90 Ellwood Street
Manhattan, NY 10040BBL 1-02172-0041Map
Owner of record: Gvs Properties IV, LLC
90 Ellwood Street is a walk-up apartment building built in 1925 in Manhattan, 10040. It has 61 residential units across 5 floors. The owner of record is Gvs Properties IV, LLC. HPD has recorded 822 housing violations here, most recently on October 5, 2026. 21 of the 50 most recent violations are still open. City tax records listed 53 rent-stabilized apartments here in 2024.
- HPD violations
- 822
- DOB violations
- 9
- ECB violations
- 11
- HPD complaints
- 1,525
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 822
- BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 9e, 5th story, 1st apartment from west at north
Oct 5, 2026 · Apt 9E
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum the maximum temperature of 130 degrees in the kitchen located at apt 9e, 5th story, 1st apartment from west at north
Oct 5, 2026 · Apt 9E
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door , 1st story
Sep 28, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 9e, 5th story, 1st apartment from south at west
Aug 20, 2026 · Apt 9E
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door at basement locked. at boiler room
Aug 20, 2026
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 9e, 5th story, 1st apartment from west at north
Aug 16, 2026 · Apt 9E
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 9e, 5th story, 1st apartment from west at north
Aug 16, 2026 · Apt 9E
Open — First no access to re- inspect violation - BHazardous
Abate the nuisance consisting of pests. evidence of flies in the entire apartment located at apt 9e, 5th story, 1st apartment from west at north
Aug 16, 2026 · Apt 9E
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4e, 5th story, 1st apartment from south at west
Aug 16, 2026 · Apt 4E
Open — Violation will be reinspected - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4e, 5th story, 1st apartment from south at west
Aug 16, 2026 · Apt 4E
Open — Violation will be reinspected
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4e, 5th story, 1st apartment from south at west
Aug 16, 2026 · Apt 4E
Open — Violation will be reinspected - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at basement
Aug 16, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at public hall, 1st story
Aug 3, 2026
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 9e, 5th story, 1st apartment from west at north
Jul 28, 2026 · Apt 9E
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door to basement locked. at boiler room
Jul 28, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 9e, 5th story, 1st apartment from south at west
May 3, 2026 · Apt 9E
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement at boiler room
May 3, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective mechanical stopper at bathtub in the bathroom located at apt 9e, 5th story, 1st apartment from west at north
Feb 27, 2026 · Apt 9E
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system locked door at basement at boiler room
Feb 27, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 9e, 5th story, 1st apartment from west at north
Feb 27, 2026 · Apt 9E
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 9e, 5th story, 1st apartment from west at north
Jan 15, 2026 · Apt 9E
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 9e, 5th story, 1st apartment from south at west
Jan 10, 2026 · Apt 9E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mechanical stopper at bathtub in the bathroom located at apt 9e, 5th story, 1st apartment from west at north
Jan 8, 2026 · Apt 9E
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 9e, 5th story, 1st apartment from west at north
Jan 8, 2026 · Apt 9E
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 9e, 5th story, 1st apartment from south at west
Dec 15, 2025 · Apt 9E
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door , 1st story
Nov 18, 2025
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots at 3rd story balcony at building front at 1st fire escape from south at east at fire escape
Sep 28, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at south wall in the bathroom located at apt 12b, 2nd story, 1st apartment from south at west , section ''north''
Sep 22, 2025 · Apt 12B
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at ceiling and all walls in the bathroom located at apt 12b, 2nd story, 1st apartment from south at west , section ''north''
Sep 22, 2025 · Apt 12B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 12b, 2nd story, 1st apartment from south at west , section ''north''
Sep 22, 2025 · Apt 12B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 12b, 2nd story, 1st apartment from south at west , section ''north''
Sep 22, 2025 · Apt 12B
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 12b, 2nd story, 1st apartment from north at east
Sep 14, 2025 · Apt 12B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 12b, 2nd story, 1st apartment from north at east
