61 Ellwood Street
Manhattan, NY 10040BBL 1-02174-0105Map
Owner of record: 61-73 Ellwood Realty LLC
61 Ellwood Street is a walk-up apartment building built in 1923 in Manhattan, 10040. It has 72 residential units across 5 floors. The owner of record is 61-73 Ellwood Realty LLC. HPD has recorded 780 housing violations here, most recently on August 27, 2026. 25 of the 50 most recent violations are still open. City tax records listed 72 rent-stabilized apartments here in 2024.
- HPD violations
- 780
- DOB violations
- 7
- ECB violations
- 7
- HPD complaints
- 1,267
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 780
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, east wall, west wall in the bathroom located at apt 2c, 2nd story, 1st apartment from west at north , section ''73''
Aug 27, 2026 · Apt 2C
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall, 2nd window frame from south at west wall in the 3rd room from east located at apt 2c, 2nd story, 1st apartment from west at north , section ''73''
Aug 27, 2026 · Apt 2C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall in the foyer located at apt 2c, 2nd story, 1st apartment from west at north , section ''73''
Aug 27, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). north wall in the foyer located at apt 2c, 2nd story, 1st apartment from west at north , section ''73''
Aug 27, 2026 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the bathroom located at apt 2c, 2nd story, 1st apartment from west at north , section ''73''
Aug 27, 2026 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from south at west wall, 2nd window frame from south at west wall in the 3rd room from east located at apt 2c, 2nd story, 1st apartment from west at north , section ''73''
Aug 27, 2026 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 3rd room from east located at apt 2c, 2nd story, 1st apartment from west at north , section ''73''
Aug 27, 2026 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the kitchen located at apt 2c, 2nd story, 1st apartment from west at north , section ''73''
Aug 27, 2026 · Apt 2C
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the 3rd room from east located at apt 2c, 2nd story, 1st apartment from west at north , section ''73''
Aug 27, 2026 · Apt 2C
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, south wall, east wall in the 3rd room from east located at apt 2c, 2nd story, 1st apartment from west at north , section ''73''
Aug 27, 2026 · Apt 2C
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from north at east wall in the kitchen located at apt 2c, 2nd story, 1st apartment from west at north , section ''73''
Aug 27, 2026 · Apt 2C
Open — Civ14 mailed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .... in the bathroom located at apt 2c, 2nd story, 1st apartment from west at north , section ''73''
Aug 27, 2026 · Apt 2C
Open — Civ14 mailed - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration the drop ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from west at north , section ''73''
Aug 27, 2026 · Apt 2C
Open — Civ14 mailed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from west at north , section ''73''
Aug 27, 2026 · Apt 2C
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from west at north , section ''73''
Aug 27, 2026 · Apt 2C
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, east wall, west wall in the bathroom located at apt 2c, 2nd story, 1st apartment from west at north , section ''73''
Aug 27, 2026 · Apt 2C
Open — Civ14 mailed - BHazardous
Trace and repair the source and abate the visible mold condition... more than 1o square feet at the ceiling, the east wall, west wall, south wall and the north wall in the bathroom located at apt 2c, 2nd story, 1st apartment from west at north , section ''73''
Aug 27, 2026 · Apt 2C
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east at south, the bathroom , the private hallway located at apt 2c, 2nd story, 1st apartment from west at north , section ''73''
Aug 27, 2026 · Apt 2C
