17 Arden Street
Manhattan, NY 10040BBL 1-02174-0187Map
Owner of record: Arden-Vermilyea Properties LLC
17 Arden Street is a walk-up apartment building built in 1920 in Manhattan, 10040. It has 16 residential units across 5 floors. The owner of record is Arden-Vermilyea Properties LLC. HPD has recorded 243 housing violations here, most recently on October 13, 2026. 7 of the 50 most recent violations are still open. City tax records listed 15 rent-stabilized apartments here in 2024.
- HPD violations
- 243
- DOB violations
- 13
- ECB violations
- 19
- HPD complaints
- 2,637
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 243
- BHazardous
Provide adequate supply of hot water for the fixtures low volume in the kitchen located at apt 2, 1st story, 2nd apartment from west at north
Oct 13, 2026 · Apt 2
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing. in the entire apartment located at apt 41, 4th story, 1st apartment from south at west
Jun 7, 2026 · Apt 41
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 41, 4th story, 1st apartment from south at west
Jun 7, 2026 · Apt 41
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic-tiles at north and east walls. in the bathroom located at apt 43, 4th story, 1st apartment from north at east
Jun 7, 2026 · Apt 43
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower base cabinet at sink in the kitchen located at apt 43, 4th story, 1st apartment from north at east
Jun 7, 2026 · Apt 43
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the kitchen located at apt 43, 4th story, 1st apartment from north at east
Jun 7, 2026 · Apt 43
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak above ceiling in the kitchen located at apt 43, 4th story, 1st apartment from north at east
Jun 7, 2026 · Apt 43
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall at public hall, 2nd story
May 4, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at west wall at public hall, 2nd story
May 4, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall at public hall, 1st story
May 4, 2026
Closed — Violation closed
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall at public hall, 1st story
May 4, 2026
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 41, 4th story, 1st apartment from south at west
Mar 13, 2026 · Apt 41
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective mortise lock at building front entrance door , 1st story
Mar 13, 2026
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 22, 2nd story, 1st apartment from south at west
Mar 11, 2026 · Apt 22
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective locking device vestibule door leading in to the building at public hall, 1st story
Mar 11, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective heavy duty lock and latch set at building entrance door at public hall, 1st story
Mar 10, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective heavy duty lock and latch set at vestibule door. at public hall, 1st story
Mar 10, 2026
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north wall in the kitchenette located at apt 22, 2nd story, 1st apartment from west at north
Feb 28, 2026 · Apt 22
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective mortise lock mechanism at door in the entrance located at apt 22, 2nd story, 1st apartment from west at north
Feb 28, 2026 · Apt 22
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 22, 2nd story, 1st apartment from west at north
Feb 28, 2026 · Apt 22
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 22, 2nd story, 1st apartment from west at north
Feb 28, 2026 · Apt 22
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchenette located at apt 22, 2nd story, 1st apartment from west at north
Feb 28, 2026 · Apt 22
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak over the ceiling in the kitchenette located at apt 22, 2nd story, 1st apartment from west at north
Feb 28, 2026 · Apt 22
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective escutcheon plate at ceiling riser in the bathroom located at apt 22, 2nd story, 1st apartment from west at north
Feb 28, 2026 · Apt 22
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 41, 4th story, 1st apartment from south at west
Nov 10, 2025 · Apt 41
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 41, 4th story, 1st apartment from south at west
Nov 6, 2025 · Apt 41
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at fire door leading to north yard at public hall, 1st story
Oct 21, 2025
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at bsmt-apt bsmt1, 1st bsmt-apt from north at east
May 24, 2025 · Apt BSMT1
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 43, 4th story, 1st apartment from north at east
Feb 16, 2025 · Apt 43
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door to boiler room
Feb 16, 2025
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of bicycle. air condidtion unit and other rubbish at public hall, 1st story
Feb 16, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door
Nov 15, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door , 1st story
Nov 15, 2024
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retarded material at west wall at public hall stairs, 2nd story
Nov 4, 2024
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall at public hall stairs, 2nd story
Nov 4, 2024
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective latch at vestibule door at public hall, 1st story
Oct 30, 2024
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at lower sash at building entrance door at public hall, 1st story
Oct 30, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door at public hall, 1st story
Oct 30, 2024
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective latch at building entrance door leading to vestibule at public hall, 1st story
Oct 30, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door at public hall, 1st story
Oct 30, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story
Oct 18, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door at public hall, 1st story
Oct 18, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective locking assembly at building entrance door
Oct 15, 2024
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective locking assembly at vestibule door
Oct 15, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door 1st defective. at public hall, 1st story
Oct 14, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door is defective.
Oct 14, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door to public hall, 1st sty
Oct 13, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door
Oct 13, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door , 1st story
Oct 10, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story
Oct 10, 2024
Closed — Violation closed
DOB building violations · 13
- Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 2, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 2, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 14, 2011
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 15, 2010
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed
Show 3 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
ECB violations · 19
- Class - 2
At time of inspection of 5 story residential building observed sidewalk shed in place with access panel entrance/exit open and not maintained causing hazardous conditions.maintain
Nov 7, 2025 · Penalty $2,400
Resolve - Class - 2
Failure to maintain sidewalk shed. observed parapet wall of the shed is detached at exposure 1 and 2; 3307.6.5, comply with code; repair/replace
Nov 3, 2025
Resolve - Class - 2
At time of inspection of 5 story building observed sidewalk shed in place with lighting permit m01186047 expired 11-1-2025 causing hazardous conditions.
