply with commiss
Oct 22, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioners orde contained in summons/violation #35347045y issued on 08/28/18 and to file a certificate of correction pursuant to 28-201.1. and 1rcny 102-01. comply with commissione
Apr 13, 2019 · Penalty $3,125
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35347045y issued on 08/28/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.no compliance recorded f
Dec 19, 2018 · Penalty $625
Resolve - Class - 2
Failure to comply with the commissioners order contained in summons/violation #35347043k issued on 08/28/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.no compliance recorded f
Dec 19, 2018 · Penalty $625
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/violation #35124428nissued on 09/29/16 and to file a certificate of cor rection pursuant to 28-201.1 and 1rcny 102-01.no perit or application
Dec 19, 2018 · Penalty $2,500
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. lack of required number of means of egress for every floor per bc 1018.1 (2008 code; 27-366, bc 1021, (2014 code) for transient use. rmdy: discontinue illegal
Dec 18, 2018 · Penalty $2,500
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. lack of a system ofautomatic sprinkler where is required as per bc 903.2 and 27-954 for transient use at apt 6h at 6 flr. rmdy: discontinue illegal occupancy.
Dec 18, 2018 · Penalty $1,250
Resolve - Class - 1
Bc907.2.8 failure to provide a fire alarm system for a transient use at apt 6h at 6th floor. rmdy: discontinue illegal occupancy use.
Dec 18, 2018 · Penalty $2,500
Resolve
Show 40 more ↓
- Class - 2
Permanent dwelling used/converted for other than permanent-residentialpurposes. by cofo #33295 premises to be legally approved as a class a multiple dwelling based on physical inspeciton apt 6h being use. as tr
Dec 18, 2018 · Penalty $1,250
Resolve - Class - 1
Unapproved/unsafe/unsuitable electrical equipment, apparatus, materials, devices, appliances or wiring in use. i observed open outlet boxes with live wires protruding from the box, outlet receptacles without fa
Oct 17, 2018 · Penalty $4,000
Resolve - Class - 1
Work without a permit. i observed in the basement area three gas-fired dryers installed and three washing machines, no record on the cfo for the laundry room. all the work and installation was done with a permi
Oct 17, 2018
Resolve - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the department of buildings. failure to correct violating condition that was observed by previous inspector on 9/29/16 un
Oct 17, 2018 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in code-compliant manner. lack of a system of automatic sprinklers where required per bc 903.2; 27-954. i observed in the basement area three gas-fired dryers installed with no fire
Oct 17, 2018 · Penalty $1,000
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/violation#35347043k issued on 8/28/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. remedy:comply w/ commissio
Oct 12, 2018 · Penalty $1,250
Resolve - Class - 1
Failure to comply w/ the commissioner's order contained in summons/violation#35124428n issued on 9/29/16 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for work w/o a permit. rem
Oct 12, 2018 · Penalty $2,500
Resolve - Class - 2
Failure to comply w/ the commissioner's order contained in summons/violation#35347045y issued on 8/28/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. remedy:comply w/ commissio
Oct 12, 2018 · Penalty $1,250
Resolve - Class - 2
Sec. 27-2009.2 failure to distribute or post safe construction bill of rights in accordance w/the housing & maintance code section 27-2009.261. noted: work occuring under job#123560841;123235436;140674857 & 140
Aug 29, 2018 · Penalty $625
Resolve - Class - 1
Work without a permit.noted:at cellar level created a laundry room forcommercial use with 3 washers and 3 gas fired dryers no permits on file for the alternation and water,waste lines, and gas lines.rem:comply
Aug 28, 2018 · Penalty $1,600
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. lack of automatic sprinklers where needed as per bc903.2; 27-954. noted observed no sprinklers system at laundry room at cellar level.remedy: comply with
Aug 28, 2018 · Penalty $2,500
Resolve - Class - 1
Failure to maintain building in a code compliant manner.noted:at cellar level at gas meter rooms multiple combustible materials and house hold appliances accumulating around gas meters creating a fire hazard.lo
Aug 28, 2018 · Penalty $1,250
Resolve - Class - 1
Occupancy contrary to certificate of occupancy.noted:observed an illegal apt at cellar level at corner of cabrini blvd and west 180 st observed a male occupying the apt has full bathroom,living room,2 bedrooms
Aug 28, 2018 · Penalty $2,500
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/violation #35124428n issued on 09/29/16 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for work without a permi
Aug 28, 2018 · Penalty $2,500
Resolve - Class - 1
C/u 05a10,c/u 52b12,c/u 55b12,r/c 56y13,r/c 58f10,40d06,68b07,26d07,53m07,69b07,100bb11. 05a10,52b12,55b12 cease use items & 05 & 55 are also reccuring condition.repair door zone restrictor & resmackle hoist ro
Jan 22, 2018 · Penalty $5,000
Resolve - Class - 2
5m7,58b1,55b12,39o2. door restrictor missing provide; 58b1-machine bearings insufficient tighten 55b12 39o2.
