roofy

564 West 189 Street

Manhattan, NY 10040BBL 1-02158-0041Map

Owner of record: 564 189th Street LLC

564 West 189 Street is a walk-up apartment building built in 1923 in Manhattan, 10040. It has 37 residential units across 5 floors. The owner of record is 564 189th Street LLC. HPD has recorded 199 housing violations here, most recently on October 17, 2026. 50 of the 50 most recent violations are still open. City tax records listed 37 rent-stabilized apartments here in 2024.

HPD violations
199
DOB violations
0
ECB violations
0
HPD complaints
252

What to know

Concern
15 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 17, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
37
About 100% of the building's 37 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 199

  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). west wall in the kitchen located at apt 2c, 3rd story, 1st apartment from north at east

    Oct 17, 2026 · Apt 2C

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective porcelain glaze at the bath tub in the bathroom located at apt 2c, 3rd story, 1st apartment from north at east

    Oct 17, 2026 · Apt 2C

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 1o square feet at the ceiling in the bathroom located at apt 2c, 3rd story, 1st apartment from north at east

    Oct 17, 2026 · Apt 2C

    Open — Notice of issuance sent to tenant
  • A

    Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the bathroom located at apt 2c, 3rd story, 1st apartment from north at east

    Oct 17, 2026 · Apt 2C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the south wall, north wall in the bathroom located at apt 2c, 3rd story, 1st apartment from north at east

    Oct 17, 2026 · Apt 2C

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective wood floor in the 2nd room from north at west located at apt 2c, 3rd story, 1st apartment from north at east

    Oct 17, 2026 · Apt 2C

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 2c, 3rd story, 1st apartment from north at east

    Oct 17, 2026 · Apt 2C

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2c, 3rd story, 1st apartment from north at east

    Oct 17, 2026 · Apt 2C

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tiles at the east wall and the south wall in the bathroom located at apt 2c, 3rd story, 1st apartment from north at east

    Oct 17, 2026 · Apt 2C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, south wall in the foyer located at apt 2c, 3rd story, 1st apartment from north at east

    Oct 17, 2026 · Apt 2C

    Open — Nov sent out
Show 40 more ↓
  • A

    Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the kitchen located at apt 2c, 3rd story, 1st apartment from north at east

    Oct 17, 2026 · Apt 2C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the east wall, south wall, north wall, ceiling in the kitchen located at apt 2c, 3rd story, 1st apartment from north at east

    Oct 17, 2026 · Apt 2C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, west wall, east wall in the 2nd room from north at west located at apt 2c, 3rd story, 1st apartment from north at east

    Oct 17, 2026 · Apt 2C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the south wall in the 1st room from north located at apt 2c, 3rd story, 1st apartment from north at east

    Oct 17, 2026 · Apt 2C

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from south at west wall in the 1st room from north located at apt 2c, 3rd story, 1st apartment from north at east

    Oct 17, 2026 · Apt 2C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the east wall, north wall in the 1st room from north located at apt 2c, 3rd story, 1st apartment from north at east

    Oct 17, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). east wall in the bathroom located at apt 2c, 3rd story, 1st apartment from north at east

    Oct 17, 2026 · Apt 2C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the bathroom located at apt 2c, 3rd story, 1st apartment from north at east

    Oct 17, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from south at west wall in the foyer located at apt 2c, 3rd story, 1st apartment from north at east

    Oct 17, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall in the foyer located at apt 2c, 3rd story, 1st apartment from north at east

    Oct 17, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st dumb waiter from south at west wall in the kitchen located at apt 2c, 3rd story, 1st apartment from north at east

    Oct 17, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, north wall, south wall in the 2nd room from north at west located at apt 2c, 3rd story, 1st apartment from north at east

    Oct 17, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). west wall in the 1st room from north located at apt 2c, 3rd story, 1st apartment from north at east

    Oct 17, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at east wall, baseboard at west wall in the 1st room from north located at apt 2c, 3rd story, 1st apartment from north at east

    Oct 17, 2026 · Apt 2C

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 4g, 4th story, 1st apartment from south at west

    Sep 28, 2026 · Apt 4G

    Open — Nov sent out
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2d, 2nd story, 2nd apartment from north at east

    Sep 17, 2026 · Apt 2D

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2c, 2nd story, 1st apartment from north at east

    Sep 17, 2026 · Apt 2C

    Open — First no access to re- inspect violation
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2d, 2nd story, 2nd apartment from north at east

    Sep 17, 2026 · Apt 2D

    Open — First no access to re- inspect violation
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2d, 2nd story, 2nd apartment from north at east

    Sep 17, 2026 · Apt 2D

    Open — First no access to re- inspect violation
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall, west wall, south wall in the 4th room from north located at apt 2d, 2nd story, 2nd apartment from north at east

    Sep 17, 2026 · Apt 2D

    Open — Civ14 mailed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall, ceiling in the 2nd room from north at west located at apt 2c, 2nd story, 1st apartment from north at east

    Sep 17, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). south wall, west wall in the 2nd room from north at west located at apt 2c, 2nd story, 1st apartment from north at east

    Sep 17, 2026 · Apt 2C

    Open — Certification postponment granted
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from south at west wall, 1st door frame from south at west wall in the foyer located at apt 2d, 2nd story, 2nd apartment from north at east

    Sep 17, 2026 · Apt 2D

    Open — Certification postponment granted
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north wall, south wall in the 1st room from north located at apt 2c, 2nd story, 1st apartment from north at east

    Sep 17, 2026 · Apt 2C

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation at 1st riser from west at north wall in the kitchen located at apt 2c, 2nd story, 1st apartment from north at east

