4240 Broadway
Manhattan, NY 10033BBL 1-02163-0044Map
Owner of record: 4240 Broadway L.p.
4240 Broadway is a walk-up apartment building built in 1920 in Manhattan, 10033. It has 45 residential units across 6 floors. The owner of record is 4240 Broadway L.p.. HPD has recorded 225 housing violations here, most recently on October 10, 2026. 25 of the 50 most recent violations are still open. City tax records listed 33 rent-stabilized apartments here in 2024.
- HPD violations
- 225
- DOB violations
- 29
- ECB violations
- 39
- HPD complaints
- 317
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 225
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3c, 3rd story, 3rd apartment from east at south
Oct 10, 2026 · Apt 3C
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3c, 3rd story, 3rd apartment from east at south
Oct 10, 2026 · Apt 3C
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3c, 3rd story, 3rd apartment from east at south
Oct 10, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3c, 3rd story, 3rd apartment from east at south
Oct 10, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 3c, 3rd story, 3rd apartment from east at south
Oct 10, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color west and south wall in the kitchen located at apt 3c, 3rd story, 3rd apartment from east at south
Oct 10, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 3c, 3rd story, 3rd apartment from east at south
Oct 10, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 2nd room from north located at apt 3c, 3rd story, 3rd apartment from east at south
Oct 10, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north located at apt 3c, 3rd story, 3rd apartment from east at south
Oct 10, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Properly secure the loose radiator at east wall in the 1st room from north located at apt 3c, 3rd story, 3rd apartment from east at south
Oct 10, 2026 · Apt 3C
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt 3c, 3rd story, 3rd apartment from east at south
Oct 10, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash at south wall in the 2nd room from north located at apt 3c, 3rd story, 3rd apartment from east at south
Oct 10, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective entrance door in the 1st room from north located at apt 3c, 3rd story, 3rd apartment from east at south
Oct 10, 2026 · Apt 3C
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 8, 2026
Open — Nov certified on time - CImmediately hazardous
Remove device preventing door from being self-closing kickstand at vestibule door
Jun 8, 2026
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3b, 3rd story, 2nd apartment from east at south
Jun 8, 2026 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection wasteline at basin sink in the bathroom located at apt 3c, 3rd story, 3rd apartment from east at south
May 13, 2026 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash 2nd window at south wall in the 4th room from north at west located at apt 3c, 3rd story, 3rd apartment from east at south
May 13, 2026 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at tub faucet in the bathroom located at apt 3c, 3rd story, 3rd apartment from east at south
Mar 18, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective approx 4 sq ft of wood floor at east wall in the 3rd room from north located at apt 3c, 3rd story, 3rd apartment from east at south
Mar 18, 2026 · Apt 3C
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3b, 3rd story, 2nd apartment from east at south
Mar 18, 2026 · Apt 3B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 2nd apartment from east at south
Mar 18, 2026 · Apt 3B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 1st room from north located at apt 3b, 3rd story, 2nd apartment from east at south
Mar 18, 2026 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective approx 4sq ft of wood floor at east wall in the 1st room from north located at apt 3b, 3rd story, 2nd apartment from east at south
Mar 18, 2026 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective counter balance at lower window sash at 2nd window at south wall in the 6th room from north located at apt 3c, 3rd story, 3rd apartment from east at south
Mar 18, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balance at lower window sash at south wall in the kitchen located at apt 3c, 3rd story, 3rd apartment from east at south
Mar 18, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective caulking at bathtub area at north, south and east walls in the bathroom located at apt 3c, 3rd story, 3rd apartment from east at south
Mar 18, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 3c, 3rd story, 3rd apartment from east at south
Mar 18, 2026 · Apt 3C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the kitchen located at apt 3c, 3rd story, 3rd apartment from east at south
Mar 18, 2026 · Apt 3C
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of free standing radiator in the 3rd room from north located at apt 3c, 3rd story, 3rd apartment from east at south
Mar 18, 2026 · Apt 3C
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3c, 3rd story, 3rd apartment from east at south