Jan 25, 2017 · Penalty $1,250
Resolve - Class - 2
Work variance. at time of inspection 20 men were performing plumbing electrical,sheetrock work throughout bldg w/no weekend or after hour variance. remedy: stop all work. obtain work after hours work variance
Jan 7, 2017 · Penalty $800
Resolve - Class - 2
08v01,40p16. 08v01-adjust leveling at floors to eliminate raush stop.40p16-provide access to machine room.
Dec 19, 2016 · Penalty $2,500
Resolve - Class - 2
421n11,56y13,68b7. 42-fuse bypassed on controller; 56 hoist machine oil leak.
Sep 30, 2016 · Penalty $500
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. use of prohibited door &/or hardware per bc1008.1.8;27-371(j). at multiple apts & 5b,locking door pole device,which serves as a brace on the inside of the apt
Sep 29, 2016 · Penalty $1,000
Resolve - Class - 1
Occupancy contrary to that allowed by c of o or bldg dept records. noted: c of o reflects(49)units w/1 class'a'apt at basement level/on ground. in addition to permitted apt b1 at cellar,another unit has been
Sep 29, 2016 · Penalty $2,400
Resolve - Class - 2
Electrical work w/o a permit. observed at 8am panels,switches,fixtures installed in apt 1b,5g & hallway fixtures throughout hallways & outside lights. no application on file for electrical work. remedy: obtain
Sep 29, 2016 · Penalty $400
Resolve - Class - 2
Unapproved,unsafe,unsuitable electrical equipment devices apparatus applicances materials or wiring in use. defective fixture wiring throughout basement. remedy: comply w/ec code(obtain permit).
Sep 29, 2016 · Penalty $400
Resolve - Class - 2
Failure to provide approved/accepted plans at job site at time of inspection. noted: ongoing work at apt 2d,5d,under appl#122895581. bldg manager on site advises that there aren't any approved bldg plans onsite
Sep 29, 2016 · Penalty $500
Resolve - Class - 1
Work w/o a permit. noted: at basement/on ground level,installed new full height partition walls creating 3 rooms,bathroom,kitchen area,ceilings. no permits filed for this work. remedy: obtain permit.
Sep 29, 2016 · Penalty $1,600
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. lack of a system ofautomatic sprinklers where required per bc903.2;27-954. at time of in spection 111am i observed a laundry room w/multiple dryers gas fired
Sep 29, 2016
Resolve - Class - 1
Failure to maintain bldg in code compliant manner prohibited materials. at time of inspection 11am i observed a gas fired dryer w/flexable exhaust. mechanical code 504.8.3 requires"rigid metal"constructed of"sh
Sep 29, 2016 · Penalty $1,000
Resolve - Class - 2
Failure to comply w/the comm's order contained in nov #35167033z issued on 06/29/16 & to file a c of c pursuant to 28-201.1;28-204.4 & 1rcny102-01. unlawfully continued work while on notice of stop work order.