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4b, 4th story, 2nd apartment from south at west
Jul 9, 2026 · Apt 4B
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4b, 4th story, 2nd apartment from south at west
Jul 9, 2026 · Apt 4B
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4b, 4th story, 2nd apartment from south at west
Jul 9, 2026 · Apt 4B
Open — Violation will be reinspected - CImmediately hazardous
Properly repair or replace the broken or defective window sash lock at fire escape window in the 1st room from north located at apt 4b, 4th story, 2nd apartment from south at west
Jul 9, 2026 · Apt 4B
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration drywall partition erected from floor to ceiling, subdividing the room and disminishing light in the 4th room from north located at apt 4b, 4th story, 2nd apartment from south at west , section ''73''
May 13, 2026 · Apt 4B
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 4b, 4th story, 2nd apartment from south at west , section ''73''
May 13, 2026 · Apt 4B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 4b, 4th story, 2nd apartment from south at west , section ''73''
May 13, 2026 · Apt 4B
Open — False certification - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the kitchen located at apt 4b, 4th story, 2nd apartment from south at west , section ''73''
May 13, 2026 · Apt 4B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from south at west wall in the kitchen located at apt 4b, 4th story, 2nd apartment from south at west , section ''73''
May 13, 2026 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from south at west wall in the kitchen located at apt 4b, 4th story, 2nd apartment from south at west , section ''73''
May 13, 2026 · Apt 4B
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective sash lock at fire escape window in the 1st room from north located at apt 4b, 4th story, 2nd apartment from south at west , section ''73''
May 13, 2026 · Apt 4B
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 4th story, 2nd apartment from south at west , section ''73'', at north
Apr 17, 2026 · Apt 4B
Open — Not complied with - BHazardous
Refit lower window sash, 1st from south at west wall in the 1st room from north located at apt 4b, 4th story, 2nd apartment from south at west , section ''73'', at north
Apr 17, 2026 · Apt 4B
Open — Not complied with - CImmediately hazardous
M/d law abate the nuisance consisting of key operated lock at door leading to room with fire escape window in the 1st room from north located at apt 4b, 4th story, 2nd apartment from south at west , section ''73'', at north
Apr 17, 2026 · Apt 4B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 4b, 4th story, 2nd apartment from south at west , section ''73'', at north
Apr 17, 2026 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4b, 4th story, 2nd apartment from south at west , section ''73'', at north
Apr 17, 2026 · Apt 4B
Open — Not complied with - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration consisting of dry wall partition erected from floor to ceiling and hence creating additional room and reducing natural light and ventilation in the 4th room from north located at apt 4b, 4th story, 2nd apartment from south at west , section ''73'', at north
Apr 17, 2026 · Apt 4B
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls, ceiling, and wood trims in the entire apartment located at apt 4b, 4th story, 2nd apartment from south at west , section ''73'', at north
Apr 17, 2026 · Apt 4B
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the bathroom located at apt 4b, 4th story, 2nd apartment from south at west , section ''73'', at north
Apr 17, 2026 · Apt 4B
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4b, 4th story, 2nd apartment from south at west , section ''73'', at north
Apr 17, 2026 · Apt 4B
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4b, 4th story, 2nd apartment from south at west , section ''73'', at north
Apr 17, 2026 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame in the foyer located at apt 5d, 5th story, 2nd apartment from west at north , section ''73'', at north
