28 Ellwood Street
Manhattan, NY 10040BBL 1-02171-0032Map
Owner of record: Maye 2830 Ellwood LLC
28 Ellwood Street is an elevator apartment building built in 1940 in Manhattan, 10040. It has 52 residential units across 6 floors. The owner of record is Maye 2830 Ellwood LLC. HPD has recorded 554 housing violations here, most recently on June 23, 2026. 17 of the 50 most recent violations are still open. City tax records listed 50 rent-stabilized apartments here in 2024.
- HPD violations
- 554
- DOB violations
- 24
- ECB violations
- 19
- HPD complaints
- 581
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 554
- BHazardous
Properly repair with similar material the broken or defective reglaze the procelain enemal finish at the bathtub in the bathroom located at apt 3g, 3rd story, 3rd apartment from east at south
Jun 23, 2026 · Apt 3G
Open — Civ14 mailed - ANon-hazardous
Properly repair or replace the broken or defective grout around bathtub in the bathroom located at apt 3g, 3rd story, 3rd apartment from east at south
Jun 23, 2026 · Apt 3G
Open — Nov certified on time - ANon-hazardous
Cleanse to the satisfaction of this department the mold around metal window frame in the kitchen located at apt 3g, 3rd story, 3rd apartment from east at south
Jun 23, 2026 · Apt 3G
Open — Civ14 mailed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 3g, 3rd story, 3rd apartment from east at south
Jun 23, 2026 · Apt 3G
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 3g, 3rd story, 3rd apartment from east at south
May 20, 2026 · Apt 3G
Open — False certification - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3g, 3rd story, 3rd apartment from east at south
May 20, 2026 · Apt 3G
Open — False certification - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3g, 3rd story, 3rd apartment from east at south
May 20, 2026 · Apt 3G
Open — False certification - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30sq feet at ceiling in the bathroom located at apt 3g, 3rd story, 3rd apartment from east at south
May 20, 2026 · Apt 3G
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective grout at bathtub area at east, west and north walls in the bathroom located at apt 2g, 2nd story, 3rd apartment from east at south
May 5, 2026 · Apt 2G
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective escutcheon plate at top of heat riser in the bathroom located at apt 2g, 2nd story, 3rd apartment from east at south
May 5, 2026 · Apt 2G
Closed — Violation closed
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls in the foyer located at apt 2g, 2nd story, 3rd apartment from east at south
May 5, 2026 · Apt 2G
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 2g, 2nd story, 3rd apartment from east at south
May 5, 2026 · Apt 2G
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 2g, 2nd story, 3rd apartment from east at south
May 5, 2026 · Apt 2G
Open — False certification - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2g, 2nd story, 3rd apartment from east at south
May 5, 2026 · Apt 2G
Open — False certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the private hallway located at apt 2g, 2nd story, 3rd apartment from east at south
May 5, 2026 · Apt 2G
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation at heat riser in the bathroom located at apt 2g, 2nd story, 3rd apartment from east at south
May 5, 2026 · Apt 2G
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 square feet at ceiling and west wall in the bathroom located at apt 2g, 2nd story, 3rd apartment from east at south
May 5, 2026 · Apt 2G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the 3rd room from north at west located at apt 2h, 2nd story, 4th apartment from east at south
Apr 29, 2026 · Apt 2H
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective cabinet base at sink in the bathroom located at apt 2h, 2nd story, 4th apartment from east at south
Apr 29, 2026 · Apt 2H
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color in closet at west wall in the 1st room from north at west located at apt 2h, 2nd story, 4th apartment from east at south
Apr 29, 2026 · Apt 2H
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material in closet at west wall in the 1st room from north at west located at apt 2h, 2nd story, 4th apartment from east at south
Apr 29, 2026 · Apt 2H
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceilings in the 1st room from north at west located at apt 2h, 2nd story, 4th apartment from east at south
Apr 29, 2026 · Apt 2H
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2h, 2nd story, 4th apartment from east at south
Apr 29, 2026 · Apt 2H
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2h, 2nd story, 4th apartment from east at south
Apr 29, 2026 · Apt 2H
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceilings in the kitchen located at apt 2h, 2nd story, 4th apartment from east at south
Apr 29, 2026 · Apt 2H
Open — Civ14 mailed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 29, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2h, 2nd story, 4th apartment from east at south
Apr 29, 2026 · Apt 2H
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at south wall in the kitchen located at apt 5e, 6th story, 1st apartment from east at south
Jan 23, 2026 · Apt 5E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen located at apt 5e, 6th story, 1st apartment from east at south
Jan 23, 2026 · Apt 5E