Aug 23, 2016 · Penalty $800
Resolve - Class - 2
Failure to comply with the commissioner's order contained in nov#35194633x issued on 05/05/16 & to file a certificate of correction pursuant to 28-201.1,28-204.4 & 1rcny 102-01. remedy:comply with commissioner'
Jul 6, 2016 · Penalty $2,000
Resolve - Class - 2
Failure to comply with the commissioner's order contained in nov#35194752z issued on 05/06/16 & to file a certificate of correction pursuant to 28-201.1,28-204.4 & 1rcny 102-01. noted:all obstructions removed.
Jul 6, 2016 · Penalty $2,000
Resolve - Class - 2
Failure to comply with the commissioner's order contained in nov#35194634h issued on 05/05/16 & to file a certificate of correction pursuant to 28-201.1,28-204.4 & 1rcny 102-01. remedy:comply with commissioner'
Jul 6, 2016
Resolve - Class - 1
Unlawfully continued work while on notice of stop work order. at time of inspection 1:25pm observed 2 workers doing internal demolition of partitions & removing concrete flooring in apt#4d while entire bldg is
Jun 30, 2016 · Penalty $12,000
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations.noted: alteration work being under permits# 140484580,1405 08546, apts 1d,2a,2h,3g and 4d and permit #140484544 renovating 2c,4e,
Jun 29, 2016 · Penalty $5,000
Resolve - Class - 1
Failure to provide unobstructed exit passageway.noted center courtyardnorthside fire escape drop ladder blocked by numerous black plastic bags & wood pallets below vertical drop ladder.rem comply w/ nov,remove
May 6, 2016 · Penalty $3,000
Resolve - Class - 1
Failure to maintain bldg in code compliant manner. noted: at apt 2c,2a,4c,6b fire rating removed from the walls & ceiling. big holes in the floors left open on all these apts-gas meters being removed. stop work
May 5, 2016 · Penalty $2,500
Resolve - Class - 1
Work does not conform to approved construction documents &/or approvedamendments in a manufacturing district for residential use. noted: work does not confomr to the approved plans under job#140484580 responden
May 5, 2016
Resolve - Class - 1
Failure to maintain bldg in code compliant manner.no fire stopping perbc712.3;27-345.noted apt1d ceiling w/ exposed wood joists & wood lathe@ several locations due to renovations inside apt.rem comply w/ nov
May 4, 2016 · Penalty $2,500
Resolve - Class - 2
Work does not conform to approved construction documents &/or approvedamendments.noted 1st fl apt10 under permit#140484580 for interior renovation of existing apts10 & 2a.apt10 currently under renovation w/ met
May 4, 2016 · Penalty $1,250
Resolve - Class - 2
58-i-10:58-worn/gear.i-damageed.10-repair.
