362 Wadsworth Avenue
Manhattan, NY 10040BBL 1-02170-0271Map
Owner of record: Fansam Properties LLC
362 Wadsworth Avenue is a walk-up apartment building built in 1917 in Manhattan, 10040. It has 26 residential units across 5 floors. The owner of record is Fansam Properties LLC. HPD has recorded 328 housing violations here, most recently on September 10, 2026. 13 of the 50 most recent violations are still open. City tax records listed 25 rent-stabilized apartments here in 2024.
- HPD violations
- 328
- DOB violations
- 5
- ECB violations
- 7
- HPD complaints
- 723
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 328
- BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household storage at balcony at 3rd story 1st from south at building front at fire escape
Sep 10, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door at public hall, 1st story
Aug 29, 2026
Open — Violation will be reinspected - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door , 1st story
Aug 18, 2026
Open — Nov certified late - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly at vestibule door , 1st story
Aug 18, 2026
Open — Nov certified on time - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at at front yard
Jun 3, 2026
Open — Invalid certification - BHazardous
Properly repair with similar material the broken or defective wood floor in the foyer located at bsmt-apt 56b, 1st bsmt-apt from east at south
May 29, 2026 · Apt 56B
Closed — Violation dismissed - ANon-hazardous
Properly repair or replace the broken or defective rotted lower wood bottom shelf at the sink based vanity in the bathroom located at bsmt-apt 56b, 1st bsmt-apt from east at south
May 29, 2026 · Apt 56B
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at bsmt-apt 56b, 1st bsmt-apt from east at south
May 29, 2026 · Apt 56B
Closed — Violation dismissed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Mar 31, 2026
Closed — Violation dismissed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the household and construction materials storage at public hall, 1st story
Mar 31, 2026
Closed — Violation closed
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building front entrance door at public hall, 1st story
Mar 18, 2026
Closed — Violation closed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Mar 18, 2026
Closed — Violation closed - ANon-hazardous
Repair leaky water closet flush pipe connection .. in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Feb 14, 2026 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective shut off valve at radiator in the 1st room from north located at apt 1, 1st story, 1st apartment from east at south
Feb 14, 2026 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective missing outlet cover at south wall in the 2nd room from north at east located at apt 1, 1st story, 1st apartment from east at south
Feb 14, 2026 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective missing cover at electrical outlet at north wall in the 1st room from north located at apt 1, 1st story, 1st apartment from east at south
Feb 14, 2026 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at cellar at 1st boiler room from north
Feb 4, 2026
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color east wall and west wall in the bathroom located at apt 1, 1st story, 1st apartment from east at south
Feb 4, 2026 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash at west wall. in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Feb 4, 2026 · Apt 1
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Feb 4, 2026 · Apt 1
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 1, 1st story, 1st apartment from east at south
Feb 4, 2026 · Apt 1
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from east at south
Feb 4, 2026 · Apt 1
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective inoperable hinges at door in the entrance located at apt 1, 1st story, 1st apartment from east at south
Feb 4, 2026 · Apt 1
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of standing ac at public hall, 5th story
Aug 22, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the 2nd room from east at south located at apt 42, 4th story, 2nd apartment from west at north
Jul 10, 2025 · Apt 42
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 2nd room from east at south located at apt 42, 4th story, 2nd apartment from west at north
Jul 10, 2025 · Apt 42
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the foyer located at apt 42, 4th story, 2nd apartment from west at north