Mar 18, 2026 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3c, 3rd story, 3rd apartment from east at south
Mar 18, 2026 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ... in the bathroom located at apt 3c, 3rd story, 3rd apartment from east at south
Sep 5, 2025 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and east wall in the 5th room from north at west located at apt 3c, 3rd story, 3rd apartment from east at south
Sep 5, 2025 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3c, 3rd story, 3rd apartment from east at south
Sep 5, 2025 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the 5th room from north at east located at apt 3c, 3rd story, 3rd apartment from east at south
Sep 5, 2025 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective counter balance at lower sash window in the kitchen located at apt 3c, 3rd story, 3rd apartment from east at south
Sep 5, 2025 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3b, 3rd story, 2nd apartment from east at south
Apr 23, 2025 · Apt 3B
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 2nd apartment from east at south
Apr 23, 2025 · Apt 3B
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the private hallway located at apt 3b, 3rd story, 2nd apartment from east at south
Apr 23, 2025 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling in the kitchen located at apt 3b, 3rd story, 2nd apartment from east at south
Apr 23, 2025 · Apt 3B
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department south wall and north wall in the bathroom located at apt 3b, 3rd story, 2nd apartment from east at south
Apr 23, 2025 · Apt 3B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective wash/basin cabinet in the bathroom located at apt 3c, 3rd story, 3rd apartment from east at south
Sep 27, 2023 · Apt 3C
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in the wasteline at bathtub in the bathroom located at apt apt2g, 2nd story, 3rd apartment from west at north
May 11, 2023 · Apt APT2G
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector incorrectly installed in the entire apartment located at apt apt2g, 2nd story, 3rd apartment from west at north
May 11, 2023 · Apt APT2G
Closed — Violation dismissed - BHazardous
Refit at door leading to east court at public hall, 1st story
May 11, 2023
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
May 11, 2023
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly at door at building entrance , 1st story
May 11, 2023
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at vestibule at public hall, 1st story
May 11, 2023
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at 1st door from east at public hall, 1st story
May 11, 2023
Closed — Violation closed
DOB building violations · 29
- No report and / or late filing (facade) facade required
Failed to file fisp cycle 9c technical report by 2/21/2024
Feb 22, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2021
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 3, 2021
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 17, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 19, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 1, 2014
Dob violation - resolved - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 21, 2013
Dob violation - resolved
Show 19 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Apr 6, 2012
Dob violation - resolved - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Oct 5, 2011
Dob violation - dismissed - Facade facade optional
Ll11/98-local law 11/98 - facade facade optional
Oct 5, 2011
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 28, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 20, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 3, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 3, 2008
Dob violation - resolved - Facade facade optional
Ll1198-local law 11/98 - facade facade optional
Nov 30, 2007
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 23, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 4, 2005
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 18, 2004
Dob violation - resolved - Elevator elevatorrequired
1p10343
Apr 17, 2003
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Elevator elevatorrequired
1p10343
Nov 12, 2001
Dob violation - resolved - Elevator elevatorrequired
1p10343
Apr 24, 2000
Dob violation - resolved - Elevator elevatorrequired
1p10343
Apr 13, 1999
Dob violation - resolved - Elevator elevatorrequired
(17) provide v.p. car gate
Sep 5, 1990
Dob violation - resolved - Elevator elevatorrequired
74 repair and restore to proper service
Jul 16, 1990
Dob violation - resolved - Elevator elevatorrequired
(03)car-gate provide (51)provide capacity plate in elevator
Dec 22, 1988
Dob violation - resolved
ECB violations · 39
- Class - 2
Failure to submit an acceptable required cycle 8c and 9c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #907226. agg1: prior nov 3702277
Apr 8, 2025 · Penalty $6,250
Active - Class - 2
Car saddle to hall saddle is not level at the basement floor creating a tripping hazard, need to adjust floor stops. alarm bell not working, need to repair/replace.