Apr 3, 2016 · Penalty $1,250
Resolve - Class - 2
52bb12, 61g07
Aug 3, 2015
Resolve
Complaints
- Water leak
Slow leak
Aug 19, 2026 · Apt 1D
Close - Plumbing
Water supply
Jun 18, 2026 · Apt 1H
Close - Water leak
Heavy flow
Feb 1, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 22, 2026 · Apt 1H
Close - Plumbing
Steam pipe/riser
Jan 22, 2026 · Apt 1H
Close - Heat/hot water
Entire building
Nov 5, 2025 · Apt 6H
Close - Heat/hot water
Entire building
Oct 11, 2025 · Apt BLDG
Close - Water leak
Heavy flow
May 16, 2025 · Apt 3G
Close - Heat/hot water
Apartment only
Dec 8, 2024 · Apt 3F
Close
Show 40 more ↓
- Door/window
Door
Oct 8, 2024 · Apt ENTRAN
Close - Unsanitary condition
Mold
Sep 13, 2024 · Apt 2G
Close - Unsanitary condition
Pests
Jul 22, 2024 · Apt B1
Close - General
Bell/buzzer/intercom
May 28, 2024 · Apt 3F
Close - Plumbing
Bathtub/shower
Apr 24, 2024 · Apt B1
Close - Paint/plaster
Wall
Apr 24, 2024 · Apt B1
Close - Unsanitary condition
Pests
Apr 24, 2024 · Apt B1
Close - Unsanitary condition
Pests
Apr 24, 2024 · Apt B1
Close - Unsanitary condition
Mold
Apr 24, 2024 · Apt B1
Close - Appliance
Electric/gas range
Mar 8, 2024 · Apt 3B
Close - Plumbing
Toilet
Feb 10, 2024 · Apt 3F
Close - General
Cooking gas
Dec 7, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 17, 2023 · Apt 1B
Close - Heat/hot water
Entire building
Nov 12, 2023 · Apt BLDG
Close - Paint/plaster
Window/frame
Nov 12, 2023 · Apt 2B
Close - Heat/hot water
Entire building
Nov 12, 2023 · Apt 2B
Close - Heat/hot water
Entire building
Oct 10, 2023 · Apt BLDG
Close - General
Bell/buzzer/intercom
Sep 28, 2023 · Apt 3F
Close - Plumbing
Toilet
Sep 28, 2023 · Apt 3F
Close - Door/window
Window frame
Apr 27, 2023 · Apt 3A
Close - Unsanitary condition
Pests
Dec 3, 2022 · Apt 3D
Close - Unsanitary condition
Pests
Nov 8, 2022 · Apt 1E
Close - Electric
Lighting
Oct 28, 2022 · Apt 4F
Close - General
Bell/buzzer/intercom
Oct 19, 2022 · Apt 4G
Close - Heat/hot water
Apartment only
Oct 19, 2022 · Apt 4C
Close - Plumbing
Bathtub/shower
Oct 19, 2022 · Apt 4C
Close - Heat/hot water
Apartment only
Oct 19, 2022 · Apt 4G
Close - Plumbing
Bathtub/shower
Oct 19, 2022 · Apt 4G
Close - Door/window
Window frame
Sep 7, 2022 · Apt 5H
Close - Electric
Outlet/switch
May 23, 2022 · Apt 4F
Close - Safety
Window guard broken/missing
Mar 11, 2022 · Apt BLDG
Close - Water leak
Heavy flow
Sep 27, 2021 · Apt B1
Close - Electric
Lighting
Mar 7, 2021 · Apt 1D
Close - Unsanitary condition
Mold
Mar 7, 2021 · Apt 1D
Close - Electric
Lighting
Mar 7, 2021 · Apt 1D
Close - Water leak
Slow leak
Mar 7, 2021 · Apt 1D
Close - Electric
Lighting
Feb 3, 2021 · Apt 1D
Close - Unsanitary condition
Mold
Feb 3, 2021 · Apt 1D
Close - Electric
Lighting
Feb 3, 2021 · Apt 1D
Close - Water leak
Slow leak
Feb 3, 2021 · Apt 1D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1910
- Floors
- 6
- Residential units
- 48
- Building area
- 46,530 ft²
- Lot area
- 10,000 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2177 / 163
- Assessed value
- $1,879,200
- Landmark / historic district
- No
HPD registration #119389, last renewed Aug 30, 2025.
Questions about 854 West 180 Street
Who owns 854 West 180 Street?
The owner of record in NYC Department of City Planning PLUTO data is Liv Hudson Heights LLC.
Does 854 West 180 Street have violations?
Yes. NYC HPD has recorded 206 housing violations at this property.
Is 854 West 180 Street rent stabilized?
NYC Department of Finance tax bills listed 30 rent-stabilized units here in 2024 (about 63% of its 48 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 854 West 180 Street built?
City records list 1910 as the year it was built.
How many apartments are in 854 West 180 Street?
It has 48 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.