Aug 1, 2025 · Apt 5D
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall, 1st window frame from west at north wall in the 3rd room from east located at apt 5d, 5th story, 2nd apartment from west at north , section ''73'', at north
Aug 1, 2025 · Apt 5D
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the kitchenette located at apt 5d, 5th story, 2nd apartment from west at north , section ''73'', at north
Aug 1, 2025 · Apt 5D
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall, west wall, 1st window frame from west at north wall in the 1st room from east located at apt 5d, 5th story, 2nd apartment from west at north , section ''73'', at north
Aug 1, 2025 · Apt 5D
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door from east at south wall, 1st door frame from east at south wall in the foyer located at apt 5d, 5th story, 2nd apartment from west at north , section ''73'', at north
Aug 1, 2025 · Apt 5D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door, north wall, south wall, east wall, west wall in the foyer located at apt 5d, 5th story, 2nd apartment from west at north , section ''73'', at north
Aug 1, 2025 · Apt 5D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 2nd window frame from west at north wall, east wall, 2nd door frame from north at east wall, north wall in the 3rd room from east located at apt 5d, 5th story, 2nd apartment from west at north , section ''73'', at north
Aug 1, 2025 · Apt 5D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from west at north wall, 2nd window frame from west at north wall in the 1st room from east located at apt 5d, 5th story, 2nd apartment from west at north , section ''73'', at north
Aug 1, 2025 · Apt 5D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from east located at apt 5j, 5th story, 2nd apartment from west at north , section ''61'', at south
Jul 7, 2025 · Apt 5J
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the window casings in the 3rd room from east located at apt 5j, 5th story, 2nd apartment from west at north , section ''61'', at south
Jul 7, 2025 · Apt 5J
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the window stools and casings at the north wall in the 1st room from east located at apt 5j, 5th story, 2nd apartment from west at north , section ''61'', at south
Jul 7, 2025 · Apt 5J
Closed — Violation dismissed
DOB building violations · 7
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2016
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 27, 2016
Dob violation - dismissed - Plumbing none
Full stop work order - access to building to inspection work under job #140286928 denied remedy: stop all work and provide access to dept personnel
May 28, 2015
Dob violation - dismissed - Failure to submit eer none
Failure to submit an energy efficiency report in 2014 per ad. code sec. 28-308.4
Dec 31, 2014
Dob violation - dismissed
ECB violations · 7
- Class - 2
Plumbing work w/o a permit. work noted: 1st fl corridor: front installed water & waste lines for a sink,toiler,shower & clothes washer;rear corridor installed water & waste lines for an open shower,sink & toile
Mar 15, 2016
Resolve - Class - 1
Work w/o a permit:gas piping from osp thru bsmt.insp time:11:30.on 10/30/15, i was granted access to bsmt by super.i observed app 150ft of 2" gas pipe running thru bsmt to osp.a permit was issued to run 4" pipe
Oct 30, 2015
Resolve - Class - 3
Failure to maintain bldg. noted: in apt 5m, observed minor spalling ofplaster ceiling and small crack on wall. also observed small cracks atentrance steps. remedy: repair defects & maintain bldg.
Feb 26, 2014 · Penalty $230
Resolve - Class - 2
Work w/o permit. work noted: portion of living room converted into bedroom w/wood wall & door & locking/keyed hardware. at 3rd fl apt 4i. remedy: obtain permit or restored premise to prior legal condition.
Jul 8, 2013
Resolve - Class - 2
Occupancy contrary to that which is allowed by the dept of building records.noted: portion of living room ara subdivided to create bedroom with enclosure and door. (with keyed entry) bed,dresser, clothes, ster