Jul 10, 2025 · Apt 42
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 2nd room from east at south located at apt 42, 4th story, 2nd apartment from west at north
Jul 10, 2025 · Apt 42
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the 1st room from east at south located at apt 42, 4th story, 2nd apartment from west at north
Jul 10, 2025 · Apt 42
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 42, 4th story, 2nd apartment from west at north
Jul 10, 2025 · Apt 42
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall in the 1st room from east at south located at apt 42, 4th story, 2nd apartment from west at north
Jul 10, 2025 · Apt 42
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 42, 4th story, 2nd apartment from west at north
Jul 10, 2025 · Apt 42
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 42, 4th story, 2nd apartment from west at north
Jul 10, 2025 · Apt 42
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 1st room from east at north located at apt 42, 4th story, 2nd apartment from west at north
Jul 10, 2025 · Apt 42
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 42, 4th story, 2nd apartment from west at north
Jul 10, 2025 · Apt 42
Closed — Violation dismissed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 35, 3rd story, 1st apartment from east at south
Jun 9, 2025 · Apt 35
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2, 1st story, 2nd apartment from east at south
Jun 9, 2025 · Apt 2
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 42, 4th story, 2nd apartment from west at north
Jun 9, 2025 · Apt 42
Open — Nov sent out - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Apr 14, 2025
Open — Nov sent out - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Apr 14, 2025
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 55, 5th story, 1st apartment from south at west
Mar 4, 2025 · Apt 55
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective intercommunication system from building entrance to panel at south wall in the private hallway located at apt 55, 5th story, 1st apartment from south at west
Mar 4, 2025 · Apt 55
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective closet door frame in the 1st room from north at east located at apt 55, 5th story, 1st apartment from south at west
Mar 4, 2025 · Apt 55
Closed — Violation dismissed - BHazardous
Refit lowers sash at window at north in the 1st room from north at east located at apt 55, 5th story, 1st apartment from south at west
Mar 4, 2025 · Apt 55
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from north at east located at apt 55, 5th story, 1st apartment from south at west
Mar 4, 2025 · Apt 55
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department window sill at north in the 1st room from north at east located at apt 55, 5th story, 1st apartment from south at west
Mar 4, 2025 · Apt 55
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical outlet at south wall in the kitchen located at apt 55, 5th story, 1st apartment from south at west
Mar 4, 2025 · Apt 55
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of construction materials under the staircase at public hall, 1st story
Feb 19, 2025
Open — Not complied with - BHazardous
Remove all encumbrances consisting of construction materials at public hall, 1st story
Jan 14, 2025
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of free standing radiator at public hall, 1st story
Oct 14, 2024
Closed — Violation dismissed
DOB building violations · 5
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 2, 2010
Dob violation - dismissed - Construction other optional
C-construction other optional
Apr 3, 2008
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 18, 1993
Dob violation - dismissed
ECB violations · 7
- Class - 2
Failure to maintain building in a code compliant manner. noted at exp #2 and #3 vertical cracking in masonry wall construction present at multiple locations with cracks extending from widow lintels at exp #3 ty
Mar 14, 2025
Resolve - Class - 3
Failure to maintain building in code compliant manner. at time of inspection observed cracks in floor tiles on all landings., repair and or replace
Nov 9, 2023
Resolve - Class - 1
Working without permit on gas piping in apartment 24 on 12-22-15,at 11:54am.on my inspection on the second floor in apartment 24,i observed new piping from the gas meter going into the ceiling of the kitchen.go