Sep 14, 2025 · Apt 12B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 12b, 2nd story, 1st apartment from north at east
Sep 14, 2025 · Apt 12B
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color north and south walls in the bathroom located at apt 12b, 2nd story, 1st apartment from north at east
Sep 14, 2025 · Apt 12B
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at north and south walls in the bathroom located at apt 12b, 2nd story, 1st apartment from north at east
Sep 14, 2025 · Apt 12B
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department north wall at public hall stairs, 4th story, section ''south''
Aug 16, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at building entrance window sash
Aug 16, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective wired glass pane at lower window sash at intermiediate landing at public hall, 5th story, section ''south''
Aug 16, 2025
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 3rd story balcony at 2nd fire escape from south at west on building front
Aug 16, 2025
Open — Not complied with - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 3rd story balcony at 1st. fire escape from south at west on building front
Aug 16, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set assembly at bulkhead door, roof , section ''north''
Aug 16, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at north wall at public hall stairs, 4th story, section ''south''
Aug 16, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at the fire door leading to the north yard at public hall, 1st story, section ''west''
Aug 16, 2025
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4e, 5th story, 1st apartment from south at west , section at southeast
Jul 29, 2025 · Apt 4E
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq. ft. at the north wall in the 2nd room from north located at apt 4e, 5th story, 1st apartment from south at west , section at southeast
Jul 29, 2025 · Apt 4E
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in waste line at the bathtub in the bathroom located at apt 4e, 5th story, 1st apartment from south at west , section at southeast
Jul 29, 2025 · Apt 4E
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective wired glass pane at lower window sash at intermediate landing at public hall stairs, 5th story
Jun 10, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective glass pane at sidelite at building front entrance , 1st story
Jun 2, 2025
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling in the bathroom located at apt 9b, 2nd story, 1st apartment from south at west
Jun 2, 2025 · Apt 9B
Closed — Violation closed
DOB building violations · 9
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 30, 2022
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 30, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 8, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 8, 2013
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 11
- Class - 1
Failure to maintain building in code complaint manner i observed in the basement gas meter room being used as a storage room, repair and/replace
Jan 3, 2022 · Penalty $1,250
Resolve - Class - 1
Work without a permit i observed on the floor apartment 4d installed new gas piping and gas valve behind stove work done 100 percent, obtain permit
Jan 3, 2022 · Penalty $2,500
Resolve - Class - 2
Work without a permit. noted: in apt #5a on first floor, construction work in progress, removal of non fire rated wall finishes, installation of new partitions and drop ceiling., obtain all permits; put back fi
Oct 28, 2019 · Penalty $1,250
Resolve - Class - 1
Work without a permit. noted: in apt # 5a on first floor electrical work, rewiring entire apartment, new electrical panel. 30 receptacles total. 100% electrical work completed., obtain permit
Oct 28, 2019 · Penalty $1,250
Resolve - Class - 1
Work w/o a permit: installation of gas piping in cellar.inspec time: 9:50.on 9-8-15,i inspected above cited premises.i observed in basementthe gas meter for the boiler had a tee installed to feed gas to super
Sep 8, 2015 · Penalty $1,600
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in nov #35010751h issued on 2.8.13. erected partition, 16' x 8' approx in bsmt w/o a permit. remedy: comply w/the commissioner's order.
Apr 19, 2013 · Penalty $2,400
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c/c w/the dob for nov #35010750x issued on 2.8.13 pursuant to 28-204.4& 1rcny 102-0 2-01. remedy: file a c/c.
Apr 19, 2013 · Penalty $400
Resolve - Class - 1
Work w/o a permit. noted in basement,in corridor a partition has been erected ffrom wall to wall & floor to ceiling. approx 16'x 8'. dept records indicate no permits were issued for work. remedy: obtain permit
Feb 8, 2013 · Penalty $1,600
Resolve - Class - 1
Failure to provide unobstructed exit passageway. noted: in basement corridor a partition hass been constructed obstructing exit to rear of bldg. remedy: remove obstruction.