Jul 8, 2013
Resolve - Class - 2
Failure to maintain bldg in a code complaint manner. noted: the following condition: the rear yard west side has excessive debris consistingof (plastic bags & misc debris) this condition is attractive to vermin
Jul 6, 2013 · Penalty $250
Resolve - Hazardous
Work without a permit. work noted: erected partitions creating four seperate s.r.o. all with entry locks, and with padlock, with full bathrooms, and kitchens fully occupied without first obtaining permit from
Oct 19, 2005
Resolve
Complaints
- Unsanitary condition
Pests
Sep 29, 2026 · Apt 4A
Open - Unsanitary condition
Pests
Sep 29, 2026 · Apt 5A
Open - Electric
No lighting
Sep 29, 2026 · Apt 6A
Open - Unsanitary condition
Pests
Sep 29, 2026 · Apt 6A
Open - General
Cabinet
Aug 19, 2026 · Apt 2C
Close - Paint/plaster
Wall
Aug 19, 2026 · Apt 2C
Close - Plumbing
Basin/sink
Aug 19, 2026 · Apt 2C
Close - Plumbing
Toilet
Aug 19, 2026 · Apt 2C
Close - Door/window
Door
Aug 19, 2026 · Apt 2C
Close - Appliance
Electric/gas range
Aug 19, 2026 · Apt 2C
Close
Show 40 more ↓
- Electric
Wiring
Aug 19, 2026 · Apt 2C
Close - Unsanitary condition
Mold
Aug 19, 2026 · Apt 2C
Close - Paint/plaster
Ceiling
Aug 19, 2026 · Apt 2C
Close - Door/window
Window frame
Aug 19, 2026 · Apt 2C
Close - General
Cabinet
Aug 19, 2026 · Apt 2C
Close - Paint/plaster
Ceiling
Aug 19, 2026 · Apt 2C
Close - Unsanitary condition
Mold
Aug 6, 2026 · Apt 5J
Close - Door/window
Window frame
Jun 15, 2026 · Apt 4B
Close - Door/window
Window pane
Jun 15, 2026 · Apt 4B
Close - Flooring/stairs
Floor
Jun 15, 2026 · Apt 4B
Close - Door/window
Door
Jun 15, 2026 · Apt 4B
Close - Unsanitary condition
Pests
Jun 15, 2026 · Apt 4B
Close - Flooring/stairs
Floor
May 5, 2026 · Apt 4B
Close - Unsanitary condition
Pests
May 5, 2026 · Apt 4B
Close - Door/window
Door
May 5, 2026 · Apt 4B
Close - Door/window
Door
May 5, 2026 · Apt 4B
Close - Safety
Fire escape
May 5, 2026 · Apt 4B
Close - Paint/plaster
Wall
May 5, 2026 · Apt 4B
Close - Water leak
Heavy flow
May 5, 2026 · Apt 4B
Close - Plumbing
Toilet
May 5, 2026 · Apt 4B
Close - Plumbing
Bathtub/shower
May 5, 2026 · Apt 4B
Close - Door/window
Window frame
May 5, 2026 · Apt 4B
Close - Paint/plaster
Wall
Apr 8, 2026 · Apt 4B
Close - Door/window
Door
Apr 8, 2026 · Apt 4B
Close - Plumbing
Bathtub/shower
Apr 8, 2026 · Apt 4B
Close - Unsanitary condition
Pests
Apr 8, 2026 · Apt 4B
Close - Plumbing
Basin/sink
Apr 8, 2026 · Apt 4B
Close - Flooring/stairs
Floor
Apr 8, 2026 · Apt 4B
Close - Unsanitary condition
Pests
Apr 8, 2026 · Apt 4B
Close - Water leak
Heavy flow
Apr 8, 2026 · Apt 4B
Close - Paint/plaster
Wall
Apr 8, 2026 · Apt 4B
Close - Safety
Fire escape
Apr 8, 2026 · Apt 4B
Close - Plumbing
Toilet
Apr 8, 2026 · Apt 4B
Close - Door/window
Window frame
Apr 8, 2026 · Apt 4B
Close - Door/window
Door
Apr 8, 2026 · Apt 4B
Close - Door/window
Door
Apr 8, 2026 · Apt 4B
Close - Plumbing
Bathtub/shower
Mar 25, 2026 · Apt 4B
Close - Door/window
Window frame
Mar 25, 2026 · Apt 4B
Close - Paint/plaster
Wall
Mar 25, 2026 · Apt 4B
Close - Door/window
Door
Mar 25, 2026 · Apt 4B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1923
- Floors
- 5
- Residential units
- 72
- Building area
- 52,920 ft²
- Lot area
- 15,000 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2174 / 105
- Assessed value
- $1,523,250
- Landmark / historic district
- No
HPD registration #122999, last renewed Sep 9, 2025.
Questions about 61 Ellwood Street
Who owns 61 Ellwood Street?
The owner of record in NYC Department of City Planning PLUTO data is 61-73 Ellwood Realty LLC.
Does 61 Ellwood Street have violations?
Yes. NYC HPD has recorded 780 housing violations at this property.
Is 61 Ellwood Street rent stabilized?
NYC Department of Finance tax bills listed 72 rent-stabilized units here in 2024 (about 100% of its 72 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 61 Ellwood Street built?
City records list 1923 as the year it was built.
How many apartments are in 61 Ellwood Street?
It has 72 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.