35 Arden Street
Manhattan, NY 10040BBL 1-02174-0194Map
Owner of record: Arden Realty, L.l.c.
35 Arden Street is a walk-up apartment building built in 1930 in Manhattan, 10040. It has 68 residential units across 5 floors. The owner of record is Arden Realty, L.l.c.. HPD has recorded 822 housing violations here, most recently on July 8, 2026. 2 of the 50 most recent violations are still open. City tax records listed 69 rent-stabilized apartments here in 2024.
- HPD violations
- 822
- DOB violations
- 5
- ECB violations
- 6
- HPD complaints
- 1,720
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 822
- CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.
Jul 8, 2026
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.
Jul 8, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door
Feb 18, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door , 1st story
Oct 25, 2025
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes conisting of house hold items at 2nd story balcony at north fire escape at building front
Sep 8, 2025
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of boxes and household items at public hall, 4th story
Aug 21, 2025
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage bags at south yard at 1st story yard
Aug 21, 2025
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Aug 21, 2025
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Aug 21, 2025
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective counter balance (lower sash) at intermediate landing (guilotein effect) at public hall stairs, 3rd story
Aug 21, 2025
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Remove all encumbrances consisting of sleeve air conditioner at north wall at public hall, 6th story
Aug 21, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the baseboard at south wall in the 1st room from north located at apt 3f, 3rd story, 1st apartment from north at east
Aug 19, 2025 · Apt 3F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the foyer located at apt 3f, 3rd story, 1st apartment from north at east
Aug 19, 2025 · Apt 3F
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the baseboard at east wall in the 2nd private hallway from north located at apt 3f, 3rd story, 1st apartment from north at east
Aug 19, 2025 · Apt 3F
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from north at east wall in the 1st room from north located at apt 3f, 3rd story, 1st apartment from north at east
Aug 19, 2025 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall in the foyer located at apt 3f, 3rd story, 1st apartment from north at east
Aug 19, 2025 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall in the 2nd private hallway from north located at apt 3f, 3rd story, 1st apartment from north at east
Aug 19, 2025 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) picture moulding at north wall in the 1st private hallway from north located at apt 3f, 3rd story, 1st apartment from north at east
Aug 19, 2025 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, 1st riser from north at east wall in the 1st room from north located at apt 3f, 3rd story, 1st apartment from north at east
Aug 19, 2025 · Apt 3F
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 square feet at ceiling, north, east and south walls in the bathroom located at apt 5m, 5th story, 1st apartment from south at west
Aug 19, 2025 · Apt 5M
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective counter balance at lower window sash at public hall stairs, 2nd story
Aug 19, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the picture moulding at north wall in the 1st private hallway from north located at apt 3f, 3rd story, 1st apartment from north at east
Aug 19, 2025 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 5m, 5th story, 1st apartment from south at west
Aug 19, 2025 · Apt 5M
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at vestibule door , 1st story, section ''35''
Aug 19, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at building front entrance door , 1st story, section ''35''
Aug 19, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door , 1st story, section ''35''
Aug 19, 2025
Closed — Violation closed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st private hallway from north located at apt 3f, 3rd story, 1st apartment from north at east
Aug 19, 2025 · Apt 3F
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the 2nd room from east located at apt b, 1st story, 1st apartment from south at west