Feb 8, 2013 · Penalty $1,200
Resolve - Class - 2
At 6th floor defective lintels in various locations also defective alumnu capping hanging in various locations rem; make all repairs in safe and lawful manner
May 1, 2011 · Penalty $500
Resolve
Show 1 more ↓
- Hazardous
Fail to maintain exterior bldgs wall *haz*. noted: at parapet walls facing ellwood st. & main entranc to bldg - precast masonary cracked, spalled displaced & dislodged w/port falling to sidewalk.
Jul 3, 2006 · Penalty $800
Resolve
Complaints
- Flooring/stairs
Floor
Oct 5, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
Oct 5, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
Oct 2, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
Sep 29, 2026 · Apt 9E
Close - Flooring/stairs
Floor
Sep 28, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
Sep 28, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
Sep 27, 2026 · Apt 9E
Close - Flooring/stairs
Floor
Sep 26, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
Sep 26, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
Sep 25, 2026 · Apt 9E
Close
Show 40 more ↓
- Flooring/stairs
Floor
Sep 25, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
Sep 23, 2026 · Apt 9E
Close - Heat/hot water
Entire building
Sep 11, 2026 · Apt BLDG
Close - Plumbing
Water supply
Aug 25, 2026 · Apt 9E
Close - Unsanitary condition
Pests
Aug 25, 2026 · Apt 9E
Close - Unsanitary condition
Pests
Aug 25, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
Aug 19, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
Aug 18, 2026 · Apt 9E
Close - Plumbing
Water supply
Aug 17, 2026 · Apt 9E
Close - Unsanitary condition
Pests
Aug 17, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
Aug 17, 2026 · Apt 9E
Close - Plumbing
Water supply
Aug 15, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
Aug 15, 2026 · Apt 9E
Close - Plumbing
Water supply
Aug 15, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
Aug 1, 2026 · Apt 9E
Close - Unsanitary condition
Pests
Jul 30, 2026 · Apt 9E
Close - Unsanitary condition
Pests
Jul 30, 2026 · Apt 9E
Close - Water leak
Heavy flow
Jul 29, 2026 · Apt 4E
Close - Heat/hot water
Apartment only
Jul 29, 2026 · Apt 9E
Close - Unsanitary condition
Pests
Jul 29, 2026 · Apt 4E
Close - Unsanitary condition
Pests
Jul 29, 2026 · Apt 4E
Close - Flooring/stairs
Floor
Jul 28, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
Jul 27, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
Jul 25, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
Jul 22, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
Jul 22, 2026 · Apt 9E
Close - Plumbing
Water supply
Jul 22, 2026 · Apt 9E
Close - Heat/hot water
Entire building
Jul 7, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
Jun 30, 2026 · Apt APT9E
Close - Heat/hot water
Apartment only
Jun 16, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
May 3, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
May 3, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
May 2, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
May 2, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
Apr 24, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
Apr 24, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
Apr 12, 2026 · Apt 9E
Close - Heat/hot water
Apartment only
Apr 7, 2026 · Apt 9E
Close - Unsanitary condition
Pests
Apr 2, 2026 · Apt 9E
Close - Unsanitary condition
Pests
Apr 2, 2026 · Apt 9E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1925
- Floors
- 5
- Residential units
- 61
- Building area
- 51,345 ft²
- Lot area
- 15,600 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2172 / 41
- Assessed value
- $987,300
- Landmark / historic district
- No
HPD registration #111005, last renewed Jul 17, 2026.
Questions about 90 Ellwood Street
Who owns 90 Ellwood Street?
The owner of record in NYC Department of City Planning PLUTO data is Gvs Properties IV, LLC.
Does 90 Ellwood Street have violations?
Yes. NYC HPD has recorded 822 housing violations at this property.
Is 90 Ellwood Street rent stabilized?
NYC Department of Finance tax bills listed 53 rent-stabilized units here in 2024 (about 87% of its 61 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 90 Ellwood Street built?
City records list 1925 as the year it was built.
How many apartments are in 90 Ellwood Street?
It has 61 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.