Dec 22, 2015 · Penalty $800
Resolve - Class - 2
Failure to comply w/ the comms order to file a cert of correction w/ the dob noted respondent failed to correct the violating conditions & file a cert of correction pursuant to 28-204.2 for nov#3482466n rem: fi
Nov 4, 2010 · Penalty $800
Resolve - Class - 3
Work w/o a permit work noted added 3pc btrm at front of cellar rem: obtain permit and restore to prior legal condition
Sep 13, 2010 · Penalty $200
Active - Class - 1
Occupancy contrary to that allowed by bldg dept records legal use storage current use single room occupancy location cellar rem: vacate sro
Sep 13, 2010
Resolve - Class - 2
Failure to maintain building in code compliant manner: window at rear bedroom defective, in that glass is broken & guiding tracks with spring not operable, causing window to not operate properly. said occurance
Jul 19, 2010 · Penalty $2,500
Resolve
Complaints
- Unsanitary condition
Pests
Sep 15, 2026 · Apt 23
Close - Unsanitary condition
Pests
Sep 15, 2026 · Apt 23
Close - Unsanitary condition
Mold
Sep 15, 2026 · Apt 23
Close - Heat/hot water
Entire building
Sep 8, 2026 · Apt BLDG
Close - Door/window
Door
Aug 21, 2026 · Apt 44
Close - Plumbing
Water supply
Aug 18, 2026 · Apt BLDG
Close - Door/window
Door
Aug 6, 2026 · Apt BLDG
Close - General
Cabinet
May 28, 2026 · Apt 56B
Close - Flooring/stairs
Floor
May 28, 2026 · Apt 56B
Close - Plumbing
Steam pipe/riser
May 28, 2026 · Apt 56B
Close
Show 40 more ↓
- Water leak
Slow leak
May 28, 2026 · Apt 56B
Close - Heat/hot water
Entire building
Apr 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 30, 2026 · Apt 3
Close - Heat/hot water
Entire building
Mar 30, 2026 · Apt BLDG
Close - Plumbing
Radiator
Mar 29, 2026 · Apt 1
Close - Plumbing
Radiator
Mar 29, 2026 · Apt 1
Close - Flooring/stairs
Floor
Mar 29, 2026 · Apt 1
Close - Heat/hot water
Entire building
Mar 29, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 29, 2026 · Apt 44
Close - Heat/hot water
Entire building
Mar 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 24, 2026 · Apt 1
Close - Heat/hot water
Entire building
Mar 24, 2026 · Apt 44
Close - Heat/hot water
Apartment only
Mar 9, 2026 · Apt APT1
Close - Heat/hot water
Entire building
Mar 6, 2026 · Apt 1
Close - Heat/hot water
Entire building
Mar 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 4, 2026 · Apt 31
Close - Electric
Lighting
Feb 23, 2026 · Apt 44
Close - Heat/hot water
Entire building
Feb 16, 2026 · Apt BLDG
Close - Plumbing
Water supply
Feb 16, 2026 · Apt 44
Close - Heat/hot water
Apartment only
Feb 14, 2026 · Apt 44
Close - Unsanitary condition
Garbage/recycling storage
Feb 14, 2026 · Apt 44
Close - Heat/hot water
Entire building
Feb 14, 2026 · Apt 44
Close - Plumbing
Radiator
Feb 13, 2026 · Apt 1
Close - Plumbing
Steam pipe/riser
Feb 13, 2026 · Apt 1
Close - Flooring/stairs
Floor
Feb 13, 2026 · Apt 1
Close - Electric
Wiring
Feb 13, 2026 · Apt 1
Close - Plumbing
Radiator
Feb 13, 2026 · Apt 1
Close - Plumbing
Steam pipe/riser
Feb 13, 2026 · Apt 1
Close - Heat/hot water
Apartment only
Feb 9, 2026 · Apt 44
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt 44
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt 44
Close - Electric
No lighting
Feb 8, 2026 · Apt 44
Close - Heat/hot water
Apartment only
Feb 5, 2026 · Apt 25
Close - Heat/hot water
Entire building
Feb 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 5, 2026 · Apt 44
Close - Heat/hot water
Entire building
Feb 5, 2026 · Apt 44
Close - Heat/hot water
Entire building
Feb 5, 2026 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1917
- Floors
- 5
- Residential units
- 26
- Building area
- 21,485 ft²
- Lot area
- 6,125 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2170 / 271
- Assessed value
- $468,450
- Landmark / historic district
- No
HPD registration #121593, last renewed Sep 11, 2025.
Questions about 362 Wadsworth Avenue
Who owns 362 Wadsworth Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Fansam Properties LLC.
Does 362 Wadsworth Avenue have violations?
Yes. NYC HPD has recorded 328 housing violations at this property.
Is 362 Wadsworth Avenue rent stabilized?
NYC Department of Finance tax bills listed 25 rent-stabilized units here in 2024 (about 96% of its 26 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 362 Wadsworth Avenue built?
City records list 1917 as the year it was built.
How many apartments are in 362 Wadsworth Avenue?
It has 26 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.