Jun 25, 2024
Resolve - Class - 2
Failure to conduct or file a final inspection of permitted work with the dept of buildings. permit #m00450324-i1-gc (expired 04/05/2022) issued for construction of wheelchair access ramp to first floor commerci
Dec 13, 2023 · Penalty $1,280
Active - Class - 2
Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#807226.agg1:prior nov#37018131x under 2
Oct 19, 2022 · Penalty $3,125
Active - Class - 1
No door lock monitor installed in controller as mandated in 3.10.12 of appendix k of the 2014 building code. remedy: install dlm, file and perform test with nyc dob
Nov 10, 2020 · Penalty $312
Active - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35254448x issued on 05/07/19,& to file a cert to correction pursuant to 28.201.1 & 1rcny 102-01(d)(2). an accepted cert has not yet been filed despi
Apr 2, 2020 · Penalty $3,125
Resolve - Class - 2
Failure to submit an acceptable required cycle 8c report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#807226.rem:submit acceptable required t
Feb 13, 2020 · Penalty $6,250
Active - Class - 2
Failure to maintain exterior building walls and appurtenances. as not ed: at time of inspection i observed on exp1 south elevation: open mortar joins at widow sill and parapet decorative stone/terra cotta, on s
May 7, 2019 · Penalty $1,250
Active - Class - 2
Failure to maintain exterior building facade and appurtenances south elevation exposure 1,observed cracked decorative stone on roof parapet wall (7th floor)cracked window sill stone on 1st floor;stored items on
Nov 20, 2017 · Penalty $500
Active - Class - 1
Failure to maintain exterior bldg facade and appurtenances.*no amendedreport filed as of 02-04-17 noted: exposure 1,south elevation:spall/ crack decorative stones at parapet wall and at 7th floor hairline crac
Feb 4, 2017 · Penalty $1,000
Resolve
Show 29 more ↓
- Class - 2
Sidewalk shed parapet sign is not provided. noted: at time of inspeciton sidewalk shed at exp#1 & #2 missing parapet sign. it must contain: 1)the street address of the site. 2)name of the owner of the site.
Jul 29, 2015 · Penalty $800
Resolve - Class - 2
Failure to maintain bldg walls & appurtenances.noted @ north courtyard,spalled brickwork @ (spandrel) between fls 3 & 4 @ 1st window line from northeast corner.rem maintain bldg exteriors;repair defect;provide
Jun 24, 2015 · Penalty $250
Resolve - Class - 1
Failure to provide adequate safety measures such as sidewalk shed,fence,netting etc to protect public from unsafe conditions @ north facade by north courtyard.noted unsafe condition @ north facade @ spanrel bet
Jun 24, 2015 · Penalty $2,400
Resolve - Class - 1
Failure to maintain facade and appurtenances.noted:at both south west exposures (#1 exps)broke,cracked,bulging and loose 1/2" thick stu cco was observed.many stucco pieces are in danger of falling onto stre
Jun 16, 2015 · Penalty $1,000
Resolve - Class - 1
Failure to take required action to secure public safety & unsafe facade.noted:at the time of this inspection this building's facade is declared "unsafe" which requires safety measure in place.no safety measures
Jun 16, 2015 · Penalty $2,400
Resolve - Class - 2
Failure to file an acceptable amended cycle 7 report to this dept indicating correcton of unsafe conditions described in inital local law fisp report.rem:file an amended report following remedial repairs of the
May 29, 2015
Resolve - Class - 2
Failure to file an acceptable amended cycle 7 report to this dept indicating correction of unsafe conditions described in initial local law fisp report. remedy: file an amended report following remedial repair
Nov 28, 2014 · Penalty $800
Resolve - Class - 2
Occupancy contrary to dept records,noted apt 6c with 4 sro units, withindependent refrigerators, microwave, other personal effects, tenants not related. rmdy: discontinue illegal use! do not block fire escape.
Apr 4, 2013 · Penalty $1,200
Resolve - Class - 1
Failure to provide unobstructed exit passageway. note: in apt "6c" theemergency exits to fire escape is from leaving room, now at time of inspection the living room is converted in to bedroom w/door locking
Jan 28, 2013
Resolve - Class - 2
Sec. 28-116.4.1. 16r11,97r07. 97r- operating device w/o a c/c, no report of inspection submitted to dob & no witnessing of test by dob. remedy: contact [email protected] to schedule test appt to obtain a
Jun 13, 2012 · Penalty $400
Resolve - Class - 2
14m11,39o02,39q03,68m07,70z02,76m07. 39q- install guard for light top of car. 76m- provide plank switch for safety.