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 5e, 5th story, 2nd apartment from west at north
Jan 14, 2026 · Apt 5E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchen located at apt 5e, 5th story, 2nd apartment from west at north
Jan 14, 2026 · Apt 5E
Closed — Violation dismissed - BHazardous
Replace with new the missing cabinet at south wall in the kitchen located at apt 5e, 5th story, 2nd apartment from west at north
Jan 14, 2026 · Apt 5E
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door , 1st story
Jan 12, 2026
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north , section at west
Dec 26, 2025 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from west at north , section at west
Dec 26, 2025 · Apt 2A
Closed — Violation closed - BHazardous
Repair the broken or defective connection drain pipe at sink in the kitchen located at apt 3g, 3rd story, 1st apartment from south at west
Oct 28, 2025 · Apt 3G
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 3g, 3rd story, 1st apartment from south at west
Oct 28, 2025 · Apt 3G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3g, 3rd story, 1st apartment from south at west
Oct 28, 2025 · Apt 3G
Closed — Violation dismissed - BHazardous
Refit door in the entrance located at apt 3g, 3rd story, 1st apartment from south at west
Oct 28, 2025 · Apt 3G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3g, 3rd story, 1st apartment from south at west
Oct 28, 2025 · Apt 3G
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... more than 1o sq at ceiling in the bathroom located at apt 3g, 3rd story, 1st apartment from south at west
Oct 28, 2025 · Apt 3G
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the entire apartment located at apt 3g, 3rd story, 1st apartment from south at west
Oct 28, 2025 · Apt 3G
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at throughout yard
Aug 20, 2025
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at rear yard
Aug 20, 2025
Closed — Violation dismissed - ANon-hazardous
Repair leaky water closet flush pipe connection .. in the bathroom located at apt 3g, 3rd story, 3rd apartment from south at west
Aug 11, 2025 · Apt 3G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3g, 3rd story, 3rd apartment from south at west
Aug 11, 2025 · Apt 3G
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall and ceiling in the 1st room from north located at apt 3g, 3rd story, 3rd apartment from south at west
Aug 11, 2025 · Apt 3G
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective balancing spring at upper window sash at west wall in the 1st room from north located at apt 3g, 3rd story, 3rd apartment from south at west
Aug 11, 2025 · Apt 3G
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 3g, 3rd story, 3rd apartment from south at west
Aug 11, 2025 · Apt 3G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the 1st room from north located at apt 3g, 3rd story, 3rd apartment from south at west
Aug 11, 2025 · Apt 3G
Closed — Violation dismissed
DOB building violations · 24
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 2, 2014
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7c technical report by 02/21/2013
Dec 31, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 21, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 12, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 23, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 17, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 19, 2008
Dob violation - resolved
Show 14 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Oct 31, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 18, 2004
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Elevator elevatorrequired
1p20640
Apr 25, 2003
Dob violation - resolved - Facade facade required
L1198-local law 11/98 - facade facade required
Aug 8, 2002
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 19, 2002
Dob violation - dismissed - Elevator elevatorrequired
1p20640
Jan 11, 2002
Dob violation - resolved - Elevator elevatorrequired
1p20640
Jan 23, 2001
Dob violation - resolved - Elevator elevatorrequired
1p20640
Dec 12, 1999
Dob violation - resolved - Elevator elevatorrequired
1p20640
Dec 1, 1999
Dob violation - resolved - Elevator elevatorrequired
1p20640
Jan 12, 1999
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 20, 1994
Dob violation - active - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
May 31, 1994
Dob violation - dismissed
ECB violations · 19
- Class - 2
Sidewalk shed erected under job#140368965 along exp1 & 2 on exp1 has inoperable bulbs rendering affected areas visibly dark & shadowy creating a potential risk to public safety.rem comply w/ code
Dec 29, 2015
Resolve - Class - 2
Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat
Jan 5, 2015 · Penalty $800
Resolve - Class - 2
Failure to maintain exterior bldg east elevation, exp #1 observe bending and deteriorating in lintel facade; blocks of wood under a/c units:flower pot store on fire escape landing. remedy:maintain exterior bldg
Nov 26, 2013 · Penalty $500
Resolve - Class - 2
97r07,45r07. illegal operation:operating a device w/o a certificate ofcompliance or ebn-1202 rmdy: contact nyc dob schedule a test appointment for ebn 1202-13.(device was used for the public before the acceptan
Jul 9, 2013
Resolve - Class - 3
Work w/o a permit. work noted: installed partition w/door between kitchen & dining room in apt 6h. remedy: restore to prior legal condition.