Aug 12, 2025 · Apt B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt b, 1st story, 1st apartment from south at west
Aug 12, 2025 · Apt B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1i, 1st story, 2nd apartment from north at east
Aug 1, 2025 · Apt 1I
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 3 in the entire apartment located at apt 1i, 1st story, 2nd apartment from north at east
Aug 1, 2025 · Apt 1I
Closed — Violation dismissed - BHazardous
Replace with new the missing silicone caulking at bathtub in the bathroom located at apt 1i, 1st story, 2nd apartment from north at east , section ''west''
Jun 28, 2025 · Apt 1I
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective water damaged cabinet at wash basin in the bathroom located at apt 1i, 1st story, 2nd apartment from north at east , section ''west''
Jun 28, 2025 · Apt 1I
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3f, 4th story, 1st apartment from north at east
Jun 8, 2025 · Apt 3F
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the kitchen located at apt 3f, 4th story, 1st apartment from north at east
Jun 8, 2025 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall, 1st window frame from north at east wall in the 1st room from north located at apt 3f, 4th story, 1st apartment from north at east
Jun 8, 2025 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door, 1st closet from south at west wall door frame in the 2nd private hallway from north located at apt 3f, 4th story, 1st apartment from north at east
Jun 8, 2025 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the kitchen located at apt 3f, 4th story, 1st apartment from north at east
Jun 8, 2025 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 1st room from north located at apt 3f, 4th story, 1st apartment from north at east
Jun 8, 2025 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall, 1st window frame from north at east wall in the 1st room from north located at apt 3f, 4th story, 1st apartment from north at east
Jun 8, 2025 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 1st room from north located at apt 3f, 4th story, 1st apartment from north at east
Jun 8, 2025 · Apt 3F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the 1st room from north located at apt 3f, 4th story, 1st apartment from north at east
Jun 8, 2025 · Apt 3F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 3f, 4th story, 1st apartment from north at east
Jun 8, 2025 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall in the 3rd room from north located at apt 3f, 4th story, 1st apartment from north at east
Jun 8, 2025 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 1st private hallway from north located at apt 3f, 4th story, 1st apartment from north at east
Jun 8, 2025 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0, wg to replace = 0, wg to repair = 2 in the entire apartment located at apt 3f, 4th story, 1st apartment from north at east
Jun 8, 2025 · Apt 3F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 3rd room from north located at apt 3f, 4th story, 1st apartment from north at east
Jun 8, 2025 · Apt 3F
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 3f, 4th story, 1st apartment from north at east
Jun 8, 2025 · Apt 3F
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the east riser in the 1st room from north located at apt 3f, 4th story, 1st apartment from north at east
Jun 8, 2025 · Apt 3F
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st private hallway from north located at apt 3f, 4th story, 1st apartment from north at east
Jun 8, 2025 · Apt 3F
Closed — Violation closed
DOB building violations · 5
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 6
- Class - 2
Failure to maintain. observed garbage bags and household items partially obstructing emergency egress., repair and/or replace; repair/replace
May 16, 2025
Resolve - Class - 2
At time of inspection observed excessive accumulation of household garbage and debris obstructing south fire passageway., repair and/or replace
Feb 10, 2025
Resolve - Class - 2
Failure to maintain bldg wall(s) or appurtenances. noted: masonry coping @ top of parapet wall is cracked,missing & defective @ various locations, front of bldg (exp#1). rem: make all repairs in a safe & lawful
Apr 30, 2017 · Penalty $500
Resolve - Class - 2
B254,32a. wires exposed on heat timer sensor.