    Sep 17, 2026 · Apt 2C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st closet from east at south wall door in the foyer located at apt 2c, 2nd story, 1st apartment from north at east

    Sep 17, 2026 · Apt 2C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door from west at north wall in the bathroom located at apt 2c, 2nd story, 1st apartment from north at east

    Sep 17, 2026 · Apt 2C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from north located at apt 2d, 2nd story, 2nd apartment from north at east

    Sep 17, 2026 · Apt 2D

    Open — Civ14 mailed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st closet from north at east wall door in the foyer located at apt 2d, 2nd story, 2nd apartment from north at east

    Sep 17, 2026 · Apt 2D

    Open — Civ14 mailed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north wall, west wall in the bathroom located at apt 2d, 2nd story, 2nd apartment from north at east

    Sep 17, 2026 · Apt 2D

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 2c, 2nd story, 1st apartment from north at east

    Sep 17, 2026 · Apt 2C

    Open — Civ14 mailed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable in the entire apartment located at apt 2c, 2nd story, 1st apartment from north at east

    Sep 17, 2026 · Apt 2C

    Open — Civ14 mailed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the foyer located at apt 2c, 2nd story, 1st apartment from north at east

    Sep 17, 2026 · Apt 2C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall, north wall, east wall, ceiling in the kitchen located at apt 2c, 2nd story, 1st apartment from north at east

    Sep 17, 2026 · Apt 2C

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation at 1st riser from west at north wall in the kitchen located at apt 2c, 2nd story, 1st apartment from north at east

    Sep 17, 2026 · Apt 2C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall, south wall, north wall in the bathroom located at apt 2c, 2nd story, 1st apartment from north at east

    Sep 17, 2026 · Apt 2C

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation at 1st riser from west at north wall in the bathroom located at apt 2c, 2nd story, 1st apartment from north at east

    Sep 17, 2026 · Apt 2C

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt 2c, 2nd story, 1st apartment from north at east

    Sep 17, 2026 · Apt 2C

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door from west at north wall in the bathroom located at apt 2c, 2nd story, 1st apartment from north at east

    Sep 17, 2026 · Apt 2C

    Open — Nov sent out
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at west located at apt 2c, 2nd story, 1st apartment from north at east

    Sep 17, 2026 · Apt 2C

    Open — Civ14 mailed

DOB building violations · 0

No DOB violations on record

ECB violations · 0

No ECB violations on record

Complaints

  • Plumbing

    Water supply

    Oct 12, 2026 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Oct 10, 2026 · Apt 2C

    Close
  • Paint/plaster

    Ceiling

    Oct 10, 2026 · Apt 2C

    Close
  • Plumbing

    Bathtub/shower

    Oct 10, 2026 · Apt 2C

    Close
  • Paint/plaster

    Wall

    Oct 10, 2026 · Apt 2C

    Close
  • Water leak

    Slow leak

    Oct 10, 2026 · Apt 2C

    Close
  • Plumbing

    Steam pipe/riser

    Sep 25, 2026 · Apt 4G

    Close
  • Appliance

    Refrigerator

    Sep 25, 2026 · Apt 4G

    Close
  • Flooring/stairs

    Floor

    Sep 25, 2026 · Apt 4G

    Close
  • Plumbing

    Toilet

    Sep 25, 2026 · Apt 4G

    Close
Show 40 more ↓
  • Paint/plaster

    Wall

    Sep 3, 2026 · Apt 2C

    Close
  • Paint/plaster

    Ceiling

    Sep 3, 2026 · Apt 2C

    Close
  • Paint/plaster

    Wall

    Aug 21, 2026 · Apt 2D

    Close
  • Unsanitary condition

    Sewage

    Jul 6, 2026 · Apt BSMT

    Close
  • Heat/hot water

    Entire building

    May 17, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    May 17, 2026 · Apt BLDG

    Close
  • Water leak

    Heavy flow

    Mar 10, 2026 · Apt BSMT

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 29, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 28, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 27, 2026 · Apt BLDG

    Close
  • Door/window

    Window frame

    Jan 16, 2026 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2026 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Jan 16, 2026 · Apt 1A

    Close
  • Paint/plaster

    Wall

    Jan 16, 2026 · Apt 1A

    Close
  • Door/window

    Door

    Jan 16, 2026 · Apt 1A

    Close
  • Paint/plaster

    Ceiling

    Jan 16, 2026 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2026 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    Jan 15, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 15, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 15, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 16, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 16, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 16, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 16, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 15, 2025 · Apt 1F

    Close
  • Heat/hot water

    Entire building

    Dec 15, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 15, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 1, 2025 · Apt 5E

    Close
  • Plumbing

    Basin/sink

    Jun 6, 2025 · Apt BSMT

    Close
  • Heat/hot water

    Entire building

    Feb 21, 2025 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1923
Floors
5
Residential units
37
Building area
22,850 ft²
Lot area
5,000 ft²
Zoning
R7-2
Community board
112
Council district
10
Block / lot
2158 / 41
Assessed value
$904,500
Landmark / historic district
No

HPD registration #132678, last renewed Sep 8, 2025.

Questions about 564 West 189 Street

Who owns 564 West 189 Street?

The owner of record in NYC Department of City Planning PLUTO data is 564 189th Street LLC.

Does 564 West 189 Street have violations?

Yes. NYC HPD has recorded 199 housing violations at this property.

Is 564 West 189 Street rent stabilized?

NYC Department of Finance tax bills listed 37 rent-stabilized units here in 2024 (about 100% of its 37 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 564 West 189 Street built?

City records list 1923 as the year it was built.

How many apartments are in 564 West 189 Street?

It has 37 residential units and 39 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.