Jun 21, 2011
Resolve - Class - 2
08v01,16l01,21q03,39x10,40y02,70o02,77x10.(16l01)adjust 4 flr hoistway door so that the elevator dont stop when door is pulled.(21q03)install cover for the 3 flr interlock.(39x10)repair light top of car.(40y02)
Oct 22, 2010
Resolve - Class - 2
05j01,70o02,56y13,56o02. 05j01-adjust gap between cab door & strickpost.
Jul 7, 2010
Resolve - Class - 3
70o02.70o02 clean pit
Oct 7, 2008
Resolve - Hazardous
1b10/2b10/60t7/59m7/55y13/51o2/86bb5/58e1/39i10/20i10/5i10/38o2/38m7/28m7/5b10/66o2/.1,2b-barley audible alarm.60t-provide co.info for main line.59m-motor room light missing.55y-hoist motor leak-seal.51o-clean
Aug 7, 2007
Resolve - Non-hazardous
01x07/02x07/11d07/05i10/16b01 01-repair emg stop switch alarm bell in car 11-secure car station 5-repair car door 16-adjust 5th flfloor hoistway door for proper closing
Jan 25, 2005
Resolve
Show 9 more ↓
- Non-hazardous
16j01 38p16 66p16 71p16 16-adjust at lobby level interlock contact breaks when door is pulled. 38-provide 66-provide 71-provide
Jun 17, 2003
Resolve - Non-hazardous
51b12,8v1,21q3,41g10,55y13,85b1,60t15,41q3,16b1,84m7,34q3,31h11,32h11,32o2,33o2,38o2,39o2,66o2,67o2,68o2,71o2,12b10. 51- reshackle as per code 21 where needed 85 as per code 1002.3 60 company name main line 41
Jun 3, 2003
Resolve - Non-hazardous
46b13/ 75#05/ 57o02/ 46 reshackle as per code 75 - 5yr past due ( 6 -96)
Feb 6, 2002
Resolve - Non-hazardous
3m7/ 15l11/ 23u16/ 25q3/ 35y2/ 37g12/ 50y14/ 53x11/ 57o2/ 75u5/ 3m7 = capacity plate 15l11 = slams 2 & 5th floors 37g12 = #s 4 to 8 fuses
Dec 7, 2001
Resolve - Hazardous
Failure to maintain exterior building wall noted on east and north elevations.improperly supported/unsafe window mounted a/c units overlooking public walkways.remedy:make area safe take precautions to protect t
May 18, 2001
Resolve - Non-hazardous
52m12-replace missing machine brake and file for acceptance test.
Nov 29, 2000
Resolve - Non-hazardous
17b12,36m12,75r05,30oo2,62o02,15b07,53b07. 17- replace car door visionglass, 36- replace missing m.r. door. 75- perform required five year tests. 30-62- clean down hoistway and under car platform. 15- put all
Apr 14, 2000 · Penalty $350
Resolve - Non-hazardous
11q57o73o50y21ix01 #73 clean intire shaft pit, top of car #21 repair hall indicator
May 23, 1997 · Penalty $100
Resolve - Non-hazardous
21x,20d,14q,11q,36w,50y,57o,1t,2t,22d,74x,53b,74y,35y. 74- work sight 74-top car.