Apr 22, 2011
Resolve - Hazardous
Failure to maintain exterior of bldg defects noted:at roof level parapet wall exposure 1(south elevation)bricks are loose & a section have fallen onto roof & is hanging by water proof material.remedy:maintain
Jul 14, 2007 · Penalty $800
Resolve - Hazardous
Failure to maintain exterior building wall.noted:at south west corner-vertical crack from parapet to below 6th fl window where limestone band course is cracked and displaced.remedy:provide overhead protection &
May 25, 2001
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Sep 12, 2026 · Apt BLDG
Open - Door/window
Door
Jun 29, 2026 · Apt 3D
Close - Plumbing
Bathtub/shower
Jun 29, 2026 · Apt 3D
Close - Paint/plaster
Ceiling
Jun 29, 2026 · Apt 3D
Close - Unsanitary condition
Garbage/recycling storage
Jun 15, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 3, 2026 · Apt BLDG
Close - Flooring/stairs
Floor
May 11, 2026 · Apt 3B
Close - Plumbing
Bathtub/shower
May 11, 2026 · Apt 3B
Close - Door/window
Door
May 11, 2026 · Apt 3B
Close - Heat/hot water
Apartment only
May 11, 2026 · Apt 3B
Close
Show 40 more ↓
- Plumbing
Bathtub/shower
May 11, 2026 · Apt 3B
Close - Heat/hot water
Entire building
May 3, 2026 · Apt BLDG
Close - Door/window
Door
Apr 20, 2026 · Apt 3D
Close - Plumbing
Bathtub/shower
Apr 20, 2026 · Apt 3D
Close - Flooring/stairs
Floor
Apr 20, 2026 · Apt 3D
Close - Unsanitary condition
Garbage/recycling storage
Apr 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 18, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Feb 17, 2026 · Apt BLDG
Close - Unsanitary condition
Sewage
Dec 22, 2025 · Apt 3D
Close - Plumbing
Bathtub/shower
Dec 22, 2025 · Apt 3D
Close - Door/window
Door
Dec 22, 2025 · Apt 3D
Close - Unsanitary condition
Garbage/recycling storage
Nov 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 24, 2025 · Apt 1C
Close - Heat/hot water
Entire building
Oct 24, 2025 · Apt BLDG
Close - Paint/plaster
Ceiling
Oct 22, 2025 · Apt 3D
Close - Paint/plaster
Ceiling
Oct 22, 2025 · Apt 3D
Close - Plumbing
Bathtub/shower
Oct 22, 2025 · Apt 3D
Close - Paint/plaster
Wall
Oct 22, 2025 · Apt 3D
Close - Heat/hot water
Entire building
Oct 18, 2025 · Apt 1B
Close - Unsanitary condition
Garbage/recycling storage
Oct 17, 2025 · Apt BLDG
Close - Plumbing
Water supply
Sep 11, 2025 · Apt 5F
Close - Unsanitary condition
Mold
Jul 25, 2025 · Apt 1I
Close - Unsanitary condition
Garbage/recycling storage
Jun 24, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
Jun 24, 2025 · Apt 1I
Close - Unsanitary condition
Mold
Jun 24, 2025 · Apt 1I
Close - Unsanitary condition
Garbage/recycling storage
Jun 22, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 19, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jun 15, 2025 · Apt BLDG
Close - Flooring/stairs
Floor
Jun 6, 2025 · Apt 3F
Close - Paint/plaster
Ceiling
Jun 6, 2025 · Apt 3F
Close - Unsanitary condition
Mold
Jun 6, 2025 · Apt 3F
Close - Paint/plaster
Ceiling
Jun 6, 2025 · Apt 3F
Close - Plumbing
Radiator
Jun 6, 2025 · Apt 3F
Close - Paint/plaster
Wall
Jun 6, 2025 · Apt 3F
Close - Unsanitary condition
Pests
Jun 6, 2025 · Apt 3F
Close - Unsanitary condition
Mold
May 22, 2025 · Apt 3F
Close - Paint/plaster
Ceiling
May 22, 2025 · Apt 3F
Close - Flooring/stairs
Floor
May 22, 2025 · Apt 3F
Close - Paint/plaster
Ceiling
May 22, 2025 · Apt 3F
Close - Plumbing
Radiator
May 22, 2025 · Apt 3F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1930
- Floors
- 5
- Residential units
- 68
- Building area
- 52,705 ft²
- Lot area
- 15,000 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2174 / 194
- Assessed value
- $1,594,800
- Landmark / historic district
- No
HPD registration #103522, last renewed Jun 29, 2026.
Questions about 35 Arden Street
Who owns 35 Arden Street?
The owner of record in NYC Department of City Planning PLUTO data is Arden Realty, L.l.c..
Does 35 Arden Street have violations?
Yes. NYC HPD has recorded 822 housing violations at this property.
Is 35 Arden Street rent stabilized?
NYC Department of Finance tax bills listed 69 rent-stabilized units here in 2024 (about 100% of its 68 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 35 Arden Street built?
City records list 1930 as the year it was built.
How many apartments are in 35 Arden Street?
It has 68 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.