Nov 3, 2025
Resolve - Class - 2
Failure to comply with the commoners orders to file a certificate of correction with the dob for violation#39137792h, issued on 02/07/25, file a certificate of correction; comply with the commissioners orders
Aug 21, 2025 · Penalty $1,250
Resolve - Class - 2
Failure to maintain. broken/defective plastered surfaces with visible cracks between bricks at building facade exp#1, maintain exterior building wall; repair/replace
Aug 21, 2025 · Penalty $6,280
Resolve - Class - 2
Failure to maintain building wall(s) or appurtenances noted: at time of inspection observed broken/defective plastered surfaces with visible cracks between bricks at building facade exp#1,also observed missing
Feb 7, 2025 · Penalty $1,250
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34985398j issued on 8/3/12. erected full height partitions,installed gas,electric & plumbing,to create apts at cellar,w/o a permit.
Mar 21, 2013 · Penalty $2,400
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #34985399l issued on 8/3/12 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c of c.
Mar 21, 2013 · Penalty $800
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34985398j issued on 8/3/12. for work w/o a permit at cellar installed plumbing,electric & partitions. remedy: comply w/the comm's
Jan 15, 2013 · Penalty $6,000
Resolve - Class - 1
Failure to comply with commissioner's order contained in nov#34985398jissued on 8/3/12.for work w/o permit;at cellar level erected full height partitions & installed water,waste & gas lines for 9 rooms, 3 3pc b
Oct 13, 2012 · Penalty $2,400
Resolve
Show 9 more ↓
- Class - 1
Work w/o a permit: work noted: at cellar level erected full height partitions creating 9 rooms,installed water & waste lines for 3 3pc baths3 sinks,3 toilets,3 showers,& 3 residential sinks,w/3 gas line for 3
Aug 3, 2012 · Penalty $1,600
Resolve - Class - 1
Occupancy contrary to that allowed by the c of o a dob records. dob's hpd records. mdr #127476 indicates 16 class'a' apts,3 per floor,1 class'a' at cellar. now premises arranged & occupied as 19 class'a' apts
Aug 3, 2012 · Penalty $2,400
Active - Class - 2
Residence altered for occupancy as a dwelling for more th an the leally approved # of families.noted:dob records indicate basement use permits 1 class"a'apt.premises altered to 2 class "a"apts.w/illegal plumbin
Oct 5, 2011 · Penalty $1,200
Resolve - Class - 1
Occupancy contrary to that allowed by the c/o or bldgs dept. record."i-cards"-illegal class"a"apt. erected @ cellar.vacate order recommended.remedy:discontinue illegal use or amend c of o.
Aug 2, 2011
Resolve - Class - 1
50. 28-105.1 commercial water heater installed w.o a permit. make uni versal as commercial water heater. obtain a permit to legalize work performed or remove back to original condition.
Sep 22, 2010 · Penalty $800
Resolve - Class - 2
3b,15,24b,34a/b,50,50a,50b,50c,50d,50e,50f,50g,26. 50- hole at chimneyreseal chimney to prevent fumes releasing into bldg. 50a- rear chamberdoor site glass missing install glass. 50b- remove fan at fresh air lo
Sep 22, 2010 · Penalty $250
Resolve - Class - 2
Occupancy contrary to that allowed by certificate of occupancy or building department records. occupancy noted: building has at rear- west side basement -bedroom apartment & living room & 3 piece bath & kitchen
Jul 27, 2009
Resolve - Class - 2
Work without a permit. work noted: building has erected in basement rear-west side partitions to create 2 bedroom & kitchen and 3 piece bathroom. without first obtaining dob permits. all work completed and spac
Jul 27, 2009
Resolve - Non-hazardous
Exit passageway or corridor: total obstruction: noted exit to st from inner court yard locked with dead bolt with no means to operate dead bolt from inside. court yard is part of second means of egress for 17
Oct 23, 2007 · Penalty $480
Resolve
Complaints
- Heat/hot water
Entire building
Oct 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 10, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Sep 21, 2026 · Apt 21
Close - Unsanitary condition
Pests
Sep 21, 2026 · Apt 21
Close - Flooring/stairs
Floor
Sep 21, 2026 · Apt 21
Close - Unsanitary condition
Mold
Sep 21, 2026 · Apt 21
Close - Plumbing
Water supply
Sep 19, 2026 · Apt 1
Close - Heat/hot water
Entire building
Sep 4, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Sep 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 24, 2026 · Apt BLDG
Close - Unsanitary condition
Sewage
May 17, 2026 · Apt 21
Close - Heat/hot water
Entire building
May 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 4, 2026 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1920
- Floors
- 5
- Residential units
- 16
- Building area
- 10,245 ft²
- Lot area
- 2,970 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2174 / 187
- Assessed value
- $373,500
- Landmark / historic district
- No
HPD registration #127476, last renewed Jul 17, 2026.
Questions about 17 Arden Street
Who owns 17 Arden Street?
The owner of record in NYC Department of City Planning PLUTO data is Arden-Vermilyea Properties LLC.
Does 17 Arden Street have violations?
Yes. NYC HPD has recorded 243 housing violations at this property.
Is 17 Arden Street rent stabilized?
NYC Department of Finance tax bills listed 15 rent-stabilized units here in 2024 (about 94% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 17 Arden Street built?
City records list 1920 as the year it was built.
How many apartments are in 17 Arden Street?
It has 16 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.