Jun 13, 2012 · Penalty $250
Resolve - Class - 2
14m11 37d06 37q03 37t07 39o02 56y02 67m07 68m07 70o02 71x10 71q03 76m07. 37d06-secure light in overhead sheave room. 37q03-install guard for light in overhead sheave room. 37t07-provide sign for overhead sheave
Feb 15, 2012 · Penalty $500
Resolve - Class - 2
Failure to file an amended sixth round report acceptable to this department indicating correction of unsafe conditions described iniitial local law 11/98 report rem: file an amended report following remedial re
Dec 29, 2011
Resolve - Class - 2
Failure to file an amended 7th round report acceptable to this department indicating correction of unsafe conditions described iniitial local law 11/98 report rem: file an amended report following remedial repa
Dec 29, 2011
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance w/ code provisions periodic insp of exterior walls and appurtenances as required by article 28.302 and the dob rules and regulations rem:
Jan 25, 2011 · Penalty $2,000
Resolve - Class - 2
Failure to file an acceptable sixth round technical report in compliance with code provisions: periodic inspection of exterior walls and appurtenances as required by article 28.302 and the department of buildin
Jul 3, 2010 · Penalty $800
Resolve - Class - 2
Failure to file an acceptable 6th round technical report in compliancew/code provisions:periodic inspection of exterior walls & appurtenacesas required by article 28.302 & the dob rules & regulations.rem:file t
Jun 4, 2010 · Penalty $2,000
Resolve - Class - 2
Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 & the dob rules & regulations
Jan 23, 2009 · Penalty $4,000
Resolve - Non-hazardous
Use of illegal hardware observed: at egress to street for rear fire escape a gate with padlock is present.according to super gate is only locked at night if present. according to super gate is only locked at ni
Apr 1, 2008 · Penalty $2,500
Resolve - Non-hazardous
3i10/5h11/51bb5/33m7/71m7/71o2/66z2/51o2/52o2/41g7/57h11/55y13/39y2/41o6/38o2/84i10/26u15/28m7/44o2/36o2/36m7/64m7/.3i-close all gates in dome,properly secure grating.5h-worn car door gobs.51bb-expired re-shack
Jul 31, 2007 · Penalty $2,500
Resolve - Non-hazardous
21j01/25d06/86m05/2r/16i10 (21-j-01)6th floor interlock misaligned adjust (25-d-06)top exit unsecured properly secure (86-m-05) 2yr tag missing perform & file test (16-i-10) basement hoistway door buck damaged
Jun 14, 2006 · Penalty $2,500
Resolve - Non-hazardous
8v1/5j1/38o2 8-v-1- adjust leveling. 5-j-1- adjust car door 33-o-02- clean entire hoistway.
Mar 14, 2006 · Penalty $2,500
Resolve - Non-hazardous
21m11/55o2/46l11/08y01. 21-replace lock cover on 3rd floor. 55-clean machine and seal. 46-replace defective rubber washers on drum. 08-adjust floor leveling.
Jun 28, 2005 · Penalty $2,500
Resolve - Non-hazardous
8v1/ 5j11/ 9h12/ 15l11/ 18q3/ 22l6/ 23u16/ 25q3/ 33i11/ 35y2/ 35o2/ 50y14/ 57z9/ 74b7/ 5j11 = too much gap to car post 15l11 = slams 2 & 3rd gls 18q3 = bsmt fl. 22l6 = secure to code 33i11 = sky l
Dec 7, 2001
Resolve - Non-hazardous
5j11 22l6 22o2 23u16 25q3 35o2 35y2 32q3 57z9 35m7 73o2 75u5 5j11=too much gap to post 22-o-2 car top 35m7=fire exti
Jun 12, 2000
Resolve - Non-hazardous
38x,55x,08j,17i,75u,33h,05b,09h,57z,34i, 55-repair pit switch light 33-defector sheave bearing repair 05-provide gauard for vision panel in car 57-remove water from pit
Nov 17, 1997 · Penalty $2,500
Resolve - Hazardous
01m,47l,14m,50o,30o,62o,53b, do not return to service until stop switch and governor cable is corrected, and a reinspection by this department has been made call 312-8730
Apr 19, 1993
Resolve - Non-hazardous
01l,73#,50f, 73 perform 5 yr test tag governor device file elv3 form
Aug 11, 1992 · Penalty $200
Resolve - Non-hazardous
73#,35p,22d,01m,03m,08v,14m,73o,73# perform 5 year test, properly tag device, and file elv 3 form. 03) provide glass in car door.
