564 West 189 Street
Manhattan, NY 10040BBL 1-02158-0041Map
Owner of record: 564 189th Street LLC
564 West 189 Street is a walk-up apartment building built in 1923 in Manhattan, 10040. It has 37 residential units across 5 floors. The owner of record is 564 189th Street LLC. HPD has recorded 199 housing violations here, most recently on October 17, 2026. 50 of the 50 most recent violations are still open. City tax records listed 37 rent-stabilized apartments here in 2024.
- HPD violations
- 199
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 252
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 199
- CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). west wall in the kitchen located at apt 2c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2C
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective porcelain glaze at the bath tub in the bathroom located at apt 2c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2C
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 1o square feet at the ceiling in the bathroom located at apt 2c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2C
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the bathroom located at apt 2c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, north wall in the bathroom located at apt 2c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2C
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north at west located at apt 2c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2C
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 2c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2C
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 2c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at the east wall and the south wall in the bathroom located at apt 2c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, south wall in the foyer located at apt 2c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2C
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the kitchen located at apt 2c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, south wall, north wall, ceiling in the kitchen located at apt 2c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, west wall, east wall in the 2nd room from north at west located at apt 2c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the 1st room from north located at apt 2c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2C
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from south at west wall in the 1st room from north located at apt 2c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, north wall in the 1st room from north located at apt 2c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). east wall in the bathroom located at apt 2c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the bathroom located at apt 2c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from south at west wall in the foyer located at apt 2c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall in the foyer located at apt 2c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st dumb waiter from south at west wall in the kitchen located at apt 2c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall, baseboard at east wall, baseboard at west wall, north wall, south wall in the 2nd room from north at west located at apt 2c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). west wall in the 1st room from north located at apt 2c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at east wall, baseboard at west wall in the 1st room from north located at apt 2c, 3rd story, 1st apartment from north at east
Oct 17, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 4g, 4th story, 1st apartment from south at west
Sep 28, 2026 · Apt 4G
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2d, 2nd story, 2nd apartment from north at east
Sep 17, 2026 · Apt 2D
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2c, 2nd story, 1st apartment from north at east
Sep 17, 2026 · Apt 2C
Open — First no access to re- inspect violation - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2d, 2nd story, 2nd apartment from north at east
Sep 17, 2026 · Apt 2D
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2d, 2nd story, 2nd apartment from north at east
Sep 17, 2026 · Apt 2D
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall, west wall, south wall in the 4th room from north located at apt 2d, 2nd story, 2nd apartment from north at east
Sep 17, 2026 · Apt 2D
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall, ceiling in the 2nd room from north at west located at apt 2c, 2nd story, 1st apartment from north at east
Sep 17, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). south wall, west wall in the 2nd room from north at west located at apt 2c, 2nd story, 1st apartment from north at east
Sep 17, 2026 · Apt 2C
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door from south at west wall, 1st door frame from south at west wall in the foyer located at apt 2d, 2nd story, 2nd apartment from north at east
Sep 17, 2026 · Apt 2D
Open — Certification postponment granted - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north wall, south wall in the 1st room from north located at apt 2c, 2nd story, 1st apartment from north at east
Sep 17, 2026 · Apt 2C