Dec 20, 1994
Resolve
Complaints
- Unsanitary condition
Mold
Jun 22, 2026 · Apt 3G
Close - Flooring/stairs
Floor
Jun 22, 2026 · Apt 3G
Close - Paint/plaster
Wall
Jun 22, 2026 · Apt 3G
Close - Paint/plaster
Ceiling
Jun 22, 2026 · Apt 3G
Close - Unsanitary condition
Mold
May 18, 2026 · Apt 3G
Close - Flooring/stairs
Floor
May 18, 2026 · Apt 3G
Close - Unsanitary condition
Pests
May 18, 2026 · Apt 3G
Close - Plumbing
Bathtub/shower
May 18, 2026 · Apt 3G
Close - Flooring/stairs
Floor
May 13, 2026 · Apt A1BASE
Close - Safety
Smoke detector
Apr 28, 2026 · Apt 2H
Close
Show 40 more ↓
- Paint/plaster
Wall
Apr 28, 2026 · Apt 2H
Close - Water leak
Heavy flow
Apr 28, 2026 · Apt 2G
Close - Unsanitary condition
Mold
Apr 28, 2026 · Apt 2G
Close - Paint/plaster
Ceiling
Apr 28, 2026 · Apt 2H
Close - Paint/plaster
Ceiling
Apr 28, 2026 · Apt 2H
Close - Water leak
Slow leak
Apr 28, 2026 · Apt 2H
Close - Heat/hot water
Entire building
Mar 24, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 10, 2026 · Apt A2
Close - Flooring/stairs
Floor
Feb 10, 2026 · Apt A2
Close - Paint/plaster
Wall
Feb 10, 2026 · Apt A2
Close - Unsanitary condition
Pests
Feb 10, 2026 · Apt A2
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 31, 2026 · Apt BLDG
Close - Water leak
Slow leak
Jan 15, 2026 · Apt 5E
Close - Paint/plaster
Ceiling
Jan 15, 2026 · Apt 5E
Close - Paint/plaster
Wall
Jan 15, 2026 · Apt 5E
Close - Unsanitary condition
Mold
Jan 15, 2026 · Apt 5E
Close - Unsanitary condition
Pests
Jan 14, 2026 · Apt A2
Close - Flooring/stairs
Floor
Jan 14, 2026 · Apt A2
Close - General
Cabinet
Jan 14, 2026 · Apt A2
Close - Paint/plaster
Wall
Jan 14, 2026 · Apt A2
Close - Paint/plaster
Wall
Jan 14, 2026 · Apt A2
Close - Flooring/stairs
Floor
Jan 14, 2026 · Apt A2
Close - Unsanitary condition
Garbage/recycling storage
Jan 14, 2026 · Apt A2
Close - Unsanitary condition
Mold
Jan 12, 2026 · Apt 5E
Close - Paint/plaster
Ceiling
Jan 12, 2026 · Apt 5E
Close - Paint/plaster
Wall
Jan 12, 2026 · Apt 5E
Close - Water leak
Heavy flow
Jan 12, 2026 · Apt 5E
Close - General
Cabinet
Jan 12, 2026 · Apt 5E
Close - Heat/hot water
Entire building
Dec 29, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2025 · Apt 2A
Close - Heat/hot water
Entire building
Dec 8, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
Oct 21, 2025 · Apt 3G
Close - Unsanitary condition
Pests
Oct 21, 2025 · Apt 3G
Close - Door/window
Door
Oct 21, 2025 · Apt 3G
Close - Unsanitary condition
Pests
Oct 21, 2025 · Apt 3G
Close - Flooring/stairs
Floor
Oct 21, 2025 · Apt 3G
Close - Plumbing
Basin/sink
Oct 21, 2025 · Apt 3G
Close - Plumbing
Basin/sink
Oct 21, 2025 · Apt 3G
Close - Unsanitary condition
Mold
Jul 8, 2025 · Apt 4A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1940
- Floors
- 6
- Residential units
- 52
- Building area
- 43,248 ft²
- Lot area
- 10,000 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2171 / 32
- Assessed value
- $1,392,300
- Landmark / historic district
- No
HPD registration #107802, last renewed Sep 15, 2025.
Questions about 28 Ellwood Street
Who owns 28 Ellwood Street?
The owner of record in NYC Department of City Planning PLUTO data is Maye 2830 Ellwood LLC.
Does 28 Ellwood Street have violations?
Yes. NYC HPD has recorded 554 housing violations at this property.
Is 28 Ellwood Street rent stabilized?
NYC Department of Finance tax bills listed 50 rent-stabilized units here in 2024 (about 96% of its 52 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 28 Ellwood Street built?
City records list 1940 as the year it was built.
How many apartments are in 28 Ellwood Street?
It has 52 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.