Jun 7, 1991 · Penalty $1,000
Resolve
Complaints
- Flooring/stairs
Floor
Oct 3, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Oct 3, 2026 · Apt 3B
Close - General
Bell/buzzer/intercom
Sep 24, 2026 · Apt 4F
Open - Paint/plaster
Radiator
Sep 20, 2026 · Apt 3C
Close - Paint/plaster
Wall
Sep 20, 2026 · Apt 3C
Close - Unsanitary condition
Pests
Sep 17, 2026 · Apt 3B
Open - Safety
Fire escape
Sep 16, 2026 · Apt 3C
Close - Door/window
Door
Sep 16, 2026 · Apt 3C
Close - Door/window
Door frame
Sep 16, 2026 · Apt 3C
Close - General
Bell/buzzer/intercom
Sep 4, 2026 · Apt 4F
Close
Show 40 more ↓
- Unsanitary condition
Pests
Aug 21, 2026 · Apt 3B
Close - Unsanitary condition
Pests
Jun 3, 2026 · Apt 3B
Close - Heat/hot water
Entire building
May 12, 2026 · Apt BLDG
Close - Flooring/stairs
Floor
Apr 30, 2026 · Apt 3C
Close - Electric
Lighting
Apr 30, 2026 · Apt 3C
Close - Plumbing
Bathtub/shower
Apr 30, 2026 · Apt 3C
Close - Plumbing
Basin/sink
Apr 30, 2026 · Apt 3C
Close - Door/window
Window frame
Apr 30, 2026 · Apt 3C
Close - Safety
Fire escape
Apr 30, 2026 · Apt 3C
Close - Door/window
Door
Mar 30, 2026 · Apt 5G
Close - Flooring/stairs
Floor
Mar 7, 2026 · Apt 3C
Close - Unsanitary condition
Pests
Mar 7, 2026 · Apt 3C
Close - Plumbing
Radiator
Mar 7, 2026 · Apt 3C
Close - Paint/plaster
Wall
Mar 7, 2026 · Apt 3C
Close - Door/window
Window frame
Mar 7, 2026 · Apt 3C
Close - Safety
Fire escape
Mar 7, 2026 · Apt 3C
Close - Appliance
Electric/gas range
Mar 7, 2026 · Apt 3C
Close - Plumbing
Bathtub/shower
Mar 7, 2026 · Apt 3C
Close - Electric
No lighting
Mar 7, 2026 · Apt 3C
Close - Plumbing
Basin/sink
Mar 7, 2026 · Apt 3C
Close - Door/window
Window frame
Mar 7, 2026 · Apt 3C
Close - Heat/hot water
Apartment only
Mar 7, 2026 · Apt 3C
Close - Unsanitary condition
Pests
Mar 2, 2026 · Apt 3B
Close - Unsanitary condition
Mold
Feb 27, 2026 · Apt 3G
Close - Paint/plaster
Wall
Feb 27, 2026 · Apt 3G
Close - Paint/plaster
Ceiling
Feb 27, 2026 · Apt 3G
Close - Water leak
Slow leak
Feb 27, 2026 · Apt 3G
Close - Unsanitary condition
Pests
Feb 26, 2026 · Apt 3B
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 2, 2026 · Apt 4D
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close - Water leak
Damp spot
Jan 29, 2026 · Apt 2G
Close - Water leak
Slow leak
Jan 29, 2026 · Apt 2G
Close - Heat/hot water
Entire building
Jan 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 15, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Door/window
Door
Nov 22, 2025 · Apt 3B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1920
- Floors
- 6
- Residential units
- 45
- Building area
- 59,200 ft²
- Lot area
- 11,525 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2163 / 44
- Assessed value
- $2,704,950
- Landmark / historic district
- No
HPD registration #108149, last renewed Sep 4, 2025.
Questions about 4240 Broadway
Who owns 4240 Broadway?
The owner of record in NYC Department of City Planning PLUTO data is 4240 Broadway L.p..
Does 4240 Broadway have violations?
Yes. NYC HPD has recorded 225 housing violations at this property.
Is 4240 Broadway rent stabilized?
NYC Department of Finance tax bills listed 33 rent-stabilized units here in 2024 (about 73% of its 45 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 4240 Broadway built?
City records list 1920 as the year it was built.
How many apartments are in 4240 Broadway?
It has 45 residential units and 50 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.