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from west at north wall in the kitchen located at apt 2c, 2nd story, 1st apartment from north at east
Sep 17, 2026 · Apt 2C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st closet from east at south wall door in the foyer located at apt 2c, 2nd story, 1st apartment from north at east
Sep 17, 2026 · Apt 2C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door from west at north wall in the bathroom located at apt 2c, 2nd story, 1st apartment from north at east
Sep 17, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 1st room from north located at apt 2d, 2nd story, 2nd apartment from north at east
Sep 17, 2026 · Apt 2D
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st closet from north at east wall door in the foyer located at apt 2d, 2nd story, 2nd apartment from north at east
Sep 17, 2026 · Apt 2D
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north wall, west wall in the bathroom located at apt 2d, 2nd story, 2nd apartment from north at east
Sep 17, 2026 · Apt 2D
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 2c, 2nd story, 1st apartment from north at east
Sep 17, 2026 · Apt 2C
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable in the entire apartment located at apt 2c, 2nd story, 1st apartment from north at east
Sep 17, 2026 · Apt 2C
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the foyer located at apt 2c, 2nd story, 1st apartment from north at east
Sep 17, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall, north wall, east wall, ceiling in the kitchen located at apt 2c, 2nd story, 1st apartment from north at east
Sep 17, 2026 · Apt 2C
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from west at north wall in the kitchen located at apt 2c, 2nd story, 1st apartment from north at east
Sep 17, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall, south wall, north wall in the bathroom located at apt 2c, 2nd story, 1st apartment from north at east
Sep 17, 2026 · Apt 2C
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from west at north wall in the bathroom located at apt 2c, 2nd story, 1st apartment from north at east
Sep 17, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt 2c, 2nd story, 1st apartment from north at east
Sep 17, 2026 · Apt 2C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door from west at north wall in the bathroom located at apt 2c, 2nd story, 1st apartment from north at east
Sep 17, 2026 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at west located at apt 2c, 2nd story, 1st apartment from north at east
Sep 17, 2026 · Apt 2C
Open — Civ14 mailed
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Plumbing
Water supply
Oct 12, 2026 · Apt BLDG
Close - Paint/plaster
Wall
Oct 10, 2026 · Apt 2C
Close - Paint/plaster
Ceiling
Oct 10, 2026 · Apt 2C
Close - Plumbing
Bathtub/shower
Oct 10, 2026 · Apt 2C
Close - Paint/plaster
Wall
Oct 10, 2026 · Apt 2C
Close - Water leak
Slow leak
Oct 10, 2026 · Apt 2C
Close - Plumbing
Steam pipe/riser
Sep 25, 2026 · Apt 4G
Close - Appliance
Refrigerator
Sep 25, 2026 · Apt 4G
Close - Flooring/stairs
Floor
Sep 25, 2026 · Apt 4G
Close - Plumbing
Toilet
Sep 25, 2026 · Apt 4G
Close
Show 40 more ↓
- Paint/plaster
Wall
Sep 3, 2026 · Apt 2C
Close - Paint/plaster
Ceiling
Sep 3, 2026 · Apt 2C
Close - Paint/plaster
Wall
Aug 21, 2026 · Apt 2D
Close - Unsanitary condition
Sewage
Jul 6, 2026 · Apt BSMT
Close - Heat/hot water
Entire building
May 17, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 17, 2026 · Apt BLDG
Close - Water leak
Heavy flow
Mar 10, 2026 · Apt BSMT
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close - Door/window
Window frame
Jan 16, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Jan 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Jan 16, 2026 · Apt 1A
Close - Paint/plaster
Wall
Jan 16, 2026 · Apt 1A
Close - Door/window
Door
Jan 16, 2026 · Apt 1A
Close - Paint/plaster
Ceiling
Jan 16, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Jan 16, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Jan 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 16, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt 1F
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 15, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 1, 2025 · Apt 5E
Close - Plumbing
Basin/sink
Jun 6, 2025 · Apt BSMT
Close - Heat/hot water
Entire building
Feb 21, 2025 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1923
- Floors
- 5
- Residential units
- 37
- Building area
- 22,850 ft²
- Lot area
- 5,000 ft²
- Zoning
- R7-2
- Community board
- 112
- Council district
- 10
- Block / lot
- 2158 / 41
- Assessed value
- $904,500
- Landmark / historic district
- No
HPD registration #132678, last renewed Sep 8, 2025.
Questions about 564 West 189 Street
Who owns 564 West 189 Street?
The owner of record in NYC Department of City Planning PLUTO data is 564 189th Street LLC.
Does 564 West 189 Street have violations?
Yes. NYC HPD has recorded 199 housing violations at this property.
Is 564 West 189 Street rent stabilized?
NYC Department of Finance tax bills listed 37 rent-stabilized units here in 2024 (about 100% of its 37 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 564 West 189 Street built?
City records list 1923 as the year it was built.
How many apartments are in 564 West 189 Street?
It has 37 residential units and 39 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.